SCHEDULE FOR USCGC HERIBERTO HERNANDEZ FY18 DS REPAIRS

View the file

Other files for this federal contract opportunity

Other files attached to USCGC HERIBERTO HERNANDEZ, newest first.
File Type Posted
HERIBERTO_HERNANDEZ_SPEC.pdf PDF
Heriberto_Hernandez__Dockside_Combined_Synopsis_Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CPD Estimate

PRICING SCHEDULE FOR:
USCGC Heriberto Hernandez (WPC-114) DOCKSIDE AVAILABILITY FY2018
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Bilges, Clean and Partial Preserve$5,166JOB1$5,166AFC45
D-002Tanks, Clean and Inspect$19,285JOB1$19,285AFC45
D-003Sewage and Grey Water System, Clean and Inspect$32,200JOB1$32,200AFC45
D-00AGFP ReportNSPEA1NSP
D-00BTravel and Perdiem$27,508Job1$27,508AFC45
Total Price of Definate Items$84,159AFC30$0
Total Price of Optional Items$0AFC45$84,159
Total Price of Definate and Optional Items$84,159
Labor Rates for Growth Work
Electrician92$/hr
Machinest92$/hr
Rigger89$/hr
Welder/Brazer/Shipfitter88$/hr
Painter67$/hr
General Labor/Helper51$/hr
The price estimates for the jobs listed above are based on 1) a direct labor and material estimate,
stored in the APM's files, and 2) an estimated composite labor rate of 70 $/hr
which is the expected mean composite labor rate for the geographic area where the contract will be executed.
The estimated trade labor rates above were calculated by 1) normalizing a sample of BLS wage data for
those trades to that estimated composite labor rate and then 2) estimating how the contracted work
may be distributed, on average, across those trades.
Actual rates quoted by primes will vary based on 1) employee seniority, 2) the prime's home location
relative to the location where the contract will be executed, 3) the prime's subcontracting plans,
4) the supply/demand balance of the labor market at the time of solicitation, and 5) variety of
other potential factors. The estimated labor rate prices should only be used as a rough guideline
for determining if pricing is fair and reasonable. Once the LPTA offer is identified, this estimate
can be further refined by PBPL ENG or PDM reps, as necessary, pending discussions with the offeror.

Blank Schedule for FBO

PRICING SCHEDULE FOR:
USCGC Heriberto Hernandez (WPC-114) DOCKSIDE AVAILABILITY FY2018
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Bilges, Clean and Partial PreserveJOB1$0
D-002Tanks, Clean and InspectJOB1$0
D-003Sewage and Grey Water System, Clean and InspectJOB1$0
D-00AGFP ReportNSPEA1NSP
D-00BTravel and PerdiemJob1$0
Total Price of Definate Items$0
Total Price of Optional Items$0
Total Price of Definate and Optional Items$0
Labor Rates for Growth Work
Electrician$/hr
Machinest$/hr
Rigger$/hr
Welder/Brazer/Shipfitter$/hr
Painter$/hr
General Labor/Helper$/hr
$/hr
$/hr
$/hr
$/hr
$/hr
NOTE: Enter fully burdened labor rates for the trades listed above, as applicable to this contract.
Add any additional trades/rates that may be applicable, as required, in the blanks provided.

CPD Estimate-a

PRICING SCHEDULE FOR:
USCGC Heriberto Hernandez (WPC-114) DOCKSIDE AVAILABILITY FY2018
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Bilges, Clean and Partial Preserve$5,166JOB1$5,166AFC45
D-002Tanks, Clean and Inspect$19,285JOB1$19,285AFC45
D-003Sewage and Grey Water System, Clean and Inspect$32,200JOB1$32,200AFC45
D-00AGFP ReportNSPEA1NSP
D-00BTravel and Perdiem$27,508Job1$27,508AFC45
Total Price of Definate Items$84,159AFC30$0
Total Price of Optional Items$0AFC45$84,159
Total Price of Definate and Optional Items$84,159
The price estimates for the jobs listed above are based on 1) a direct labor and material estimate,
stored in the APM's files, and 2) an estimated composite labor rate of 70 $/hr
which is the expected mean composite labor rate for the geographic area where the contract will be executed.
-------------------------------------

Blank Schedule for FBOa

PRICING SCHEDULE FOR:
USCGC Heriberto Hernandez (WPC-114) DOCKSIDE AVAILABILITY FY2018
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Bilges, Clean and Partial PreserveJOB1$0
D-002Tanks, Clean and InspectJOB1$0
D-003Sewage and Grey Water System, Clean and InspectJOB1$0
D-00AGFP ReportNSPEA1NSP
D-00BTravel and PerdiemJob1$0
Total Price of Definate Items$0
Total Price of Optional Items$0
Total Price of Definate and Optional Items$0
Composite Labor Rate for Growth Work$/hr

Offer Analysis Sheet

Contractor 1 Extended PriceContractor 2 Extended PriceContractor 3 Extended PriceContractor 4 Extended PriceContractor 5 Extended PriceContractor 6 Extended Price
700.150.1
CLINDescriptionUnit PriceUnitQTYExtended Price
D-001Bilges, Clean and Partial Preserve$5,166Job1$5,1664818061276.80168
D-002Tanks, Clean and Inspect$19,285Job1$19,285232304501624812
D-003Sewage and Grey Water System, Clean and Inspect$32,200Job1$32,2003209800067201120
D-00AGFP ReportNSPEA1NSP
D-00BTravel and Perdiem$27,508Job1$27,508
Total Price of Definate Items$84,159$0-$84,159-100%$0-$84,159-100%$0-$84,159-100%$0-$84,159-100%$0-$84,159-100%$0-$84,159-100%
Total Price of Optional Items$0$0$0ERROR:#DIV/0!$0$0ERROR:#DIV/0!$0$0ERROR:#DIV/0!$0$0ERROR:#DIV/0!$0$0ERROR:#DIV/0!$0$0ERROR:#DIV/0!
Total Price of Definate and Optional Items$84,159$0-$84,159-100%$0-$84,159-100%$0-$84,159-100%$0-$84,159-100%$0-$84,159-100%$0-$84,159-100%

Source Data for Negotiations

ESTIMATE SOURCE DATA DETAILS for USCGC Heriberto Hernandez (WPC-114) DOCKSIDE AVAILABILITY FY2018
UnitExtendedHoursLabor PriceMaterial Price (ODCm)Sub-svcs Price (ODCs)Consumables Price (ODCc)Estimate Description
D-001Bilges, Clean and Partial Preserve$5,166JOB1$5,16648$3,360$1,596$0$210[1] bilges x 2b 2d(8h) + 38% ODCm (solvent, paint, etc) + 0% ODCs + 5% ODCc (rags, gloves, etc)
D-002Tanks, Clean and Inspect$19,285JOB1$19,285232$16,240$0$2,030$1,0156 large tks[fuel svc/strg] x 2b 1.5d(8h) per tank + 5 small tks [ovrfl, OW,DO, aft void] x 2b 1d(8h) per tank + 1 EDG Tank [1b 1d(8h)] + 10% ODCs (diposal, etc) + 5% ODCc
D-003Sewage and Grey Water System, Clean and Inspect$32,200JOB1$32,200320$22,400$0$8,400$1,4005b 5d(8h) sewage sys, 3b 5d(8h) grey wtr sys + 30% ODCs (temp bathrm/shower, disposal costs, etc) + 5% ODCc
Travel and Per Diem$27,508Total
Assume an average of 7 hotel rooms will be required per night (i.e. avg direct-labor-crew size, including supervisiors and/or ship superintendents, each individual gets a single hotel room).
Assume 187 $/day Total Per Diem Rate (daily room rate plus food rate, each individual above expends this each day.)
Assume 20 hotel nights will be needed (i.e. 1 night for each day of estimated duration, plus 1 night on front end for a travel day)
Assume 300 miles is the one-way road distance from the prime contractor's facility to the the contract performance loaction (e.g. cutter homeport, etc.).
Assume the contractor will drive 3 vehicles from his facility to the cutter, and assume each will be driven an additional 10 miles of local travel per day.
Based on the above, assume a combined total of 2370 miles will be put on all 3 vehicles. Assume that cost will be at the GSA milage rate of 0.56 $/mile.
Total Per Diem Cost (Hotel/Meals) = 7 rooms/meals x 187 $/day x 20 hotel nights = $26,180
Total Travel Cost = 2370 total miles x 0.56 $/mile = $1,327

CWD Input Table

CLINItem # per ORGAFCSWBSItem DescriptionSpec AuthorSpending CategorySpec #NOUNUnitIGE Unit PriceQuantityIGE Max PriceGrowth Risk
D-00145631Bilges, Clean and Partial PreserveWard, James LRMBILGESJOB5,1661
D-00245120Tanks, Clean and InspectWard, James LRMTANKSJOB19,2851
D-00345590Sewage and Grey Water System, Clean and InspectWard, James LRMPIPINGJOB32,2001