QUESTIONS_AND_ANSWER_70FB7019Q00000015.pdf

PDF 82 KB Posted

Attached to
10 year shelf life bottle water Federal contract opportunity
Solicitation number
70FB7019Q00000015
Issued by
Federal Emergency Management Agency Logistics Section

View the file

Other files for this federal contract opportunity

Other files attached to 10 year shelf life bottle water, newest first.
File Type Posted
70FB7019Q00000015_Final.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 06/11/2019

Title: Ten (10) year shelf life water replenishment for Guam distribution center.

Solicitation#: 70FB7019Q00000015 Q&A

Questions from vendors

Page 4 states:

"Primary Container: The water shall be packaged in a 1-liter re-closable and biodegradable packaging (box, pouch or similar biodegradable package) suitable for water consumption. The container shall not contain any sharp edges that could possibly injure the user."

Question 1: Will the government consider accepting a proposal for water that is filled in a plastic 1-liter bottle as the "primary container?"

Answer: The spec does not exclude plastic bottles. "Primary Container: The water shall be packaged in a 1-liter re-closable and biodegradable packaging (box, pouch or similar biodegradable package) suitable for water consumption.

The contractor recognizes that water stored in 1L plastic bottles is generally 7-10 times cheaper than water stored in a box or pouch. Given that the government is seeking the lowest price technically acceptable, the vendor would like to confirm that a proposal including plastic

1L bottles would be considered "technically acceptable."

Page 33 states:

"Volume I-Technical Proposal:

The content of the Technical Proposal must not exceed 5 single spaced pages using font size 12. Each page is one sheet, 8 ó” x 11”, with at least one inch margins on all sides using Times New Roman font. Pages shall be consecutively numbered. The Government will not review content exceeding the 3 page limitations."

Question 2: Is the Volume 1- Technical proposal response limited to 3 pages or 5 pages?

Answer: 5 page limitation