Europa Absolute Pressure Transducer - RFP Sections B-M
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Source_Selection_Statement.pdf | ||
| Source_Selection_Statement.pdf | ||
| SF30_Amend_2.pdf | ||
| SF30_Amend_1.pdf | ||
| RFP-_Cover_Letter.pdf | ||
| Exhibit_A_-_Past_Performance_Questionnaire.pdf | ||
| Enclosure_A_-_Quality_Assurance_Surveillance_Plan_-_Informational_Purposes_Only.pdf | ||
| SF33_-_Absolute_Pressure_Transducer.pdf | ||
| Attachment_B_-_EUROPA-PROP-SPEC.pdf | ||
| Attachment_C_Quality_Assurance_Plan.pdf | ||
| Attachment_A_-_EUROPA-PROP-SOW.pdf | ||
| Attachment_D_-_Contractor_Proposed_Enhancements.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP-80GSFC18R0011
Table of Contents
SECTION B - SUPPLIES OR SERVICES AND PRICES
B.1 1852.216-78 FIRM FIXED PRICE (DEC 1988)
B.2 GSFC 52.211-90 SUPPLIES AND/OR SERVICES TO BE PROVIDED (SEP 2017)
B.3 GSFC 52.232-99 MILESTONE PAYMENT SCHEDULE (FIXED PRICE) (NOV 2013) 13
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 GSFC 52.211-91 SCOPE OF WORK (FEB 2016)
C.2 GSFC 52.227-90 LIMITED RIGHTS DATA OR RESTRICTED COMPUTER
SOFTWARE (MAR 2008)
C.3 GSFC 52.235-91 REPORTS OF WORK (CORE) (AUG 2013)
SECTION D - PACKAGING AND MARKING
D.1 1852.211-70 PACKAGING, HANDLING, AND TRANSPORTATION (SEP 2005)
D.2 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT
(JAN 2011)
D.3 CLAUSES INCORPORATED BY REFERENCE -SECTION D
SECTION E - INSPECTION AND ACCEPTANCE
E.1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)
E.2 52.246-15 CERTIFICATE OF CONFORMANCE (APR 1984)
E.3 52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)
E.4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
E.5 1852.246-71 GOVERNMENT CONTRACT QUALITY ASSURANCE FUNCTIONS
(OCT 1988)
E.6 1852.246-72 MATERIAL INSPECTION AND RECEIVING REPORT (APR 2015)
E.7 GSFC 52.246-93 ACCEPTANCE LOCATION(S) (SEP 2013)
E.8 GSFC 52.246-94 MATERIAL INSPECTION AND RECEIVING REPORT NOT
REQUIRED (APR 1989)
E.9 GSFC 52.246-102 INSPECTION SYSTEM RECORDS (APR 2013)
E.10 CLAUSES INCORPORATED BY REFERENCE -SECTION E
SECTION F - DELIVERIES OR PERFORMANCE
F.1 52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)
F.2 52.242-15 STOP-WORK ORDER (AUG 1989)
F.3 52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)
F.4 52.247-34 F.O.B. DESTINATION (NOV 1991)
F.5 1852.247-72 ADVANCE NOTICE OF SHIPMENT (OCT 1988)
F.6 GSFC 52.247-94 SHIPPING INSTRUCTIONS--CENTRAL RECEIVING (FEB 2016) .. 23
F.7 CLAUSES INCORPORATED BY REFERENCE -SECTION F
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
G.2 1852.227-72 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE AND
PATENT REPRESENTATIVE (APR 2015)
G.3 1852.227-86 COMMERCIAL COMPUTER SOFTWARE LICENSE (APR 2015)
G.4 1852.245-75 PROPERTY MANAGEMENT CHANGES (JAN 2011)
G.5 GSFC 52.232-95 INVOICES - SUBMISSION OF (AUG 2016)
G.6 CLAUSES INCORPORATED BY REFERENCE -SECTION G
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 1852.208-81 RESTRICTIONS ON PRINTING AND DUPLICATING (NOV 2004)
H.2 1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY (FEB 2002)
H.3 1852.228-78 CROSS-WAIVER OF LIABILITY FOR SCIENCE OR SPACE
H.4 1852.225-70 EXPORT LICENSES (FEB 2000)
H.5 GSFC 52.211-100 CONTRACTOR PROPOSED ENHANCEMENTS (SEP 2013)
H.6 GSFC 52.227-93 APPLICABILITY OF RIGHTS IN DATA – SPECIAL WORKS (MAR
2008) 27
H.7 GSFC 52.227-99 RIGHTS IN DATA (JUN 2012)
H.8 CLAUSES INCORPORATED BY REFERENCE -SECTION H
SECTION I - CONTRACT CLAUSES
I.1 52.202-1 DEFINITIONS (NOV 2013)
I.2 52.203-3 GRATUITIES (APR 1984)
I.3 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
I.4 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT
(SEP 2006)
I.5 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)
I.6 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR
ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
I.7 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY
(MAY 2014)
I.8 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS (OCT 2010)
I.9 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL
CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)
I.10 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER
CONTENT PAPER (MAY 2011)
I.11 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER
SUBCONTRACT AWARDS (OCT 2016)
I.12 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016)
I.13 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE
(JUL 2016)
I.14 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN
SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED
FOR DEBARMENT (OCT 2015)
I.15 52.209-9 UPDATES OF PUBLICALLY AVAILABLE INFORMATION REGARDING
RESPONSIBLY MATTERS (JUL 2013)
I.16 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS (NOV 2015)
I.17 52.211-5 MATERIAL REQUIREMENTS (AUG 2000)
I.18 52.215-2 AUDIT AND RECORDS - NEGOTIATION (OCT 2010)
I.19 52.215-8 ORDER OF PRECEDENCE—UNIFORM CONTRACT FORMAT (OCT 1997)
I.20 52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING
DATA - MODIFICATIONS (AUG 2011)
I.21 52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA -
MODIFICATIONS (OCT 2010)
I.22 52.215-14 INTEGRITY OF UNIT PRICES (OCT 2010)
I.23 52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2010)
I.24 52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT
BENEFITS (PRB) OTHER THAN PENSIONS. (JUL 2005)
I.25 52.215-19 NOTIFICATIONS OF OWNERSHIP CHANGES (OCT 1997)
I.26 52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND
DATA OTHER THAN CERTIFIED COST OR PRICING DATA - MODIFICATIONS (OCT
2010) 29
I.27 RESERVED
I.28 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011)
I.29 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (NOV 2016)
I.30 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2011)
I.31 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(JUL 2013)
I.32 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
I.33 52.222-19 CHILD LABOR - COOPERATION WITH AUTHORITIES AND REMEDIES
(OCT 2016)
I.34 52.222-20 CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND
EQUIPMENT EXCEEDING $15,000 (MAY 2014)
I.35 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
I.36 52.222-26 EQUAL OPPORTUNITY (SEP 2016)
I.37 52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2016)
I.38 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL
LABOR RELATIONS ACT (DEC 2010)
I.39 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)
I.40 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015)
I.41 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY
DATA (JAN 1997) - ALTERNATE I (JUL 1995)
I.42 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
I.43 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING
WHILE DRIVING (AUG 2011)
I.44 52.225-1 BUY AMERICAN - SUPPLIES (MAY 2014)
I.45 52.225-8 DUTY-FREE ENTRY (OCT 2010)
I.46 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)
I.47 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)
I.48 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT
INFRINGEMENT (DEC 2007)
I.49 52.227-11 PATENT RIGHTS - - RETENTION BY THE CONTRACTOR (MAY 2014) . 30
I.50 52.227-14 RIGHTS IN DATA-GENERAL (MAY 2014) AS MODIFIED BY
I.51 52.227-17 RIGHTS IN DATA -- SPECIAL WORKS (DEC 2007) AS MODIFIED BY
1852.227-17 (JUL 1997)
I.52 52.227-19 COMMERCIAL COMPUTER SOFTWARE LICENSE (DEC 2007) AS
MODIFIED BY 1852.227-19 (JUL 1997)
I.53 52.227-21 TECHNICAL DATA DECLARATION, REVISION, AND WITHHOLDING
OF PAYMENT-MAJOR SYSTEMS (MAY 2014)
I.54 52.227-23 -- RIGHTS TO PROPOSAL DATA (TECHNICAL) (JUN 1987)
I.55 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
I.56 52.232-1 PAYMENTS (APR 1984)
I.57 52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)
I.58 52.232-9 LIMITATION ON WITHHOLDING OF PAYMENTS (APR 1984)
I.59 52.232-11 EXTRAS (APR 1984)
I.60 52.232-17 INTEREST (MAY 2014)
I.61 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
I.62 52.232-25 PROMPT PAYMENT (JAN 2017)
I.63 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR
AWARD MANAGEMENT (JUL 2013)
I.64 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)31
I.65 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
SUBCONTRACTORS (DEC 2013)
I.66 52.233-1 DISPUTES (MAY 2014)
I.67 52.233-3 PROTEST AFTER AWARD (AUG 1996)
I.68 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004) ... 31
I.69 52.242-13 BANKRUPTCY (JUL 1995)
I.70 52.243-1 CHANGES - FIXED-PRICE (AUG 1987)
I.71 52.243-6 CHANGE ORDER ACCOUNTING (APR 1984)
I.72 52.243-7 NOTIFICATION OF CHANGES (APR 1984)
I.73 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (JAN 2017)
I.74 52.246-24 LIMITATION OF LIABILITY - HIGH-VALUE ITEMS (FEB 1997)
I.75 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-
PRICE) (APR 2012)
I.76 52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984)
I.77 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)
I.78 1852.203-71 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER
RIGHTS (AUG 2014)
I.79 1852.215-84 OMBUDSMAN (NOV 2011)
I.80 1852.227-11 PATENT RIGHTS - - OWNERSHIP BY THE CONTRACTOR (APRIL
2015) 32
I.81 1852.237-73 RELEASE OF SENSITIVE INFORMATION (JUN 2005)
I.82 1852.243-71 SHARED SAVINGS (MAR 1997)
I.83 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)
I.84 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL
2014) 33
I.85 52.223-7 - NOTICE OF RADIOACTIVE MATERIALS (JAN 1997)
I.86 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
I.87 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
I.88 1852.225-71 RESTRICTION ON FUNDING ACTIVITY WITH CHINA (DEVIATION)
(FEB 2012)
I.89 CLAUSES INCORPORATED BY REFERENCE -SECTION I
SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
J.1 GSFC 52.211-101 LIST OF ATTACHMENTS (FEB 2016)
SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATE
K.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2017)
K.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013) .. 42
K.3 52.225-18 PLACE OF MANUFACTURE (MAR 2015)
K.4 1852.225-72 RESTRICTION ON FUNDING ACTIVITY WITH CHINA –
REPRESENTATION (FEB 2012) (DEVIATION)
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFEROR
L.1 52.204-7 SYSTEM FOR AWARD MANANGEMENT (OCT 2016)
L.2 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL
2016) 46
L.3 52.204-22 ALTERNATIVE LINE ITEM PROPOSAL (JAN 2017)
L.4 52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)
L.5 52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)
L.6 52.215-1 INSTRUCTIONS TO OFFERORS - COMPETITIVE ACQUISITION. (JAN
2017) 46
L.7 1852.227-84 PATENT RIGHTS CLAUSES (APR 2015)
L.8 1852.233-70 PROTESTS TO NASA (DEC 2015)
L.9 52.216-1 TYPE OF CONTRACT (APR 1984)
L.10 52.233-2 GSFC MODIFICATION TO FAR 52.233-2 -- SERVICE OF PROTEST (SEP
2006) 46
L.11 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB
1998) 47
L.12 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
L.13 GSFC 52.215-200 COMMUNICATIONS REGARDING THIS SOLICITATION (SEP
2017) 48
L.14 GSFC 52.215-201 PROPOSAL PREPARATION—GENERAL INSTRUCTIONS (APR
2016) 48
SECTION M - EVALUATION FACTORS FOR AWARD
M.1 GSFC 52.209-300 PROSPECTIVE CONTRACTOR RESPONSIBILITY (JAN 2014)
M.2 SOURCE SELECTION AND EVALUATION FACTORS AND TRADEOFF PROCESS
M.3 LIMITED TRADEOFF (LTO) PROPOSAL EVALUATION
SECTION B - SUPPLIES OR SERVICES AND PRICES
B.1 1852.216-78 FIRM FIXED PRICE (DEC 1988)
The total firm fixed price of this contract is $[TO BE PROPOSED (TBP)].
(End of clause)
B.2 GSFC 52.211-90 SUPPLIES AND/OR SERVICES TO BE PROVIDED (SEP 2017)
The Contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to deliver and/or perform the items below in accordance with the Statement of Work (SOW), incorporated as Attachment A.
Hardware Deliverable Schedule
Table 1
Absolute Pressure Transducers
Item Hardware
SOW
Section Quantity Due Date
Shipping
Class /
Flight
Transducers
Type “A”
4.2 2 16 months
After Contract
Award (ACA)
Class III
Spare Flight
Transducer
Type “A”
4.2 1 16 months
After Contract
Award (ACA)
Class III
Flight
Transducers
Type “B”
4.2 4 16 months
ACA
Class III
Spare Flight
Transducer
Type “B”
4.2 1 16 months
ACA
Class III
Flight
Transducers
Type “C”
4.2 10 16 months
ACA
Class III
Spare Flight
Transducer
Type “C”
4.2 1 16 months
ACA
Class III
Qualification
Transducer
6.1.1 1 16 months
ACA
Class III
Contract Data Requirements List
Table 2
Item
No.
Data Item Description
SOW/Contract
Section Delivery Date
Shipping
Class /
1 Weekly Program Status
Meeting
2.2.3 Weekly Class IV
2 Monthly Technical Status
Reports
2.2.2 & Section C
GSFC 52.235-91
Monthly As specified in Clause
GSFC 52.235-
3 Anomaly Reports 7.1.3 As required Class IV
4 Class I Changes 7.1.4 As required Class IV
5 Waivers/ETAS Forms 7.1.4 As required Class IV
6 GIDEP Alert Dispositioning 7.5.3 As required Class IV
7 Kickoff Meeting 2.3.1 Within 1 month after award
Class IV
8 Kickoff Meeting
Presentation
2.3.1 1 week prior to
Kickoff
Meeting
Class IV
9 Program Plan 2.2.1 Preliminary:
At Kickoff
Meeting
Final: 1 week after Kickoff
Meeting
Class IV
10 Program Schedule 2.2.1 Preliminary:
At Kickoff
Meeting
Updates: As necessary
Class IV
11 Fabrication, Assembly, and
Inspection Flow Plan
4.1 1 week prior to
Kickoff
Meeting
Updates at major reviews as needed
Class IV
12 Quality Plan/Manual 7.1.1 1 week prior to
Kickoff
Meeting
Class IV
Data Item Description
SOW/Contract
Section Delivery Date
Shipping
Class /
13 CM Plan 7.1.1 1 week prior to
Kickoff
Meeting
Class IV
14 DCR Meeting 2.3.2 Prior to start of qualification and flight manufacturing
Class IV
15 DCR Presentation 2.3.2 2 weeks prior to DCR
Class IV
16 DCR Report/Minutes 2.3.2 1 week after
DCR
Class IV
17 Specification Verification
Matrix
1.4 Preliminary: 2
weeks prior to
DCR
Updates at each major review
Class IV
18 Interface Control
Document/Drawing
3.1 2 weeks prior to DCR
Class IV
19 Drawing Package 3.2 Review onsite at DCR
Review any updates as required
Class IV
20 Mechanical Model 3.3 2 weeks prior to DCR
Class IV
21 Structural Analysis Report 3.4 2 weeks prior to DCR
Class IV
22 Parts Stress Analysis 3.7 2 weeks prior to DCR
Class IV
23 Worst Case Circuit Analysis
Report
3.6 2 weeks prior to DCR
Class IV
24 Radiation Hardness Analysis
Report
3.8 2 weeks prior to DCR
Class IV
25 FMECA Report 3.9 2 weeks prior to DCR
Class IV
26 Thermal Analysis Report 3.5 2 weeks prior to DCR
Class IV
27 Materials Identification and
Usage List (MIUL)
5.1.1 2 weeks prior to DCR
Class IV
28 Planetary Protection Plan 5.6.5 Preliminary:
At Kickoff
Meeting
Data Item Description
SOW/Contract
Section Delivery Date
Shipping
Class /
Final: 2 weeks prior to DCR
29 Material Usage Agreement
(MUA)
5.1.1 2 weeks prior to DCR
Class IV
30 SCC Evaluation Form 5.1.4 2 weeks prior to DCR
Class IV
31 Limited Life Items List 7.3.1 2 weeks prior to DCR
Class IV
32 Contamination Control Plan 7.7.1 2 weeks prior to DCR
Class IV
33 SOW Compliance Matrix 1.3 2 weeks prior to DCR
Class IV
34 Qualification Test Report 6.1.2 2 weeks prior to DCR
Class IV
35 QBS Report 6.1.3 2 weeks prior to DCR
Class IV
36 Acceptance Verification Plan 6.2 2 weeks prior to DCR
Class IV
37 Qualification TRR Meeting 2.3.3 Prior to start of qualification testing
Class IV
38 Qualification TRR Package 2.3.3 2 weeks prior to
Qualification
TRR
Class IV
39 Qualification Verification
Plan
6.1.4 2 weeks prior to
Qualification
TRR
Class IV
40 Qualification Verification
Test Procedure
6.1.4 2 weeks prior to
Qualification
TRR
Class IV
41 Acceptance TRR Meeting 2.3.5 Prior to start of flight acceptance testing
Class IV
42 Acceptance TRR Package 2.3.5 2 weeks prior to Acceptance
TRR
Class IV
43 Acceptance Verification Test
Procedure
2.3.5 2 weeks prior to Acceptance
TRR
Data Item Description
SOW/Contract
Section Delivery Date
Shipping
Class /
44 PSR Meeting 2.3.6 Prior to shipment of flight hardware
Class IV
45 Data Delivery Package 2.3.6 2 weeks prior to PSR
Class IV
46 As-Built Materials List
(ABML)
2.3.6 2 weeks prior to PSR
Class IV
47 Qualification Test Report 6.1.2 2 weeks prior to PSR
Class IV
48 Acceptance Test Report 2.3.6 2 weeks prior to PSR
Class IV
49 Tripped Sensor Protocol 2.3.6 2 weeks prior to PSR and hard copy with shipper
Class IV
50 Material Inspection and
Receiving Reports (MIRR)
(DD Form 250)
Section E
NFS 1852.246-72
Section E
GSFC 52.246-94
At time of
Delivery
Hard
Copy/CO, COR, and
Receiving &
Inspection
51 Reporting of Inventions Section G NFS
1852.227-72
Section I
FAR 52.227-11
Interim
Reports Every
12 Months (or sooner to preserve Patent
Rights) and
Final Report within 3
Months after
Contract
Completion
Electronic or
Hard Copy
Format/New
Technology
Representative or Patent
Representative
52 Safety & Health Reporting Section H
NFS 1852.223-75
As specified by
NFS
1852.223-75
NASA
Mishap
Information
System
(NMIS)
53 Equal Opportunity Reports Section I
FAR 52.222-26
As specified by
FAR
52.222-26
Electronic
Format/CO &
Code 120
B.3 GSFC 52.232-99 MILESTONE PAYMENT SCHEDULE (FIXED PRICE) (NOV
2013)
(a) Subject to other limitations and conditions specified in this contract, milestone payment shall be made to the Contractor upon delivery and acceptance of the milestone events described under paragraph (b).
(b) The payment schedule amount shall be calculated by the application of the contract percentage established per milestone event to the total fixed price amount indicated under
Section B contract clause NFS 1852.216-78, Firm-Fixed Price.
(c) The Contractor may submit requests for payment not more frequently than monthly, in a form and manner acceptable to the Contracting Officer. Unless otherwise authorized by the
Item No.
Event Qty
Contract
Value %
Unit
Price
Total
Amount Completion Determination
7 Kickoff Meeting 1 15 To Be
Proposed
To Be
Meeting completed, presentation package and actions documented and delivered.
14, 15, and 16 Design Conformance
Review
1 15 To Be
To Be
Design Review Completed, presentation package and actions documented and delivered.
41, 42, 43, 48 Acceptance Test
Readiness Review
(ATRR)
1 10 To Be
Proposed
To Be
Proposed
ATRR completed, presentation package and actins documented and delivered and accepted by the
Government.
44 Pre Ship Review
(PSR) Review
1 5 To Be
Proposed
To Be
Proposed
Pre-Ship completed, presentation package and actions documented and delivered and accepted by the
Government.
1, 2, 3, 4, 5, 6, and 7
Flight Units and
Qualification Unit
20 40 To Be
Proposed
To Be
Proposed
Delivered and accepted by the
Government
34 Qualification Test
Report
1 10 To Be
Proposed
To Be
Proposed
Final qualification test report delivered and accepted by the
Government
2 Final Report 1 5 To Be
To Be
Proposed
Final report delivered and accepted by the Government
Contracting Officer, all milestone payments in any period for which payment is being requested shall be included in a single request, appropriately itemized and totaled.
(d) The Contractor shall not be entitled to payment of a request for milestones payment prior to successful accomplishment and acceptance by the Government of the milestone event. The
Contracting Officer shall determine whether the milestone event or performance criterion for which payment is requested has been successfully accomplished and accepted by the
Government in accordance with the terms of the contract. The Contracting Officer may, at any time, require the Contractor to substantiate the successful performance of any event or performance criterion which has been or is represented as being payable.
(End of Clause)
(End of Section B)
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 GSFC 52.211-91 SCOPE OF WORK (FEB 2016)
The Contractor shall provide the personnel, materials, and facilities, except as otherwise specified in this contract, necessary to perform the work and to furnish the items specified in the
Supplies and/or Services To Be Provided clause of this contract in accordance with the Statement of Work, Attachment A; and Specifications, Attachment B.
C.2 GSFC 52.227-90 LIMITED RIGHTS DATA OR RESTRICTED COMPUTER
SOFTWARE (MAR 2008)
In accordance with the delivery requirements of this contract, all software data rights shall be delivered in accordance with the Rights in Data – General clause, specified elsewhere in this contract, except for the following: NONE
C.3 GSFC 52.235-91 REPORTS OF WORK (CORE) (AUG 2013)
(a) Monthly progress reports. The Contractor shall submit monthly progress reports of all work accomplished during each month of contract performance. Reports shall address the accomplishments and progress of all work performed the month being reported. The report shall be in narrative form and brief in content. The report shall include a description of technical accomplishments and status of deliverables. Also the report shall provide a quantitative description of overall progress and identify any risks or problems, which may impede performance and proposed corrective actions. Also the report shall have a discussion of the projected work activities to be performed during the next monthly reporting period.
(b) Final Report. The Contractor shall submit a final report that summarizes the results of the entire contract, including recommendations and conclusions based on the experience and results obtained. The final report should include, as appropriate, tables, graphs, diagrams, curves, sketches, photographs, and drawings in sufficient detail to comprehensively explain the results achieved under the contract.
(c) Submission. The Contractor shall submit the reports required by this clause as follows:
Copies Report Type Addressee Mail Code
1 M,F Contracting
Officer (CO)
210.M
1 M,F Contracting
Officer's
Representative
(COR)
[M=Monthly Report, F=Final Report]
(d) Submission dates. Monthly reports shall be submitted by the 15th day of the month following the month being reported. If the contract is awarded beyond the middle of a month, the first monthly report shall cover the period from award until the end of the following month. The final report shall be submitted within 30 days after completion of the contract.
(End of Section C)
SECTION D - PACKAGING AND MARKING
D.1 1852.211-70 PACKAGING, HANDLING, AND TRANSPORTATION (SEP 2005)
D.2 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT
EQUIPMENT (JAN 2011)
(a) The Contractor shall identify all equipment to be delivered to the Government using NASA
Technical Handbook (NASA-HDBK) 6003, Application of Data Matrix Identification
Symbols to Aerospace Parts Using Direct Part Marking Methods/Techniques, and NASA
Standard (NASA-STD) 6002, Applying Data Matrix Identification Symbols on Aerospace
Parts or through the use of commercial marking techniques that: (1) are sufficiently durable to remain intact through the typical lifespan of the property: and, (2) contain the data and data format required by the standards. This requirement includes deliverable equipment listed in the schedule and other equipment when no longer required for contract performance and
NASA directs physical transfer to NASA or a third party. The Contractor shall identify property in both machine and human readable form unless the use of a machine readable-only format is approved by the NASA Industrial Property Officer.
(b) Equipment shall be marked in a location that will be human readable, without disassembly or movement of the equipment, when the items are placed in service unless such placement would have a deleterious effect on safety or on the item’s operation.
(c) Concurrent with equipment delivery or transfer, the Contractor shall provide the following data in an electronic spreadsheet format:
(1) Item Description.
(2) Unique Identification Number (License Tag).
(3) Unit Price.
(4) An explanation of the data used to make the unique identification number.
(d) For equipment no longer needed for contract performance and physically transferred under paragraph (a) of this clause, the following additional data is required:
(1) Date originally placed in service.
(2) Item condition.
(e) The data required in paragraphs (c) and (d) of this clause shall be delivered to the NASA center receiving activity listed below:
NASA Goddard Space Flight Center, Building 35, Code 279, Greenbelt, MD 20771
Marked for: Joseph Thomas Miller, (Contracting Officer’s Representative), Code 597.0
(f) The contractor shall include the substance of this clause, including this paragraph (f), in all subcontracts that require delivery of equipment.
D.3 CLAUSES INCORPORATED BY REFERENCE -SECTION D
Clause(s) D.1 at the beginning of this Section is incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in clause 52.252-2, Clauses Incorporated by Reference, of this contract.
(End of text)
(End of Section D)
SECTION E - INSPECTION AND ACCEPTANCE
E.1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)
E.2 52.246-15 CERTIFICATE OF CONFORMANCE (APR 1984)
E.3 52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)
E.4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC
2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below. The contractor shall implement a Quality Management System that meets with the intent of the requirements of ANSI/ISO/ASQ Q9001 (2008 version) or equivalent, as documented in a
Quality Assurance Plan.
Title
Reference
Date
Quality Assurance Plan Attachment C To Be Submitted With Proposal
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in—
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require—
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
E.5 1852.246-71 GOVERNMENT CONTRACT QUALITY ASSURANCE
FUNCTIONS (OCT 1988)
In accordance with the Inspection clause of this contract, the Government intends to perform the following functions at the locations indicated:
QUALITY
ASSURANCE ITEM
QA FUNCTION LOCATION
Testing Monitoring and Witnessing by
Government QA Representatives
Contractor and Subcontractor
Facilities
Mechanical Assemblies Inspection of mechanical assemblies prior to assembly into next higher level of assembly
Contractor and Subcontractor
Facilities
Manufacturing Process Monitoring of various manufacturing processes for compliance
Contractor and Subcontractor
Facilities
Procedural and
Requirements
Compliance
Surveys, audits, monitoring of compliance to procedures and requirements
Contractor and Subcontractor
Facilities
E.6 1852.246-72 MATERIAL INSPECTION AND RECEIVING REPORT (APR 2015)
(a) At the time of each delivery to the Government under this contract, the Contractor shall prepare and furnish a Material Inspection and Receiving Report (DD Form 250 series). The form(s) shall be prepared and distributed as follows:
(1) Via mail and marked "Advance Copy", one copy each to the Contracting Officer, the
Contracting Officer's Representative (if designated in the contract), and to the cognizant
Administrative Contracting Officer, if any.
(2) Via mail, the original and 1 copy (unfolded) to the shipment address (delivery point) specified in Section F of this contract. Mark the exterior of the envelope "CONTAINS
DD FORM 250". This must arrive prior to the shipment.
(3) With shipment in waterproof envelope (one copy) for the consignee.
(4) If the shipment address is not directly to the Goddard Space Flight Center (Greenbelt) or
GSFC/Wallops Flight Facility (Wallops) central receiving areas, then one copy of the DD
Form 250 must be provided (via mail) to one on the following addresses depending upon whether this contract is with GSFC Greenbelt or GSFC/WFF Wallops:
Receiving and Inspection (Code 279), Goddard Space Flight Center, Greenbelt, MD 20771.
Receiving and Inspection (Bldg. F16), Wallops Flight Facility, Wallops Island VA 23337.
(b) The Contractor shall prepare the DD Form 250 in accordance with NASA FAR Supplement
1846.6. The Contractor shall enclose the copies of the DD Form 250 in the package or seal them in a waterproof envelope, which shall be securely attached to the exterior of the package in the most protected location.
(c) When more than one package is involved in a shipment, the Contractor shall list on the DD
Form 250, as additional information, the quantity of packages and the package numbers. The
Contractor shall forward the DD Form 250 with the lowest numbered package of the shipment and print the words “CONTAINS DD FORM 250” on the package.
E.7 GSFC 52.246-93 ACCEPTANCE LOCATION(S) (SEP 2013)
The Contracting Officer or authorized representative will accomplish acceptance at the
NASA/Goddard Space Flight Center.
Authorized
Item: Location Authorized Representative
All Hardware Items NASA/GSFC Contracting Officer’s Representative (COR)
Code 597
The Contracting Officer reserves the right to designate other Government agents as authorized representatives. The Contractor will be notified by a written notice or by a copy of the delegation letter if other agents are authorized.
If this is a fixed price type contract, acceptance shall be deemed to have occurred constructively-
-for the sole purpose of computing an interest penalty that might be due the Contractor under the
Prompt Payment Act--on the 30th day after the Contractor has delivered the supplies or services in accordance with the terms and conditions of the contract. In the event that actual acceptance occurs within the constructive acceptance period, the determination of an interest penalty shall be based on the date of the actual acceptance.
E.8 GSFC 52.246-94 MATERIAL INSPECTION AND RECEIVING REPORT NOT
REQUIRED (APR 1989)
NASA FAR Supplement clause 1852.246-72 of this contract requires the furnishing of a Material
Inspection and Receiving Report (MIRR) (DD Form 250 series) at the time of each delivery under this contract. However, a MIRR is not required for the following deliverable items:
paper/electronic deliverables (i.e. reports).
E.9 GSFC 52.246-102 INSPECTION SYSTEM RECORDS (APR 2013)
The Contractor shall maintain records evidencing inspections in accordance with the Inspection clause of this contract for six (6) years after delivery of all items and/or completion of all services called for by the contract.
E.10 CLAUSES INCORPORATED BY REFERENCE -SECTION E
Clause(s) E.1 - E.3 at the beginning of this Section are incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses
(End of Section E)
SECTION F - DELIVERIES OR PERFORMANCE
F.1 52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)
F.2 52.242-15 STOP-WORK ORDER (AUG 1989)
F.3 52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)
F.4 52.247-34 F.O.B. DESTINATION (NOV 1991)
F.5 1852.247-72 ADVANCE NOTICE OF SHIPMENT (OCT 1988)
Two (2) weeks prior to Pre-Ship Review (PSR), for any hardware deliverable item(s), the
Contractor shall furnish the anticipated shipment date, bill of lading number (if applicable), and carrier identity to Joseph Thomas Miller, Code 597 and to the Contracting Officer.
F.6 GSFC 52.247-94 SHIPPING INSTRUCTIONS--CENTRAL RECEIVING (FEB
2016)
Shipments of the items required under this contract shall be to:
Receiving Officer
Goddard Space Flight Center
Building 35, Code 279
Greenbelt, MD 20771
Marked for:
Technical Officer: Joseph Thomas Miller, Code 597
Building: 11
Room: E125
Contract No.: TBD
Item(s) No.: TBD
Compliance with this clause is necessary to assure verification of delivery and acceptance and prompt payment.
If this is a fixed price type contract, delivery--for purposes of the Prompt Payment Act--must be through the above shipping address unless another location has been authorized by the
Contracting Officer. If delivery is made to other than the Receiving Officer listed above and shipment to that other location has not been authorized by the Contracting Officer, a delivery for the purposes of the Prompt Payment Act has not occurred and no interest penalty under the Act shall result. Shipment to other than Receiving Officer listed above will be construed as contract noncompliance.
F.7 CLAUSES INCORPORATED BY REFERENCE -SECTION F
Clause(s) F.1 - F.4 at the beginning of this Section are incorporated by reference, with the same require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding
(End of Section F)
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
G.2 1852.227-72 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE
AND PATENT REPRESENTATIVE (APR 2015)
G.3 1852.227-86 COMMERCIAL COMPUTER SOFTWARE LICENSE (APR 2015)
G.4 1852.245-75 PROPERTY MANAGEMENT CHANGES (JAN 2011)
G.5 GSFC 52.232-95 INVOICES - SUBMISSION OF (AUG 2016)
Invoices shall be prepared in accordance with the Prompt Payment clause of this contract and submitted to the NASA Shared Services Center (NSSC), Financial Management Division (FMD)
– Accounts Payable, Bldg 1111, Jerry Hlass Road, Stennis Space Center, MS 39529, Email:
NSSC-AccountsPayable@nasa.gov. For purposes of the Prompt Payment Act, the above office is considered to be the "Designated Billing Office" and the "Designated Payment Office".
Note: Invoices must contain an invoice date in order for an invoice to be considered “Proper.”
Invoices without an invoice date will be deemed to be “Improper” and will be rejected by the
NSSC.
G.6 CLAUSES INCORPORATED BY REFERENCE -SECTION G
Clause(s) G.1 - G.4 at the beginning of this Section are incorporated by reference, with the same require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding
(End of Section G)
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 1852.208-81 RESTRICTIONS ON PRINTING AND DUPLICATING (NOV 2004)
H.2 1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY (FEB 2002)
H.3 1852.228-78 CROSS-WAIVER OF LIABILITY FOR SCIENCE OR SPACE
EXPLORATION ACTIVITIES UNRELATED TO THE INTERNATIONAL SPACE
STATION (OCT 2012)
H.4 1852.225-70 EXPORT LICENSES (FEB 2000)
(a) The Contractor shall comply with all U.S. export control laws and regulations, including the
International Traffic in Arms Regulations (ITAR), 22 CFR Parts 120 through 130, and the
Export Administration Regulations (EAR), 15 CFR Parts 730 through 799, in the performance of this contract. In the absence of available license exemptions/exceptions, the Contractor shall be responsible for obtaining the appropriate licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance.
(b) The Contractor shall be responsible for obtaining export licenses, if required, before utilizing foreign persons in the performance of this contract, including instances where the work is to be performed on-site at Goddard Space Flight Center where the foreign person will have access to export-controlled technical data or software.
(c) The Contractor shall be responsible for all regulatory record keeping requirements associated with the use of licenses and license exemptions/exceptions.
(d) The Contractor shall be responsible for ensuring that the provisions of this clause apply to its subcontractors.
H.5 GSFC 52.211-100 CONTRACTOR PROPOSED ENHANCEMENTS (SEP 2013)
The Contractor shall provide the enhancements that are described in Attachment D. These enhancements, which are over and above the requirements required by the contract terms and conditions, Statement of Work and other contract attachments, were proposed by the Contractor in the proposal submitted in response to the Request for Proposal (RFP) 80GSFC18R0011 for
Europa Absolute Pressure Transducers. The incorporation of these enhancements does not relieve the Contractor from the responsibilities of meeting all other contract terms and conditions and requirements in the Statement of Work and other contract attachments. The Contractor shall perform these enhancements on all work performed, unless specifically waived by the
Contracting Officer in writing.
H.6 GSFC 52.227-93 APPLICABILITY OF RIGHTS IN DATA – SPECIAL WORKS
(MAR 2008)
The "Rights in Data - Special Works" clause of this contract applies to the following aspects (or items):
Any data negotiated by the parties to be delivered with unlimited rights.
H.7 GSFC 52.227-99 RIGHTS IN DATA (JUN 2012)
The default Data Rights clause under this contract is FAR 52.227-14 RIGHTS IN DATA-
GENERAL—Alternate II and Alternate III as modified by NASA FAR Supplement 1852.227-14 and GSFC 52.227-90. Any exceptions to this clause will be covered by FAR 52.227-17 RIGHTS
IN DATA--SPECIAL WORKS as modified by NASA FAR Supplement 1852.227-17, if applicable, and GSFC 52.227-93.
H.8 CLAUSES INCORPORATED BY REFERENCE -SECTION H
Clause(s) H.1 - H.3 at the beginning of this Section are incorporated by reference, with the same require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding
(End of Section H)
SECTION I - CONTRACT CLAUSES
I.1 52.202-1 DEFINITIONS (NOV 2013)
I.2 52.203-3 GRATUITIES (APR 1984)
I.3 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
I.4 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE
GOVERNMENT (SEP 2006)
I.5 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)
I.6 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR
ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
I.7 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER
ACTIVITY (MAY 2014)
I.8 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN
FEDERAL TRANSACTIONS (OCT 2010)
I.9 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL
CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)
I.10 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER
CONTENT PAPER (MAY 2011)
I.11 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER
SUBCONTRACT AWARDS (OCT 2016)
I.12 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016)
I.13 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE
MAINTENANCE (JUL 2016)
I.14 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN
SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR
PROPOSED FOR DEBARMENT (OCT 2015)
I.15 52.209-9 UPDATES OF PUBLICALLY AVAILABLE INFORMATION
REGARDING RESPONSIBLY MATTERS (JUL 2013)
I.16 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS (NOV 2015)
I.17 52.211-5 MATERIAL REQUIREMENTS (AUG 2000)
I.18 52.215-2 AUDIT AND RECORDS - NEGOTIATION (OCT 2010)
I.19 52.215-8 ORDER OF PRECEDENCE—UNIFORM CONTRACT FORMAT (OCT
1997)
I.20 52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR
PRICING DATA - MODIFICATIONS (AUG 2011)
I.21 52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA -
MODIFICATIONS (OCT 2010)
I.22 52.215-14 INTEGRITY OF UNIT PRICES (OCT 2010)
I.23 52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2010)
I.24 52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR
POSTRETIREMENT BENEFITS (PRB) OTHER THAN PENSIONS. (JUL 2005)
I.25 52.215-19 NOTIFICATIONS OF OWNERSHIP CHANGES (OCT 1997)
I.26 52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND
DATA OTHER THAN CERTIFIED COST OR PRICING DATA - MODIFICATIONS
(OCT 2010)
I.27 RESERVED
I.28 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011)
I.29 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (NOV 2016)
I.30 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2011)
I.31 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM
REREPRESENTATION (JUL 2013)
I.32 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
I.33 52.222-19 CHILD LABOR - COOPERATION WITH AUTHORITIES AND
REMEDIES (OCT 2016)
I.34 52.222-20 CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND
EQUIPMENT EXCEEDING $15,000 (MAY 2014)
I.35 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
I.36 52.222-26 EQUAL OPPORTUNITY (SEP 2016)
I.37 52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2016)
I.38 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL
LABOR RELATIONS ACT (DEC 2010)
I.39 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)
I.40 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015)
I.41 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL
SAFETY DATA (JAN 1997) - ALTERNATE I (JUL 1995)
I.42 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
I.43 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT
MESSAGING WHILE DRIVING (AUG 2011)
I.44 52.225-1 BUY AMERICAN - SUPPLIES (MAY 2014)
I.45 52.225-8 DUTY-FREE ENTRY (OCT 2010)
I.46 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)
I.47 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)
I.48 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND
COPYRIGHT INFRINGEMENT (DEC 2007)
I.49 52.227-11 PATENT RIGHTS - - RETENTION BY THE CONTRACTOR (MAY
2014)
I.50 52.227-14 RIGHTS IN DATA-GENERAL (MAY 2014) AS MODIFIED BY
1852.227-14 ALT II (DEC 2007) AND ALT III (DEC 2007)
I.51 52.227-17 RIGHTS IN DATA -- SPECIAL WORKS (DEC 2007) AS MODIFIED
BY 1852.227-17 (JUL 1997)
I.52 52.227-19 COMMERCIAL COMPUTER SOFTWARE LICENSE (DEC 2007) AS
MODIFIED BY 1852.227-19 (JUL 1997)
I.53 52.227-21 TECHNICAL DATA DECLARATION, REVISION, AND
WITHHOLDING OF PAYMENT-MAJOR SYSTEMS (MAY 2014)
I.54 52.227-23 -- RIGHTS TO PROPOSAL DATA (TECHNICAL) (JUN 1987)
I.55 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
I.56 52.232-1 PAYMENTS (APR 1984)
I.57 52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)
I.58 52.232-9 LIMITATION ON WITHHOLDING OF PAYMENTS (APR 1984)
I.59 52.232-11 EXTRAS (APR 1984)
I.60 52.232-17 INTEREST (MAY 2014)
I.61 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
I.62 52.232-25 PROMPT PAYMENT (JAN 2017)
I.63 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR
AWARD MANAGEMENT (JUL 2013)
I.64 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN
I.65 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
SUBCONTRACTORS (DEC 2013)
I.66 52.233-1 DISPUTES (MAY 2014)
I.67 52.233-3 PROTEST AFTER AWARD (AUG 1996)
I.68 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT
2004)
I.69 52.242-13 BANKRUPTCY (JUL 1995)
I.70 52.243-1 CHANGES - FIXED-PRICE (AUG 1987)
I.71 52.243-6 CHANGE ORDER ACCOUNTING (APR 1984)
I.72 52.243-7 NOTIFICATION OF CHANGES (APR 1984)
I.73 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (JAN 2017)
I.74 52.246-24 LIMITATION OF LIABILITY - HIGH-VALUE ITEMS (FEB 1997)
I.75 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT
(FIXED-PRICE) (APR 2012)
I.76 52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984)
I.77 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)
I.78 1852.203-71 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER
RIGHTS (AUG 2014)
I.79 1852.215-84 OMBUDSMAN (NOV 2011)
I.80 1852.227-11 PATENT RIGHTS - - OWNERSHIP BY THE CONTRACTOR
(APRIL 2015)
I.81 1852.237-73 RELEASE OF SENSITIVE INFORMATION (JUN 2005)
I.82 1852.243-71 SHARED SAVINGS (MAR 1997)
I.83 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)
(a) Definitions. As used in this clause—
“Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,”
“disabled veteran,” “protected veteran,” “qualified disabled veteran,” and “recently separated veteran” have the meanings given at FAR 22.1301.
(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the
Contractor to employ and advance in employment qualified protected veterans.
(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts of
$150,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor. The
Contractor shall act as specified by the Director, Office of Federal Contract Compliance
Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
I.84 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES
(JUL 2014)
(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.
(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of
Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
I.85 52.223-7 - NOTICE OF RADIOACTIVE MATERIALS (JAN 1997)
(a) The Contractor shall notify the Contracting Officer or designee, in writing, 30 days prior to the delivery of, or prior to completion of any servicing required by this contract of, items containing either
(1) radioactive material requiring specific licensing under the regulations issued pursuant to the
Atomic Energy Act of 1954, as amended, as set forth in Title 10 of the Code of Federal
Regulations, in effect on the date of this contract, or
(2) other radioactive material not requiring specific licensing in which the specific activity is greater than 0.002 microcuries per gram or the activity per item equals or exceeds 0.01 microcuries. Such notice shall specify the part or parts of the items which contain radioactive materials, a description of the materials, the name and activity of the isotope, the manufacturer of the materials, and any other information known to the Contractor which will put users of the items on notice as to the hazards involved (OMB No. 9000-0107).
(b) If there has been no change affecting the quantity of activity, or the characteristics and composition of the radioactive material from deliveries under this contract or prior contracts, the
Contractor may request that the Contracting Officer or designee waive the notice requirement in paragraph (a) of this clause. Any such request shall --
(1) Be submitted in writing;
(2) State that the quantity of activity, characteristics, and composition of the radioactive material have not changed; and
(3) Cite the contract number on which the prior notification was submitted and the contracting office to which it was submitted.
(c) All items, parts, or subassemblies which contain radioactive materials in which the specific activity is greater than 0.002 microcuries per gram or activity per item equals or exceeds 0.01 microcuries, and all containers in which such items, parts or subassemblies are delivered to the
Government shall be clearly marked and labeled as required by the latest revision of MIL-STD
129 in effect on the date of the contract.
(d) This clause, including this paragraph (d), shall be inserted in all subcontracts for radioactive materials meeting the criteria in paragraph (a) of this clause.
I.86 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation (FAR) clauses: https://www.acquisition.gov/far/index.html
NASA FAR Supplement (NFS) clauses:
http://www.hq.nasa.gov/office/procurement/regs/nfstoc.htm
I.87 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR
Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any NASA FAR Supplement Regulation (48 CFR
Chapter 18) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
I.88 1852.225-71 RESTRICTION ON FUNDING ACTIVITY WITH CHINA
(DEVIATION) (FEB 2012)
(a) Definition - "China" or "Chinese-owned company" means the People's Republic of China, any company owned by the People's Republic of China or any company incorporated under the laws of the People's Republic of China.
(b) Public Laws 112-10, Section 1340(a) and 112-55, Section 539, restrict NASA from contracting to participate, collaborate, coordinate bilaterally in any way with China or a Chinese-owned company using funds appropriated on or after April 25, 2011. Contracts for commercial and non developmental items are exempted from the prohibition because they constitute purchase of goods or services that would not involve participation, collaboration, or coordination between the parties.
(c) This contract may use restricted funding that was appropriated on or after April 25, 2011. The contractor shall not contract with China or Chinese-owned companies for any effort related to this contract except for acquisition of commercial and non-developmental items. If the contractor anticipates making an award to China or Chinese-owned companies, the contractor must contact the contracting officer to determine if funding on this contract can be used for that purpose.
(d) Subcontracts - The contractor shall include the substance of this clause in all subcontracts made hereunder.
I.89 CLAUSES INCORPORATED BY REFERENCE -SECTION I
Clause(s) I.1 – I.82 at the beginning of this Section are incorporated by reference, with the same require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding
(End of Section I)
SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
J.1 GSFC 52.211-101 LIST OF ATTACHMENTS (FEB 2016)
The following documents are attached hereto and made a part of this contract:
Attachment Description Date No. of Pages
A EUROPA-PROP-SOW-0011
Absolute Pressure Transducer
Statement of Work
11/2017 72
B EUROPA-SPEC-0011
Absolute Pressure Transducer
Specification
11/2017 31
C Quality Assurance Plan
TBD To be Proposed
D Contractor Proposed Enhancements
03/2015 To be Proposed
(End of Section J)