Wastewater_testing_and_analysis_SOW_Final_FY20.docx
DOCX document 61 KB Posted
- Attached to
- Waste water Sampling & analysis Federal contract opportunity
- Solicitation number
- 70Z0819QPE7000
About this file
Scope of work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF18_70Z0819QPE7000.pdf | ||
| Wage_rates_70Z0819QPE7000_waste_water_sampling.pdf | ||
| FAR_Clauses__Provisions_Services.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work & Specifications
Wastewater Testing and Analysis FY20
Located at U.S. Coast Guard Base Elizabeth City, N.C.
July 2019
Commanding Officer United States Coast Guard Base Elizabeth City Facilities Engineering Department Elizabeth City, NC 27909
Chris Dunn (Environmental Protection Specialist) Wastewater Permit Manager Facilities Engineering Department Environmental Compliance Office Building 62
1) SCOPE: The Contractor shall provide all supervision, trained labor, transportation, equipment and materials to perform sampling, lab analysis and provide reports, for all samples taken at Building 29 Lift Station Pipe 002 in accordance with the 2017 Elizabeth City Wastewater Permit # 0001 [Ref. (a)] here to for referred to as Permit # 0001 or Ref. (a).
2) GOVERNMENT FACILITIES AND UTILITIES: Telephone, Restroom facilities, Electrical power and water is available on the site. The Contractor will be permitted to utilize these utilities in performing the work, provided that the existing systems are not overloaded.
3) MATERIALS AND LOCATIONS: The Contractor will furnish all materials, equipment, instruments, tools and other items necessary for accomplishment of these services.
4) SCHEDULE OF WORK: The Contractor shall perform all work during Core Base working hours; Monday – Friday, 0800-1600 unless otherwise agreed to in advance by the Environmental Protection Specialist and the Contracting Officers Representative (COR). The initial report will be required by December 22, 2019.
5) EXISTING CONDITIONS: The contractor is expected to satisfy himself as to the existing conditions and the work to be performed and shall verify all dimensions and equipment data prior to ordering materials and commencement of work. Any site visit will be arranged by the Contracting Officers Representative (COR) and the Environmental Protection Specialist (EPS). The Contractor shall wear the appropriate personal protective equipment (PPE) when visiting the site in accordance with OSHA, State, and Federal regulations.
6) LIABILITY OF CONTRACTOR: Any damage to government property caused by the contractor shall be repaired or replaced by the contractor at no cost to the government. The contractor shall not disconnect any service without approval from the Contracting Officers Representative (COR).
7) INSPECTION AND ACCEPTANCE: The Contracting Officers Representative (COR) and the Environmental Protection Specialist (EPS) will accomplish inspection and acceptance of all work performed.
8) LABOR LAWS: The Davis-Bacon Act applies to the procurement.
9) SAFETY: The Contractor is wholly responsible for work site safety. The Contractor shall implement a safety program that protects the lives and health of personnel in the service area, prevents damage to property, and avoids work interruptions. To accomplish this end, the Contractor shall provide appropriate safety barricades, signs, signal lights, etc. as well as complying with the requirements of all Federal, State and Local safety laws, rules and regulations as applicable.
10) SITE RESTORATION & CLEAN UP: The work site shall be cleaned up at the completion of each work day. Upon completion of the job, the Contractor shall clean up the job site, returning it to a state of cleanliness equal to or exceeding that in which it was found. The Contractor shall properly dispose of any trash, extra materials, dirt, debris, or other litter that remains.
11) GOVERNMENT FACILITIES AND REGULATIONS: The Contractor, their employees, and any sub-contractors shall become familiar with and obey all Base regulations. All personnel employed on the project shall keep within the limits of the work area, and shall not enter any other area outside of the work site unless to do so in the performance of their duties. There shall be No Smoking in any Government Building. All smoking must be done in the designated smoking area.
12) CONTRACT TIMELINE: The Contractor shall complete all work within a schedule agreeable to both the Contracting Officers Representative and the Environmental Protection Specialist.
13) SUBMITTALS: Once awarded, the following list of submittals required for approval defines the specific minimum requirements for this contract. The submittal shall contain sufficient information that can be used to determine compliance of the service with these specifications and referenced specifications.
a) Certification of Laboratory as defined by the permit.
b) Detailed schedule of work.
c) Twelve month Security Request Form filled out and submitted to Chris Dunn @ chris.a.dunn@uscg.mil.
14) TECHNICAL REQUIREMENTS:
General: The Contractor shall provide sampling, analysis, transportation, training requirements, and reporting of results of wastewater analysis at Building 29 of the U.S. Coast Guard Base Elizabeth City, Elizabeth City, NC. Sampling and analysis shall be comply with Local Wastewater Discharge Permit 0001 issued by the City of Elizabeth City, North Carolina as well as the Federal Clean Water Act and any State overarching regulatory requirements.
a) All equipment, sampling, storage, transportation, training, preparations and analyses shall be conducted in accordance with Federal EPA testing procedures, 40 CFR Part 136 and protocols governing the testing of wastewater for Publicity Owned Treatment Works (POTW). The technicians and chemists responsible for setting up, taking, and analyzing the samples shall be familiar with the above referenced procedures and protocols to insure that accurate and reproducible results are obtained. A chain of custody shall be kept on all samples with a copy being part of the report. The laboratory doing the analysis shall hold a current certification to test Industrial and POTW wastewater under the Clean Water Act by the Division of Environmental Management, Laboratory Section, North Carolina Department of Environment and Natural Resources. A copy of that certification shall be provided to the Coast Guard prior to contract award.
b) Composite samples shall be taken from Building 29 once per six months for BOD and TSS; at the same time flow will also be recorded. Monthly Composite samples will be collected for Total Kjeldal Nitrogen (TKN), and potentially Cyanide, Copper, Ph and Chromium, if added to permit upon the 2019 Renewal. Grab samples will be taken annually in January for Priority Pollutant Analysis, including flow. This sampling criteria must be performed as described in Part 1 Section F, pg. 5 and 6 of Permit # 0001 [Ref. (a)]. For the purposes of this Scope of Work, composite and grab samples are defined in Part I, G 1, 2 and 4 on pg. 7 of the attached Wastewater Discharge Permit # 0001.
c) Depending on exceedances this contract should include (3) additional composite sampling events IAW section (b) above. However if the government can reasonably prove the sample was mishandled or lab analysis was inaccurate/inconclusive/botched or taken with faulty equipment or wrongful set-up of equipment, or transported improperly or tainted with foreign contaminates or mishandled, the resampling/analysis/report etc. will occur at no additional cost to the government.
d) Testing Procedures for the analysis of pollutants shall be performed in accordance with the techniques prescribed in 40 CFR part 136 and amendments thereto unless specified otherwise in the monitoring conditions of the permit.
e) Composite samples must be drawn over a 24-hour period by use of a calibrated sample pump in accordance with Part 1 G 2 pg. 7 of Permit # 0001 [Ref. (a)].
f) The results of the sampling and analysis shall be emailed to the Base Elizabeth City Environmental Compliance Office (ECO), Wastewater Permit Manager “Confidential” no later than 15 working days after the completion of the sampling event. The initial report will be required by December 22, 2019. The report shall contain the analytical results for each sample location, detection limits, EPA analytical method used, lab quality control information, chain of custody, concentration limits listed in Permit # 0001 [Ref. (a)]and any other pertinent information concerning the sampling and analysis of each sample. The results shall be reported as milligrams per liter (mg/l) when concentration is reported and in all other cases in the standard unit of measurement. The test report is to be emailed “Confidential” to:
Chris Dunn Wastewater Permit Manager (chris.a.dunn@uscg.mil)
g) The contractor shall coordinate sampling and security clearance via Ref. (b) with the Environmental Compliance Office (ECO), Wastewater Permit Manager,Chris Dunn @ (252) 267-9789 as early as possible, prior to visiting the site for the purpose of setting up equipment or taking samples. This notification shall occur at least 7 calendar days prior to sampling. No testing equipment shall be installed or samples taken until the Contractor's Representative has coordinated with Chris Dunn at the Environmental Compliance Office Base Elizabeth City, Building 62.
15) EXECUTION: Inspection, sampling and analysis as well as site preparation and cleanup shall be in accordance with appropriate sections of 29 CFR 1910, 1926.
Ref. (a) Base Elizabeth City Wastewater Permit # 0001
(b) Base Elizabeth City Security Access Request Form image1.png