File Type Posted
STURGEON_Combined_Synopsis_Solicitation_DOCKSIDE_WTCA.pdf PDF
Schedule.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC STURGEON (WPB 87336)

SPECIFICATION FOR DOCKSIDE REPAIRS

FY2020

Developed By: Freemont O Hinkle

(Rev-0, 18 April 2019)

USCGC STURGEON (WPB-87) DOCKSIDE AVAILABILITY FY2020

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ................................................................................. vi Consolidated List of Critical Inspection Items ........................................................................................... vii Principal Characteristics ............................................................................................................................ viii General Requirements WORK ITEM 1: Ventilation System, Engine Room Supply and Exhaust Fan Assemblies, Clean and

Inspect WORK ITEM 2: Watertight Closures, Assess WORK ITEM 3: Anchor Windlass Foundation, Renew WORK ITEM 4: Interior Deck Covering System, Renew WORK ITEM 5: HVAC System, Repair WORK ITEM 6: Stuffing Tube, Remove WORK ITEM 7: Ducting, HVAC System, Clean WORK ITEM 8: Insulation, Renew WORK ITEM 9: Electrical Power Distribution System, Thermographic Inspection (450 VAC and Below)36 WORK ITEM 10: Fire Alarm Control Panel, Replace WORK ITEM 11: Motor Controller, Install WORK ITEM 12: Sewage System (Toilet), Modify WORK ITEM 13: HVAC 2-Stage Intake Separator, Renew WORK ITEM 14: Cable Stand-offs, Mast, Renew iii (Rev-0)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv (Rev-0)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 113-001, Rev F, Platform Plating & Framing Coast Guard Drawing 87 WPB 113-002, Rev B, Galley/Mess Deck Bilge Access Coast Guard Drawing 87 WPB 131-001, Rev J, Deck Construction Plan Coast Guard Drawing 87 WPB 151-001, Rev L, Superstructure Details Coast Guard Drawing 87 WPB 167-002, Rev B, CG Schedule of Doors, Manholes, Windows & Hatches Coast Guard Drawing 87 WPB 167-003, Rev -, Weather Tight Door for Fuel Station Access Coast Guard Drawing 87 WPB 167-004, Rev G, W.T. Doors and Hatches Coast Guard Drawing 87 WPB 171-001, Rev U, Mast Details Coast Guard Drawing 87 WPB 185-001, Rev AN, Auxiliary Foundation Booklet Coast Guard Drawing 87 WPB 186-001, Rev -, Foundations for Install of Jets Vacuum System Coast Guard Drawing 87 WPB 201-001, Rev F, Machinery Arrangement Coast Guard Drawing 87 WPB 252-002, Rev N, Alarm and Monitoring System Coast Guard Drawing 87 WPB 302-001, Rev W, Misc. Controls Wiring Diagram Coast Guard Drawing 87 WPB 302-003, Rev -, Jets Vacuum Toilet Electrical Details Coast Guard Drawing 87 WPB 310-001, Rev H, Ship’s Service One-Line Drawing Coast Guard Drawing 87 WPB 321-001, Rev K, Power System Deck Plan Coast Guard Drawing 87 WPB 321-003, Rev A, Anchor Windlass and Boat Winch Installation Power and Control System Coast Guard Drawing 87 WPB 331-001, Rev N, Lighting System Deck Plan Coast Guard Drawing 87 WPB 436-001, Rev C, Fire Detection System Coast Guard Drawing 87 WPB 514-001, Rev M, HVAC Duct & Piping Systems Coast Guard Drawing 87 WPB 514-004, Rev -, Mods to HVAC Intake Duct Coast Guard Drawing 87 WPB 556-001, Rev L, Hydraulic System Piping Coast Guard Drawing 87 WPB 556-004, Rev B, HPU, Anchor, Anchor Windlass and Boat Winch Coast Guard Drawing 87 WPB 581-002, Rev C, Mods Incidental to Hydraulic Anchor Windlass

Installation Coast Guard Drawing 87 WPB 581-003, Rev -, Anchor Windlass Isolation Details Coast Guard Drawing 87 WPB 582-001, Rev J, Mooring and Towing v (Rev-0)

Coast Guard Drawing 87 WPB 593-004, Rev A, Sewage System Modifications to suit Jets Vacuum System

Coast Guard Drawing 87 WPB 601-001, Rev R, Outboard Profile & General Arrangements Coast Guard Drawing 87 WPB 634-001, Rev C, Deck Coverings & Details Coast Guard Drawing 87 WPB 635-001, Rev C, Linings and Insulation Plan & Details Coast Guard Drawing 87 WPB 640-001, Rev N, Interior Furnishings

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors

Manual Coast Guard Technical Publication (TP) 9051, SWBS 436, Mar 2016, Fire Alarm Control Panel NFS-

320/E/C & LCD2-80, Multiple Class Cutters Coast Guard Technical Publication (TP), 9115, Jets Vacuum Sewage System, 2016 Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General

Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and

Allied Processes Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard

Electrical Cable Test Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard

Electrical Cable Removal, Relocation, Splice, Repair, And Installation Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary

Machine Systems Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2014, Clean

Shipboard Ventilation Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2014, Install Interior

Deck Covering Systems

OTHER REFERENCES

American Society for Nondestructive Testing, SNT-TC-1A: Personnel Qualification and Certification in

Nondestructive Testing, 2016 Coast Guard Technical Publication 4540, Pump, Chilled Water- Model KC2.

Coast Guard TP 4542, Pump, Lube Oil Evacuation-Model 01SS1PTYDJHLW Coast Guard TP 4570, Pump, Waste Oil Coast Guard TP 4988, Ventilation Fan, Engine Room Circulating-Model YM-18 MIL-PRF-24613, Nov 2007, Deck Covering Materials, Interior, Cosmetic Polymeric vi (Rev-0)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

1 N **Fan, Tube Axial NSN: 4010-01-598-0425 1 ea. 2,223.72 1 N **Fan, Tube Axial NSN: 4010-01-598-1549 1 ea. 3,091.15 4 N Panel, Deck, 5/8"x48"x96", Aluminum 5052-H32

Core, 1/4" Cell, 0.063" 6061-T6 Face Sheets, Natural Mill Finish

NSN: 2040-01-F19-5621 PN:

SPXC-1000-1000D

10 Ea. 654.00

10 N Fire Alarm Control Panel

NSN: 6320-01-F18-5529 1 ea. 2,185.00

10 N Battery, 12 Volt, 12

AH

NSN: 6140-01-529-4234 2 ea. 151.95

11 N Controller with power supply

NIIN: 01F175288 3 ea. 600.00

11 N Controller with power supply

NIIN: 01F175287 1 ea. 540.18

12 N Sewage installation kit:

Jets 610SS Toilets, Vacuum Pump, controller and Vacuum

Accumulator

NSN: 4510-01-F16-4844 PN:

CUSTVU15-TO610

1 ea. $13,957

13 N HVAC 2-Stage Separator

NSN: 4140-01-F13-3459 1 ea. $4500.00

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter vii (Rev-0)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):

Work Item Title

13 SEWAGE SYSTEM (TOILET), MODIFY

viii (Rev-0)

PRINCIPAL CHARACTERISTICS

87’ WPB

PHYSICAL

Length overall 87’ Length between perpendiculars 81’ 7” Depth 10’ 11” Maximum beam 19.4’ Draft, mean to design waterline 5’ 9” Height of highest projection 50.2’ Full load displacement 93.5 long tons Minimum operating displacement 83.9 long tons Displacement, light ship 77.9 long tons Framing Longitudinal Bulkheads Four watertight bulkheads located below the Main Deck Anchor 40 lb Fortress with 480 ft. 3 strand 5/8” dia. Line stayset

HULL

Hull/main weatherdeck material ABS Grade AH 36 Superstructure 5086 Aluminum

MACHINERY

Main propulsion Two MTU 8V396TE94, sequential turbo-charged diesels Reduction gears Two ZF Type BW 255 Propulsion shaft Two AQUAMET 22, 101.6mm Shaft diameter 4” Shaft seal Two John Crane mechanical seals Shaft bearing, intermediate Thordon Elastomeric Bearing Shaft bearing, aft Thordon Elastomeric Bearing Number of propellers 2 Number of blades 5 Diameter of propeller 1040mm Pitch 1230 mm fixed Shaft RPM 828 Rudders Two 316L Stainless Steel Ship’s service generators Two Man Model D08241F01 diesel with Stanford 60KW Generator

TANK CAPACITIES

3-9-1-f (fuel oil) 1402 gal 3-9-2-f (fuel oil) 1402 gal 3-12-2-f (waste oil) 86 gal 3-12-1-f (oily water) 86 gal 3-7-0-q (sewage collection) 352 gal 3-7-1-q (grey water) 52 gal 3-12-1-w (fresh water) 200 gal 3-12-2-w (fresh water) 200 gal

1 (Rev-0)

00000_0618_FLT

REC_00000_FLT_Commercial Project @ CG Facility (1212)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.

1.2 Term interchangeability. The terms ‘Contractor’, ‘CG Yard’, ‘NAVSTA EVERETT’, ‘shipyard’, ‘Base’, and ‘Coast Guard Industrial’ are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General

Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and

Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

2 (Rev-0)

3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:

• Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.

• Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is Small Quantity Generator.

3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:

• Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.

• National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.

• Air Emission Permit: Unit has a Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.

3 (Rev-0)

3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;

ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).

3.5.6 Additional Requirements. The Contractor shall be aware of the following:

3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.

3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.

3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.

3.6 Local Policy. None.

3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:

4 (Rev-0)

3.7.1 Change to SFLC Std Spec 0000, paragraph 1.3. ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”

3.7.1.1 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” To “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”

3.7.2 Change to Std Spec 5000, paragraph D2.2.1.1 bullet, “For running rigging, furnish class 6x37, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope,” to “For running rigging, furnish class 6x36, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope.”

3.7.2.1 Change to Std Spec 5000, page D-2, Table D-1 title from “DYFORM-18, 6X19 AND 6X37 IWRC RRL,” to “ DYFORM-18, 6X19 AND 6X36 IWRC RRL”

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

5 (Rev-0)

QA-1 – QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK ITEM

WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 – PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.

CHECKPOINT 3 – AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.

CHECKPOINT 4 – PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 – SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 – PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer’s recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

6 (Rev-0)

QA-2 – QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

VESSEL NAME HULL # WORK ITEM

# WORK ITEM TITLE

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE

TIME

ACTIVITY (SURFACE

PREPARATION, PRIMER COAT,

BARRIER COAT, TOP COAT,

ETC…)

LOCATION (FRAME &

DECK, RELATION TO

EQUIPMENT, ETC.)

TEMPERATURE % REL.

HUMID-

ITY

DEW

PT.

SURFACE AMBIENT ΔT

| DP –

SURFACE |

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

7 (Rev-0)

QA-3a – QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

VESSEL NAME HULL # WORK ITEM

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS

PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS

DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /

8 (Rev-0)

TIME

9 (Rev-0)

QA-3b – QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

VESSEL NAME HULL # WORK ITEM

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA

RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO

SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Reading (mils)

Mean Reading (mils) IAW ASTM DD4417).

10 (Rev-0)

QA-4 – QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

VESSEL NAME HULL # WORK ITEM

SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.

DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)

11 (Rev-0)

12 (Rev-0)

QA-5 – QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

VESSEL NAME HULL # WORK ITEM

# WORK ITEM TITLE

COATING MFG PRODUCT NAME BATC

H #

INDUCTI

ON TIME

COATING SYSTEM

SEQUENCE

(PRIMER/TOUCHUP/3RD

COAT, ETC.)

DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.

SPOT 1 2 3 4 5 AVERAGE

VALUE

*BASE METAL READING

(BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

1 AVG. BMR DEVIATION

1 AVG. BMR DEVIATION

APPLICATION METHOD (AIRLESS,

CONVENTIONAL SPRAY, ROLLED)

AVERAGE DFT

13 (Rev-0)

51300_FJL_0618_87336

WORK ITEM 1: Ventilation System, Engine Room Supply and Exhaust Fan Assemblies, Clean and Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the engine room supply and exhaust fan assemblies.

1.2 Government-furnished property.

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

N **Fan, Tube Axial NSN: 4010-01-598-0425 1 ea. 2,223.72 N **Fan, Tube Axial NSN: 4010-01-598-1549 1 ea. 3,091.15

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 185-001, Rev AN, Auxiliary Foundation Booklet Coast Guard Drawing 87 WPB 601-001, Rev R, Outboard Profile & General Arrangements

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

14 (Rev-0)

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel’s components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

• Louver screens

• Air diffusers

• Ventilation access covers

3.1.5 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.2 Work particulars. Using Coast Guard Drawings 87 WPB 185-001 and 87 WPB 601-001 as guidance, the Contractor shall accomplish the following:

3.2.1 Remove the louver screens from the intake and exhaust vent trunks (aft side of superstructure, FR 16, main deck, port and stbd side) to gain access to supply and exhaust vent fans. Disassemble, clean, and inspect duct and fan housing assemblies. Unbolt aluminum rings (fan assembly foundations) from main deck and inspect. Inspect both electric motors and measure the insulation resistance of the motor windings. Determine all required repairs (e.g. metal renewal, etc.). Submit CFR.

3.2.2 At reassembly, renew all disturbed fasteners.

3.3 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.4 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)

3.5 Government’s right for change out. The Contractor shall be aware that the Government reserves the right to furnish a new port and/or starboard fan assembly for installation in place of the existing. If the Government exercises this right, the Contractor shall dispose of the removed fan assemblies in accordance with all applicable Federal, state, and local regulations.

15 (Rev-0)

4. NOTES

This section is not applicable to this work item.

16 (Rev-0)

16700_FJL_1018_87336

WORK ITEM 2: Watertight Closures, Assess

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to perform a condition assessment of all installed watertight closures.

TABLE 1: 87’ WPB WATERTIGHT CLOSURES

LOCATION DESIGNATION DESCRIPTION

Pilot House Access 01-15-0 54” x 24” Clear Opening w/ 4-Dog Weathertight

Door w/2 Windows (Hulls 87301-87309) Pilot House Access 01-15-0 54” x 24” Clear Opening, Quick-Acting Heavy Duty

Style w/ Window, Weathertight (Hulls 87310 on) Forepeak Access 1-1-2 18” Clear Opening Round Al. Cast Hatch, SST Deck

Ring w/ Integral Topside Handle Fwd Crew Quarters

Access 1-2-0 24”x24” Clear Opening 4-Dog Quick Action

WTRTT Flush Hatch Deck Locker Access 1-6-0 52” x 26” Clear Opening 6-Dog, Quick Acting

WTRTT Door Fuel Station Access 1-6-2 26” x 28” Clear Opening, 8-Dog, Weathertight, Individually-Dogged Main Deck Access 1-15-0 54” x 26” Clear Opening, 6-Dog, Quick Acting

WTRTT Door Engine Room Access 1-21-1 24” x 24” Clear Opening 4-Dog Quick Acting

WTRTT Raised Hatch Lazaret Access (Stbd) 1-22-1 24” x 24” Clear Opening 4-Dog Quick Acting

WTRTT Raised Hatch Lazaret Access (Port) 1-22-2 24” x 24” Clear Opening 4-Dog Quick Acting

WTRTT Flush Hatch Fwd Passageway Access 2-9-0 54” x 26” Clear Opening 6-Dog, Quick Acting

WTRTT Door Engine Room Access 2-14-0 54” x 26” Clear Opening 6-Dog, Quick Acting

WTRTT Door

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 167-002, Rev B, CG Schedule of Doors, Manholes, Windows &

Hatches

17 (Rev-0)

Coast Guard Drawing 87 WPB 167-003, Rev -, Weather Tight Door for Fuel Station Access Coast Guard Drawing 87 WPB 167-004, Rev G, W.T. Doors and Hatches

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel’s components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.1.5 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and non-destructive examination (NDE) in accordance with SFLC Std Spec 0740.

3.2. Watertight closure assessment. Using Coast Guard Drawings 87 WPB 167-002, 87 WPB 167-003, and 87 WPB 167-004 as reference, the Contractor shall perform an assessment of all watertight closures listed in Table 1 as follows. Submit CFR with results of inspections including recommendations for repair or renewal:

3.2.1 Inspect all watertight closures for loose, missing or damaged parts; wear of hinge pins and striker plates; and clogged drain lines where applicable.

3.2.2 Operate closures through complete dogging cycle, checking for binding and/or difficult operation.

18 (Rev-0)

3.2.3 Inspect closure gasket for the following:

3.2.3.1 Paint/foreign matter, cracks, or deterioration.

3.2.3.2 Uneven or excessive depression (greater than 1/8”).

3.2.3.3 Gaps greater than 1/16” where ends meet, or any ends that meet in a radius (except for round closures).

3.2.4 Apply grease to all intact grease fittings. Note any missing or broken fittings.

3.2.5 Inspect closure knife edge for nicks and gouges. Minor gouges shall be repaired by filing smooth.

NOTE

If the nick or gouge has a gap greater than 1/16”, the knife edge may require weld buildup prior to filing smooth in order to keep the knife edge fair.

3.2.5 Chalk test. Perform a chalk test of all inspected closures in accordance with SFLC Std Spec 0740, Appendix C.

3.2.6 Water hose test. Perform a water hose test of all watertight closure boundaries in accordance with SFLC Std Spec 0740, Appendix C.

3.3 Repair change request authorization. If a Change Request has been authorized and released by the Contracting Officer (KO), the Contractor shall execute minor repairs as identified by CFR to return closure(s) to operable condition and/or restore watertight integrity. Minor repairs are defined as adjustments, spare parts renewals, hinge bracket renewal/relocation, and knife edge repairs.

3.4 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been repaired to be in satisfactory operating condition.

3.5 Personnel training. While conducting assessments, the Contractor shall provide training on maintenance and repair of watertight closures to Ship’s Force personnel designated by cutter Engineering Petty Officer (EPO). The Contractor shall allow designated personnel to shadow the Contractor while conducting assessments in order to learn assessment and repair techniques used by Contractor.

3.6 Assessment deliverables. Within seven (7) days after the completion of the assessment and follow-on repairs, the Contractor shall submit a final report to the cutter EO with copy to the COR. The final reports must include:

• Complete list of watertight closures assessed

• List of closures not assessed and the reasons for non-assessment

• Condition found on all assessed closures

• List of repairs accomplished

• List of additional recommended repairs

3.7 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)

19 (Rev-0)

20 (Rev-0)

18501_MWS_0417_87336

WORK ITEM 3: Anchor Windlass Foundation, Renew

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to renew the anchor windlass foundation and doubler plate.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 131-001, Rev J, Deck Construction Plan Coast Guard Drawing 87 WPB 185-001, Rev AN, Auxiliary Foundation Booklet Coast Guard Drawing 87 WPB 321-003, Rev A, Anchor Windlass and Boat Winch Installation

Power and Control System Coast Guard Drawing 87 WPB 556-001, Rev L, Hydraulic System Piping Coast Guard Drawing 87 WPB 556-004, Rev B, HPU, Anchor, Anchor Windlass and Boat Winch Coast Guard Drawing 87 WPB 581-002, Rev C, Mods Incidental to Hydraulic Anchor Windlass

Installation Coast Guard Drawing 87 WPB 581-003, Rev -, Anchor Windlass Isolation Details Coast Guard Drawing 87 WPB 601-001, Rev R, Outboard Profile & General Arrangements Coast Guard Drawing 87 WPB 634-001, Rev D, Deck Coverings & Details

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

21 (Rev-0)

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel’s components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

• Hydraulic hoses

• Anchor windlass

• Anchor

• Anchor hardware

• Anchor line

• Anchor line storage basket

• Deck non-skid pads

• Ultrapoly chain pad

3.1.5 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.2 Renewal particulars. Using the references under Section 2 above as guidance, the Contractor shall crop and renew the existing anchor windlass deck mount foundation and doubler plate.

3.3 Interference-related hydraulic requirements. If opening any hydraulic system due to interference removal is necessary, the following requirements apply for hydraulic restoration.

3.3.1 Hydraulic fluid renewal. Any required system hydraulic fluid renewal shall be in accordance with SFLC Std Spec 5000, Appendix C, Paragraph C2.1 (Fluids).

3.3.2 Hydraulic fluid filtering. Any required system hydraulic fluid filtering shall be in accordance with SFLC Std Spec 5000, Appendix C, Paragraph C2.1 (Fluids).

22 (Rev-0)

3.3.3 Hydraulic fluid sampling and testing. Any required system hydraulic fluid sampling and testing shall be in accordance with SFLC Std Spec 5000, Appendix C, Paragraph C2.1 (Fluids).

3.4 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.5 Slip-resistant sheet(s) renewal. Contractor shall renew all damaged or disturbed slip resistant sheets.

Apply new slip resistant sheets and seal per the arrangement shown on Coast Guard Drawing 87 WPB 634-001 as specified for “Weather Deck Slip Resistant Sheets, Option I, Steel” in SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior Paint Systems).

3.6 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs).

4. NOTES

4.1 Slip-resistant sheet material procurement information. Pre-cut sheeting for certain classes of vessels is available from 3-M distributors, including http://www.floormat.com/antisliptape.html and Louisiana Association for the Blind, 1750 Claiborne Avenue, Shreveport, LA 71103-4189, 318-635-6471 / Fax:

318-635-8902 http://www.lablind.com. Aluminum templates for cutting the Slip Resistant Sheet are available from Reedsport Marine and Fabrication, http://www.reedsportmachine.com/, (877) 271-5414.

23 (Rev-0)

S18_004_63411_FJL_0818_87336

WORK ITEM 4: Interior Deck Covering System, Renew

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to renew the deck covering systems designated below. If an “X” appears beside the location, that area is designated for renewal. If an “X” does not appear beside the location then that area is NOT designated for renewal.

TABLE I – DECKING SYSTEM

LOCATION AREA

(*SQFT)

DECK

MTL

(A/S**)

SYSTEM/APPENDIX

(SFLC STD SPEC

6341)

***COVE

BASE

SYSTEM

COLOR

UNDERLAYMENT

REQUIREMENT

Berthing (1-8-1-L) 20 S Carpeting, Appendix E

Yes:__ No :__

See Paragraph 3.2.1

(1-8-2-L) 20 S Carpeting, Appendix E

X Head

(1-10-2-L) 15 S Epoxy Flake System, Type I/ Appendix A See Para 3.2.3

Yes:_X_

New: X__ Retain Existing:__ None:__

X Shower

(1-10-1-L) 9 S One-Step Epoxy System /Appendix A See Para 3.2.2

New: __

None:_X_

Office

(1-10-0-Q) 120 S Laminate

(2-2-0-L) 30 A Carpeting, Appendix E

Yes: .

Head

(2-5-2-L) 12 A Epoxy Flake System, Type I/ Appendix A See Para 3.2.3

Yes:X__

None:__

X Shower

(2-5-1-L) 9 S One-Step Epoxy System /Appendix A See Para 3.2.2

New: __

None:_X_

(2-6-2-L) 20 S Carpeting, Appendix E

Yes: .

(2-6-1-L) 25 S Carpeting, Appendix E

Yes: _

Passage

(2-5-0-L) 40 A Epoxy Flake System, Type I/ Appendix A See Para 3.2.3

Yes:X__

None:__

24 (Rev-0)

Mess Deck and Galley

(2-9-2-Q, 2-9- 1-Q)

250 A Epoxy Flake System, Type I/ Appendix A See Para 3.2.3

Yes:_X_

New: _X_

None:__

*Approximated.

**Note: A = Aluminum; S = Steel.

***See SFLC Std Spec 6341 for definition of cove base.

1.2 Government-furnished property.

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

N Panel, Deck, 5/8”x48”x96”, Aluminum 5052-H32 Core, 1/4” Cell, 0.063” 6061-T6 Face Sheets, Natural Mill

Finish

NSN: 2040-01-F19-5621

PN: SPXC-1000-1000D

10 Ea. $654.00

N Half H-Post CRES 16 Ga.

304L #4, 96"

P/N- Half H-Post 10 ea. $78.10

N Z-Strip .062” Aluminum

P/N- Z-Strip 10 ea. $54.35

N Wall Channel, .062” Aluminum 5086

P/N- Wall Channel 10 ea. $54.35

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 113-001, Rev F, Platform Plating & Framing Coast Guard Drawing 87 WPB 113-002, Rev B, Galley/Mess Deck Bilge Access Coast Guard Drawing 87 WPB 634-001, Rev D, Deck Coverings & Details

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2014, Install Interior Deck Covering Systems

OTHER REFERENCES

MIL-PRF-24613, Nov 2007, Deck Covering Materials, Interior, Cosmetic Polymeric

25 (Rev-0)

3.1.1 CIR.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

• Tables

• Benches

• Galley equipment

• Ladder

• Carpet

• Joiner panels

3.2 Deck covering renewal. Using Coast Guard Drawings 87 WPB 113-001 and 87 WPB 113-002 as guidance, the Contractor shall renew the deck covering systems in the space or spaces identified in Table 1 as specified below. Renew the associated underlayment and cove base as indicated in Table 1.

3.2.1 Upon removal of existing deck covering system, the Contractor shall renew underlying joiner panels using GFP provided.

3.2.2 Cosmetic polymeric epoxy resin, Type III (One-Step Epoxy). Where this covering is specified under Table 1 above, the Contractor shall renew the deck covering material using Cosmetic Polymeric Epoxy Resin, Type III, Class 3 (One-Step Epoxy System), in accordance with appendix A of SFLC Std Spec 6341. Apply initial sealer coat.

CAUTION

Cosmetic polymeric epoxy system is installed over delicate joiner deck. Any joiner decking panels that are damaged during the removal of existing deck covering material must be renewed with the government provided panels.

To minimize impact on cutter weight & moment, do not add excessive deck covering material.

Use caution while removing joiner deck panels in fwd passageway as to not damage existing carpet.

3.2.3 Cosmetic polymeric epoxy resin, Type I (Epoxy Flake). Where this covering is specified under Table 1 above, the Contractor shall renew the deck covering material using Cosmetic Polymeric Epoxy Resin, Type I, Class 2 (Epoxy Flake System), in accordance with appendix A of SFLC Std Spec 6341.

26 (Rev-0)

3.2.3.1 Renew all applicable doorway transition strips.

3.2.4 Carpeting. Where this covering is specified under Table 1 above, the Contractor shall remove existing deck covering system, prepare and paint underlying substrate, then apply new carpeting system in accordance with Appendix E of SFLC Std Spec 6341.

3.2.5 Laminate deck. When specified under Table 1 above, the Contractor shall renew the deck covering in the ship’s office (1-10-0-Q) in accordance with Coast Guard Drawing 87 WPB 634-001.

3.2.5.1 The Contractor shall omit installation of the compass rose in the center of the deck, and instead shall cover the entire deck in the compartment with laminate material.

3.3 Unobstructed flow test. For wet space decks, the Contractor shall perform the following testing following installation of new deck coverings:

3.3.1 Accomplish an unobstructed flow test of each deck drain (where installed)…