(7) HALIBUT (WPB 87) DS FQ4 SCP 21ER0_BLANK.xls
XLS spreadsheet 47 KB Posted
- Attached to
- Dock-Side USCGC HALIBUT (WPB-87340) DS2 FY21 Federal contract opportunity
- Solicitation number
- 70Z080-21-Q-P4580800
About this file
This document contains a pricing schedule for ship repair and maintenance work on the USCGC HALIBUT (WPB-87) during its FY2021 dockside availability period. Definite line items on the schedule include cleaning and inspecting grey water and sewage holding tanks and piping, preserving the forepeak compartment, repairing quick-acting watertight closures, and renewing a sound powered phone bracket. Optional items include modifying stern door cross connect valves and providing laydays. The total price of definite items and total price of definite and optional items are listed as $0.00, indicating this is a template.
The related federal contract opportunity is for the dock-side FY2021 maintenance availability of the USCGC HALIBUT in Marina Del Rey, California. Standard recurring maintenance items to be completed include a MDE top end overhaul W5, cleaning of sewage and grey water system tanks and piping, and hydraulic piping modifications. The solicitation number is 70Z080-21-Q-P4580800 and is being conducted by the Department of Homeland Security's U.S. Coast Guard.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| (5) HALIBUT (WPB 87) DS FQ4 SCP 21R0.pdf | ||
| RFQ SHIP REPAIR COMBINED SYNOPSIS HALIBUT.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC HALIBUT (WPB-87) DOCKSIDE AVAILABILITY FY2021 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | U/W Body, Diver Clean and Inspect | JOB | $0.00 | ||
| D-002 | Main Diesel Engine Assemblies, Perform W-5 Maintenance And Update Control System Configuration | JOB | $0.00 | ||
| D-003 | Grey Water Holding Tank(s), Clean and Inspect | JOB | $0.00 | ||
| D-004 | Sewage Holding Tank(s), Clean and Inspect | JOB | $0.00 | ||
| D-005 | Grey Water Piping, Clean And Flush | JOB | $0.00 | ||
| D-006 | Sewage Piping, Clean And Flush | JOB | $0.00 | ||
| D-007 | Sewage Air Compressor, Remove | JOB | $0.00 | ||
| D-008 | Forepeak Compartment, Preserve - Partial | JOB | $0.00 | ||
| D-009 | Quick-Acting Watertight Closure(s), Repair | JOB | $0.00 | ||
| D-010 | Bracket, Sound Powered Phone, Renew | JOB | $0.00 | ||
| D-011 | Stern Door Cross Connect Valves Modify | JOB | $0.00 | ||
| O-00A | Composite Labor Rate | Hour | 250 | $0.00 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | $0.00 | JOB | $0.00 | |
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(02/02/2021)
Rev-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .