This solicitation seeks offers from qualified U.S. citizens to provide personal services as an Infrastructure and Engineering Advisor under a United States Personal Services Contract with USAID's Office of Food for Peace. Offerors must submit a resume detailing relevant experience, duties, supervisor references, education, and citizenship by January 10, 2020 at 4:00 PM Eastern Time. The solicitation also requires responses to Quality Ranking Factors and a signed USAID Application Form 309-2. The contract will be a one-year base period with four one-year options located in Washington D.C. with possible domestic and overseas travel. The position is designated as a GS-13 equivalent. Registration in SAM.gov and a DUNS number are required prior to award for contracts with a place of performance in the United States.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 72DFFP20R00006 - IEA - 1.20 FINAL SIGNED - Deadline Extended.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 | Page
SOLICITATION NUMBER: 72DFFP20R00006
ISSUANCE DATE: December 20, 2019 CLOSING DATE AND TIME: January 10, 2020
4:00 P.M. Eastern Time
SUBJECT: Solicitation for U.S. Personal Service Contractor (USPSC)
Dear Prospective Offerors:
The United States Government (USG), represented by the U.S. Agency for International Development’s (USAID) Office of Food for Peace (FFP), is seeking offers from qualified U.S.
citizens to provide personal services as an Infrastructure and Engineering Advisor under a United States Personal Services Contract (USPSC), as described in the solicitation.
Submittals must be in accordance with the attached information at the place and time specified.
Offerors interested in applying for this position MUST submit the following materials:
1. Complete resume. In order to fully evaluate your offer, your resume must include:
(See sample resume on www.ffpjobs.com website)
(a) Paid and non-paid experience, job title, location(s), dates held (month/year), and hours worked per week for each position. Dates (month/year) and locations for all field experience must also be detailed. Any experience that does not include dates (month/year), locations, and hours per week will not be counted towards meeting the solicitation requirements.
(b) Specific duties performed that fully detail the level and complexity of the work.
(c) Names and contact information (phone/email) of your current and/or previous supervisor(s). Current and/or previous supervisor(s) may be contacted for a reference.
(d) Education and any other qualifications including job-related training courses, job-related skills, or job-related honors, awards, or accomplishments.
(e) U.S. Citizenship.
Your resume should contain sufficient information to make a valid determination that you fully meet the experience requirements as stated in this solicitation. This information should be clearly identified in your resume. Failure to provide information sufficient to determine your qualifications for the position will result in loss of full consideration.
2. Responses to the Quality Ranking Factors (QRFs): Each offeror’s supplemental document must address the QRFs shown in the solicitation.
3. USPSC Application form AID 309-2: Offerors are required to complete sections A through I. This form must be physically signed and scanned. Electronic signatures will not be accepted.
http://www.ffpjobs.com/
Solicitation for a USPSC Infrastructure and Engineering Advisor
72DFFP20R00006
2 | Page
All USPSCs with a place of performance in the United States are required to have a Data Universal Numbering System (DUNS) number and be registered in the System for Award Management (SAM) database prior to receiving an offer. You will be disqualified if you either fail to comply with this requirement or if your name appears on the excluded parties list.
Registration information is available at www.sam.gov and further guidance will be provided to the selectee regarding DUNS and SAM registration.
The submission of additional documents submitted will not be accepted. Incomplete or late offers will not be considered. FFP reserves the right to select additional candidates if vacancies become available during future phases of the selection process.
Offerors can expect to receive a confirmation email when offer materials have been received.
Offerors should retain for their records copies of all enclosures which accompany their offers.
Your complete resume, signed and scanned AID 309-2 form, and the supplemental document addressing the QRFs must be emailed to:
FFP PSC Recruitment Team E-Mail Address: ffprecruitmentteam@usaid.gov
Any questions on this solicitation may be directed to FFP PSC Recruitment Team via the information provided above. Further guidance on applying, including a sample resume, can be found at www.ffpjobs.com.
This solicitation in no way obligates USAID to award a PSC contract, nor does it commit USAID to pay any cost incurred in the preparation and submission of the offer.
Sincerely, /s/
Patrice Lee Contracting Officer https://www.sam.gov/SAM/ mailto:ffprecruitmentteam@usaid.gov http://www.ffpjobs.com/application/process.aspx
3 | Page
ATTACHMENT 1
I. GENERAL INFORMATION
1. SOLICITATION NO.: 72DFFP20R00006
2. ISSUANCE DATE: December 20, 2019
3. CLOSING DATE AND TIME FOR RECEIPT OF OFFERS:
January 10, 2020, 4:00 P.M. Eastern Time
4. POINT OF CONTACT: FFP PSC Recruitment Team, ffprecruitmentteam@usaid.gov
5. POSITION TITLE: Infrastructure and Engineering Advisor
6. MARKET VALUE: This position has been designated as a GS-13 ($99,172 - $128,920) equivalent level, including Washington, D.C. locality pay. Final Grade will be determined by the candidate’s established work history, qualifications, and education. Final compensation will be negotiated within the listed market value and based upon the candidate’s established salary history. Candidates who live outside the Washington, D.C. area will be considered for employment but relocation expenses will not be reimbursed. Salaries over and above the top of the pay range will not be entertained or negotiated.
7. PERIOD OF PERFORMANCE: One (1) year with four (4) one-year options.
8. PLACE OF PERFORMANCE: Washington, D.C., with possible overseas and domestic travel.
9. ELIGIBLE OFFERORS: U.S. Citizens
10. SECURITY LEVEL REQUIRED: Ability to obtain and maintain a Secret up to Top Secret/Sensitive Compartmented Information level clearance as provided by USAID.
11. STATEMENT OF WORK:
BACKGROUND
USAID's Office of Food for Peace (FFP) predicts, prevents, and responds to hunger overseas.
Through its emergency food assistance activities, FFP saves lives, reduces suffering, and supports the early recovery of people affected by conflict and natural disaster emergencies, including refugees.
FFP also addresses the root causes of food insecurity and helps individuals and communities withstand future crises and lay the foundation for stable, inclusive growth. FFP development activities help chronically food insecure populations reduce their long-term need for food
4 | Page assistance by helping communities improve access to food for their most vulnerable people, especially women and children.
FFP works closely with other parts of USAID, especially the Bureau for Food Security (BFS), which plays a key role in implementing the U.S. Government’s (USG) Feed the Future initiative, and the Office of U.S. Foreign Disaster Assistance (OFDA), which leads on disaster response around the world. FFP employs a staff of over 140 in Washington and also has officers posted abroad.
More information on FFP is available at: https://www.usaid.gov/food-assistance.
INTRODUCTION
The incumbent is a member of the Policy and Technical Division (PTD) in FFP and provides technical leadership and guidance in the design, implementation, and evaluation of infrastructure strategies, approaches, and interventions, as funded within FFP emergency and development food security activities.
The incumbent works together with FFP technical experts, Washington, D.C.-based staff, and field-based staff to integrate infrastructure and engineering interventions into FFP’s emergency and development food assistance activities. The incumbent focuses on meeting FFP’s objectives of providing technical expertise on the quality of program design and implementation, as well as monitoring the implementation of FFP infrastructure and engineering interventions. The incumbent ensures that these interventions are in line with FFP’s mandate. The work requires teamwork and personal responsibility. In support of emergency and development food assistance activities through a wide variety of work tasks, the incumbent has a high level of integrity and places a premium on building positive relationships with his or her respective teams in the field and Washington, D.C. The incumbent demonstrates initiative and the ability to manage competing work priorities and works independently. The incumbent coordinates with a range of technical experts, management, and program staff, and serves as an advocate for establishing best infrastructure practices.
12. CORE FUNCTIONAL AREAS OF RESPONSIBILITY:
Under the direct supervision of the Food Security Team Leader or his/her designee, the incumbent performs the following duties:
At the GS-13 Equivalent level:
● Serve as a technical infrastructure and engineering advisor within FFP’s PTD and provide technical assistance to FFP staff, cooperating agencies, and mission staff on issues related to infrastructure and engineering, for both emergency and non-emergency programming;
● Contribute to FFP’s strategic thinking related to program and policy discussions (e.g.
policy-technical discussions related to cash-for-assets/food-for-assets under public international organization (PIO) and non-governmental organization (NGO) awards);
https://www.usaid.gov/food-assistance
5 | Page
● Maintain currency in the literature and ongoing research activities related to the professional field of focus, with particular emphasis on:
o Improving the quality and impact of infrastructure and asset investments in ultra-poor and low-resource settings;
o Minimum standards and best practice for construction practice, including safety and health standards at construction sites;
o Improving quality of design and construction under grant mechanisms;
o Incorporating and improving technical capacity building on construction into ongoing food security programming; and o Improving linkages and integration of infrastructure and asset investments;
● Maintain up-to-date, expert-level knowledge of the organizations engaged in related program activities, whether emergency or development;
● Develop and maintain coordination strategies and strong working relationships with FFP/OFDA Water, Sanitation, and Hygiene (WASH)/Water teams, as well as OFDA’s Shelter and Settlements Advisors;
● Engage and coordinate with USAID’s Bureau for Economic Growth, Education, and
Environment’s (E3) Engineering and Infrastructure (E&I) programming as well as liaising with BFS and other relevant bureaus/offices, as needed;
● Develop and deliver infrastructure training on behalf of FFP staff and NGO partners, with a focus on best practice, current/new developments within the infrastructure sector, and with up-to-date USAID policy/guidance;
● Document and share success stories on evidence-based and innovative strategies to integrate infrastructure activities into programs as well as innovative strategies for maintenance and governance;
● In collaboration with the FFP Regional Teams and FFP technical experts, review proposals containing infrastructure for appropriateness to FFP’s mandate, compliance with USAID requirements, technical merit and effectiveness, and for identifying areas where infrastructure can build upon food security outcomes in ongoing emergency and/or development programming, and assist regional teams and technical leads in assessing infrastructure gaps and needs;
● Coordinate with and assist technical experts from FFP’s PTD, where appropriate, in integrating cross-cutting issues related to infrastructure into activities under each sector;
● Support development food security activity design, including:
o Serving on multi-sectoral program design teams;
o Conducting background research on country-specific initiatives, laws, and partners;
o Participating in field work to conduct infrastructure needs assessments in vulnerable and often remote populations of priority countries; and o Drafting a strategic response and designing criteria for infrastructure activities to be
6 | Page addressed within the scope of a food security program; and
● Support technical review of project applications, both development and emergency, to ensure technically sound design of infrastructure activities. This includes conducting background analytical work as well as providing substantive written and oral comments on the technical quality and best practice, contextual appropriateness, feasibility, and likelihood of impact and sustainability of program design.
Supervisory Relationship:
The incumbent takes direction from and reports to the Food Security Team Leader in FFP/Washington.
Supervisory Controls:
The incumbent’s supervisor sets the overall work objectives and the incumbent consults with the Food Security Team Leader to develop deadlines, projects, and work to be performed. The supervisor evaluates work for technical soundness and effectiveness in meeting work objectives.
The incumbent keeps his/her supervisor informed of progress in the achievement of objectives and advised of potentially controversial matters. The incumbent is expected to take initiative and act independently with little direction when providing technical infrastructure and engineering support for FFP programs. The supervisor evaluates works for technical soundness and effectiveness in advancing FFP’s Strategic Plan, and the Bureau for Democracy, Conflict and Humanitarian Assistance (DCHA) objectives as enunciated in the annual results reports/resource request submissions.
Guidelines:
Pertinent sources of information consist of the Food for Peace Act, the Foreign Assistance Act, the Farm Bill, and other legislation; USAID, DCHA, and other USG rules and regulations; and FFP rules, policies, guidelines, and information bulletins. The incumbent uses initiative and resourcefulness in deviating from traditional methods or in researching patterns and trends to develop new methods, criteria, or proposed policies as it pertains to infrastructure and engineering. The incumbent interprets policies in terms of established objectives with input from the Food Security Team Leader. Administrative policies and precedents are applicable but are stated in general terms (i.e. Agency policy). Technical work at this level requires expertise in the field of food security and humanitarian assistance, specifically issues related to infrastructure and engineering.
Complexity:
Duties are significantly varied and require many different unrelated processes and methods that are applied to a broad range of problems/situations that require a substantial depth of analysis.
The incumbent undertakes a wide range of technical duties in regards to infrastructure and engineering that requires the exercise of judgment, the interpretation of policies and practices, and their relevance to new problems or situations. The incumbent applies his/her depth and
7 | Page breadth of knowledge and experience in technical areas such as structural engineering, infrastructure quality, best construction practice, and health and safety. The recommended changes will be consistent with existing legislative, regulatory, and policy guidelines, but may require the formulation and application of new approaches and/or methodologies. The incumbent is responsible for originating new techniques, establishing criteria, and developing new information regarding infrastructure, engineering, and food security priorities.
Scope and Effect:
The work includes planning, organizing, directing, designing, and coordinating technical and infrastructure priorities, thus requiring creativity and support from others. The incumbent assesses and monitors programs through field visits, reporting by field staff and implementing partners. This includes technical data reviews to maximize program effectiveness and ensuring efforts are implemented in a manner consistent with policy and legislative guidelines. The incumbent is responsible for proposal review, technical policy and guidance development, in addition to the implementation of improvements that impact the infrastructure sector of food assistance programs. The incumbent recommends strategies to achieve the best possible infrastructure outcomes for FFP’s beneficiary populations, facilitates the integration of evidence driven improved approaches, and manages the development and integration of new programming guidance for implementing partners. The incumbent analyzes infrastructure issues and identifies state-of-the art infrastructure approaches for implementation within Title II and International Disaster Assistance programs. The incumbent works to resolve critical problems or develop new theories affecting the work of other experts. The work of the incumbent directly affects major aspects of FFP’s infrastructure programming.
Personal Contacts:
Contacts are with individuals or groups outside of USAID in moderately unstructured settings, specifically with individuals or groups related to infrastructure programming and engineering.
The incumbent is responsible for liaising with a variety of Agency and external actors in order to ensure the effective use of FFP resources. This includes PIOs, NGOs, FFP/Washington, field staff, USAID mission and regional offices, and other U.S. Agencies. The incumbent works closely with staff from the Bureau for Global Health, E3, BFS, and OFDA to provide assistance to FFP teams in planning, implementing, and monitoring risk reduction interventions.
Purpose of Contacts:
The incumbent must be skillful in determining the appropriate approach in negotiating and persuading others, and in establishing rapport in order to gain and relay information as it applies to infrastructure and engineering in emergency and non-emergency FFP programming. The incumbent consults with other professional or technical personnel and user organizations to develop more detailed objectives and to reconcile conflicts, as it relates to infrastructure and engineering in emergency and non-emergency FFP programs.
8 | Page
13. WORK ENVIRONMENT AND PHYSICAL DEMANDS:
Work is primarily performed in an office setting. While on long-term travel for FFP, thirty (30) days or more in a calendar year, the work may additionally involve special safety and/or security precautions, wearing of protective equipment, and exposure to severe weather conditions.
The work is generally sedentary and does not pose undue physical demands. The requirement for field trip assignments to consult with cooperating sponsor managers of food assistance programs may expose the successful candidate to additional physical exertion including long periods of standing, walking over rough terrain, or carrying of moderately heavy items (less than 50 pounds).
14. START DATE: Immediately, once necessary clearances are obtained.
9 | Page
II. MINIMUM QUALIFICATIONS REQUIRED FOR THIS POSITION
EDUCATION/EXPERIENCE REQUIRED FOR THIS POSITION
(Determines basic eligibility for the position. Offerors who do not meet all of the education and experience factors are considered NOT qualified for the position.)
At the GS-13 Equivalent Level:
A Bachelor’s degree from an accredited U.S. or internationally recognized institution with significant study in environmental, civil, structural engineering, or other field related to engineering with a minimum of seven (7) years of progressively responsible experience, of which three (3) years must be related to infrastructure and engineering in an international and/or disaster-related context.
OR
A Master’s degree from an accredited U.S. or internationally recognized institution with significant study in environmental, civil, structural engineering or other field related to engineering with a minimum of five (5) years of progressively responsible experience, of which two (2) years must be related to infrastructure and engineering in an international and/or disaster-related context.
III. EVALUATION AND SELECTION FACTORS
The Government may award a contract without discussions with offerors in accordance with FAR 52.215-1. The Contracting Officer (CO) reserves the right at any point in the evaluation process to establish a competitive range of offerors with whom negotiations will be conducted pursuant to FAR 15.306(c). In accordance with FAR 52.215-1, if the CO determines that the number of offers that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the CO may limit the number of offerors in the competitive range to the greatest number that will permit an efficient competition among the most highly rated offers. FAR provisions of this solicitation are available at https://www.acquisition.gov/browse/index/far.
SELECTION FACTORS
(Determines basic eligibility for the position. Offerors who do not meet all of the selection factors are considered NOT qualified for the position.)
• Offeror is a U.S. Citizen;
• Submission of a current resume, with complete contact information. See cover page for resume requirements;
• Supplemental document specifically addressing the QRFs;
• USPSC Application form AID 309-2. Offerors are required to complete sections A through I. This form must be physically signed and scanned. Electronic signatures will not be accepted;
https://www.acquisition.gov/browse/index/far
10 | Page
• Ability to obtain and maintain a Secret level clearance up to Top Secret/Sensitive Compartmented Information level clearance within a nine month period after offer acceptance;
• Ability to obtain a Department of State medical clearance within a three month period after offer acceptance;
• Must not appear as an excluded party in the System for Award Management (SAM.gov);
and
• Satisfactory verification of academic credentials.
Offerors not meeting minimum qualifications will not be evaluated further.
QUALITY RANKING FACTORS (QRFs)
Offerors who meet the Education/Experience requirements and Selection Factors will be further evaluated based on the QRFs listed below. In 500 words or less, the offeror will address each factor on a separate sheet describing specifically and accurately the experience, training, and/or education they have that is relevant to each factor. Please provide a word count after each response. Offerors must be sure to include their name and the announcement number at the top of each additional page.
● QRF 1. Demonstrated experience in designing, implementing, monitoring, and/or evaluating infrastructure/engineering interventions or activities, with an emphasis on international based efforts, in 500 words or less. (25 points)
● QRF 2. Demonstrated experience in working across a range of sectors (e.g. risk reduction, WASH, settlement planning or civil planning works for communal or public space/buildings, natural resource management (NRM), agriculture, health and nutrition, gender), in 500 words or less. (20 points)
● QRF 3. Ability to effectively articulate and communicate complex technical infrastructure and engineering concepts, methods, policies, and best practices to specialists and non-specialists both orally and in writing, in 500 words or less. (15 points)
● QRF 4. Demonstrated ability to work well under pressure, successfully balancing competing priorities and demands, in 500 words or less. (5 points)
● QRF 5. Demonstrated understanding of programs and organizational aspects of major international donors, multilateral agencies, NGOs, and private voluntary organizations supporting the NRM sector, in 500 words or less. (5 points)
Total Possible QRF Points: 70 points Total Possible Interview Points: 30 points Satisfactory Professional Reference Checks: Pass/Fail
Total Possible Points: 100
11 | Page
BASIS OF RATING: Offerors who meet the Education/Experience requirements and Selection Factors will be further evaluated based on scoring of the QRF responses. Those offerors determined to be competitively ranked will be evaluated on interview performance and satisfactory professional reference checks.
Failure to address the selection factors and/or QRFs may result in not receiving credit for all pertinent experience, education, and/or training.
The most qualified candidates will be interviewed. Please be advised that FFP will not pay for any expenses associated with the interviews. Professional references and academic credentials will be evaluated for offerors being considered for selection. Please be advised that references may be obtained independently from other sources in addition to the ones provided by an offeror.
FFP reserves the right to select additional candidates to fill possible future vacant positions.
IV. SUBMITTING AN OFFER
Offers must be received by the closing date and time at the address specified in the cover letter.
Offerors are required to submit:
1. Complete, current resume. See cover page for resume requirements.
2. Supplemental document specifically addressing the QRFs shown in the solicitation.
3. USPSC Application form AID 309-2. Offerors are required to complete sections A through
I. This form must be physically signed and scanned. Electronic signatures will not be accepted.
Additional documents submitted will not be accepted.
By submitting your offer materials, you certify that all of the information on and attached to the offer is true, correct, complete, and made in good faith. You agree to allow all information on and attached to the offer to be investigated.
False or fraudulent information on or attached to your offer may result in you being eliminated from consideration for this position, or being terminated after award, and may be punishable by fine or imprisonment.
To ensure consideration of offers for the intended position, please reference the solicitation number and the position you are applying for on your offer, and as the subject line in any email.
DOCUMENT SUBMITTALS
Via email: ffprecruitmentteam@usaid.gov
NOTE: If the full security application package is not submitted within 30 days after the Office of Security determines eligibility, the offer may be rescinded. If a Secret security clearance is not
12 | Page obtained within nine months after offer acceptance, the offer may be rescinded. If Top Secret is required, and clearance is not obtained within nine months after award, USAID may terminate the contract at the convenience of the government. If Sensitive Compartmented Information (SCI) access is not obtained within nine months after Top Secret clearance is granted, USAID may terminate the contract at the convenience of the government.
NOTE: If the full medical clearance package is not submitted within one month after offer acceptance, the offer may be rescinded. If a Department of State medical clearance is not obtained within three months after offer acceptance, the offer may be rescinded.
NOTE REGARDING GOVERNMENT OBLIGATIONS FOR THIS SOLICITATION
This solicitation in no way obligates USAID to award a PSC contract, nor does it commit USAID to pay any cost incurred in the preparation and submission of the offer.
NOTE REGARDING DATA UNIVERSAL NUMBERING SYSTEM (DUNS)
NUMBERS AND THE SYSTEM FOR AWARD MANAGEMENT
All USPSCs with a place of performance in the United States are required to have a Data Universal Numbering System (DUNS) number and be registered in the System for Award Management (SAM) database prior to receiving an offer. You will be disqualified if you either fail to comply with this requirement or if your name appears on the excluded parties list. The selectee will be provided with guidance regarding this registration.
NOTE: Registration for a DUNS number is FREE.
For general information about DUNS Numbers, please refer to Federal Acquisition Regulation (FAR) Clause 52.204-6, Data Universal Numbering System Number at https://www.acquisition.gov/far/current/html/52_200_206.html and FAR 52.204-7, System for Award Management at https://www.acquisition.gov/far/current/html/52_200_206.html or www.sam.gov.
Interested offerors are highly encouraged to initiate the registration process early in the offer stage to avoid any delays during contract award.
V. LIST OF REQUIRED FORMS FOR PSCs
The CO will provide instructions about how to complete and submit the following forms after an offeror is selected for the contract award.
Forms outlined below can found at:
http://www.usaid.gov/forms/ or at http://www.forms.gov/bgfPortal/main.do
1. Complete, current resume.
2. Supplemental Document addressing QRFs.
3. USPSC Application Form (AID 309-2).
https://www.acquisition.gov/far/current/html/52_200_206.html https://www.acquisition.gov/far/current/html/52_200_206.html http://www.sam.gov/ http://www.usaid.gov/forms/ http://www.forms.gov/bgfPortal/main.do
13 | Page
4. Medical History and Examination Form (DS-6561).
5. Questionnaire for Sensitive Positions (for National Security) (SF-86), or
6. Questionnaire for Non-Sensitive Positions (SF-85).
7. Finger Print Card (FD-258).
8. Employment Eligibility Verification (I-9 Form).
**Forms 4-8 shall be completed ONLY upon the advice of the Contracting Officer that an offeror is the successful candidate for the job.
CONTRACT INFORMATION BULLETINS (CIBs) and ACQUISITION & ASSISTANCE POLICY DIRECTIVES (AAPDs) PERTAINING TO PSCs
CIBs and AAPDs contain changes to USAID policy and General Provisions in USAID regulations and contracts. Please refer to https://www.usaid.gov/work-usaid/aapds-cibs to determine which CIBs and AAPDs apply to this contract.
AIDAR Appendix D can be found at: https://www.usaid.gov/ads/policy/300/aidar
ADS 309 – Personal Services Contracts can be found at:
https://www.usaid.gov/sites/default/files/documents/1868/309.pdf
AAPD 06-10 – PSC MEDICAL PAYMENT RESPONSIBILITY
AAPD No. 06-10 is hereby incorporated as Attachment 2 to the solicitation.
AAPD 15-02 – Authorization of Family and Medical Leave for U.S. Personal Services Contractors (USPSCs) AAPD No. 15-02 is hereby incorporated as Attachment 3 to the solicitation.
AAPD 18-02 – Medical Evacuation (MEDEVAC) Services AAPD No. 18-02 is hereby incorporated as Attachment 4 to the solicitation.
FAR 52.222-50 – COMBATING TRAFFICKING IN PERSONS
FAR Clause 52.222-50 is hereby incorporated as Attachment 5 to the solicitation.
FAR 52.204-24 – Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Aug 2019) FAR Clause 52.204-24 is hereby incorporated as Attachment 6 to the solicitation.
FAR 52.204-25 – Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (Aug 2019) FAR Clause 52.204-25 is hereby incorporated as Attachment 7 to the solicitation.
VI. BENEFITS AND ALLOWANCES
As a matter of policy, and as appropriate, a USPSC is normally authorized the following benefits and allowances:
https://www.usaid.gov/work-usaid/aapds-cibs https://www.usaid.gov/ads/policy/300/aidar https://www.usaid.gov/sites/default/files/documents/1868/309.pdf
14 | Page
BENEFITS
(a) Employer's FICA Contribution
(b) Contribution toward Health & Life Insurance
(c) Pay Comparability Adjustment
(d) Annual Increase (pending a satisfactory performance evaluation)
(e) Eligibility for Worker's Compensation
(f) Annual & Sick Leave
ALLOWANCES (if Applicable) *
The following allowances may be provided for PSCs located in foreign countries using rates prescribed under the Department of State Standardized Regulations (Government Civilian Foreign areas) available at https://aoprals.state.gov/:
(a) Temporary Quarter Subsistence Allowance (Section 120)
(b) Living Quarters Allowance (Section 130)
(c) Cost-of-Living Allowance (Chapter 210)
(d) Post Allowance (Section 220)
(e) Separate Maintenance Allowance (Section 260)
(f) Education Allowance (Section 270)
(g) Education Travel (Section 280)
(h) Post Differential (Chapter 500)
(i) Payments during Evacuation/Authorized Departure (Section 600)
(j) Danger Pay Allowance (Section 650)
VII. TAXES
USPSCs are required to pay Federal income taxes, FICA, Medicare and applicable State Income taxes.
VIII. USAID REGULATIONS, POLICIES AND CONTRACT CLAUSES PERTAINING
TO PSCs
USAID regulations and policies governing USPSC awards are available at these sources:
1. USAID Acquisition Regulation (AIDAR), Appendix D, “Direct USAID Contracts with a
U.S. Citizen or a U.S. Resident Alien for Personal Services Abroad,” including contract clause “General Provisions,” available at https://www.usaid.gov/sites/default/files/documents/1868/aidar_0.pdf.
2. Contract Cover Page form AID 309-1 available at https://www.usaid.gov/forms.
https://aoprals.state.gov/ https://www.usaid.gov/sites/default/files/documents/1868/aidar_0.pdf https://www.usaid.gov/forms
15 | Page
3. Acquisition and Assistance Policy Directives/Contract Information Bulletins (AAPDs/CIBs) for Personal Services Contracts with Individuals available at http://www.usaid.gov/work-usaid/aapds-cibs.
[The CO must check http://www.usaid.gov/work-usaid/aapds-cibs to determine which AAPDs/CIBs apply and insert the relevant text as required.]
4. Ethical Conduct. By the acceptance of a USAID personal services contract as an individual the contractor will be acknowledging receipt of the “Standards of Ethical Conduct for Employees of the Executive Branch,” available from the U.S. Office of Government Ethics, in accordance with General Provision 2 and 5 CFR 2635. See https://www.oge.gov/web/oge.nsf/OGE%20Regulations.
ALL QUALIFIED OFFERORS WILL BE CONSIDERED REGARDLESS OF AGE,
RACE, COLOR, SEX, CREED, NATIONAL ORIGIN, LAWFUL POLITICAL
AFFILIATION, NON-DISQUALIFYING DISABILITY, MARITAL STATUS, SEXUAL
ORIENTATION, AFFILIATION WITH AN EMPLOYEE ORGANIZATION, OR
OTHER NON-MERIT FACTOR.
http://www.usaid.gov/work-usaid/aapds-cibs https://www.oge.gov/web/oge.nsf/OGE%20Regulations
16 | Page
ATTACHMENT 2
MEDICAL EXPENSE PAYMENT RESPONSIBILITY (OCTOBER 2006) (AAPD06-10)
(a) Definitions. Terms used in this General Provision are defined in 16 FAM 116 (available at http://www.foia.state.gov/REGS/fams.asp?level=2&id=59&fam=0). Note: personal services contractors are not eligible to participate in the Federal Employees Health Programs.
(b) The regulations in the Foreign Affairs Manual, Volume 16, Chapter 520 (16 FAM 520), Responsibility for Payment of Medical Expenses, apply to this contract, except as stated below.
The contractor and each eligible family member are strongly encouraged to obtain health insurance that covers this assignment. Nothing in this provision supersedes or contradicts any other term or provision in this contract that pertains to insurance or medical costs, except that section (e) supplements General Provision 25. “MEDICAL EVACUATION (MEDEVAC)
SERVICES.”
(c) When the contractor or eligible family member is covered by health insurance, that insurance is the primary payer for medical services provided to that contractor or eligible family member(s) both in the United States and abroad. The primary insurer’s liability is determined by the terms, conditions, limitations, and exclusions of the insurance policy. When the contractor or eligible family member is not covered by health insurance, the contractor is the primary payer for the total amount of medical costs incurred and the U.S. Government has no payment obligation (see paragraph (f) of this provision).
(d) USAID serves as a secondary payer for medical expenses of the contractor and eligible family members who are covered by health insurance, where the following conditions are met:
(1) The illness, injury, or medical condition giving rise to the expense is incurred, caused, or materially aggravated while the eligible individual is stationed or assigned abroad;
(2) The illness, injury, or medical condition giving rise to the expense required or requires hospitalization and the expense is directly related to the treatment of such illness, injury, or medical condition, including obstetrical care; and
(3) The Office of Medical Services (M/MED) or a Foreign Service medical provider (FSMP) determines that the treatment is appropriate for, and directly related to, the illness, injury, or medical condition.
(e) The Mission Director may, on the advice of M/MED or an FSMP at post, authorize medical travel for the contractor or an eligible family member in accordance with the General Provision 10, Travel and Transportation AAPD 06-10 PSC Medical Expense Payment Responsibility 6 Expenses (July 1993), section (i) entitled “Emergency and Irregular Travel and Transportation.”
In the event of a medical emergency, when time does not permit consultation, the Mission Director may issue a Travel Authorization Form or Medical Services Authorization Form DS- 3067, provided that the FSMP or Post Medical Advisor (PMA) is notified as soon as possible following such an issuance. The contractor must promptly file a claim with his or her medevac
17 | Page insurance provider and repay to USAID any amount the medevac insurer pays for medical travel, up to the amount USAID paid under this section. The contractor must repay USAID for medical costs paid by the medevac insurer in accordance with sections (f) and (g) below. In order for medical travel to be an allowable cost under General Provision 10, the contractor must provide USAID written evidence that medevac insurance does not cover these medical travel costs.
(f) If the contractor or eligible family member is not covered by primary health insurance, the contractor is the primary payer for the total amount of medical costs incurred. In the event of a medical emergency, the Medical and Health Program may authorize issuance of Form DS-3067, Authorization for Medical Services for Employees and/or Dependents, to secure admission to a hospital located abroad for the uninsured contractor or eligible family member.
In that case, the contractor will be required to reimburse USAID in full for funds advanced by USAID pursuant to the issuance of the authorization. The contractor may reimburse USAID directly or USAID may offset the cost from the contractor’s invoice payments under this contract, any other contract the individual has with the U.S. Government, or through any other available debt collection mechanism.
(g) When USAID pays medical expenses (e.g., pursuant to Form DS-3067, Authorization for Medical Services for Employees and/or Dependents), repayment must be made to USAID either by insurance payment or directly by the contractor, except for the amount of such expenses USAID is obligated to pay under this provision. The Contracting Officer will determine the repayment amount in accordance with the terms of this provision and the policies and procedures for employees contained in 16 FAM 521. When USAID pays the medical expenses, including medical travel costs (see section (e) above), of an individual (either the contractor or an eligible family member) who is covered by insurance, that individual promptly must claim his or her benefits under any applicable insurance policy or policies. As soon as the individual receives the insurance payment, the contractor must reimburse USAID for the full amount that USAID paid on the individual’s behalf or the repayment amount determined by the Contracting Officer in accordance with this paragraph, whichever is less. If an individual is not covered by insurance, the contractor must reimburse USAID for the entire amount of all medical expenses and any travel costs the contractor receives from his/her medevac provider.
(h) In the event that the contractor or eligible family member fails to recover insurance payments or transfer the amount of such payments to USAID within 90 days, USAID will take appropriate action to collect the payments due, unless such failure is for reasons beyond the control of the USPSC/dependent. (i) Before departing post or terminating the contract, the contractor must settle all medical expense and medical travel costs. If the contractor is insured, he or she must provide proof to the Contracting AAPD 06-10 PSC Medical Expense Payment Responsibility 7 Officer that those insurance claims have been submitted to the insurance carrier(s) and sign a repayment agreement to repay to USAID any amounts paid by the insurance carrier(s).
(i) Before departing post or terminating the contract, the contractor must settle all medical expense and medical travel costs. If the contractor is insured, he or she must provide proof to the Contracting Officer that those insurance claims have been submitted to the insurance carrier(s)
18 | Page and sign a repayment agreement to repay to USAID any amounts paid by the insurance carrier(s).
[END PROVISION]
19 | Page
ATTACHMENT 3
AUTHORIZATION OF FAMILY AND MEDICAL LEAVE FOR U.S. PERSONAL
SERVICES CONTRACTORS (USPSCs)
GP 5. LEAVE AND HOLIDAYS (DEC 2017)
(Pursuant to class deviation #M/OAA-DEV-AIDAR-18-1c)
(a) Annual Leave.
(1) The contractor is not entitled to annual leave if the period of performance of this contract is 90 days or less. If the contract period of performance is more than 90 days, the contractor shall earn annual leave as of the start date of the contract period of performance as specified in paragraph (a)(2) below.
(2) The contractor shall accrue annual leave based on the contractor’s time in service according to the following table:
Time in Service Annual Leave (AL) Accrual Calculation 0 to 3 years Four hours of leave for each two week period over 3, and up to 15 years
Six hours of AL for each two week period (including 10 hours AL for the final pay period of a calendar year) over 15 years Eight hours of AL for each two week period
USAID will calculate the contractor’s time in service based on all the previous service performed by the contractor as a: 1) USAID PSC (i.e., the contractor has served under any USAID personal services contracts of any duration covered by Sec. 636(a)(3) of the FAA or other statutory provision applicable to USAID); and/or 2) former U.S. Government (USG) direct-hire, under either civilian and/or military service.
(3)
(i) AL is provided under this contract for the purposes of affording necessary rest and recreation during the period of performance. The contractor, in consultation with the USAID Mission or USAID/Washington, as appropriate, shall develop an AL schedule early in the contractor's period of performance, taking into consideration project requirements, employee preference, and other factors. All AL earned by the contractor must be used during the contractor’s period of performance. All AL earned by the contractor, but not taken by the end of the contract, will be forfeited. However, to prevent forfeiture of AL, the Contracting Officer may approve the contractor taking AL during the concluding weeks of the contractor's period of performance.
(ii) As an exception to 3(i) above, the contractor may receive a lump-sum payment for leave not taken. To approve this exception, the contractor's supervisor must provide the Contracting Officer with a signed, written Determination and Findings (D&F). The D&F must set out the facts and circumstances that prevented the contractor from taking AL, and the Contracting Officer must find that these facts and circumstances were not caused
20 | Page by, or were beyond the control of, the contractor. This leave payment must not exceed the number of days which could be earned by the contractor during a twelve-month period.
(4) With the approval of the Mission Director or cognizant AA, as appropriate, and if the circumstances warrant, a Contracting Officer may grant the contractor advance AL in excess of the amount earned, but in no case may the Contracting Officer grant advance AL in excess of the amount earned in one year or over the life of the contract, whichever is less. The contractor agrees to reimburse USAID for any outstanding balance of advance AL provided during the contractor’s assignment under the contract.
(5) Offerors for PSC positions will provide evidence of their PSC and/or USG direct-hire service - civilian and/or military experience, as applicable, on their signed and dated application form required under USAID policy. By signing the appropriate form, the offeror attests to the accuracy of the information provided. Any offeror providing incorrect information is subject to the penalty provisions in the form. If required to satisfy due diligence requirements on behalf of the Contracting Officer, the contractor may be required to furnish evidence that verifies length of service, e.g., SF 50, DD Form 214, and/or signed contracts.
(b) Sick Leave.
The contractor may use sick leave on the same basis and for the same purposes as USAID U.S.
direct hire employees. Sick leave is earned at a rate not to exceed four (4) hours every two (2) weeks for a total of 13 work-days per year. Unused sick leave may be carried over under an extension or renewal of this contract with the same individual for the same work. Otherwise, sick leave will not be carried over from one post to another or from one contract to another. The contractor will not be compensated for unused sick leave upon completion of this contract.
(c) Home Leave.
(1) Home leave is leave earned for service abroad for use only in the U.S., its commonwealths, possessions and territories.
(2) A USPSC who has served at least two years overseas at the same USAID Mission, under the same contract, as defined in paragraph (c)(4) below, and has not taken more than 30 work days leave (annual, sick or LWOP) in the U.S. may be granted home leave in accordance with the following:
(i) if the USPSC returns to the same overseas post upon completion of home leave for an additional two (2) years under the same contract, the USPSC will receive home leave, to be taken at one time, for a period of 30 work days; or if the USPSC returns to the same overseas post upon completion of home leave for such shorter period of not less than one year, as approved in writing by the Mission Director prior to the USPSCs departure on home leave, the USPSC will receive home leave, to be taken at one time, for a period of 30 work days.
21 | Page
(ii) if the USPSC is returning to a different USAID Mission under a USAID personal services contract immediately following completion of the USPSC's home leave, for an additional two (2) years under contract, or for such shorter period of not less than one (1) year, as approved by the Mission Directors of the "losing" and "gaining" Missions, the contractor will receive home leave, to be taken at one time, for a period of not more than 20 work days. When the PSC is returning to a different USAID Mission, the former Mission will pay for the home leave regardless of what country the PSC will be working in following the home leave;
(iii) if home leave eligibility is based on (c)(2)(ii) above, the USPSC must submit written verification to the losing Mission at the time home leave is requested that the USPSC has accepted a USAID personal services contract at another USAID Mission following completion of the home leave;
(iv) travel time by the most direct route is authorized in addition to the number of work days authorized for home leave;
(v) home leave must be taken in the U.S., its commonwealths, possessions or territories, and any days spent elsewhere will be charged to annual leave (AL.) If the PSC does not have accrued AL, the PSC will be placed on LWOP.
(vi) if the PSC does not complete the additional service required under (c)(2)(i) or (ii) (that the Contracting Officer finds are other than for reasons beyond the PSC's control), the cost of home leave, travel and transportation and any other related costs must be repaid by the PSC to the Government.
(3) Notwithstanding the requirement in paragraph (c)(2) above, that the USPSC must have served two (2) years overseas under personal services contract with the same Mission to be eligible for home leave, the USPSC may be granted advance home leave subject to all of the following conditions:
(i) Granting of advanced home leave would in each case serve to advance the attainment of the objectives of this contract; and
(ii) The USPSC has served a minimum of 18 months in the Cooperating Country under this contract; and
(iii) The USPSC agrees to return to the Cooperating Country to serve out the remaining time necessary to meet two (2) years of service overseas, plus an additional two (2) years under the current contract or under a new contract for the same or similar services at the same Mission. If approved in advance by the Mission Director, the USPSC may return to serve out any remainder of the two (2) year requirement for service overseas, plus an additional period of not less than one (1) year under the current contract or under a new contract for the same or similar services at the same Mission.
22 | Page
(4) The period of service overseas required under paragraph (c)(2), or paragraph (c)(3) above, will include the actual days in orientation in the U.S. (less language training). The actual days overseas begin on the date of arrival in the cooperating country inclusive of authorized delays enroute. Allowable annual and sick leave taken while overseas, but not LWOP, shall be included in the required period of service overseas. An amount equal to the number of days of annual and sick leave taken in the U.S., its commonwealths, possessions or territories will be added to the required period of service overseas.
(5) Salary during the travel to and from the U.S., for home leave will be limited to the time required for travel by the most expeditious air route. Except for reasons beyond the USPSC's control as determined by the Contracting Officer, the USPSC must return to duty after home leave and complete the additional required service or be responsible for reimbursing USAID for payments made during home leave. Unused home leave is not reimbursable under this contract, nor can it be taken incrementally in separate time periods.
(6) Home leave must be taken at one time, and to the extent deemed necessary by the Contracting Officer, an USPSC in the U.S., on home leave may be authorized to spend not more than five (5) days in work status for consultation at USAID/Washington before returning to post. Consultation at locations other than USAID/Washington as well as any time in excess of five (5) days spent for consultation must be approved by the Mission Director or the Contracting Officer.
(d) Home Leave for Qualifying Posts (HLQP).
USPSCs who ordinarily qualify for home leave and have completed a 12-month assignment at one of the USAID qualifying posts (currently Iraq, Afghanistan and Pakistan) are entitled to take ten (10) workdays of leave in addition to the home leave an USPSCs is normally entitled to under the contract in accordance with sub-paragraphs (c)(1) - (6) above.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .