This Overhaul Description document details requirements for overhauling a power supply for the Coast Guard's SeaWatch system. The specific item is a power supply with stock number 6130-01-615-0193 and part number UPS1-2.4K-1G-SRNDTI-F2E, used on 270 and 210 SeaWatch systems. The overhaul requirements include inspection, repair, testing, and packaging according to SFLC R-400-299 rev M specification for electronics equipment repair.
Key requirements include individual wooden box packaging, preservation for two years minimum, and a warranty covering defects for up to two years after delivery. The document lists three recommended repair sources: Clary Corporation, United States Technologies, and Nova Power Solutions. The cost estimate for the overhaul is set at not to exceed $2,650.01, and government acceptance will be made at destination by a representative verifying no transit damage and compliance with packaging and marking requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 52.212-3 01 OCT 25.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OVERHAUL DESCRIPTION
FOR OFFICIAL USE ONLY
ITEM NAME POWER SUPPLY
STOCK NUMBER 6130-01-615-0193
PART NUMBER UPS1-2.4K-1G-SRNDTI-F2E
USED ON 270 AND 210 SEAWATCH SYSYTEM
Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.
OVERHAUL REQUIREMENTS:
Inspect, Repair, test and package IAW SFLC R-400-299 rev M Spec for repair of Electronics Equipment and Modules
WARRANTY:
X A. Standard Manufacturer's Warranty
B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.
Contractor must guarantee item against defects that lead to failure for days after installation for a period of up to two (2) years after delivery to Coast Guard.
GOVERNMENT ACCEPTANCE:
Acceptance will be made at destination by a Government representative.
Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.
SHELF LIFE CD 9
FOR OFFICIAL USE ONLY
PACKAGING AND MARKING FOR SHIPMENT:
X
A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:
NATIONAL STOCK NUMBER
ITEM NAME
PART NUMBER
GOVERNMENT ORDER NUMBER
6130-01-615-0193
POWER SUPPLY
UPS1-2.4K-1G-SRNDTI-F2E
PRESERVATION / PACKAGING:
X A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.
B. See Attachments
B. See Attachments
And the words: "Coast Guard SFLC Material, Condition "A"
RECOMMENDED SOURCES:
CLARY CORPORATION
150 E HUNTINGTON DR.
MONROVIA, CA. 91016
POC: CINDI GRIFFITH ***REPAIR CENTER***
(800) 442-5279, (626)-359-4486 EXT 226
UNITED STATES TECHNOLOGIES
1701 POLLITT DR
FAIR LAWN NJ 07410
(800)234-0862 EXT 276
WWW.USTECHNOLOGIES.COM
NOVA POWER SOLUTIONS,INC
21515 RIDGETOP CIRCLE SUITE 210
STERLING, VA 20166
POC: JUSTIN PALMER
O: 703-581-6862 C: 703-298-7122
WRITTEN BY:
DATE :
SEATON WOODY
16 DEC 25
Cost Estimate for Overhaul NOT TO EXCEED: $2,650.01