(7) HADDOCK pricing sheet BLANK.xls
XLS spreadsheet 47 KB Posted
- Attached to
- DOCKSIDE: USCG HADDOCK FY 21 DOCKSIDE Federal contract opportunity
- Solicitation number
- 70Z080-21-Q-P4503400
About this file
This pricing sheet and solicitation are for a ship repair contract for the USCGC HADDOCK in fiscal year 2021. The contract will be awarded through solicitation number 70Z080-21-Q-P4503400 and is for standard recurring maintenance items including hull coating, tank inspections, and main diesel engine planned maintenance to be completed at DockSide1 in San Diego, California. The pricing sheet lists various work items with unit prices and extended prices to be completed as part of the availability. It also includes composite labor rates for different locations and templates for cost estimates and breakdowns.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HADDOCK (WPB 87) SPEC.pdf | ||
| HADDOCK.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC HADDOCK (WPB-87) DOCKSIDE AVAILABILITY FY2021 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | U/W Body, Diver Clean and Inspect | JOB | $0.00 | ||
| D-002 | Main Diesel Engine Assemblies, Perform W-5 Maintenance And Update Control System Configuration | JOB | $0.00 | ||
| D-003 | Electrical Power Distribution System, Thermographic Inspection (450 VAC And Below) | JOB | $0.00 | ||
| D-004 | Ventilation System, Engine Room Supply and Exhaust Fan Assemblies, Clean and Inspect | JOB | $0.00 | ||
| D-005 | Ducting, HVAC System, Clean | JOB | $0.00 | ||
| D-006 | Fire Alarm Control Panel, Replace | JOB | $0.00 | ||
| D-007 | Foundation, Boat Winch, Modify | JOB | $0.00 | ||
| D-008 | Halyard Ring Eye Bolts, Install | JOB | $0.00 | ||
| D-009 | HVAC 2-Stage Intake Separator, Modify | JOB | $0.00 | ||
| D-010 | Sewage Air Compressor, Remove | JOB | $0.00 | ||
| D-011 | Insulation, Renew | JOB | $0.00 | ||
| D-012 | Receptacle Box And Sound Powered Telephone Jack Box Mounting Plate, Renew | JOB | $0.00 | ||
| D-013 | Watertight Closures, Assess | JOB | |||
| O-00A | Composite Labor Rate | Hour | 310 | $0.00 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | $0.00 | JOB | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(8/21/2020)
Rev-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .