This document is an award notice for contract n0010423pfc96 issued by the Department of the Navy Naval Supply Systems Command. Oil States Industries, Inc was awarded the contract for $605,641.50 on May 30, 2023 to manufacture 18 each SEAL ASSY WELDMENT with National Stock Number 7HH 5330-01-538-9275 L1. The contract requires the contractor to produce the seal assembly weldments in accordance with technical specifications for material certification, quality assurance, inspection and acceptance, packaging, and delivery requirements outlined in the document.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE 1 OF Form Approved ORDER FOR SUPPLIES OR SERVICES OMB No. 0704-0187

Expires Aug 31, 1992 5. CERTIFIED FOR NA- TIONAL DEFENSE UNDER 2. DELIVERY ORDER NO. 4. REQUISITION/PURCH REQUEST NO. 1. CONTRACT/PURCH ORDER NO. 3. DATE OF ORDER DPAS 15 CRF 700

DO

6. ISSUED BY 7. ADMINISTERED BY (If other than 6) CODE CODE 8. DELIVERY FOB

DEST

OTHER

(See Schedule if other)

11.MARK IF BUSINESS IS FACILITY CODE CODE 10. DELIVER TO FOB POINT BY (Date) 9. CONTRACTOR

SMALL

Q Q 12. DISCOUNT TERMS SMALL DISADVANTAGED NAME AND ADDRESS WOMEN-OWNED

13. MAIL INVOICES TO

Q Q

14. SHIP TO 15. PAYMENT WILL BE MADE BY CODE CODE

MARK ALL PACKAGES AND PAPERS WITH CONTRACT OR

ORDER NUMBER

16. T O DELIVERY This delivery order is issued on another Government agency or in accordance with and subject to terms and conditions of above numbered contract. Y R P D Reference your furnish the following on terms specified herein. E E R PURCHASE O THE CONTRACTOR HEREBY ACCEPTS THE OFFER REPRESENTED BY THE NUMBERED PURCHASE ORDER AS IT MAY PREVIOUSLY HAVE BEEN OR IS NOW ACCEPTANCE. F MODIFIED, SUBJECT TO ALL OF THE TERMS AND CONDITIONS SET FORTH, AND AGREES TO PERFORM THE SAME.

NAME OF CONTRACTOR SIGNATURE TYPED NAME AND TITLE DATE SIGNED

If this box is marked, supplier must sign Acceptance and return the following number of copies:

17. ACCOUNTING AND APPROPRIATION DATA/LOCAL USE

22. 23. 18. 19. 20. 21. QUANTITY ORDERED/ SCHEDULE OF SUPPLIES/SERVICES UNIT AMOUNT ITEM NO. UNIT PRICE ACCEPTED*

Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gatheringand maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection ofinformation, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0187), Washington, DC 20503. Please DO NOT RETURN your form toeither of these addresses. Send your completed form to the procurement official identified in Item 6.

24. UNITED STATES OF AMERICA 25. TOTAL * If quantity accepted by the Government is same as quantity ordered indicate by X. If different, enter 29. actual quantity accepted below quantity ordered and encircle. DIFFERENCES

BY: CONTRACTING/ORDERING OFFICER

27. SHIP. NO. 26. QUANTITY IN COLUMN 20 HAS BEEN 28. D.O. VOUCHER NO. 30. INITIALS RECEIVED ACCEPTED, AND CONFORMS TO THE INSPECTED CONTRACT EXCEPT AS NOTED PARTIAL 33. AMOUNT VERIFIED CORRECT FOR 32. PAID BY

FINAL

31. PAYMENT 34. CHECK NUMBER DATE SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

COMPLETE 36. I certify this account is correct and proper for payment

PARTIAL 35. BILL OF LADING NO.

FINAL SIGNATURE AND TITLE OF CERTIFYING OFFICER DATE

38. RECEIVED BY 40. TOTAL CONTAINERS 41. S/R ACCOUNT NUMBER 42. S/R VOUCHER NO. 37. RECEIVED AT 39. DATE RECEIVED

CONTRACTOR MUST SUBMIT FOUR COPIES OF INVOICE PREVIOUS EDITIONS ARE OBSOLETE EDADD Form 1155, MAY 90

N00104-23-P-FC96 2023 MAY 30 19324-0052 (L1 UCO )

DO-A3

N00104 S4306A

NAVSUP WEAPON SYSTEMS SUPPORT MECH DCMA NAVAL SPECIAL EMPHASIS OPS X

5450 CARLISLE PIKE 700 ROBBINS AVENUE BLDG 2D

MECHANICSBURG,PA 17050-2411 PHILADELPHIA,PA 19111-0000

BUYER: J. CURTIS/N743.5 SCD: A

PHONE: (717) 605-3229

18444

SEE SCHEDULE

OIL STATES INDUSTRIES INC

1031 COMMERCIAL BLVD NORTH NET 30 DAYS

ARLINGTON,TX 76001-7124

POC: (817) 548-4200 SEE BLOCK 15

HQ0337

SEE SCHEDULE DFAS - COLUMBUS CENTER

NORTH ENTITLEMENT OPERATIONS

P O BOX 182317

COLUMBUS,OH 43218-2317

EFT:T

X EMAIL FM R HERNANDEZ 23 MAY 2023 14:43 EST

KEITH RENFRO

SEE BLOCK 9 PRODUCT MANAGER 2023 MAY 25

X 1

SEE SECTION G

SEE SCHEDULE

LEVEL 1

$605,641.50

KLMNOPQRSTT. HAMMAKER

PAGES

OFPAGEREFERENCE NO. OF DOCUMENT BEING CONTINUED

NAME OF OFFEROR OR CONTRACTOR

CONTINUATION SHEET

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

N00104-23-P-FC96 2 46

OIL STATES INDUSTRIES INC

0001 NSN 7HH 5330-01-538-9275 L1

SEAL ASSY WELDMENT SHELF LIFE 9-C0

SEE TECHNICAL REQUIREMENTS IN SECTIONS C, D, E, AND ATTACHMENTS

HM QUP ICQ PMT CD PM WM CUD CT UC LP IC UCL SP MK PACK UNIT PKWT UNIT PKCU OPI

N 001 000 41 1 00 FA JC 0 ED A 00 B 00 EFF 0.0 0.000 M

SUP PKG: MARK IN RED MAX 2 IN HIGH -LEVEL 1- ON ALL SIDES YA6

PACKAGING IS IN ACCORDANCE WITH MIL-STD-2073

INSPECT AT SOURCE

ACCEPT AT SOURCE

SHIP TO

0001AA DEL BY: 2024 NOV 12 ACRN: AA TP: 3 N50286 18 AY $33,646.75

PR N00104-20-X-1755 DO-A3 $605,641.50

M/F: REC. OFF. NON-MILSTRIP

0001AB SEE DD FORM 1423 1 LO NSP

EXHIBIT "A"

AWARD NOTES:

1. Contract is awarded to Oil States; CAGE: 18444; POC: Ray Hernandez; Phone:

817.548.4231; Email: Ray.Hernandez@oilstates.com; Sol N00104-23-Q-FD19.

2. Data Item A001 (inspection and Test Plan) is hereby waived.

3. Change Consignment Instructions to add the following Mark for Line in the address for Portsmouth NSY: M/F Code 133.2.

4. Certifications and DD1423 Contract Data Items requiring inspection and acceptance by DCMA or the Receipt Activity shall be submitted via WAWF. The ship toremains N50286 in the contract; however, the WAWF Acceptance DODAAC is N39040 for Portsmouth NSY.

5. Portsmouth NSY's DODAAC has changed from N00102 to N50286. Any reference to N00102 within this order should be updated to N50286.

6. This order is issued pursuant to EAF.

7. This is a rated order certified for national defense use,and the Contractor will follow all the requirements ofthe Defense Priorities and Allocations Systemregulation (15 CFR 700).

8. Early delivery at no additional cost is authorized and desired.

9. Partial deliveri is authorized.

POC FAX: (717) 605-4236

POC EMAIL: JOEL.CURTIS@NAVY.MIL

N00104-23-P-FC96

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

WSSTERMBA00

CONTACT INFORMATION

When a DCMA office is shown on a Contract/Purchase Order, the Administrative Contracting Officer (ACO) is the primary point of contact and all inquiries shall initially be directed to that office for necessary action.

Inquiries and correspondence directed to the Post Award PCO should be addressed as follows:

Code: ( <N743.5> ) Weapon System LRC: ( <WVG> ) Telephone: ( <7176053229> ) E-Mail: ( <JOEL.J.CURTIS.CIV@US.NAVY.MIL> )

In the event that the listed PCO contact information is no longer valid and a follow-on PCO cannot be identified, contact itimp.wss.fct@navy.mil.

PART I - THE SCHEDULE

SECTION C

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

CLIN: 0001

NIIN: 015389275 ACTIVITY USE ONLY: TDP VERSION NO.: 002

ITEM NAME: SEAL ASSY WELDMENT

1. SCOPE

1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material.

2. APPLICABLE DOCUMENTS

2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained.

2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.

2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract.

2.2.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.

2.2.3 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order.

DRAWING NO CAGE REV DISTR CD

<302574 27826 A B 302566 18444 B B 302569 27826 - B 302571 27826 - B 302570 18444 B B 302572 18444 A B 302597 27826 - B 302575 18444 A B>

2.3

DOCUMENT REFERENCES

SPEC NO. SLASH NO. PART NO REV DATE DISTR CD AMEND CHG NTC SUPP

FED-STD-H28 B 24 APR 19 A

FED-STD-H28 0020 B 21 DEC 94 A 01

ANSI/ASQ Z1.4 01 JAN 08 A

MIL-STD-792 F 19 MAY 06 A

MIL-STD-2035 A 15 MAY 95 A

SAE AMS-S-6758 A 01 SEP 03 A

ISO_9001 15 NOV 08 A

ISO10012 15 APR 03 A

ISO/IEC 17025 15 MAY 05 A

MIL-I-45208 A 24 JUL 81 A 1

MIL-STD-45662 A 01 AUG 88 A

A-A-59004 B 18 NOV 18 A

ANSI/NCSL Z540.3 26 MAR 13 A

0900-LP-001-7000 01 JAN 81 C 01

0900-LP-003-8000 01 JUL 74 A 02

ES-83-0218 C 01 OCT 87 A

S9074-AQ-GIB-010/248 1 12 NOV 19 A

T9074-AS-GIB-010/271 1 11 SEP 14 A

S9074-AR-GIB-010A/278 (CHG A) 14 FEB 13 A

3. REQUIREMENTS

3.1 <Complete 5" Seal Assembly Weldment must be in accordance with Oil States Industries Drawing 302575, Assembly 302575-100, except as amplified or modified herein.>

3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise:

Part - <Nipple - Item 2 on Edwards Aerospace Drawing 302569; Back Flange - Item 1 on Edwards Aerospace Drawing 302571; Hub - Item 2 on Oil States Industries Drawing 302570; Attach Flange - Item 1 on Oil States Industries Drawing 302572; Elbow - Edwards Aerospace Drawing 302597> Material - <ES-83-0218 and SAE-AMS-S-6758>

3.2.1 In addition to all other marking, the cure date of the molded seal must be marked on the outside of each unit package.

3.3 Testing Certification - Certifications are required for the following tests on the items listed below.

Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below.

Test - <Magnetic Particle Inspection> Item - <Nipple - Item 2 on Edwards Aerospace Drawing 302569; Back Flange - Item 1 on Edwards Aerospace Drawing 302571; Hub - Item 2 on Oil States Industries Drawing 302570; Attach Flange - Item 1 on Oil States Industries Drawing 302572; Elbow - Edwards Aerospace Drawing 302597> Performance - <T9074-AS-GIB-010/271> Acceptance - <MIL-STD-2035 or 0900-LP-003-8000>

Test - <Visual and Magnetic Particle Inspection (Final Layer)> Item - <Weldments> Performance - <T9074-AS-GIB-010/271>

Acceptance - <MIL-STD-2035 or 0900-LP-003-8000>

Test - Non-Destructive Tests Item - <Weld Repair (as applicable)> Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification

3.4 Radiography is required on <weldments per Note 3 on Oil States Industries Drawings 302575 and 302574, and must be identified to the weld joint> .

3.5 <Recorded Dimensions A certification of recorded dimensions as depicted in N Note 4 of Edwards Aerospace Drawing 302597 is required. Certification must include the actual measured dimensions. At the time of receipt inspection, rejection of any single piece must be cause for rejection of the entire lot.>

3.6 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing.

3.7 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/

3.8 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable.

3.8.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement.

3.8.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222.

3.8.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system.

3.9 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable.

3.10 Thread Lubricant - Thread lubricants containing molybdenum disulfide must not be used on this material.

Bacteria in water, especially seawater, causes molybdenum disulfide to break down. The by-products of the breakdown form compounds which attack the fasteners. Anti-galling compound A-A-59004 must be used as a replacement when thread lubricant is required for assembly.

3.11 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order.

3.11.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor.

The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below.

a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor.

b. Number of units (and serial/lot numbers) to be delivered in this configuration.

c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product.

d. Information about remedial action being taken to prevent reoccurrence of the non-conformance.

3.11.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail.

3.11.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information:

a. The change priority, change classification (Class I or Class II), and change justification.

b. A complete description of the change to be made and the need for that change.

c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs.

d. Proposed changes to documents controlled by the Government.

e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration.

f. Recommendations about the way a retrofit should be accomplished.

g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product.

h. Impacts to the operational use of the product.

i. Complete estimated life-cycle cost impact of the proposed change.

j. Milestones relating to the processing and implementation of the engineering change.

3.12 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings.

3.13 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection.

3.14 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited.

3.14.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract.

* QUALITY ASSURANCE REQUIREMENTS *

3.15 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer.

3.16 See CDRLs DI-MISC-80875 (welding procedures) and DI-MISC-80876 (weld procedure qualification data) - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor.

Note: These requirements do not apply to tack/spot welds.

3.16.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair).

3.16.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. "WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC."

WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ.")

3.16.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendors responsibility to comply with the requirements of S9074-AQ-GIB-010/248, S9074-AR-GIB-010A/278, and the contract.

3.16.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application.

3.16.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA.

3.16.6 When drawings require hardfacing surface Iron or Nickel content not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results must be submitted as part of the qualification data.

3.16.7 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs clearly showing the fusion area) must be submitted for review and show consistent, minimized dilution. All essential elements and any elements not listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element.

3.16.8 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of

S9074-AR-GIB-010A/278.

3.16.9 When production or repair welding is required on titanium materials, the applicable fabrication plan, facilities procedure, training plan, and active welder qualification must also be submitted for review and approval.

3.16.10 If the contractor's fabrication plan, facilities procedure, training plan, or active welder qualification has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the applicable documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or any future contracts. The contractor's fabrication plan, facilities procedure, training plan, and active welder qualification must be submitted at the same time as the applicable welding procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic format, such as Adobe Acrobat PDF.

3.16.11 See CDRL DI-MISC-80678 (Consumed Weld Metal) - A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following:

a) Filler Metal LOT number(s)

b) Specification and Type

c) A positive statement that the vendor has obtained OQE and verified that each LOT of weld filler material conforms to specification requirements.

d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption.

3.16.12 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor.

3.17 Radiography (RT) - Radiography must be performed in accordance with T9074-AS-GIB-010/271. RT acceptance criteria for weldments to be per the applicabletable of S9074-AR-GIB-010A/278 (P-1 piping) or MIL-STD-2035, class 1, as applicable.

3.17.1 Submission of radiographic shooting sketches for approval is not requiredfor weldments.

3.17.2 All pieces radiographed must be permanently marked with "RT" and a unique traceability number. (Unique traceability number must be directly traceable to the RT film.)

3.17.3 See CDRL DI-MISC-80678 (Production Radiography) - Production Radiographyrequires final acceptance by the Navy. The items listed below must be submitted for final acceptance, cataloging, file, and retention. They must be submitted and approved by the Navy prior to shipment of the applicable hardware. However, when the source certification clause is invoked, they must be submitted a minimum of forty-five (45) working days prior to the date of source certification inspection.

(a) Film

(b) RSS/RSSS

(c) RS

(d) DD250 (with heat numbers corresponding to RT numbers referenced in block 16)

3.18 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate.

3.18.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order.

3.18.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative.

3.18.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement.

3.18.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately.

3.18.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption.

3.19 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected.

3.19.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition.

3.19.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative.

3.20 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately."

3.20.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document.

3.20.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract.

3.20.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract.

3.20.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government.

3.20.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier.

3.21 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following:

3.21.1 Visual examination upon receipt to detect damage during transit.

3.21.2 Inspection for completeness and proper type.

3.21.3 Verification of material quality received.

3.21.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage.

3.21.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation.

3.21.6 Identification and protection from improper use or disposition.

3.21.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use.

3.21.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained.

3.21.9 Material returned to the contractor must be handled as GFM.

3.22 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order.

3.22.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order.

3.23 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component.

3.23.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements.

Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order.

In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing.

3.23.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material.

3.23.3 Traceability markings must be maintained through assembly, and whenever possible must be visible after assembly. For items where the marking is not visible after assembly, a durable tag must be securely attached to the assembly identifying the part number, piece number, traceability number, and the location of the permanent mark.

3.23.4 Marking must be legible and must be located so as to not affect the form, fit, and function of the material.

3.24 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply:

3.24.1 Quantitative chemical and mechanical analysis of material traceable to traceability markings is required.

Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material supplied.

3.24.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified.

The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the original certification forchemical composition must be overstamped and annotated with the unique traceability material and at a minimum contain the information below.

TRACEABILITY MARKING ________________________________________________

(marking on finished item)

IS FABRICATED FROM RAW MATERIAL IDENTIFIED TO

HEAT/LOT NUMBER ______________ AND HEAT TREAT NUMBER _____________________

(when applicable)

_________________________________________ DATE _____________________

(name and signature of auth. co. rep.)

3.24.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements. Transcription of certification data is prohibited.

3.24.4 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable.

3.24.5 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected.

3.25 Material Handling - The written material control process must include the following:

3.25.1 All raw materials must have traceability markings (except as specified below).

3.25.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability.

3.25.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process.

3.25.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors.

3.25.5 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material.

3.25.6 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing.

3.26 Receiving inspection -

3.26.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to another location.

3.26.2 Receiving Inspection must include as a minimum -

Verification that the traceability marking on the material agrees with that on the certification test reports.

Verification that certification test reports are legible and complete.

Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements.

3.27 Discrepancy reporting -

3.27.1 Nonconforming products from sub-tier suppliers must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records must be maintained and available for review by the government Quality Assurance Representative

(QAR).

3.28 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance.

3.28.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size).

SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot.

3.28.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above.

3.28.3 All data concerning material verification (chemical, mechanical or physical properties), traceability (material certifications to material marking), and nondestructive test (NDT) certifications for material must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility.

3.28.4 All material requiring traceability must be 100% inspected for traceability marking and that the marking is legible.

3.28.5 In addition to all other marking, the cure date of the molded seal must be marked on the outside of each unit package.

3.29 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information:

1. Contractor's name, address and date.

2. The contract/purchase order number (for example: N00104-11-P-FA12)

3. The National Stock Number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC

(for example: 1H 4820 012345678 L1) ("N/A" when Not Applicable).

4. Lubricants, sealants, anti-seize, and/or thread locking compounds ("N/A" when Not Applicable).

5. Certification that O-rings, packing, gaskets, or other elastomeric products were installed in a compressed state within an assembly or sub-assembly, prior to expiration of the shelf life ("N/A" when Not Applicable).

6. Manufacturer's compound number ("N/A" when Not Applicable).

7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable).

8. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements and list each contractually invoked conformance/compliance test performed by name and that it was performed satisfactorily.

9. Contractor's or authorized personnel's signature.

PART I - THE SCHEDULE

SECTION D

PACKAGING AND MARKING

CLIN: 0001

NIIN: 015389275 ACTIVITY USE ONLY: TDP VERSION NO.: 002

ITEM NAME: SEAL ASSY WELDMENT

5. PACKAGING

5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below.

MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE

252.211-7003

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)

(a) Definitions. As used in this clause-

"Automatic identification device" means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.

"Concatenated unique item identifier" means-

(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or

(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code; enterprise identifier; original part, lot, or batch number; and serial number within the original part, lot, or batch number.

"Data matrix" means a two-dimensional matrix symbology, which is made up of square or, in some cases, round modules arranged within a perimeter finder pattern and uses the Error Checking and Correction 200 (ECC200) specification found within International Standards Organization (ISO)/International Electrotechnical Commission (IEC) 16022.

"Data qualifier' means a specified character (or string of characters) that immediately precedes a data field that defines the general category or intended use of the data that follows.

"DoD recognized unique identification equivalent" means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html

"DoD item unique identification" means a system of marking items delivered to DoD with unique item identifiers that have machine-readable data elements to distinguish an item from all other like and unlike items. For items that are

252.211-7003 (CONT)

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)

serialized within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier and a unique serial number. For items that are serialized within the part, lot, or batch number within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier; the original part, lot or batch number; and the serial number.

"Enterprise" means the entity (e.g., a manufacturer or vendor) responsible for assigning unique item identifiers to items.

"Enterprise identifier" means a code that is uniquely assigned to an enterprise by an issuing agency.

"Government's unit acquisition cost" means-

(1) For fixed-price type line, subline, or exhibit line items, the unit price identified in the contract at the time of delivery;

(2) For cost-type or undefinitized line, subline, or exhibit line items, the Contractor's estimated fully burdened unit cost to the Government at the time of delivery; and

(3) For items produced under a time-and-materials contract, the Contractor's estimated fully burdened unit cost to the Government at the time of delivery.

"Issuing agency" means an organization responsible for assigning a globally unique identifier to an enterprise, as indicated in the Register of Issuing Agency Codes for ISO/IEC 15459, located at http://www.aimglobal.org/?Reg_Authority15459.

"Issuing agency…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .