General_Services_SOW.docx
DOCX document 27 KB Posted
- Attached to
- TS GOLDEN BEAR General Services Federal contract opportunity
- Solicitation number
- 6991PE19Q000005
About this file
Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_Clauses.pdf | ||
| Wage_Determination.pdf | ||
| General_Contract_-_Quote_Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TITLE: General Services Annual Contract SOW
OVERVIEW:
The intent of this work package is to provide labor, materials and equipment to accomplish and assist with annual maintenance, repairs, inspections, calibrations, and other general vessel support. Contractor is to coordinate with various vendors as required to accomplish all items listed in this work package, as following:
Item 1: SR0302327 - Ship's Cranes; Annual Maintenance and Repairs Item 2: SR5193608 - Annual Life Raft Service 2019 Item 3: SR0302719 - Life boat Crane Assist Item 4: SR0302136 - OWS Annual Inspections and Repairs Item 5: SR0302201 - OCMs Annual Calibration Item 6: SR0302278 - Torque Wrenches and Test Gauges; Annual Calibration Item 7: SR0302135 - Bilge water and Slops Disposal Provide Item 8: SR0302730 - Sanitary Construction Toilet Services Provide Item 9: SR0302003 - Interior Deck Repairs Item 10: Supplemental Labor and Materials
ITEM 1
SR0302327: Ship's Cranes; Annual Maintenance and Repairs
| 1.0 | ABSTRACT |
| 1.1 | The intent of this work order is to furnish the services of a qualified crane technician to perform needed maintenance and repairs for the three (3) ship's stores cranes annually prior to the start of the Golden Bear's cruise. |
| 2.0 | REFERENCES |
| 2.1 | Blueprints in ship's library. |
| 3.0 | ITEM LOCATION / DESCRIPTION |
| 3.1 | Trident Marine Crane, 01 Level port. |
| 3.2 | Trident Marine Crane, 01 Level starboard. |
| 3.3 | EBI Crane, Main Deck. |
| 4.0 | GOVERNMENT FURNISHED EQUIPMENT / MATERIALS / SERVICES |
| 4.1 | None |
| 5.0 | STATEMENT OF WORK |
| 5.1 | Trident Crane: |
| 5.1.1 | Contractor to do a complete inspection and survey and submit a written report of any deficiencies found. Condition Found Report (CFR) to be submitted with all listed deficiencies and suggested repairs. |
| 5.1.2 | Contractor to supply a qualified crane technician who can supply proof of having worked on three (3) or more similar cranes on ships. |
| 5.1.3 | Once the repairs are completed, contractor to supply certified weights to test both the cranes to 6500 lbs. |
| 5.2 | EBI Crane: |
| 5.2.1 | Contractor is responsible for all labor, transportation, rigging, and materials to complete the repairs and weight test as noted in the contract. |
| 5.2.2 | Contractor to supply a qualified crane technician who can supply proof of experience of having worked on at least three (3) similar cranes on ships or shore side installations. |
| 5.2.3 | Contractor’s primary focus is to do a complete inspection and survey of the crane and submit a Condition Found Report (CFR) stating any deficiencies. Repairs will be done through the CFR process. |
| 5.2.4 | Upon completion of the repairs, the Contractor is to supply necessary weights and manpower to conduct the weight test. All weight testing will be conducted in the presence of the Chief Mate or his designee, with a five (5) day advance notice to the Chief Mate prior to the test date. |
| 5.2.5 | For the weight test procedure, contractor to perform an operational load test on the crane. The jib to be tested to 5,000 lbs. at 52 degrees. The main boom to be tested to 17,000 lbs. at 52 degrees. All weight testing to be witnessed to the satisfaction of the Chief Mate. |
| 5.2.6 | After completion of all repairs and weight testing, the crane will be tested by the Chief Mate or his designee to prove acceptable performance and operation. |
| 6.0 | PERFORMANCE CRITERIA / DELIVERABLES |
| 6.1 | Performance: |
| 6.1.1 | The period of performance shall be from the date of contract award (anticipated in early 2019) to the required performance completion date of April 15, 2019. CLIN items must reach completion before April 15, 2019, if at all possible. If for any reason the Contractor feels that the requirement cannot be met, any changes must be agreed upon in writing between the COR and the Contractor. |
| 6.2 | Deliverables: |
| 6.2.1 | Contractor is responsible for submission of a final report upon completion of repairs and weight testing of all three (3) cranes. Report to include but is not limited to the following: condition found, repairs completed, weight testing results, signed off work sheets for all work accomplished, and recommended additional repairs or maintenance needed to be completed by the crew in the future. |
| 6.2.2 | Two (2) each of the reports to be in hard copy, bound format for one (1) each to be submitted to the Chief Mate and Chief Engineer. Electronic copies to be submitted to the Chief Mate, Chief Engineer, and Maritime Administration (MARAD) Marine Surveyor/Port Engineer. |
ITEM 2
SR5193608: Annual Life Raft Service
1.0 ABSTRACT
1.1 This item describes the annual life raft service order for the ship’s 12 davit launched life rafts including providing associated equipment and hydrostatic releases.
2.0 REFERENCES
2.1 None
3.0 ITEM LOCATION / DESCRIPTION
3.1 Contractor to pick up and deliver to the CMA pier after scheduling with Chief Mate.
3.2 Inspection, servicing and re-certification of 12 each Elliot 25P D/L life rafts.
4.0 GOVERNMENT FURNISHED EQUIPMENT / MATERIAL / SERVICES
4.1 Forklift assistance for loading / unloading life rafts.
5.0 STATEMENT OF WORK
5.1 Contractor to pick up from CMA waterfront (12) twelve Elliot, twenty-five (25) person davit-launched life rafts and their associated hydrostatic releases and transport to a USCG/SOLAS approved repair facility.
5.2 Rafts to be serviced to SOLAS pack-A ocean service. Rafts and releases are to be inspected, tested, necessary repairs accomplished and parts/equipment replaced as necessary to bring rafts and releases into compliance. All equipment shall comply with the latest USCG requirements and regulations of the International Convention for the Safety Of Life At Sea.
| 5.3 | Contractor to convey rafts and releases to and from CMA’s waterfront by scheduled appointment time only. Otherwise, contractor shall be responsible for providing forklift services to load/unload. |
| 5.4 | Contractor is to provide all required bottle hydro-tests and renewal of expired or defective equipment and supplies. Contractor is to provide a CFR with listed expired items and costs for approval. Additionally, if any rafts are discovered to be considered unserviceable, contractor is to provide a CFR for replacement rafts (also subject to approval) which is to include costs for associated vessel deck mounting. |
| 5.5 | The contractor shall replace all parts and/or materials expiring prior to June 30, 2020. |
6.0 DELIVERABLES
6.1 Contractor to provide COTR with original and three (3) copies of inspection certificates for rafts and releases including expiration dates of all life raft equipment for each life raft. Each raft and release is to be marked with a sticker noting the latest inspection date. Hydro static releases are to be hand delivered to Chief Mate.
ITEM 3
SR0302719: Life Boat Crane Assist
| 1.0 | ABSTRACT |
| 1.1 | This item describes the Contractor Crane assisting removal, testing and reinstallation of lifeboats to allow for OEM inspection, service, weight test and repairs to both the davits and the lifeboats as required. Contractor is to coordinate with OEM representative for dates and times crane service is required. Contractor is to plan for a minimum of three (3) separate dates for this work. |
| 2.0 | REFERENCES |
| 2.1 | Life boats Technical manuals and drawings. |
| 3.0 | ITEM LOCATION / DESCRIPTION |
| 3.1 | Item Location Port side of ship – dock area |
| 3.2 | Item description: Provide labor, material and equipment and a properly sized crane to assist life boat OEM and crew to remove, test and re-install life boats #2 and #4 and #6 from the davits and life boats #1, #3 and #5 from the water. |
| 3.3 | Weights of boats: |
a) #1 and #2 boat = 7,000lbs
b) #3 and #4 boat = 3,600lbs
c) #5 and #6 boat = 12,500lbs
| 4.0 | GOVERNMENT FURNISHED EQUIPMENT / MATERIAL / SERVICES |
| 4.1 | None |
| 5.0 | STATEMENT OF WORK |
| 5.1 | Supply a crane capable of handling the weight and height of the life boats to and from their davits and from the water. Contractor to supply rigging or a strong back to connect and support boat safely to/from the davits and the water. |
| 5.2 | Supply a crane operator who is a licensed crane operator and has made at least 3 similar lifts with same reach and weight of what is detailed in this proposal. |
#1 and #2 boat = 7,000lbs #3 and #4 boat = 3,600lbs #5 and #6 boat = 12,500lbs (04 deck after port side of ship)
| 5.3 | Contractor is responsible for determining the type of crane and lift capabilities during the ship check for this work and what type of rigging is necessary for the lifts. OEM is to be consulted as to the proper way to lift the boats without causing damage, Ref OEM David Jones – Palfinger – Cell 337-577-6045 |
| 5.4 | Contractor needs to take into account the following: |
| 5.4.1 | Weight and reach of each lift |
| 5.4.2 | Crane footprint and available dock space |
| 5.4.3 | Any Rigging needed to safely handle the boats |
| 5.4.4 | Coordination of this work to be done with Chief Mate John Finch with whom the Contractor will have to arrange for dock availability and entry to and from the dock |
| 5.5 | Contractor is to plan for a minimum of three (3) separate dates for this work. Contractor is to assume that dates will not be consecutive. Any additional days required are to be submitted via CFR and are subject to approval. |
| 6.0 | DELIVERABLES |
| 6.1 | Supply ship and COR with the crane and rigging specifications that Contractor will use for future use in electronic format to Chief Engineer and Chief Mate and COR |
ITEM 4
SR0302136: OWS - Annual Inspections and Repairs
| 1.0 | ABSTRACT |
| 1.1 | The intent of this work order is to test and report any deficiencies while operating the oily water separator annually prior to the start of the Golden Bear's cruise. |
| 2.0 | REFERENCES |
| 2.1 | OEM technical manuals in ship's library. |
| 3.0 | ITEM LOCATION / DESCRIPTION |
| 3.1 | Ecostream, Sigma manufacturer, Engine Room. |
| 4.0 | GOVERNMENT FURNISHED EQUIPMENT / MATERIALS / SERVICES |
| 4.1 | None |
| 5.0 | STATEMENT OF WORK |
| 5.1 | Contractor to provide the services of a factory trained and certified technician to inspect, test, and certify the correct operation prior to the USCG COI in the last two (2) weeks of March. |
| 5.2 | Contractor to supply all labor and materials necessary to do the testing and inspection of the OWS units, two (2) each of different manufacturers. Crew will assist as necessary. All shutdown and alarm functions to be tested and reported as satisfactory and proven to the First Assistant Engineer or Chief Engineer. |
| 5.3 | Contractor to have permission from the Chief Engineer before operating the OWS and to log the exact dates and times of such to allow necessary reporting in the ship’s Oil Record Book. |
| 5.4 | Contractor can use ship’s spares to expedite the possible repairs of any of the two (2) OWS’s. Parts used are to be presented as a CFR and are only to be supplied upon written approval of said CFR. |
| 6.0 | PERFORMANCE CRITERIA / DELIVERABLES |
| 6.1 | The period of performance shall be from the date of contract award (anticipated in early 2019) to the required performance completion date of April 15, 2019. CLIN items must reach completion before April 15, 2019, if at all possible. If for any reason the Contractor feels that the requirement cannot be met, any changes must be agreed upon in writing between the COR and the Contractor. |
| 6.2 | Contractor to supply inspection report to be used for the USCG COI and ABS survey. |
ITEM 5
SR0302201: OCMs - Annual Calibration
| 1.0 | ABSTRACT |
| 1.1 | The intent of this work order is to perform a calibration of the oil content meters (OCMs) annually prior to the start of the Golden Bear's cruise. |
| 2.0 | REFERENCES |
| 2.1 | Manufacturer technical manuals in ship's library. |
| 3.0 | ITEM LOCATION / DESCRIPTION |
| 3.1 | Two (2) Shimadzu Model ET-35A Oil Content Meter for the Sigma Oily Water Separator, port side, engine room. |
| 3.2 | One (1) Deckma Hamburg Type OMD-2005 Measuring Cell for the Alfa Laval Oily Water Separator, starboard side of engine room. |
| 4.0 | GOVERNMENT FURNISHED EQUIPMENT / MATERIALS / SERVICES |
| 4.1 | There is one (1) Shimadzu Oil Content Meter in service and one (1) spare for the Sigma Oily Water Separator - both are calibrated annually. |
| 4.2 | There is one (1) Deckma Hamburg Measuring Cell in service and three (3) spares for the Alfa Laval Oily Water Separator and all four (4) are calibrated every five (5) years as required by the International Oil Pollution Prevention (IOPP) certificate, unless a failure occurs requiring immediate service. |
| 5.0 | STATEMENT OF WORK |
| 5.1 | Contractor to receive three (3) each OCM from the First Engineer or Chief Engineer. |
| 5.2 | Contractor to transport three (3) OCM to/from the shop for recalibration and perform repairs as determined after opening and inspecting upon receipt from the repair shop. |
| 5.3 | Each of the OCMs are to be recalibrated and affixed with a stamp clearing indicating the date of calibration and the shop that performed the repairs/calibration. The job will not be considered completed until this stamp is affixed and witnessed by the First Engineer or Chief Engineer. |
| 5.4 | Each of the OCMs are to have a letter stating the calibration procedures performed and the resultant readings to be used for regulatory purposes. The job will not be considered completed until this documentation is received by the ship. |
| 6.0 | PERFORMANCE CRITERIA / DELIVERABLES |
| 6.1 | Performance: |
| 6.1.1 | The period of performance shall be from the date of contract award (anticipated in early 2019) to the required performance completion date of April 15, 2019. CLIN items must reach completion before April 15, 2019, if at all possible. If for any reason the Contractor feels that the requirement cannot be met, any changes must be agreed upon in writing between the COR and the Contractor. |
| 6.2 | Deliverables: |
| 6.2.1 | Each OCM to have certificates, stating date and calibration results, given to the ship to be used for Port State Control. |
| 6.2.2 | Electronic copy of each to be given to the COR. |
ITEM 6
SR0302278: Torque Wrenches and Test Gauges; Annual Calibration
| 1.0 | ABSTRACT: |
| 1.1 | The intent of this item is to provide labor, material, and equipment to accomplish the following to ensure compliance with the ISM code and chapter IX of SOLAS, the ship is required to establish the accuracy and reliability of a certain inventory of instruments, on which further calibration of the ship’s stock of instruments can be accomplished. Contractor is to provide labor material and equipment for annual calibration of the equipment listed. |
| 2.0 | REFERENCES: |
| 2.1 | None |
| 3.0 | LOCATION OF WORK: |
| 3.1 | N/A |
| 4.0 | OWNER FURNISHED EQUIPMENT/MATERIAL/SERVICES: |
| 4.1 | Gauge Pressure Tester, Model 3112, Serial # 11469 - King Nutronics Corporation, Van Nuys, California. |
| 4.2 | Mechanical Torque Wrench,3/4-inch drive - Stanley Proto. (quantity 2) |
| 4.3 | Digital Torque Wrench, 1/2-inch drive - CDI Torque Products Model 2503CF3 |
| 4.4 | Digital Torque Wrench, 3/8" drive - Armstrong Industrial |
| 4.5 | Digital Torque Wrench, 3/8" Drive - CDI Torque Products Model 1002CF3 |
| 4.6 | Winters Gauge, 0-160 psi |
| 4.7 | Wika Gauge, 0-100 psi, S/N: 03061705 |
| 4.8 | Ashcroft Gauge, 0-30 inHg, S/N: 8232 |
| 4.9 | Ashcroft Gauge, 0-300 psi, S/N: 8234 |
| 4.10 | Marsh Gauge, 0-30 psi, S/N: 6981 |
| 4.11 | Marsh Gauge, 0-600 psi, S/N: 6282 |
| 4.12 | USG Gauge, 0-1000 psi, S/N: 6279 |
| 5.0 | STATEMENT OF WORK: |
| 5.1 | The instruments in Item 4 are to be picked up from vessel and calibrated provided with documentation consistent with ANSI/NCSL standard Z-540 and ISO standard 10012. Return to vessel upon completion of calibration. Contractor shall coordinate with the Chief Engineer for pick-up and redelivery. |
| 6.0 | CONTRACTOR DELIVERABLES: |
| 6.1 | Provide Port Engineer an electronic copy of a service report describing all test results and work performed under this work order. Note that the service report must be received ASAP after completion of work and must be received prior to invoicing. |
ITEM 7
SR0302135: Slops and Hazmat Disposal
| 1.0 | ABSTRACT |
| 1.1 | The intent of this item is to provide for trucking and disposal of an estimated 8,000 gallons of oily bilge waste water and slops and for disposal of hazardous materials on board the vessel. All removals are to be in accordance with all local, state, and federal regulations concerning the removal, transportation and disposal of hazardous material. |
| 2.0 | REFERENCES |
| 2.1 | None |
| 3.0 | ITEM LOCATION / DESCRIPTION |
| 3.1 | TS Golden Bear |
| 4.0 | GOVERNMENT FURNISHED EQUIPMENT / MATERIALS / SERVICES |
| 4.1 | None |
5.0 STATEMENT OF WORK
| 5.1 | All work must be in accordance with standard marine practice and be in compliance with ABS and USCG rules. |
| 5.2 | Contractor is to provide labor, material and equipment to remove water and slops in accordance with all local, state, and federal regulations concerning the removal, transportation and disposal of hazardous materials and liquids. |
| 5.2.1 | Contractor is to provide trucking services and attend the vessel to accomplish the removal and processing of an estimated 8,000 gallons of oily bilge waste water and slop. Contractor is to provide notification to all required regulatory bodies and coordinate with vessel crew regarding the transfer from the vessel to contractor supplied tanker trucks. Contractor is to transport waste water to an approved processing/disposal facility and /process/dispose of waste in accordance with Federal, State and local environmental regulations pertaining to the transport, processing and disposal of oily waste from vessel. Contractor is to coordinate with vessel crew for collection of fluids and ensure proper notification if over the water transfer is required Contractor is to supply all equipment for over the water transfer per USCG regulations. |
| 5.2.2 | Contractor is to provide for processing of the oily water mixture including the bilge water and is to plan for it to be a mixture of lube oils, fuel oils, sludge and water and is to process accordingly. |
| 6.0 | PERFORMANCE CRITERIA / DELIVERABLES |
| 6.1 | Provide copies of hazmat BOL in the form of CFR to the vessel and to the COR. |
| 6.2 | Contractor to provide cost breakdowns as they relate to labor, material, sub-contractors and travel costs, if applicable. Supplementary costs must be approved by the COR by written CFR, RFP Pricing Quotation, and Delivery Order process. |
| 6.3 | Contractor shall provide a CFR to confirm quantity removed. Any cost difference in the quantity disposed of shall be subject to a final price adjustment. |
ITEM 8
SR0302730: Sanitary Construction Toilet Services Provide
| 1.0 | ABSTRACT |
| 1.1 | The intent of this work order is for the contractor to supply sanitary construction style temporary toilets and hand washing station for use during the general services contract. Contractor is to supply regular service of rental toilets to set-up for operation, periodic weekly service cleaning and subsequent removal once the vessel has left the pier for its annual cruise. |
| 2.0 | REFERENCES |
| 2.1 | None |
| 3.0 | ITEM LOCATION / DESCRIPTION |
| 3.1 | California Maritime Academy Pier Area |
| 4.0 | GOVERNMENT FURNISHED EQUIPMENT / MATERIALS / SERVICES |
| 4.1 | None |
| 5.0 | STATEMENT OF WORK |
| 5.1 | Contractor is to provide labor, material and equipment, to transport and perform all operations necessary to supply, service, and relocate portable toilets and hand washing station. Contractor is to coordinate with vessel crew for location and servicing of portable toilets. |
| 5.2 | Contractor is to provide regular service to include delivery of rental toilets and hand washing station, set-up for operation, periodic weekly service cleaning and subsequent removal from location. Cleaning shall also include any minor repairs and parts discovered at time of servicing the unit. All portable toilets are to be graffiti-free and constructed of poly-plastic or heavy-duty type fiberglass and to be of sufficient height to prevent it from being blown over. |
| 5.3 | Contractor is to include vandalism insurance which must be included in the unit cost of the portable toilets. The contractor shall be responsible for any vandalism to the portable units and there shall not be any additional charges for vandalism repairs. All vandalism insurance shall be included in the weekly rental fee for the portable |
toilets.
5.4 Contractor is to provide for any portable toilet delivered in an unserviceable condition, or any unit rendered unserviceable by defect, vandalism, acts of mischief, or acts of nature and all shall be the responsibility of the contractor to supply a toilet in serviceable condition within forty-eight (48) hours of report, at no additional cost.
| 6.0 | PERFORMANCE CRITERIA / DELIVERABLES |
| 6.1 | Performance: |
| 6.1.1 | The period of performance shall be from the date of contract award (anticipated in early 2019) to when the vessel has left for its annual cruise (anticipated mid May 2019.) |
| 6.2 | Deliverables: |
| 6.2.1 | Contractor is responsible for submission in the form of CFR for invoicing purposes. Contractor is to invoice for costs on a quarterly (3 month) basis as well as a final CFR upon completion of the general services contract. |
| 6.2.2 | Contractor to provide cost breakdowns as they relate to labor, material, sub-contractors and travel costs, if applicable. Supplementary costs must be approved by the COR by written CFR, RFP Pricing Quotation, and Delivery Order process. |
ITEM 9
SR0302003: Internal Deck Repairs Provide
| 1.0 | ABSTRACT |
| 1.1 | Various locations on the ship have internal decks that need to be repaired/renewed. Total area to be dealt with is approximately 600 square feet of deck that needs to be removed and the underlayment inspected. If the underlayment has failed, then it must be removed and the steel deck scaled to SP11 and primed and coated then new underlayment installed. |
| 2.0 | REFERENCES |
| 2.1 | None |
| 3.0 | LOCATION |
| 3.1 | Main deck passageway, port side, adjacent food serving line outside of galley: 40’ x 4’ = 160 sq. ft. |
| 3.2 | Aft house, 01 deck passageway port side: 5’ x 3’ = 15 sq. ft. |
| 3.3 | Aft house, 02 deck passageway port side: 20’ x 3’ = 60 sq. ft. |
| 3.4 | Aft house, 02 deck passageway port side to exterior ladder well: 15’ x 3.5’ = 53 sq. ft. |
| 3.5 | Aft house, 02 deck passageway starboard side three (3) locations: 72’ x 3’ = 216 sq. ft. |
4.0 DESCRIPTION
4.1 Contractor responsible for making repairs to flooring such that patched areas have a smooth transition and are no longer considered a safety hazard. Minimum requirements are stated below but not limited to:
4.1.1Removal of all damaged deck flooring down to the steel deck and dispose of properly the old deck materials
4.1.2 Inspect the steel deck and submit CFR to MARAD Surveyor for those areas that need repairs prior to laying in new underlayment and top coat and sealer
4.1.3 Scale and clean the steel to SP3 in preparation painting same to seal prior to laying in underlayment. Contractor is responsible for tenting off living areas and providing ventilation to remove dust fumes from being drawn into the house areas
4.1.4 All materials to be epoxy based for the underlayment and top coat and sealer. Contractor to get approval from Chief Mate prior to beginning the installation of the underlayment to make sure that the deck steel is prepared properly.
4.1.5 Once the underlayment is ready to be installed it must be keyed into the remaining deck materials so that there is no seam that will allow moisture or water to enter areas under the deck coating. This will be a function of the deck preparation and epoxy underlayment and top coat and sealer where they join the existing/remaining deck coating
4.1.6 Contractor shall match surrounding areas to the extent possible supplying and installing similar products.
Contractor is responsible for all interference removal and reinstallation necessary to gain access to the affected decking. Contractor is to supply all necessary labor, materials, transportation and rigging and disposal of removed materials and debris. The job scope has to be scheduled and coordinated with Chief Mate for locations where cadets are currently housed.
5.0 STATEMENT OF WORK
5.1 All work must be in accordance with standard marine practice and be in compliance with ABS and USCG rules.
5.2 Contractor must have done the same type of work on at least 3 ships or multiple jobs aboard the same ship within the last 3 years and supply proof of that experience with a point of contact for each ship or the multiple jobs aboard one or more ships.
5.3 Contractor responsible for all labor, materials, transportation, rigging and disposal of debris and old decking to be disposed of properly.
5.4 Contractor to cover or tent all areas being repaired to prevent dust and debris from being drawn into the ship interior or adjacent rooms by tenting or cover and ventilation supplied by Contractor
5.5 Contractor to remove all interferences that are necessary to insure success of the new decking coating and same interferences to be returned to as found or better condition. If damage is found that requires repairs, bring that to the attention of the attending Marine Surveyor via CFR with costs for materials and labor to repair same Contractor is responsible for the actual measurements of the job as estimated is approximately 500 square feet. Contractor to complete their work to the satisfaction of the Chief Mate and attending MARAD Surveyor.
5.6 Contractor to remove as required all deck covering and below underlayment and dispose of properly per local, state and federal regulations.
5.7 Contractor to fill in with an epoxy underlayment to insure that there are no “tripping hazards” and to assure that any irregularities in the steel deck are prepared properly for the top coat and sealer.
5.8 Contractor to supply all labor and materials and transportation and rigging to install any needed steel coaming or trim needed to support the Epoxy decking materials.
5.9 Contractor to supply all necessary Epoxy to cover the new prepared deck steel and underlayment with at least 1/8” or more thickness and then two (2) coats of sealer with some “nonskid”
5.10 Contractor to reinstall all interferences.
5.11 Contractor is to supply labor material and equipment to patch the areas within the statement of work with similar and matching surrounding materials. Contractor is to verify what materials are to be used and that they are to be of marine grade.
5.12 Contractor is to supply labor material and equipment to cover any areas needing cure time which may be required to walk on prior to proper curing.
| 6.0 | PERFORMANCE CRITERIA / DELIVERABLES |
| 6.1 | Performance: |
| 6.1.1 | The period of performance shall be from the date of contract award (anticipated in early 2019) to when the vessel has left for its annual cruise (anticipated mid April 2019.) |
| 6.2 | Deliverables: |
| 6.2.1 | Contractor to supply a list of materials used including color of the Epoxy underlayment and top coat and sealer. |
| 6.3 | Contractor is responsible for submission of CFR’s for any additional locations. |
| 6.3.1 | Contractor to provide cost breakdowns as they relate to labor, material, sub-contractors and travel costs, if applicable. Supplementary costs must be approved by the COR by written CFR, RFP Pricing Quotation, and Delivery Order process. |
ITEM 10
Supplemental Labor and Materials
1.0 ABSTRACT
1.1 This work package includes contractor support for general items in support of annual regulatory required testing, calibration and repairs and maintenance of associated equipment and vessel maintenance deficiencies. Any additional items that are required and are considered to be within the scope of work, however, were not listed in the statement of work (SOW) above are to be submitted as a CFR. The CFR is to be approved prior to the contractor incurring any additional costs for associated CFR.
2.0 REFERENCES
2.1 None
3.0 ITEM LOCATION / DESCRIPTION
3.1 Various Throughout Vessel
4.0 GOVERNMENT FURNISHED EQUIPMENT / MATERIAL / SERVICES
4.1 None
5.0 STATEMENT OF WORK
5.1 Contractor is to provide a written condition found report (CFR) for work items as denoted above which will require additional costs to complete the requirements of the work package which were not stated in the original statement of work (SOW.)
5.2 Contractor is not to proceed with a CFR until it is approved by the ACO or COR with ACO permission.
5.3 If approved, the contractor is to provide labor material and equipment to accomplish the CFR.
5.4 Contractor is to supply a predetermined supplemental labor rate for any CFR’s required.
6.0 ADDITIONAL WORK AND SUPPLEMENTARY
6.1 Contractor to submit a written Condition Found report (CFR) to the COTR for any additional work outside the SOW. Approval for additional work must be approved by either the COTR ($5000 or less) or the Contracting Officer (over $5000)
6.2 Contractor to provide cost breakdowns as they relate to labor, material, subcontractors and travel costs, if applicable. Supplementary costs must be approved by COTR by written CFR, RFQ, Quotation and Delivery Order process.
Supplementary Labor = 80hrs @ $____/Hr. = Total $___________
Supplementary Material = $12,000