Over Haul Description 5998-01-463-9077.pdf

PDF 8 KB Posted

Attached to
LIQUID FUEL VALVE / LQ DRIVER Federal contract opportunity
Solicitation number
70Z08520Q39013B00
Issued by
Department of Homeland Security US Coast Guard

View the file

Other files for this federal contract opportunity

Other files attached to LIQUID FUEL VALVE / LQ DRIVER, newest first.
File Type Posted
FAR Clause.pdf PDF
Brand Name Justification.pdf PDF
Over Haul Description 5998-01-463-9389.pdf PDF
Repair Specification R-400-299-M.pdf PDF
Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OVERHAUL DESCRIPTION

FOR OFFICIAL USE ONLY

ITEM NAME LQ25 LIQUID FUEL VALVE

STOCK NUMBER 5998-01-463-9077

PART NUMBER 9907-351

USED ON WHEC 378 MAIN GAS TURBINE WOODWARD FUEL CONTROL

Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.

OVERHAUL REQUIREMENTS:

The WOODWARD LQ25 LIQUID FUEL VALVE shall be disassembled, inspected, repaired/overhauled, reassembled, calibrated and tested in accordance with WOODWARD GOVERNOR COMPANY standard repair/overhaul procedures. All replacement/overhaul parts shall be new and manufactured in accordance with WOODWARD GOVERNOR COMPANY, the Original Equipment Manufacturer (OEM) standards and specifications. After completion of the repair/overhaul, the contractor shall perform standard production tests to assure maximum design performance. The contractor shall provide certifications of successful standard production tests. One certification shall be placed in the box with each unit and a copy for each unit shall be forwarded to the Coast Guard Contracting Officer.

WARRANTY:

X A. Standard Manufacturer's Warranty

B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.

Contractor must guarantee item against defects that lead to failure for days after installation for a period of up to two (2) years after delivery to Coast Guard.

GOVERNMENT ACCEPTANCE:

Acceptance will be made at destination by a Government representative.

Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.

SHELF LIFE CD 0

FOR OFFICIAL USE ONLY

PACKAGING AND MARKING FOR SHIPMENT:

X A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:

NATIONAL STOCK NUMBER

ITEM NAME

PART NUMBER

GOVERNMENT ORDER NUMBER

5998-01-463-9077

LQ25 LIQUID FUEL VALVE

9907-351

PRESERVATION / PACKAGING:

X A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.

B. See Attachments

B. See Attachments

And the words: "Coast Guard SFLC Material, Condition "A"

File details come from the government source that posted it. Updated .