Lowest_Price_Technically_Acceptable_Criteria.docx
DOCX document 32 KB Posted
- Attached to
- Master BPA - DR 4344-CA MHU Blocking and Bracing Federal contract opportunity
- Solicitation number
- 70FBR918Q00000007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW_Blocking_and_Bracing_5_17_2018.docx | DOCX document | |
| SOW_Blocking_and_Bracing_5_17_2018.docx | DOCX document | |
| DR-4344-CA_Amendment_7_Map.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Purpose
Lowest Price Technically Acceptable Acceptable/Unacceptable Criteria and Evaluation Plan
This plan will be used to establish the evaluation criteria to determine technical acceptability of offeror proposals and establishes a controlled and impartial means of evaluating proposals for the subject solicitation. The contract will be awarded to the proposal that submits the lowest bid while meeting or exceeding the standards set for non-price factors.
Proposals shall be submitted in three separate volumes as shown below:
| VOLUME |
| VOLUME TITLE |
| FORMAT |
| PAGE LIMITATIONS |
| Vol. I |
| TECHNICAL CAPABILITIES/ |
APPROACH
| No Page Limit |
| Vol. II |
| COMPANY EXPERIENCE |
| No Page Limit |
| Vol. III |
| PRICE |
| 1 Page Limit |
2. Evaluation Factors
The evaluation factors are as follows:
| Factor |
| Name |
| 1 |
| Technical Capabilities/Approach |
| 2 |
| Company Experience |
| 3 |
| Price |
The Government will conduct a technical evaluation on the submitted proposals using the two non-price technical factors listed above, assigning a rating of Acceptable or Unacceptable. It is the Government’s intent to award the contract to the offeror whose proposal has the lowest price after determining technical acceptability for all two technical factors (i.e., the offeror’s proposal must receive a rating of Acceptable for all three factors).
3. Evaluation Standards: Each factor and/or sub-factor will be assigned a rating of Acceptable or Unacceptable. In order to be considered technically acceptable, the proposal must be technically acceptable at each factor. An unacceptable rating at any one factor makes the entire proposal unacceptable.
Factor 1: Technical Capabilities/Approach
Evaluation Criteria: Offeror must demonstrate the firm’s experience in completing the tasks detailed in the SOW.
Provide a draft Phase-In Plan that addresses how you plan to prepare to assume the responsibilities of the Statement of Work.
The phase-in plan shall include a timeline with dates and key tasks to be performed and what steps will be taken during that time to achieve phase-in and assume regular requirements (i.e. finalizing subcontracts, if applicable)
Factor 2: Company Experience
The experience of the Offeror and of proposed subcontractors and/or partners intended to occupy a major role will be considered in evaluation and selection. The government will evaluate each Offeror's corporate experience in providing services, which are of similar nature to the work to be performed under the requirement described in this solicitation. Experience listed shall be for projects which are of similar size, scope, complexity or, in any way, are relevant to the required by this solicitation. Specifically, jobs that are of similar scope, complexity, contract type, and period of performance, in relation to the requirements of this solicitation are of particular interest to the government. Contracts listed may include those entered into by the Federal Government, agencies of State and local governments, and commercial customers.
Attachment 1 – Evaluation Sheets
Evaluator:
Date of Evaluation:
Offeror Name:
| Evaluation Factors |
| Assigned Adjective Rating |
Experience and Expertise
Available Adjective Ratings: Acceptable Unacceptable
Evaluation criteria: Offeror must demonstrate the company’s Technical Capabilities/Approach in completing the tasks detailed in the SOW.
Acceptability Standard:
Weaknesses (Aspects of the proposal that fall below the minimum standards, increasing the risk of unsuccessful performance):
Deficiencies (Material failure of a proposal to meet the requirement or a combination of significant weaknesses in the proposal that increase the risk of unsuccessful contract performance to an unacceptable level. Aspects of the proposal that are omitted and fail to address the evaluation criteria):
Questions/Clarifications Required:
Evaluator:
Date of Evaluation:
Offeror Name:
| Evaluation Factor and Sub-factors |
| Assigned Adjective Rating |
Past Performance
Available Adjective Ratings: Acceptable Unacceptable
Evaluation criteria: Company Experience - Experience listed shall be for projects which are of similar size, scope, complexity or, in any way, are relevant to the required by this solicitation.
Acceptability Standard:
Weaknesses (Aspects of the proposal that fall below the minimum standards, increasing the risk of unsuccessful performance):
Deficiencies (Material failure of a proposal to meet the requirement or a combination of significant weaknesses in the proposal that increase the risk of unsuccessful contract performance to an unacceptable level. Aspects of the proposal that are omitted and fail to address the evaluation criteria):
Questions/Clarifications Required: