cv218 OD.pdf

PDF 16 KB Posted

Attached to
OIR PUMP, CENTRIFUGAL Federal contract opportunity
Solicitation number
70Z08024QCV218
Issued by
Department of Homeland Security US Coast Guard

About this file

This document is a solicitation for the overhaul, repair, and delivery of a centrifugal pump for the U.S. Coast Guard. The Coast Guard is seeking quotes for overhauling 6 pumps with part number 998-1110-D-27. The contractor must disassemble, inspect, and provide a detailed report and repair plan, which must be approved by the Contracting Officer prior to commencing work. The overhaul is intended to restore the pumps to "serviceable A condition" as defined in the requirements. The contractor must use new OEM parts, perform standard production tests, and provide preservation, packaging, and marking per the specifications. The estimated cost of a new pump is $29,500, while the estimated cost for repairs is $18,292.50. Award will be made to the lowest priced, technically acceptable offeror. Quotes are due by April 26, 2024.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OVERHAUL DESCRIPTION

FOR OFFICIAL USE ONLY

ITEM NAME PUMP,CENTRIFUGAL

STOCK NUMBER 4320-01-604-2845

PART NUMBER 998-1110-D-27

USED ON 154' FAST RESPONSE CUTTER

Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.

OVERHAUL REQUIREMENTS:

ITEM NAME : Pump, Centrifugal

STOCK NO. : 4320-01-604-2845

PART NUMBER : 998-1110-D-27

ITEM USE : Sea Water Circulation 154' WPB Vessels

PRELIMINARY INSPECTION REQUIREMENTS

The Contractor shall disassemble, clean and inspect the Pump, Centrifugal to obtain the overall condition and determine the estimated cost of overhaul. A detailed report and repair plan including material, labor rate, labor hours, overhaul, testing, preservation, packaging, packing, marking, bar-coding and crate repair or replacement costs shall be submitted to the Coast Guard Contracting Officer for approval. Overhaul is intended to restore the Pump, Centrifugal to a condition that is equal to that of a new Pump, Centrifugal as listed above. No further work shall be accomplished until the report is approved in writing by the Coast Guard Contracting Officer.

The inspection report and repair plan shall consist of, as a minimum, the following information:

1. Name of Contractor

2. Date of Inspection

3. Identification of Pump, Centrifugal by serial number, part number and stock number.

4. Condition of shipping crate and any cost of repair or replacement.

5. A list of parts and materials recommended for replacement with individual pricing.

6. Cost of overhaul labor broke down by number of hours and hourly rate.

7. Comments if any pertaining to unusual observations during inspection and disassembly.

OVERHAUL REQUIREMENTS

Overhaul - The Pump, Centrifugal shall be overhauled to a serviceable "A" condition, which shall restore the operating, coating and performance characteristics to the "original" design and technical specifications as listed above. Overhaul shall be performed in accordance with Original Equipment Manufacturer (OEM) specifications and standards.

*** Serviceable "A" condition is defined as a reconditioned Pump, Centrifugal meeting all required design specifications and design dimensions in accordance with the OEM and being capable of functioning and performing in the same manner as an identical new Pump, Centrifugal although it may not have the appearance of a new Pump, Centrifugal. ***

Replacement Parts - All replacement parts used for this requirement shall be new OEM parts. Reclaimed, recycled or aftermarket parts are not acceptable and shall not be used. The overhaul facility or any sub-contractors shall not manufacture parts to be used on overhauled assemblies without permission from the Contracting Officer. Parts not normally manufactured by the OEM such as nuts, bolts, o-rings, seals, gaskets etc. shall be equal to the quality of such parts originally installed by the OEM, but are not required to be supplied by the OEM.

Testing - Following completion of overhaul, the Contractor shall perform standard production tests and inspections to assure maximum design performance in accordance with OEM drawings and specifications. The Contractor shall provide certifications of successful standard production tests and inspections. One certification shall be placed in the box with each unit and a copy of each certification shall be forwarded to the Coast Guard Contracting Officer.

Coating - Contractor shall remove all old paint, clean and prepare surfaces for coating IAW coating manufacturer requirements. Contractor shall use a suitable primer compatible with final coating. Primer thickness and application shall be IAW primer manufacturer instructions and OEM specifications. Color of finish coat shall be the same as originally coated when new. Any changes to color shall be approved by the Contracting Officer.

Calibration - Contractor shall have a tool calibration program. All measuring devices, test equipment and attached gages shall be calibrated and have a current calibration sticker attached. Calibration shall be traceable to National standards.

Assembly - The Pump, Centrifugal shall be delivered to the Coast Guard completely assembled and ready for installation.

Warranty - The standard manufacturer warranty applies to this requirement.

PRESERVATION, PACKAGING, PACKING, MARKING AND BAR-CODING

Preservation - The Pump, Centrifugal is being overhauled for system stock and will not be installed immediately. The Contractor shall use an appropriate preservative as necessary to preserve all uncoated surfaces to prevent rust or corrosion for a minimum of two years. All openings shall be closed or plugged to prevent debris from entering.

Packaging and Packing - Each Pump, Centrifugal shall be packaged individually in a sealed clear plastic bag tie wrapped closed in appropriately sized ASTM- D6251 Type III, Class 1 Wood-Cleated Panel-board Shipping Box or ASTM-D6880 Class 2 Heavy Duty screwed Wooden Box. Each Pump, Centrifugal shall be secured to the skid mounted crate or packed in such a way to prevent any movement and damage. A five gram minimum amount of desiccant shall be added inside the plastic bag before sealing.

Marking - Marking IAW MIL-STD-129R except bar coded IAW ISO/IEC-16388-2007, Code 39 Symbology. The marking described herein shall be placed on the longest two sides of each box (on opposite ends).

NOTE: ALL PREVIOUS MARKINGS AND / OR QUALITY ASSURANCE DECALS SHALL BE

COMPLETELY REMOVED FROM THE REUSABLE SHIPPING CONTAINER PRIOR TO THE

APPLICATION OF ANY NEW MARKINGS.

SHELF LIFE CD 0

ITEM NAME : Pump, Centrifugal

STOCK NO. : 4320-01-604-2845

PART NUMBER : 998-1110-D-27

ITEM USE : Sea Water Circulation 154' WPB Vessels

PRELIMINARY INSPECTION REQUIREMENTS

The Contractor shall disassemble, clean and inspect the Pump, Centrifugal to obtain the overall condition and determine the estimated cost of overhaul. A detailed report and repair plan including material, labor rate, labor hours, overhaul, testing, preservation, packaging, packing, marking, bar-coding and crate repair or replacement costs shall be submitted to the Coast Guard Contracting Officer for approval. Overhaul is intended to restore the Pump, Centrifugal to a condition that is equal to that of a new Pump, Centrifugal as listed above. No further work shall be accomplished until the report is approved in writing by the Coast Guard Contracting Officer.

The inspection report and repair plan shall consist of, as a minimum, the following information:

1. Name of Contractor

2. Date of Inspection

3. Identification of Pump, Centrifugal by serial number, part number and stock number.

4. Condition of shipping crate and any cost of repair or replacement.

5. A list of parts and materials recommended for replacement with individual pricing.

6. Cost of overhaul labor broke down by number of hours and hourly rate.

7. Comments if any pertaining to unusual observations during inspection and disassembly.

OVERHAUL REQUIREMENTS

Overhaul - The Pump, Centrifugal shall be overhauled to a serviceable "A" condition, which shall restore the operating, coating and performance characteristics to the "original" design and technical specifications as listed above. Overhaul shall be performed in accordance with Original Equipment Manufacturer (OEM) specifications and standards.

*** Serviceable "A" condition is defined as a reconditioned Pump, Centrifugal meeting all required design specifications and design dimensions in accordance with the OEM and being capable of functioning and performing in the same manner as an identical new Pump, Centrifugal although it may not have the appearance of a new Pump, Centrifugal. ***

Replacement Parts - All replacement parts used for this requirement shall be new OEM parts. Reclaimed, recycled or aftermarket parts are not acceptable and shall not be used. The overhaul facility or any sub-contractors shall not manufacture parts to be used on overhauled assemblies without permission from the Contracting Officer. Parts not normally manufactured by the OEM such as nuts, bolts, o-rings, seals, gaskets etc. shall be equal to the quality of such parts originally installed by the OEM, but are not required to be supplied by the OEM.

Testing - Following completion of overhaul, the Contractor shall perform standard production tests and inspections to assure maximum design performance in accordance with OEM drawings and specifications. The Contractor shall provide certifications of successful standard production tests and inspections. One certification shall be placed in the box with each unit and a copy of each certification shall be forwarded to the Coast Guard Contracting Officer.

Coating - Contractor shall remove all old paint, clean and prepare surfaces for coating IAW coating manufacturer requirements. Contractor shall use a suitable primer compatible with final coating. Primer thickness and application shall be IAW primer manufacturer instructions and OEM specifications. Color of finish coat shall be the same as originally coated when new. Any changes to color shall be approved by the Contracting Officer.

Calibration - Contractor shall have a tool calibration program. All measuring devices, test equipment and attached gages shall be calibrated and have a current calibration sticker attached. Calibration shall be traceable to National standards.

Assembly - The Pump, Centrifugal shall be delivered to the Coast Guard completely assembled and ready for installation.

Warranty - The standard manufacturer warranty applies to this requirement.

PRESERVATION, PACKAGING, PACKING, MARKING AND BAR-CODING

Preservation - The Pump, Centrifugal is being overhauled for system stock and will not be installed immediately. The Contractor shall use an appropriate preservative as necessary to preserve all uncoated surfaces to prevent rust or corrosion for a minimum of two years. All openings shall be closed or plugged to prevent debris from entering.

Packaging and Packing - Each Pump, Centrifugal shall be packaged individually in a sealed clear plastic bag tie wrapped closed in appropriately sized ASTM- D6251 Type III, Class 1 Wood-Cleated Panel-board Shipping Box or ASTM-D6880 Class 2 Heavy Duty screwed Wooden Box. Each Pump, Centrifugal shall be secured to the skid mounted crate or packed in such a way to prevent any movement and damage. A five gram minimum amount of desiccant shall be added inside the plastic bag before sealing.

Marking - Marking IAW MIL-STD-129R except bar coded IAW ISO/IEC-16388-2007, Code 39 Symbology. The marking described herein shall be placed on the longest two sides of each box (on opposite ends).

NOTE: ALL PREVIOUS MARKINGS AND / OR QUALITY ASSURANCE DECALS SHALL BE

COMPLETELY REMOVED FROM THE REUSABLE SHIPPING CONTAINER PRIOR TO THE

APPLICATION OF ANY NEW MARKINGS.

NATIONAL STOCK NUMBER: NSN: 4320-01-604-2845

ITEM NAME: PUMP, CENTRIFUGAL

PART NUMBER: 998-1110-D-27

CONTRACT NUMBER: SEE CONTRACT

SERIAL NUMBER: CONTRACTOR PROVIDE

SHIPPING WEIGHT: CONTRACTOR PROVIDE

THE FOLLOWING STATEMENT: COAST GUARD SFLC MATERIAL

CONDITION "A", 1 EA

Coast Guard Acceptance - Acceptance will be made at destination by a government representative. Acceptance will be contingent upon representative's verification of no damage in transit, correctness and completeness of order and Contractor's conformance to preservation, packaging, packing, marking and bar-coding requirements.

RECOMMENDED REPAIR SOURCES

Carver Pump, Co. Inc.

2415 Park Avenue Muscatine, IA 52761-5691 563-262-7676

K&M Industrial, LLC 80 Delta Avenue Gladstone, MI 49837 906-420-8770

Estimated cost of a new Pump, Centrifugal - $29,500.00 Each Estimated OIR - $450.00 Each Estimated Cost for Repairs - $18,292.50 65% Cost of New - $19,175.00

NATIONAL STOCK NUMBER: NSN: 4320-01-604-2845

ITEM NAME: PUMP, CENTRIFUGAL

PART NUMBER: 998-1110-D-27

CONTRACT NUMBER: SEE CONTRACT

SERIAL NUMBER: CONTRACTOR PROVIDE

SHIPPING WEIGHT: CONTRACTOR PROVIDE

THE FOLLOWING STATEMENT: COAST GUARD SFLC MATERIAL

CONDITION "A", 1 EA

Coast Guard Acceptance - Acceptance will be made at destination by a government representative. Acceptance will be contingent upon representative's verification of no damage in transit, correctness and completeness of order and Contractor's conformance to preservation, packaging, packing, marking and bar-coding requirements.

RECOMMENDED REPAIR SOURCES

Carver Pump, Co. Inc.

2415 Park Avenue Muscatine, IA 52761-5691 563-262-7676

K&M Industrial, LLC 80 Delta Avenue Gladstone, MI 49837 906-420-8770

Estimated cost of a new Pump, Centrifugal - $29,500.00 Each Estimated OIR - $450.00 Each Estimated Cost for Repairs - $18,292.50 65% Cost of New - $19,175.00

WARRANTY:

X A. Standard Manufacturer's Warranty

B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.

Contractor must guarantee item against defects that lead to failure for days after installation for a period of up to two (2) years after delivery to Coast Guard.

GOVERNMENT ACCEPTANCE:

Acceptance will be made at destination by a Government representative.

Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.

PACKAGING AND MARKING FOR SHIPMENT:

A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:

NATIONAL STOCK NUMBER

ITEM NAME

PART NUMBER

GOVERNMENT ORDER NUMBER

4320-01-604-2845

PUMP,CENTRIFUGAL

998-1110-D-27

PRESERVATION / PACKAGING:

A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.

B. See Attachments

B. See Attachments

And the words: "Coast Guard SFLC Material, Condition "A"

RECOMMENDED SOURCES:

CARVER PUMP CO, INC

2415 PARK AVE

MUSCATINE, IA. 52761-5691

PHONE: 563-262-7676

(563) 499-1952

K & M INDUSTRIAL LLC

80 DELTA AVENUE

GLADSTONE, MI 49837

CAGE: 5EHF6

CHRISTINE@KMINDUSA.COM

906-280-4951

WRITTEN BY:

DATE :

WAYNE NICKEL

15 APR 24

Cost Estimate for Overhaul NOT TO EXCEED: $18,910.5

File details come from the government source that posted it. Updated .