7_Rework_and_RepairES7034.docx

DOCX document 18 KB Posted

Attached to
E-8 Fire Cart Federal contract opportunity
Solicitation number
FA8213-23-Q-3003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document provides rework and repair procedures for nonconforming materials on federal contracts. It defines rework as reprocessing material to fully conform to specifications, while repair reduces but does not eliminate nonconformance. Contractors must submit documented rework procedures for government review and approval before implementing, and repair procedures on a Request for Deviation/Waiver form to the Contracting Officer. Submissions must include the nonconformance cause and corrective actions. Reworked or repaired items must pass reinspection according to a procedure ensuring government standards are met. These requirements flow down to all suppliers and subcontractors.

The related solicitation is for an E-8 Fire Cart from the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base.

View the file

Other files for this federal contract opportunity

Other files attached to E-8 Fire Cart, newest first.
File Type Posted
4_CADPAD Item Marking Instruction - Ver 1.6.pdf PDF
5_Packaging SOW.pdf PDF
2_REPSHIP 11 Mar 14.docx DOCX document
1_AIR_SPEC_Typed.docx DOCX document
3_ADC SOW Jan 2018.docx DOCX document
6_SPI_Combined.pdf PDF
9_FD2020-23-50075 and 22-50043 CDRLS 2.pdf PDF
9_FD2020-22-50043 and 23-50075 FAT CDRLS.pdf PDF
8_Item_Descriptions_Combined.pdf PDF
FA8213-23-Q-3003 Temp.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(End of clause)