This is an amendment (SF30 form) to solicitation 70Z08025QMECP0008 for the Coast Guard Cutter VENTUROUS DS2 FY25 project, providing answers to seven vendor questions about technical specifications and requirements. The amendment clarifies details about piping renewal (9' on main deck and 3' into berthing area), confirms valve replacements are required, specifies that the deck connection riser must be cropped and renewed, and confirms requirements regarding the gooseneck renewal and chain stopper foundation work.

The closing date for the solicitation remains January 20, 2025 at 3:00 PM EST. The amendment is dated January 15, 2025, and includes confirmation that additional work beyond the specified requirements can be captured through NCWR, CFR, and CR processes if time permits. The contracting agency is the U.S. Coast Guard, and this amendment does not require contractor signature.

View the file

Other files for this federal contract opportunity

Other files attached to CGC VENTUROUS DS2 FY25, newest first.
File Type Posted
Speification.pdf PDF
Schedule of Prices.xls XLS spreadsheet
70Z08025QMECP0008_VENTUROUS FY25 DS2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

70Z08025QMECP00080001

Summary of Changes This Amendment answers vendor's questions:

Q#1: RFC1, Work Item 21: Para. 3.4 does not specify the quantity/extent of piping to be renewed. Will USG clarify how much piping shall be renewed and how far into the below berthing area the renewal shall be performed?

A#1: 9' piping renewed on main deck and 3' into the below berthing area.

Q#2: RFC2, Work Item 16: Due to conditions observed at ship check, will USG confirm that any repairs necessary to conduct the specified weight test will be authorized via Change Request Authorization?

A#2: Confirm, system is not operational therefore cannot be op-tested until repaired.

Q#3: RFC3, Work Item 23: Para. 3.3 directs KTR to renew piping, flanges and hardware. Is KTR required to replace valves?

A#3: Confirm KTR is required to replace valves.

Q#4: RFC4, Work Item 23: Table 1 directs replacement of the handwheel for the stbd riser. Is the handwheel the only component that requires replacement for the port or stbd lube oil risers?

A#4: No, the deck connection riser must be cropped and renewed, and valve replaced.

Q#5: RFC5, Work Item 23: Regarding Para. 3.3, is KTR required to renew the entire gooseneck, including the bell?

A#5: Confirm

Q#6: RFC7, Work Item 24: Para 3.2.1 requires KTR to renew structural supports for the port and stbd hawse pipes using 625-WMEC-186-005 Section 4-A as guidance. Will USG confirm this only includes the chain stopper foundation found in Section 4-A (DWG find D9)?

A#6: Yes, KTR can access the mast using approved climbing harness.

Q#7: From Our Spec 3.2.1 "The Contractor must crop and renew degraded structural support for the port and starboard Hawse pipes as designated by the Coast Guard Inspector using Coast Guard Drawing 625 WMEC 186-005 Section 4-A as guidance."

A#7: Yes, this only includes Chain Stopper Foundation, if additional work is noted we can capture with NCWR, CFR, and CR time permitting.

The closing date for 70Z08025QMECP0008 solicitation remains 20 January 2025 3:00PM EST.

Other terms and conditions remain unchanged.

Text52:
Text54: 1
TOTAL_NO_OF_PAGES: 2
CUST_PROJ_CODE:
DOCUMENT_NUMBER: 70Z08025QMECP00080001
EFFECTIVE_DATE: 2025-01-15T10:39:37.000-05:00
REF_PR_NUM_T: 52000PR250001545
SOL_DOCUMENT_NUMBER: 70Z08025QMECP0008
SOL_OPEN_BID_DATE: 2024-12-23T12:36:51.000-05:00
NO_OF_COPIES: 1
Check Box91: Yes
Check Box92: Off
MANUAL_EXTEND_FLAG: N
Check Box95: Yes
Check Box96: Off
Check Box97: Off
Check Box98: Off
Check Box99: Off
Check Box100: Off
Check Box101: Off
Text1: AMENDMENT CONTROL NUMBER :
HDR_DOCUMENT_NUMBER: 70Z08025QMECP0008
Text134: SUMMARY OF CHANGES :
AMENDMENT_DESCRIPTION: AMEND-See Schedule
Text2: Same As Issuing Office
AMD_ISSUING_OFFICE_LADDR:
AMD_ISSUING_OFFICE_LOCCODE:
Kaity George
2025-01-15T12:04:04-0500

File details come from the government source that posted it. Updated .