STATEMENT OF WORK FORMAT
Insert Title and Date
PR: _____________________
Note: Only use the sections that are applicable to your service procurement.
Background Honeybee Robotics has a long history with NASA GSFC, particularly in developing, building and delivering the Sample Analysis at Mars (SAM) Sample Manipulation System (SMS) which is currently operating on the surface of Mars. The SAM SMS utilized technical and mechanical designs which are robust and show that Honeybee is able to deliver flight handling systems, which continue to operate. The company is unrivaled in the space flight industry, and interface directly with NASA GSFC requirements and needs. We plan to leverage the SMS technology and development for application to another project, which requires Honeybee input and support. This contract modification covers labor and materials support for conducting a vibration test of the previously awarded brassboard, which Honeybee is building for this effort.
The cost for the vibration testing support from December 2020 to July 2021 will total $100,189.
Scope The contractor shall manufacture one (1) brassboard sample handling system that can survive a vibration test at GSFC for qualification. The construction of the brassboard is described in detail in the original contract.
The scope of work is listed in tasks below:
1- Perform post-shipping set up and functional testing 2- Set up CADMES brassboard for thermal vacuum testing 3- Assist with functional testing of CADMES 4- Analysis and report detailing results of post – ship functional testing
Requirements The contractor shall verify the brassboard can complete and survive all required vibration tests
Deliverables or Delivery Schedule Delivery of brassboard sample handling system shall be in the December timeframe, and the vibration and thermal work for this modification will occur after delivery to GSFC.
Place of Performance
Work shall be done at GSFC testing facilities.
Period of Performance
POP is from December 2020 to June/July 2021 for this modification. Original work POP is March 2019 to March 2021.