80AFRC17B0003P00002_-_SF30.pdf
PDF 198 KB Posted
- Attached to
- Solicitation for Demolish Armstrong Shuttle Support Facilities - Phase 3 Federal contract opportunity
- Solicitation number
- 80AFRC17B0002
About this file
Modification 2 to Solicitation 80AFRC17B0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Hazardous_Mat'ls_Survey_for_PREBID.pdf | ||
| 80AFRC17B0003P00001_-_SF30.pdf | ||
| CCR_721_-_Demolish_Shuttle_Support_Facilities_-_PH-3_small-optimized.pdf | ||
| Visit_Request-_DFRC735-1.pdf | ||
| 80AFRC17B0003_Solicitation.pdf | ||
| Specifications_rev20170707.pdf | ||
| Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
PAGE OF PAGES
3. EFFECTIVE DATE 5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO.
7. ADMINISTERED BY (If other than Item 6) CODE
FACILITY CODECODE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code)
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
1. CONTRACT ID CODE
16B. UNITED STATES OF AMERICA 16C. DATE
SIGNED
15B. CONTRACTOR/OFFEROR 15C. DATE
SIGNED
BY
(Signature of Contracting Officer)(Signature of person authorized to sign)
15A NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
is not
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation
E. IMPORTANT: Contractor is not, is required to sign this document and return
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) is extended, copies to issuing office.
4. REQUISITION/PURCHASE REQ. NO.
1 2
P00002
NASA
Armstrong Flight Research Center P.O. Box 273, M/S 4811-140 Edwards CA 93523-0273
NASA
Armstrong Flight Research Center P.O. Box 273, M/S 4811-140 Edwards CA 93523-0273
X
80AFRC17B0003
08/30/2017
X X
See Continuation Sheet If Applicable date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
CHECK ONE
(X)
EDM - 1733 (CCR #721)
Demolish Armstrong Shuttle Support Facilities - Phase 3
(A)
ITEM NO.
(F)
AMOUNT
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED Page 2 of 2
NAME OF OFFEROR OR CONTRACTOR
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
80AFRC17B0003P00002
The following changes have been made to solicitation 80AFRC17B0003.
The Invitation for Bid (IFB) opening date will take place on September 14th 2017 at 10:00 am local time. The location is the Aero Institute, 38256 Sierra Highway, Room Operation 400, Palmdale, California 93550.
Responses to questions have been added (see attachments).
Hazardous material survey report has been added (see attachments).
Questions
1. Please provide the manufacturer and model number information for the generators?
Manufacturer Model Number
Caterpillar 8032002/SP4
Detroit 12V92
Cummins DKAE‐5567925
Cummins DGCB‐5567673
Cummins 150DGFA
2. Can we get the report on the asbestos and lead survey?
Yes, see attachment.
3. Could you please discuss what type of equipment has been allowed or may be allowed on the airfield side of the project?
There are no restrictions on the types of equipment to be used on the airfield side of the project.
4. The original IFB due date lists a submittal due date of 14 September 2017. Please revise to 15
September 2017 as noted during the pre‐bid meeting.
The IFB due date is 14 September 2017 at 10:00 AM local time. The bid opening will take place at the Aero Institute, 38256 Sierra Highway, Room Operation 400, Palmdale, California 93550.
5. Please provide a revised bid schedule to include a line item for Generator Credit so we don't to write it in somewhere.
The bid schedule will not be revised to add a separate line item for the Generator Credit. Bidders are to include any proposed credit as a part of their overall additive 2 bid price.
6. Please provide "Comprehensive Haz‐Mat survey report" as referenced in the specifications to determine the extent of materials to be abated?
See attachment.
7. Will "contractor" be required to pump any residual materials / liquids from Septic systems to be removed or will the Gov't perform this activity?
The contractor will pump residual materials from septic systems if there is any.
8. Will the existing fuel tanks to be removed, be required to be emptied and triple rinsed prior to removal from site? Or can they be hauled as is due to the fact that they will be re‐used as fuel tanks @ another location?
General Note #19 on the title sheet of the drawing set says NASA will empty the fuel tanks. The contractor will triple rinse them prior to removal from the site and shall handle and dispose of the rinsate properly.
9. Will the contractor be required to obtain Abatement and demolition permits from Eastern Kern
County AQMD in accordance with NESHAP or will the Gov't obtain these permits?
There is no permit requirement for the contractor. The contractor provides notification only to the County.
10. Can The QC Manager, SSHO and Superintendent be one person?
The superintendent and QC manager need to be separate. The SSHO can be either the superintendent or the QC manager.
11. We are requesting that the period of performance be changed from 301 calendar days to 365 calendar days due to Design requirement and long lead procurement items.
There is no design requirement and we don’t anticipate any long lead procurement items, therefore the POP will remain unchanged at 291 days. 291 days includes the base bid and both additives (not 301).
12. Will a third party Commissioning Agent be required?
There is no commissioning requirement in the project.
13. Will a third party Fire Protection Engineer be required?
No.
14. Please provide LBP/ACM surveys for this project.
See attachment.
15. Is there any As built Drawing available for this (sic) buildings?
We have as‐builts for B4805, B4874, and B4985. We do not have as‐builts for B4990 or T‐20.
Everything else is either a non‐building, emergency generator with fuel tank, or miscellaneous concrete pads or equipment.
16. Does a third party consultant need to be present for hazmat activity outside of asbestos and lead abatement?
No. If any hazmat material other than the asbestos and lead already identified is found, report it to the contracting officer and NASA will provide guidance on how to proceed.
17. Is soil sampling expected, and if yes, who will perform soil samples?
No soil sampling is expected.
18. Will fuel/diesel/hydraulic/etc. tanks and lines be drained prior to our arrival, or is it in the scope of work to remove all fluids/solids? Who is responsible for haz‐cat?
NASA will drain all fuel tanks. Contractor will perform the triple rinse prior to the proper disposal of the tanks and the rinsate. No haz‐catting is anticipated. If the contractor runs into or generates something that he suspects needs to be haz‐catted, report it to the contracting officer and NASA will provide guidance on how to proceed.
19. What is the time frame for completing “flight line license”…how long is the class, and how until the license is issued?
A special class for just the contractor’s workmen can normally be scheduled in about a week after a request is made. The class lasts one hour for a level 1 license. The license is issued the same day as the class if the students pass the exam.