MUNRO_SOW_Bridge_Wing_Grating.docx

DOCX document 1 MB Posted

Attached to
BRIDGE WING GRATING INSTALLATION Federal contract opportunity
Solicitation number
70Z08519DMN12800
Issued by
Department of Homeland Security US Coast Guard

About this file

STATMENT OF WORK, SOW deck grating material changed from metal to fiberglass.

View the file

Other files for this federal contract opportunity

Other files attached to BRIDGE WING GRATING INSTALLATION, newest first.
File Type Posted
MUNRO_SOW_Bridge_Wing_Grating.docx DOCX document
Solicitation_Combined_Synopsis_Bridge_Wing_Deck_Grating_Installation.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications for Grating Instillation aboard USCGC MUNRO

1. SCOPE

This project is to install grating on MUNRO’s bridge wings to elevate the height of the deck.

Government Furnished Property: NONE

2. REFERENCES

Provided Photographs: (1, 2) Current MUNRO bridge wings

(3) Example grating image from CGC BERTHOLF (WMSL 750) Provided Drawing: (4, 5) Bridge wing measurements

3. REQUIREMENTS The Contractor shall provide all labor and material to accomplish the following in accordance with the general requirements:

3.1 SECURITY CONSIDERATIONS – USCG Base Alameda and USCGC MUNRO are United States government facilities. All personnel accessing the facility are subject to all United States federal laws. Facilities may enforce a personnel and vehicle identification or search to ensure compliance with United States Coast Guard security and facility safety requirements. Contractors must be in possession at all times of their current Federal/State issued photo identification. Access to Base Alameda requires Government Identification that complies with the Real ID Act of 2005. Any vehicle entering the facility must have current registration and insurance with the vehicle. Contractors with active warrants for arrest are not permitted to enter the facility. Firearms are not permitted on the facility.

3.1.1 Place of Performance:

USCGC MUNRO (WMSL 755)

Coast Guard Island Alameda, CA 94501

(510) 437-5757

3.2 TIMELINE – Commence work within 10 calendar days of notification of award and complete work no later than 15 October 2019. Normal working hours for this project are from 8:00 am until 4:00 pm, daily.

3.3 GENERAL – The concerned work areas are listed in the Table 3.1.A. See the photographs and bridge wing measurements referenced above for the general arrangement of the work areas.

3.4 GRATING INSTALLATION

3.4.1 Provide a bid price to procure metal grating, paint, and non-skid, fabricate fiberglass grating and frame, remove all non-skid and paint to bare metal (where necessary), weld fiberglass frame in place, prime and paint deck, and install fiberglass grating on each of the spaces identified in table 3.1.A.

Compartment Name
Compartment No.
Length (approx.)
Width (approx.)
Height (approx.)
Port Bridge Wing
03-31-2
104 in
68 in
6 3/8 in
Starboard Bridge Wing
03-31-1
104 in
68 in
6 3/8 in

Table 3.1.A

NOTE: Measurements are estimates for materials required. Actual measurements should be calculated by contractor via visual inspection.

3.4.2 Grating shall be modular in nature so that the legs are welded to the deck, but the grating can be removed from the legs. This is to accommodate necessary maintenance to the deck.

3.4.3 Grating shall be made out of fiberglass.

3.4.4 The grating extending from pilot house to edge of the bridge wing will be the same height as the lower step that is currently installed.

3.4.5 Vendor is responsible for ensuring the grating is installed onboard USCGC MUNRO’s bridge wings.

3.4.6 Vendor is responsible for delivery to Coast Guard Island in Alameda, CA.

3.4.7 Vendor is responsible for the removal of non-skid and paint prior to installation.

3.4.8 Vendor is responsible for the installation and welding of fiberglass frame and grating.

3.4.9 Grating shall extend from the forward edge of the alidade to the marine location marker (smoke float). See provided drawings (4, 5).

3.4.10 Vendor is responsible for priming and painting the deck below the grating after instillation. No non-skid will be placed below grating after installation.

3.4.11 Grating shall be removable for future maintenance necessary to the deck below.

3.4.12 ENS Michelle McGill (michelle.m.mcgill@uscg.mil) and/or LTJG Chris Weber (christopher.m.weber@uscg.mil) will supervise all contracted work.

3.5 COMPARTMENT RESTORATION

3.5.1 Restore all work areas to a clean condition upon completion of installation.

(1) (2)

(3)

(4)

(5) image3.jpeg image4.PNG image5.PNG image1.jpeg image2.jpeg

File details come from the government source that posted it.