ESCANABA DS Specification.pdf
PDF 2 MB Posted
- Attached to
- Dock-Side (DS): USCGC ESCANABA availability Federal contract opportunity
- Solicitation number
- 70Z080-21-Q-P4546600
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 00001.doc | DOC document | |
| Schedule B.xls | XLS spreadsheet | |
| RFQ Escanaba Dockside .pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC ESCANABA (WMEC 907)
SPECIFICATION FOR AVIATION AVAILABILITY
FY2021
Developed By: Cedricka M Dalton
(Rev-0, 18 September 2020)
USCGC ESCANABA (WMEC-270B) DOCKSIDE AVAILABILITY FY2021
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ................................................................................. vi Consolidated List of Critical Inspection Items ........................................................................................... vii Principal Characteristics ............................................................................................................................ viii General Requirements WORK ITEM 1: 28 Volt DC Helo Power Supply, Load Test WORK ITEM 2: Windspeed Transmitter (Anemometer), Renew WORK ITEM 3: Flow Meter (Aviation Fuel), Calibrate WORK ITEM 4: Decks, Helicopter Operating Areas, Preserve WORK ITEM 5: Helo Hangar Detacouple, Renew WORK ITEM 6: 400 Hz Power Supply, Load Test WORK ITEM 7: Helo Talon Grids, Inspect And Test iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE: All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 901 WMEC 314-005, Rev B, 28.5 VDC Hlcptr Start Rect Replacement Diagram
Coast Guard Drawing 901 WMEC 314-006, Rev C, 400 Hz Hlcptr Svce Freqconv Installation Diagram
Coast Guard Drawing 901 WMEC 431-003, Rev G, Main IC Switchboard Arrangements, Elem Wrg Diag
& Dets
Coast Guard Drawing 905 WMEC 171-001, Rev F, Main Mast
Coast Guard Drawing 905 WMEC 186-003, Rev -, 270 Ft B WMEC Talon Grid Foundation & Structural
Mod 01 Level
Coast Guard Drawing 905 WMEC 494-001, Rev K, Meteorological System Block & Isometric W.D.
Coast Guard Drawing 905 WMEC 542-002, Rev H, JP-5 Sys - A&D
Coast Guard Drawing 905 WMEC 542-006, Rev A, JP-5 System Diagram
Coast Guard Drawing 905 WMEC 588-010, Rev D, Hangar Arr and Det
Coast Guard Drawing 905 WMEC 634-002, Rev -, 270 Ft B WMEC C & A, Pnt, Dk Cov & Insul Mod
Talon Grid Instl
Coast Guard Drawing 905 WMEC 801-004, Rev F, General Arrangement 01 Level
Coast Guard Drawing FL-588-003, Rev -, Talon Grid, Supporting Skirt & Cover Fabrication & Instl
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual
Coast Guard Technical Publication (TP) 3368, Jun 2020, Talon Helicopter Landing Grid - Type 18-22-01
Multiple Class Cutters
Coast Guard Technical Publication (TP) 4931, Aug 2009, Section 321A, Precision Frequency Converters
Coast Guard Technical Publication (TP) 5461, SWBS 421, Nov 2012, Anemometer – Model 120 & 122
Coast Guard Technical Publication (TP) 5486, Mar 2013, Go-No-Go Monitor and Flow Meter, 50 GPM
Coast Guard Technical Publication (TP) 7099, SWBS 314, Oct 2009, Rectifier Power Supply - 28 VDC, 300 A
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for
Fabrication, Welding, and Inspection of Submarine Structure
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and
Allied Processes v (Rev-0)
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2018, Shipboard
Electrical Cable Test
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
OTHER REFERENCES
ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component
Adhesives (AN)
MIL-PRF-16173, 2017, Corrosion Preventive Compound, Solvent Cutback, Cold-Application
MIL-PRF-24667, March 2018, Coating system, Non-Skid, for Roll, Spray, or Self-Adhering Application
Naval Air Warfare Center (NAVAIR) Drawing 621055, Rev F, Visual Landing Aids Installation WMEC-
270 Class Ships
QPL-24667, Aug 2019, Qualified Product List of Products Qualified under Performance
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal vi (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
2 Y Anemometer NSN: 6600-00-709-9947 2 ea. 5,316.00
7 N M16 Bolts NSN: 5305-01-393-1827 24 ea. 25.65
7 N M12 Bolts NSN: 5305-01-584-6095 12 ea. 33.75
7 N Locking Nut NSN: 5305-01-598-3243 1 ea. 492.88
7 N **Talon Grid
Stanchion Bolt
Assembly, Including
Locking Nut
NSN: 5340-01-481-3786 60 ea. 31.50
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
vii (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.1.4
(Inspection report particulars)):
Work
Item Title
7 Helo Talon Grids, Inspect And Test viii (Rev-0)
PRINCIPAL CHARACTERISTICS
270' WMEC (B-CLASS)
PHYSICAL
Length overall 270' 0"
Length between perpendiculars 255' 0"
Beam molded 38' 0"
Depth molded, main deck amidships, 01 level amidships
23' 7"
31' 4"
Full load displacement 1,886 long tons
Draft, full load to baseline amidships 14' 2"
Highest projection above baseline
*height approximated
≈ 110' 0"
Shore tie voltage requirements 2 cables, 400A / 450V, 3 phase
Frame spacing 1' 0"
MACHINERY
Main propulsion 2 ALCO Model 18-251-F Diesel Engines, 3,650 BHP each
Ship’s service generators 2 Caterpillar Model D-398-TA Diesel-driven KATO 6P6-1350 Generators. 475
KW each @ 0.8 power factor, 450VAC, 3 phase, 60 cycle
Emergency generators Caterpillar Model D-348-TA Diesel-driven KATO 4P4-1900. 475KW @ 0.8 power factor, 450VAC, 3 phase, 60 cycle
Number of propellers 2
Propeller diameter 9' 0"
Number of blades, each 4
Pitch Controllable
Shaft RPM 260
Shaft diameter 10.55" at exit of hull
Anchor & chain Two 4,000 lb Navy Stockless Anchors, 8 shots of chain each
TANK CAPACITIES
Diesel fuel total (95%) 79,950 gal.
JP-5 total (95%) 19,626 gal.
Potable water total (100%) 8,553 gal.
Hydraulic & lube oil total (95%) 2,561 gal.
1 (Rev-0)
00000_0220_FLT
REC_00000_FLT_Commercial Project @ CG Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for
Fabrication, Welding, and Inspection of Submarine Structure
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
2 (Rev-0)
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec
0000, in accomplishing the following task:
Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes
(provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.4.1 HY-130 material substitution. The Contractor shall be aware that HY-130 steel plating is no longer commercially available. For the purpose of performing flight deck repairs on US Coast Guard WMEC-270 “B-
Class” cutters, Weldox 900 steel plating has been approved as a replacement for HY-130. Due to the similarity in material properties and weldability of HY-130 and Weldox 900, all welding procedures and welder qualifications for welding Weldox 900 shall be the same as those outlined in NAVSEA TP 1688 as applicable for welding HY-
130.
3.4.2 Standard spec modification. For any welding involving HY-130 on the flight deck of WMEC-270 “B-Class” cutters, perform all welding and allied processes, and non-destructive testing/inspection (NDT/NDI) in accordance with NAVSEA TP 1688. The Contractor shall be aware that the welding requirements specified in this document take precedence over paragraph 3.3.6 of SFLC Standard Spec 0000 for the purpose of welding involving HY-130.
3.4.3 Approval to weld HY-130. To obtain Coast Guard approval to weld on HY-130 steel for WMEC-270 “B-
Class” cutters, the Contractor shall provide written Performance Qualification Records (PQR’s) for each process to be used. The PQR’s shall be approved by one of the regulatory agencies affirming that the WPS meets the welding requirements of NAVSEA TP 1688. In addition, the Contractor shall ensure that all subcontractors, prior to performing welding operations, have qualified procedures by meeting all the requirements set forth in this document.
3 (Rev-0)
NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in
NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding
Weldox 900 shall be considered the same as those for welding HY-130.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC
Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable
Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is Large Quantity
Generator (LQG).
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an
NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste
Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the
4 (Rev-0)
Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the
Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For
Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor shall be aware of the following:
3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the
Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast
Guard facility without COR or KO-approval.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. None.
3.7 SFLC Standard Specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2018 Edition Standard Specifications and supersede published content:
None.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
6 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK ITEM
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
7 (Rev-0)
QA-3A - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /
TIME
8 (Rev-0)
QA-3B - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading
(mils)
Mean Reading (mils) IAW ASTM DD4417).
9 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
10 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL #
WORK ITEM
COATING MFG PRODUCT NAME
BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If Magnetic
Pull-Off (Type I/Banana) Gauge Is
Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
1 AVG. BMR DEVIATION
1 AVG. BMR DEVIATION
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
11 (Rev-0)
31410_CJ_0320_210_270
REC_31410_210_270_270 WMEC ‘B’ Class (ALL) (0519)
WORK ITEM 1: 28 Volt DC Helo Power Supply, Load Test
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to load test the 28 Volt DC Helo
Power Supply.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 901 WMEC 314-005, Rev B, 28.5 VDC Hlcptr Start Rect Replacement
Diagram
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 7099, SWBS 314, Oct 2009, Rectifier Power Supply - 28
VDC, 300 A
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall refer to the Coast Guard drawing(s) listed under Section 2 (References) for guidance in accomplishing this work item.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
12 (Rev-0)
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.2 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.
3.3 Load test 28 VDC helo start rectifier. The Contractor shall load test the 28 VDC Helo Start Rectifier in accordance with the attached C.G. Yard Test Memorandum (see Section 4 below) and using Coast
Guard Drawing 627 WMEC 314-001 and TP 7099, as guidance. Submit CFR.
3.3.1 In the event the load test for the 28 VDC helo start rectifier fails, the Contractor shall troubleshoot and identify faulty component and submit CFR for repairs.
3.3.2 Once repairs are complete, the Contractor shall conduct load test in accordance with paragraph 3.3
(Load test 28 VDC helo start rectifier).
3.4 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.
3.5 Report. The Contractor shall submit a CFR for the completed test memorandum in Section 4.1 of this
WI.
4. NOTES
4.1 Test memorandum.
13 (Rev-0)
FIGURE 1. ENCLOSURE 1, PAGE 1 OF 2
14 (Rev-0)
FIGURE 2. ENCLOSURE 1, PAGE 2 OF 2
15 (Rev-0)
43700_0620_210_270
REC_43700_270B WMEC (0620)
WORK ITEM 2: Windspeed Transmitter (Anemometer), Renew
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew two wind speed transmitters.
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
Y Anemometer NSN: 6600-00-709-9947 2 ea. 5,316.00
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 901 WMEC 431-003, Rev G, Main IC Switchboard Arrangements, Elem
Wrg Diag & Dets
Coast Guard Drawing 905 WMEC 171-001, Rev F, Main Mast
Coast Guard Drawing 905 WMEC 494-001, Rev K, Meteorological System Block & Isometric
W.D.
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 5461, SWBS 421, Nov 2012, Anemometer – Model 120
& 122
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2018, Shipboard Electrical Cable Test
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General.
16 (Rev-0)
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec
0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
Height above the main deck.
Electrical wiring.
3.2 Wind speed transmitter renewal. The Contractor shall renew windspeed transmitters using the
Government-furnished anemometers listed above; turn over the removed anemometers to the Coast Guard
Property Administrator as MTI. Make all electrical and mechanical connections using Coast Guard
Drawings 905 WMEC 171-001, 901 WMEC 431-003, 905 WMEC 494-001 and TP 5461 as guidance.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.3 Operational test, post repairs. After completion of work and in the presence of the Coast Guard
Inspector, the Contractor shall thoroughly test and demonstrate the equipment listed below to be in satisfactory operating condition.
Anemometer
3.3.1 Perform continuity checks and insulation resistance measurements for the newly installed anemometer in accordance with SFLC Std Spec 3041.Submit a CFR.
This section is not applicable to this work item.
17 (Rev-0)
50400_0620_210_270
REC_50400_210_270_270’ WMEC ‘B’ Class (ALL) (0620)
WORK ITEM 3: Flow Meter (Aviation Fuel), Calibrate
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect and calibrate the instrumentation identified in Table 1.
TABLE 1 - INSTRUMENTATION
DESCRIPTION SYSTEM USE RATING
1 ½ inch Flow meter JP-5 Helicopter refueling 50 GPM
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 905 WMEC 542-002, Rev H, JP-5 Sys - A&D
Coast Guard Drawing 905 WMEC 542-006, Rev A, JP-5 System Diagram
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 5486, Mar 2013, Go-No-Go Monitor and Flow Meter, 50
GPM
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
18 (Rev-0)
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec
0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
Aviation fuel piping and contents
Fluid pressure.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment
3.2 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR
3.3 Instrument inspection and calibration. The Contractor shall remove, clean, inspect, calibrate and reinstall the instrumentation identified in Table 1 in accordance with the referenced Coast Guard TP in
Section 2 (References). The Contractor shall refer to the Coast Guard drawings listed in Section 2
(References) for guidance while accomplishing this work item.
3.3.1 Cleaning and inspection. The Contractor shall disassemble the flow meter sufficiently to expose the gears, rotors and metering chamber. Inspect and clean gear teeth, rotors and internal housing surfaces.
Submit a CFR. A soft wire brush may be used to clean surfaces, taking care not to alter the contour of the part surfaces. Remove nicks or burrs with a stone. Ensure all parts are clean and free of foreign matter prior to reassembly. Renew all disturbed seals, packing and gaskets.
3.3.2 Calibration. The Contractor shall test for meter accuracy prior to disassembly and cleaning; and again after reassembly. Submit a CFR for each accuracy test. The Contractor shall calibrate the meter using a certified calibration facility. The Contractor shall provide a certificate of calibration to the COR.
3.3.3 Renewal. The Contractor may choose, at no additional cost to the Government, to renew the designated flow meter rather than clean, inspect and disassemble the existing meter. If the Contractor chooses to renew the flow meter, dispose of the existing meter in accordance with all Federal, State and local regulations. The Contractor shall provide a certificate of calibration to the COR for the new flow meter.
3.4 Leak test. After completing all authorized repairs, the Contractor shall test the JP-5 flow meter operation using the system fluid at normal operating pressure. Ensure zero visible leakage from or deformation of mechanical parts by repairing all leaks and discrepancies. Submit a CFR.
Coast Guard personnel will operate all shipboard machinery and equipment
19 (Rev-0)
3.5 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR
4. NOTES
4.1 Recirculation. After Contractor reinstallation of flow meter, Ship’s force will recirculate the fuel until it is clear and bright and passes the MK I and MK III detector kit tests. Flush all disturbed lines, pipes, and fittings before placing the JP-5 system back in service.
20 (Rev-0)
63120_DksHeloOps_0320_FLT
REC_63120_DksHeloOps_FLT_270' WMEC 'B' Class (ALL) (0220)
WORK ITEM 4: Decks, Helicopter Operating Areas, Preserve
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to preserve the Helicopter
Operating (HELO Ops) areas /Flight Deck (see 4.1 (Definition of HELO Ops Areas)).
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 905 WMEC 801-004, Rev F, General Arrangement 01 Level
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
OTHER REFERENCES
MIL-PRF-24667, March 2018, Coating system, Non-Skid, for Roll, Spray, or Self-Adhering
Application
Naval Air Warfare Center (NAVAIR) Drawing 621055, Rev F, Visual Landing Aids Installation
WMEC-270 Class Ships
QPL-24667, Aug 2019, Qualified Product List of Products Qualified under Performance
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP
11), 2012, Power Tool Cleaning to Bare Metal
3. REQUIREMENTS
3.1 General.
21 (Rev-0)
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
Flight deck safety net assemblies.
Talon grid cover.
Flight deck landing lights.
Deck drain gratings.
3.1.5 Surface preparation optional methods. The Contractor has the option of using either high/ultrahigh pressure water jetting or abrasive blasting to achieve the required surface preparation, prior to application of the coating system specified in 3.3 (Preservation requirements). The Contractor may add abrasives to the waterjet stream, for one or both of the following reasons:
Achieving greater productivity.
Achieving the required surface profile.
NOTES AND CAUTION!
1. Waterjetting without abrasive addition does not provide any additional anchor profile to the surface, beyond what was present after the previous surface preparation.
2. Initial removal of the coating system around deck edges, fittings, and deck coaming may be by power tool cleaning in accordance with SSPC-SP-11.
3. Flight Deck surfaces are constructed of HY-130 steel and may NOT be heated to remove the existing covering.
4. During pier side surface preparation, suitable means to contain generated dust, waste water, paint chips, spent abrasives, and overspray must be provided or employed, as applicable. Plywood or net/canvas barriers are typically used to surround the area being blasted to contain stray steel shot.
When net barriers are used, the mesh size of the netting material must be small enough to ensure that the steel shot will be contained. In addition, net barriers, when used, must be overlapped where attached to stanchions, and anchored at the bottom for the entire net’s length between stanchions, to limit the clean–up and localize the blast medium. Steel shot on a deck is a foreign object damage (FOD) hazard and extreme care must be taken to prevent slipping when walking over contaminated areas.
3.1.6 Visual Landing Aid (VLA) and safety marking sketch. Prior to commencing surface preparation tasks, the Contractor shall develop and submit, to the COR, a sketch of all existing Flight Deck VLA and safety markings and their measured locations on the Flight Deck, using NAVAIR Drawing 621055 as
22 (Rev-0) guidance. Obtain Coast Guard Inspector approval of the sketch, prior to applying new marking paint (see
3.3.2 (VLA and safety markings)).
3.1.7 Substrate inspection. After completion surface preparation and before application of primer coat, the
Contractor shall perform a visual inspection of the prepared substrate; submit a CFR.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.2 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.
3.3 Preservation requirements. The Contractor shall prepare and coat the deck surfaces designated in paragraph 1.1 (Intent), using the system specified for “Flight Deck, Option I”, in SFLC Std Spec 6310, Appendix A (Cutter and Boat Painting System)”. Ensure that the system is qualified as “UV/LSA”, as specified in QPL-24667, and is epoxy-based.
3.3.1 Top coating color. The Contractor shall accomplish the following tasks:
3.3.1.1 Non-skid/non-slip surfaces. Select Grey (36076) as the top/finish coat color.
3.3.1.2 Non-slip-exempted areas. Apply a dark grey color (36076) top/finish coating, in lieu of non-slip top-coating over the following non-slip-exempted areas:
Deck fittings, including, but not limited to: pad eyes, label plates, net supports/foundation, helicopter tie-down fittings, and lifting handles for aircraft fuel filling station.
Areas within two inches of deck fittings, welds, and protrusions.
Areas within six inches of adjacent bulkheads, deck coaming, and deck edges.
Waterways.
3.3.2 VLA and safety markings. The Contractor shall accomplish the following tasks:
3.3.2.1 Remove Flight Deck landing lights in way of work. Visually inspect light assemblies and submit
CFR. Prepare and preserve light assemblies to match existing in accordance with SFLC Std Spec 6310.
Reinstall light assemblies to original configuration.
3.3.2.2 Stripe the Flight Deck with the same pattern sketched prior to surface preparation.
3.3.2.3 Paint new VLA and safety markings with a White color (37875) finish coating.
3.4 Low temperature cure system. If a Change Request has been authorized and released, the Contractor shall apply a low temperature cure system, conforming to MIL-PRF-24667, Type VIII, Composition G.
Ensure that the white color top coating is a silicone alkyd enamel product, recommended by the nonskid coating system manufacturer, in lieu of the polyurethane-based (Interthane 990) coating listed on QPL-
24667.
3.5 In-process quality control measures. The Contractor shall abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).
23 (Rev-0)
NOTES AND WARNING
1. The flight deck coating system must be procured as a kit containing the following – all conforming to MIL-PRF-24667:
a. Anti-corrosive/primer coating.
b. Dark grey color (36076) non-slip top coating.
c. Dark grey color (36076) finish coating, for non-slip exempted areas.
d. White finish color (37875) coating, for VLA and safety markings.
2. The low temperature system is only authorized for application at temperatures between 35-45 degrees F.
3. Polyurethane-based non-skid systems are not authorized on Coast Guard vessels.
4. Surfaces being preserved are considered “critical-coated surfaces”.
3.6 Non-skid surface appearance and texture. The Contractor shall ensure the non-skid surface shall show a pattern of peaks and ridges. The ridge profile shall be continuous and reasonably uniform. Peaks and ridges shall be generally in the same direction (fore and aft), approximately 1/2 to 1 inch apart, and approximately 1/16 to 3/32 inches high. Aggregate shall present a rough uniformly coarse appearance over the entire surface with no loosely bound clumps of particles. All weld seams shall be cross-rolled from a minimum of 3 inches on either side of the weld.
3.7 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.
4. NOTES
4.1 Definition of “HELO Ops Areas”. “HELO Ops Areas” are defined as 01 Level deck surfaces, from
Frame 103 aft, port and starboard, excluding deck surfaces inside of the retracted HELO Hangar, shown on Coast Guard Drawing 905 WMEC 801-004, including helicopter tie-down fittings, 01 Deck perimeter coaming, talon grid cover, raised “mushroom” type tie-down fittings, line-up light fixtures, flight deck net supports/foundations, and up to six inches on all adjacent vertical surfaces, where applicable.
4.2 Certification hot line action desk. The Naval Air Warfare Center Aircraft Division Lakehurst has the responsibility for inspection and certification of all air capable aviation ships which support and operate with helicopters. A Shipboard Aviation Facility hot line action desk has been established at the Naval Air
Warfare Center Aircraft Division Lakehurst, to provide a central point of contact for obtaining all information pertinent inspection and certification issues, including VLA and safety markings. The hot line action desk is in operation 24 hours a day and can be reached by contacting:
NAVAIRWARCENACDIVLKE
Lakehurst, N.J 08733-5000
Hot Line Action Desk (4.8.2.5)
Phone: (732) 323-2592
24 (Rev-0)
4.3 Unit’s responsibilities. The ship's force will be responsible for the following:
Removing and reinstalling all deck drain gratings.
Plugging deck drains.
Preliminary freshwater wash down of flight deck surfaces, in addition to adjacent bulkhead surfaces, prior to the commencement of contracted work, in order to remove sea salt.
Ensuring there is no engine operation and no stack emissions at any time during flight deck resurfacing.
Restricting access to the Flight Deck work area to only authorized personnel.
Contacting NAVAIR for inspection and certification of flight deck markings following work.
25 (Rev-0)
S20_0003_58800_CMD_0820_907
WORK ITEM 5: Helo Hangar Detacouple, Renew
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to crop and renew designated amount of detacouple and preserve designated areas in the Helo Hangar (Compartment 01-117-0-Q) on both port and starboard sides.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 905 WMEC 588-010, Rev D, Hangar Arr and Det
Coast Guard Drawing 905 WMEC 801-004, Rev F, General Arrangement 01 Level
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
26 (Rev-0)
Not Applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.3.1 Apply protective measures as specified in SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection) to the following components, spaces and equipment:
Plug deck drains to prevent contamination from debris
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec
0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
Insulation
Hangar tracks
Fuel oil deck connection riser (starboard)
Fire station 01-128-2 (port)
Fueling at sea (FAS) cleats (port)
Ladder (starboard)
Boat deck (starboard)
Gym equipment
Deck drains
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.2 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of the equipment listed below to demonstrate existing operational condition. Submit a CFR.
Deck drains within coffers
3.3 Renewal. The Contractor shall crop and renew up to 10 linear feet of detacouple on the Helo Hangar on both port and starboard sides (Compartment 01-117-0-Q), as designated by the Coast Guard Inspector and as shown on Coast Guard Drawings 905…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .