74510 - Purchase Description (PD).pdf
PDF 231 KB Posted
- Attached to
- Thermal Shock Chamber Federal contract opportunity
- Solicitation number
- FA857124Q0068
About this file
The document is a Purchase Description (PD) for a Thermal Shock Chamber. The PD specifies that the Contractor shall provide an ESPEC (or equal to) Compact Air-to-air Thermal Shock Chamber, part number TSE-12-A, including all materials, parts, shipping, and training necessary, to the 402d Maintenance Group (EMXG), Hybrid Microelectronics Manufacturing Lab at Robins Air Force Base, GA. The PD details the required temperature range, performance, interior/exterior dimensions, operating system, carrier basket, traveling cable port, controller, utilities, refrigeration and plenum, and other features of the Thermal Shock Chamber. The Contractor shall deliver the item FOB Destination no later than 21 weeks ARO and provide one-year manufacturer warranty, on-site training for three government personnel, functional testing, and COTS manuals. The government will not provide any government-furnished equipment or services. Contractors must comply with various security, safety, environmental, and energy management requirements for work performed at Robins Air Force Base.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 74510 - CDRL A001 - Commercial Off-The-Shelf (COTS) Manuals and Associated Supplemental Data.pdf | ||
| 74510 - CDRL A003 - Accident Incident Report.pdf | ||
| 74510 - CDRL A002 - Contractors Safety Plan.pdf | ||
| SSJ _ Signed _ Redacted.pdf | ||
| 74510 - Appendix C.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PURCHASE DESCRIPTION
Thermal Shock Chamber
26 March 2024
1.0 DESCRIPTION. The Contractor shall provide all materials, parts, shipping, and training necessary to provide a ESPEC (or equal to) Compact Air-to-air Thermal Shock Chamber to the 402d Maintenance Group (EMXG), Hybrid Microelectronics Manufacturing Lab at Robins Air Force Base, GA.
1.1 The contractor shall provide:
Description Qty. Part # ESPEC (or equal to) Compact Air-to-air Thermal Shock Chamber
1 TSE-12-A
Additional Operation Manual 1 N/A
1.1.1 The ESPEC (or equal to) Compact Air-to-air Thermal Shock Chamber shall include:
• Temperature range: -65°C to 200°C
• Performance example:
o Test method: Mil-Std 883 1010.7 o Range: -65 to 150°C o Recovery: 15 min. (worst-case on-product) o Load: 6 lb of IC chips o Chamber: Two separately controlled vertical hot and cold zones, each zone having its own door o Carriage Transfer: Less than 30 seconds for carrier to travel from Cold to Hot chamber and vice versa o Temperature monitoring each internal chamber hot and cold zones separately while under test
• Interior dimensions: Cannot exceed 14” x 14” x 13”
• Exterior dimensions: Cannot exceed 50” x 50” x 70”
• Operating System: No, Microsoft Windows or Linux installed on controllers
• Carrier Basket: Mesh type basket, allow devices 0.5” x 0.5” to seat on bottom and not fall threw, and fits in chamber
• Traveling Cable Port: At least 2” width allowing cables from exterior sources to connect to devices under test while traveling from hot to cold zones in chambers
• Controller: Touch Screen capable of data storage of multiple profiles with at least 25 steps, looping, and product monitoring
• Utilities:
o Power supply source: 208V ±5% 3Ø 60Hz, 30 Service Amps (26 FLA) o Condensate drain required
• Chamber Design Features:
o Vertical-lift thermal shock chamber with separate hot and cold temperature zones o Direct-drive system for reliable transfer between zones (maximum load 17 lbs.)
o Compact design with integrated mechanical refrigeration o Two specimen baskets (maximum 4 lbs. each) o Tube for cables to test load, 2" diameter o Specimen power supply terminal o Includes caster and leveling pads for easy movement o Designed for performance with maximum load (lighter loads need additional mass for proper performance)
• Refrigeration and Plenum:
o Refrigeration maintains user-set low temperature in cold zone o Two sirocco blower motors circulate the air (one per zone) o Non-CFC cascade refrigeration system using 2-hp compressors o Quiet operation with sound levels below 60 dB
• ESPEC’s Exclusive P-310 Touch-Screen Programmer:
o USB and Ethernet interfaces included standard o User-friendly touch-screen operation with 7" active-matrix color display o Store 40 two-zone or three-zone test programs
Programs may be written on a PC and uploaded via USB o The trend-graph display shows a record of setpoints and actual values
Operation data can be downloaded as needed, or continually, to USB o Two time signal relays for automated on/off control of test devices/samples o System alarms are stored in memory for historical review o Built-in timer functions allow the chamber to be started or shut down automatically o Pattern Manager Lite PC software for program editing and data viewing/exporting to CSV o Ethernet interface for remote monitoring and operation control, as well as data downloading, via web browser
• Boost cooling using LN2 (cannot be added to a stock chamber)
• TSE-12 brochure (PDF)
2.0 SERVICE SUPPORT.
2.1 Delivery.
2.1.1 Government Representatives.
Primary Government Representative Alternate Government Representative Name: Jeremy S. Williams Name: Tristan Griffin Unit: 402 EMXG Unit: 402 EMXG Phone: (478) 926-9634 Phone: (478) 926-1726 Email: jeremy.williams.2@us.af.mil Email: tristan.griffin@us.af.mil
2.2 Shipping/Delivery/Period of Performance. The Contractor shall deliver all items FOB Destination no later than 21 weeks ARO via LTL service. Items shall be delivered using freight elevator to transfer chamber to 2nd floor.
2.3 Ship To Address.
Attention: Jeremy S. Williams Unit: 402 EMXG/MXDEKA
DODAAC: FY2072
Address: 635 Tech Rd.
Bldg. 639 Robins AFB, GA 31098
2.4 Incidental Services.
2.4.1 Training. Within ten (10) days of delivery, the Government shall contact the Contactor to schedule on-site initial machine setup and operational training. The Contractor shall provide on-site training for three (3) government personnel. The training will last no longer than 8 hours.
2.4.2 Acceptance. After initial machine setup has been completed, the Contractor shall conduct a functional test of the thermal shock chamber to ensure proper operation whereas all features are operating properly according to OEM specifications which shall include a visual inspection and operational test. In addition, the Government Representative(s) will observe the functional testing.
2.4.3 The Contractor shall provide one (1) electronic copy of the Commercial Off-the-Shelf (COTS) manual within three (3) calendar days after delivery of supplies. The manual shall include technical information, specifications, operational instructions, equipment maintenance instructions, a recommended spare parts list, and/or any other applicable information such as test certificates. All copies shall be legible and written in English. (CDRL A001, DI-TMSS- 80527D, Commercial Off-the-Shelf (COTS) Manuals and Associated Supplement Data)
2.5 Warranty. The Contractor shall provide one year manufacturer warranty.
2.6 Options. None
3.0 Government Furnished Equipment and Services or Government Furnished Property
(GFP) and services. None
4.0 General Information.
4.1 Contractor Program Manager. The Contractor shall provide a Program Manager who shall be the single point of contact between the Contractor and the Government. The name and phone number of the Contractor’s Program Manager shall be provided in writing to the Contracting Officer, Government Representatives, and COR no later than five (5) calendar days after contract award date.
4.2 Place of Performance and Hours of Work. On-site contract services shall be performed at the Warner Robins Air Logistic Complex. The training will take place in building 645, Room 2111 at Robins Air Force Base, GA. The Contractor’s work hours (shifts) shall normally be from 8:00 am to 4:00 pm (EST), Monday through Friday. The Government may adjust the Contractor’s work hours based on workload requirements, with the flexibility to start work earlier, work odd shifts, and/or work weekends. The Government will provide the Contractor the required work hours (schedule) for contractor personnel, and will provide a 48-hour notice prior to changing any work hours.
4.3 Recognized Holidays. Unless otherwise required by the Government, the Contractor shall not have access to Government facilities to work or telework on all federal holidays or during facility closings as authorized by the Government. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.
4.4 Security Requirements.
4.4.1 Government Security Regulations. The Contractor shall ensure personnel, information, system, facility, and international security requirements are met in accordance with 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM), Air Force Instruction (AFI) 31-101, Integrated Defense.
4.4.2 Visitors Only – No Badging ID. The Air Force has mandated all visitors consent to a check of their criminal history prior to being allowed access to installations. The check will be conducted at the Visitor Control Center (VCC) off Watson Boulevard, Robins AFB, GA.
Visitors requiring unescorted access will need their driver’s license or state-issued ID along with insurance and registration if driving on base. The pass issued by the Visitor Control Center authorizes unescorted entry to Robins AFB for the bearer only. For visitors, a short term pass is up to 60 days. Any time greater than 60 days requires a secondary form of ID (Social security card, birth certificate or passport).
4.4.3 Operations Security (OPSEC). The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall comply with DoDD 5205.02E “DoD Operations Security”, DoD Manual 5205.02-M and AFI 10-701 “Operations Security” to protect United States (U.S. Government interest. The Contractor shall ensure compliance with OPSEC requirements including procedures to protect classified and/or sensitive, but unclassified, Government projects and/or programs. The Contractor shall ensure Contractor personnel who perform work at Robins AFB or another Government facility comply with the OPSEC procedures of the facility.
4.4.4 Security Incident or Violation. The Contractor shall immediately notify the Government Security Office of any potential or actual security incidents or violations including potential or actual unauthorized disclosure or compromise of classified and/or sensitive, but unclassified, information.
4.5 Supply Chain Risk Management. The Contractor shall implement risk management procedures to ensure that system, equipment, components, software, maintenance equipment, and supplies do not incorporate counterfeit parts, malicious code, or other elements that would allow adversaries to gain access to data and critical program information and disrupt operations.
Contractor risk management procedures shall comply with:
Air Force Pamphlet (AFPAM) 63-113, Program Protection Planning for Life Cycle Management, SAE Aerospace Standard AS5553C, Counterfeit Electrical, Electronic, and Electromechanical (EEE) Parts; Avoidance, Detection, Mitigation and Disposition, National Institute of Standards and Technology (NIST) Special Publication 800-53 Rev 5, Security and Privacy Controls for Information Systems and Organizations.
4.6 Contractor Identification. Contractor personnel shall wear visible identification designating them as contractors at all times while on Robins Air Force Base.
4.7 Contractor Vehicle Entry. The Contractor shall contact the Robins Air Force Base Visitor's Center to and comply with local procedures for obtaining credentials and vehicle entry.
Information may be obtained by calling the following phone number: Commercial 478-222- 1972.
4.8 Agency Affirmative Procurement Program. In accordance with FAR 23.404(b)(1), 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list [https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program] and/or United States Department of Agriculture (USDA)-designated products included in the bio based product listings [http://www.biopreferred.gov] shall, at a minimum, meet the EPA or USDA standards for recovered materials or bio based content, respectively, unless an item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.
4.8.1 In accordance with FAR 23.404(a)(3)(iii), the Contractor shall provide estimates and verification of recovered material for EPA-designated CPG products and certification for both EPA-designated CPG products and USDA-designated bio based products. In accordance with the Robins Air Force Base, Georgia / Affirmative Procurement Program (formerly Green Procurement Program (GPP)) Plan, the Contractor shall provide estimates and certifications to the Government for completion of the applicable attachment(s) to be included in the Purchase Request (PR) package.
4.9 Environmental Management Systems (EMS) Awareness. Environmental Management Systems (EMS) Awareness Training: All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force-provided initial EMS Awareness Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB. Notification of training completion shall be sent to the Robins AFB Contracting Officer (CO) to be maintained in the contract file for tracking purposes. Failure to provide documentation of EMS Training may result in termination of the contract.
http://www.biopreferred.gov/
4.9.1 EMS training is provided by Environmental Management. Request for Robins EMS Awareness training through email at 78ceg.cev.FrontOfc@us.af.mil. Contractors have two options to satisfy the mandatory EMS Awareness Training requirement. (Front Desk: 478-926- 8178.)
4.9.2 Option 1: Contractors can register for an account through The Environmental Awareness Course Hub (TEACH), the Air Force training database: https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f Search for Course ID: EMS110UHHZ00293 Directions:
1. Hover your mouse over the Courses and Transcripts tab.
2. Click on Transcripts
3. Click into the TEACH Course Completion Log by clicking the orange Continue or Begin button.
4. When you are on the transcript, click on the blue “Search for Course” button.
5. When the pop up appears enter the course name or course number and press search.
6. Once you find the course you want to add, click on the +Select button to add the course to your transcript.
(Note: TEACH may not supported by Internet Explorer; recommend using Chrome.)
4.9.3 Option 2: Contractor requests a copy of the Robins EMS Awareness Training PowerPoint Presentation from Environmental Management. The request should be sent to the Environment Management Workflow Box at the following email address, 78ceg.cev.FrontOfc@us.af.mil.
Once the presentation is received, the contractor is responsible for ensuring that all his/her employees view the training.
4.10 ISO 50001-Energy Management. System Due to the WR-ALC being ISO 50001 certified, all contractors are subject to the Energy Management System (EnMS) requirements and shall abide by certification guidelines whenever applicable.
4.10.1. EnMS Training. All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force provided initial EnMS Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB.
4.10.1.1. EnMS training is provided by the Energy Assurance Office. The Contractor shall request the training by sending an email to 402MXSG.MXDEA.EnergyAssurance@us.af.mil.
4.10.2. Notification of training completion shall be sent to the Energy Assurance Office (402MXSG.MXDEA.EnergyAssurance@us.af.mil) and the CSMO POC to be maintained for tracking purposes. Failure to provide documentation of EnMS Training prior to beginning work may result in termination of the contract.
mailto:78ceg.cev.FrontOfc@us.af.mil https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f mailto:78ceg.cev.FrontOfc@us.af.mil mailto:402MXSG.MXDEA.EnergyAssurance@us.af.mil mailto:402MXSG.MXDEA.EnergyAssurance@us.af.mil
4.11 Contractor’s Safety Program. (See Appendix C, Part II, Para 7) The Contractor shall establish and maintain an acceptable safety program in accordance with their accepted Safety and Health Plan. The Air Force is part of the OSHA Voluntary Protection Program (VPP). All shall familiarize themselves with the requirements of VPP. Information on the VPP can be accessed at http://www.osha.gov/dcsp/vpp/index.html. Additionally, the Contractor is responsible for the safety and health of all subcontractor employees. No more than two Class C mishaps per contract year and Zero Class A or B mishaps will be tolerated. All changes to the plan must also be submitted in writing and approved by the Government.
4.11.1 Safety and Health Plan: Within 10 calendar days after contract award, the contractor shall email a copy of their company Safety Plan that is required to ensure compliance with the Occupational Safety and Health Act (OSHA) (Public Law 91-596) to 402mxw.se.wf@us.af.mil.
The Safety Plan will be provided to the Safety Office for review. The Safety Office will provide acceptance or non-acceptance within 5 working days of receipt to the government point-of-contact who will notify the CO. (CDRL A002, DI-SAFT-82080/T NOT 1, Contractor's Safety Plan).
4.11.2 The Contractor Safety Plan shall address in detail the items listed in the Contract Appendix C, Part II through Part IV as applicable. For task specific procedures identified in the Contract Appendix C, the contractor’s internal procedures for those tasks must be identifiable within the submitted Safety Plan or shall be provided in an amendment or addendum to the company’s Safety Plan. If task specific procedures identified in the Contract Appendix C, are not submitted with the contractor’s Safety Plan, the submitted Safety Plan will be returned as NOT ACCEPTED. The contractor will have 5 working days to resubmit the Safety Plan, amendment or addendum to address or correct issues identified for non-acceptance. The Safety Office will provide acceptance or non-acceptance of the resubmission within 5 workings days of receipt to the government POC who will notify the CO.
4.12 Mishap Notification. (See Appendix C, Part II, Para 5) The Contractor shall notify the Robins AFB Safety Office telephonically at (478)-222-0043 during duty hours and (478)-926- 3567 after hours, within four (4) hour after initial notification of all mishaps or incidents for damage to DoD property (material plus labor) entrusted by this contract and employee injuries as a result of the contract operation. A follow-up (written or e-mail) of this mishap/incident notification shall be sent within three calendar days to the Government Representative, the Procurement Contracting Officer (PCO) or the Administrative Contracting Officer (ACO) (with a copy to program manager), who will forward it to the Safety Office. The information that is not available at the time of the initial notification shall be provided within 20 calendar days after the mishap. Mishap notification shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (Events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Impound Authority Name and Phone Number (as applicable)
g. Nomenclature of equipment and personnel involved in accident/incident http://www.osha.gov/dcsp/vpp/index.html mailto:402mxw.se.wf@us.af.mil
h. Corrective actions (taken or proposed)
i. Other pertinent information
(CDRL A003, DI-SAFT-81563 NOT 2, Accident/Incident Report)
4.13 Essential Services During Crisis. The Services Acquisition Lead (SAL) has determined, by placing in writing their decision, that this requirement is not Mission Essential (M-E) in accordance with DFARS 237.76, Continuation of Essential Contractor Services.
4.14 Inspection of Services/Inspection of Supply: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.
4.15 Invoice/Payment and Receipt/Acceptance: In accordance with DFARS clause 252.232-7003, Electronic submission of Payment Requests and Receiving Reports, the Contractor shall submit/process payment requests (invoices, Receiving Reports or combos) and receipt/acceptance documents via Procurement Integrated Enterprise Environment (PIEE) through module Wide Area Workflow (WAWF). Access at the following site:
https://piee.eb.mil/
5.0 Appendices. None
https://piee.eb.mil/
File details come from the government source that posted it. Updated .