SOW_ATTACHMENTS.pdf

PDF 1 MB Posted

Attached to
GENERATOR MAINTENANCE DR4339PR PUERTO RICO Federal contract opportunity
Solicitation number
70FBR219B00000002
Issued by
Federal Emergency Management Agency Headquarters Office of the Chief Procurement Officer

View the file

Other files for this federal contract opportunity

Other files attached to GENERATOR MAINTENANCE DR4339PR PUERTO RICO, newest first.
File Type Posted
Statement_of_work.pdf PDF
B1M_WAGE_DETERMINATION.pdf PDF
equip_inventory.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SIZE (kW): MANUFACTURER: BARCODE:

DATE OF THIS SERVICE HOUR METER READING (@ Start of Service):

LOCATION OF SERVICE: (Select) RUN UP HOUR METER READING:

STATION OF ORIGIN: (Select)

CURRENT CONDITION: (Select)

LEVEL OF SERVICE: (Select)

ACTION ITEM

SERVICE REQUIRED

**Quarterly tasks are to be completed during Annual & RTS services**

CODE

(OK= No Problem; CS=Corrected to spec; TF=Temporary

Fix; PF=Permanent Fix; NA=Not Applicable; XP=No replacement part available; XF=FEMA Waived Repair;

XX=Uncorrectable damage)

CHECK/CLEAN Battery terminals / battery hold down QUARTERLY

DISCONNECT (Secure) Battery Cable QUARTERLY

TEST Panel Lights QUARTERLY

CHECK / ADD (if needed) Coolant fill level - add recharge if necessary QUARTERLY

INSPECT Coolant Leak QUARTERLY

CHECK Tension on belts QUARTERLY

CHECK Silencer isolator mount QUARTERLY

CHECK/ADJUST Governor QUARTERLY

CHECK/CLEAN Air filter(s) QUARTERLY

INSPECT Loose/worn belts/hoses QUARTERLY

INSPECT Oil Leak QUARTERLY

INSPECT Turbo/chair-air cooler QUARTERLY

CHECK Exhaust components QUARTERLY

CHECK Fuel line quick couplers QUARTERLY

DRAIN Fuel / water separator QUARTERLY

INSPECT Fuel Leak QUARTERLY

INSPECT

All filters marked with date and run hours at replacement

QUARTERLY

INSPECT All gauges/meters QUARTERLY

INSPECT Breaker(s)/lugs QUARTERLY

INSPECT Frayed/Corroded Wiring QUARTERLY

INSPECT Housing - proper FEMA identification QUARTERLY

INSPECT Loose Bolts/linkage/etc. Replace if missing QUARTERLY

LUBE/ADJUST Various linkages QUARTERLY

CHECK Lube oil level QUARTERLY

DRAIN & REPLACE Coolant ANNUAL / RTS

DRAIN & REPLACE Lube Oil ANNUAL / RTS

REPLACE Air cleaner element(s) ANNUAL / RTS

REPLACE Fuel filter(s) ANNUAL / RTS

REPLACE Fuel/Water Separator ANNUAL / RTS

REPLACE Oil filter(s) ANNUAL / RTS

ACTION ITEM SERVICE REQUIRED CODE ACTION CODE / VOLTAGE CONFIGURATION

CLEAN Clean out Coolant Strainer ANNUAL Voltage Configuration at time of load test

CLEAN DEF Filter ANNUAL 1-Phase Breaker Functionality

DRAIN / REPLACE DEF Fluid ANNUAL 3-Phase Breaker Functionality

CHANGE During Coolant Change - Bleed EGR Coolant COOLANT CHANGE ONLY Output Voltage Stability

REPLACE Crankcase filter EVERY 1,000 hrs

TEST DEF Fluid Concentration EVERY 90 DAYS Start (Hours)

INSPECT / RE-TORQUE

Power Balance Connections (Re-torque terminal bolts to 75 IN-

LBS)

EVERY 90 DAYS Stop (Hours)

COOLANT PROTECTION (Every 90 days) OUTPUT VOLTAGE READINGS (Every 90 Days) adjust if needed

FREEZE POINT: READINGS: BATTERY STATUS: BATTERY REPLACEMENT DATE: PASS

DEF CONCENTRATION (TIER 4 ONLY) SET POINT: ESTOP STATUS: FAIL

SET POINT:

OVERALL GENERATOR READINESS

FUEL FILTER PRIMARY: SECONDARY: BLOW BY (TIER 4 ONLY)

LUBE OIL PRIMARY: SECONDARY: CRANKCASE (TIER 4 ONLY, EVERY 1,000 HRS)

AIR PRIMARY: SECONDARY: DEF (TIER 4 ONLY

COOLANT PRIMARY: SECONDARY:

ACTION CODE New Coolant

Drain/inspect fuel tank (no fuel present) New Lube Oil (15w40)

NOTES

GOVERNMENT FINAL Q/A INSPECTOR:

SIGNATURE OF CONTRACTOR AND GOVERNMENT REPRESENATIVE

FUEL TANK COOLANT / LUBE OIL

NOTE ALL NEW DAMAGE / REPAIRS/ LOAD TST FAILURES / NO-START

CONTRACTOR FINAL Q/A INSPECTOR:

FILTERS (PART & MFG) TIER 4 FILTERS ONLY

TIER 4 SERVICE REQUIREMENT (Applicable Generators) LOAD TEST DETAILS (PERFORMED & COMPLETED UPON COMPLETION OF ALL OTHER SERVICES)

BATTERY / ESTOP STATUS

Load Bank Tested (90minutes)

LOAD TEST RESULTS (CONDUCTED AT MAX CAPACITY)

GENERATOR MAINTENACE CHECKLIST - (TO BE COMPLETED AS SERVICES ARE RENDERED)

FEMA PWS REQUIRED GENERATOR MAINTENACE CHECKS & SERVICES

IDENTIFICATION

CURRENT MAINTENANCE DATA

PRE-EXISTING DAMAGE:

ATTACHMENT 1: GENERATOR MAINTENANCE PROFILE SHEET (GMP) - Oct 2018

Date of Estimate: Date of Repair: Barcode:

Maintenance Location: Service:

Description of Fault:

Repair Needed:

Cost: Part Cost: Freight Cost: Other Total Cost

Repair Completed:

Repair Completed Date:

Contractor Submitted Cost Estimate (Check one): Yes No

Approved by:

CONTRACTOR FEMA Technical Monitor

FEMA COR/Program Office FEMA CO (If needed)

RFP:

ATTACHMENT 2: AUTHORIZATION FOR REPAIR

OCONUS_vPR 10/06/2018

FSR Finding:

Repair Requires Specialized Equipment Not Available by KTR: Yes / No

Total Estimated Cost

Recommended Repairs:

CostParts/Material

$0.00

Non-Mission Capable DLA Generator - Repair Worksheet (> $3,000.00)

Generator ID Generator Location Generator Data

Make Model Gen Vendor Hour Meter Reading NMC Date

Transponder#Generator Size (KW) Barcode

KTR / FEMA Diagnostic Data

Recommendations

FSR / Diagnostic Data

Damage/Findings:

Name:_____________________________ Signature:__________________________________________

DLA Vendor FSR POC & Contact Info Date FSR Contacted Field / GOV POC &Contact Info

Repair Requires >16 manhours to complete: Yes / No

Attachment 3_DLA NMC Repair Worksheet_PR_6Oct18.pdf
NMC Worksheet
PREEXISTING DAMAGERow1:
SET POINT:
PRIMARY:
SECONDARY:
BLOW BY TIER 4 ONLY:
PRIMARY_2:
SECONDARY_2:
CRANKCASE TIER 4 ONLY EVERY 1000 HRS:
PRIMARY_3:
DEF TIER 4 ONLY:
NOTE ALL NEW DAMAGE REPAIRS LOAD TST FAILURES NOSTART:
Service: []
Service Location: []
Condition: []
Date of Service:
Station of Origin: []
Check1:
0: []
1: []
2: []
3: []
4: []
5: []
6: []
7: []
8: []
9: []
10: []
11: []
12: []
13: []
14: []
15: []
16: []
17: []
18: []
19: []
20: []
21: []
22: []
23: []
Run up Hour Meter:
Notes_Text1:
1:
2:
3:
4:
5:
6:
7:
8:
9:
10:
11:
12:
13:
14:
15:
16:
17:
0:
18:
Notes_Text2:
Notes_Text3:
Notes_Text4:
Notes_Text5:
Notes_Text6:
Check2:
1: []
2: []
3: []
0: []
4: []
5: []
8: []
6: []
7: []
9: []
Notes1:
1:
2:
3:
4:
5:
0:
Check3:
0: []
1: []
2: []
3: []
Check4:
3: []
1: []
2: []
FREEZE POINT:
Output Voltage:
Battery1: []
ESTOP: []
Text4:
Voltage Config1:
Voltage Config2:
Start Hours:
Stop Hours:
Check Box5: Off
Check Box6: Off
New Lube Oil 15w40:
Generator Readiness: []
Coolant Check: []
Hour Meter @ Start of Service:
kW Size:
Manufacture:
PRIMARY_4:
SECONDARY_3:
SECONDARY_4:
Clear Form:
Technican Name: TECHNICIAN NAME:
Total Cost: 0
Date of Estimate:
Date of Repair:
Maintenance Location: []
BARCODE:
Service Provided: []
DISCRIPTION:
REPAIR NEEDED:
Repair Completion Date:
Repair Completed: []
YES: Off
NO: Off
Cost Part:
Cost Labor:
Cost Freight:
CLEAR:
Equipment Type: Equipment Type:
RentalFEMA:
Generator Size KW:
USACE Barcode:
Transponder:
Generator Location:
Make:
Model:
ESN:
Hour Meter Reading:
NMC Date:
Name:
DLA Vendor:
FSR POC Contact Info:
Date FSR Contacted:
Field GOV POC Contact Info:
FSR Finding:
Recommended Repairs:
Parts / Materials 1:
Cost 1:
Parts / Materials 2:
Cost 2:
Parts / Materials 3:
Cost 3:
Parts / Materials 4:
Cost 4:
Parts / Materials 5:
Cost 5:
Parts / Materials 6:
Cost 6:
Total: 0
Damage / Findings:
Dropdown1: [Yes]
Dropdown2: []

File details come from the government source that posted it.