Bid_Tabs_UT_FLAP_3108(1).pdf

PDF 601 KB Posted

Attached to
UT FLAP 3108(1), Cascade Springs Road Federal contract opportunity
Solicitation number
6982AF18B000024
Issued by
Department of Transportation Federal Highway Administration

View the file

Other files for this federal contract opportunity

Other files attached to UT FLAP 3108(1), Cascade Springs Road, newest first.
File Type Posted
UT_FLAP_3108(1)_Bid_Opening_Summary.pdf PDF
A002.pdf PDF
A001.pdf PDF
11.7.18_Cascade_Springs_Road_Horizontal_Alignment_Report.pdf PDF
QnA_11.07.2018.pdf PDF
11.7.18_Cascade_Scenic_Drive_Horizontal_Alignment_Report.pdf PDF
11.7.18_Cascade_Springs_Road_Vertical_Alignment_Report.pdf PDF
QnA_10.24.2018.pdf PDF
UT_FLAP_3108(1)_Final_Geotech_Report.pdf PDF
UT_FLAP_3108(1)_XSections.pdf PDF
6982AF18B000024.pdf PDF
UT_FLAP_3108(1)_Final_Pavement_Report.pdf PDF
UT_FLAP_3108(1)_Final_Hyd_Report.pdf PDF
UT_FLAP_3108(1)_FinalStamped_Reduced.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 11/21/18

1 out of 21

Project No: UT FLAP 3108(1)

Project Name: Cascade Springs Road

Schedule: A

Schedule Type: Base

Solcitation No: 6982AF18B000028

Division: Central Federal Lands

State: UT County: Wasatch

Federal Land: Uinta-Wasatch-Cache National Forest Opened at: Lakewood, CO

Opened by: Ryan Phillips

Date: 11/21/18

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

DSB-GRP TSB Joint Venture $13,528,513.00 377 East 60 South American Fork, UT 84003

Brown Brothers Construction $13,728,885.00 90 North 200 East Loa, UT 84747

ROAD AND HIGHWAY BUILDERS, LLC $14,040,040.00

P.O. Box 70846 Reno, NV 89570

Skyview Excavation & Grading, Inc. $14,040,535.00 446 E. Young St.

Morgan, UT 84050

Staker & Parson Companies $14,675,000.00 89 West 13490 South Draper, UT 84020

Hooker Creek, Inc. $14,827,812.00 1015 Anderson St.

Red Bluff, CA 96080

Engineer's Estimate $11,945,130.00

2 out of 21

Project No: UT FLAP 3108(1)

Project Name: Cascade Springs Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0020 15101-0000 MOBILIZATION

DSB-GRP TSB Joint Venture Lump Sum $1,305,000.00 Brown Brothers Construction Lump Sum $1,397,759.00 ROAD AND HIGHWAY BUILDERS, LLC Lump Sum $1,299,480.00 Skyview Excavation & Grading, Inc. Lump Sum $1,200,000.00 Staker & Parson Companies Lump Sum $1,801,221.00 Hooker Creek, Inc. Lump Sum $1,480,000.00 Engineer's Estimate ALL LPSM Lump Sum $1,269,652.00

A0040 15210-3000 CENTERLINE, VERIFICATION AND STAKING

DSB-GRP TSB Joint Venture $3,150.00 $20,160.00 Brown Brothers Construction $2,000.00 $12,800.00

ROAD AND HIGHWAY BUILDERS, LLC $25,000.00 $160,000.00

Skyview Excavation & Grading, Inc. $1,700.00 $10,880.00 Staker & Parson Companies $3,405.00 $21,792.00 Hooker Creek, Inc. $1,800.00 $11,520.00 Engineer's Estimate 6.400 MILE $2,250.00 $14,400.00

A0060 15214-2000 SURVEY AND STAKING, RETAINING WALL (REINFORCED SOIL SLOPE)

DSB-GRP TSB Joint Venture Lump Sum $12,300.00 Brown Brothers Construction Lump Sum $60,000.00 ROAD AND HIGHWAY BUILDERS, LLC Lump Sum $15,000.00 Skyview Excavation & Grading, Inc. Lump Sum $51,000.00 Staker & Parson Companies Lump Sum $14,850.00 Hooker Creek, Inc. Lump Sum $10,500.00 Engineer's Estimate ALL LPSM Lump Sum $3,000.00

A0080 15215-1000 SURVEY AND STAKING, APPROACH ROAD

DSB-GRP TSB Joint Venture $900.00 $10,800.00 Brown Brothers Construction $700.00 $8,400.00

ROAD AND HIGHWAY BUILDERS, LLC $300.00 $3,600.00

Skyview Excavation & Grading, Inc. $800.00 $9,600.00 Staker & Parson Companies $711.00 $8,532.00 Hooker Creek, Inc. $710.00 $8,520.00 Engineer's Estimate 12 EACH $775.00 $9,300.00

A0100 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE

DSB-GRP TSB Joint Venture $105.00 $6,510.00 Brown Brothers Construction $800.00 $49,600.00

ROAD AND HIGHWAY BUILDERS, LLC $150.00 $9,300.00

Skyview Excavation & Grading, Inc. $800.00 $49,600.00 Staker & Parson Companies $647.00 $40,114.00 Hooker Creek, Inc. $710.00 $44,020.00 Engineer's Estimate 62 EACH $700.00 $43,400.00

3 out of 21

Project No: UT FLAP 3108(1)

Project Name: Cascade Springs Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0120 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES

DSB-GRP TSB Joint Venture $4,500.00 $48,600.00 Brown Brothers Construction $6,000.00 $64,800.00

ROAD AND HIGHWAY BUILDERS, LLC $6,000.00 $64,800.00

Skyview Excavation & Grading, Inc. $6,000.00 $64,800.00 Staker & Parson Companies $6,250.00 $67,500.00 Hooker Creek, Inc. $5,600.00 $60,480.00 Engineer's Estimate 10.800 MILE $5,000.00 $54,000.00

A0140 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL

DSB-GRP TSB Joint Venture $2,030.00 $21,518.00 Brown Brothers Construction $6,000.00 $63,600.00

ROAD AND HIGHWAY BUILDERS, LLC $2,500.00 $26,500.00

Skyview Excavation & Grading, Inc. $6,500.00 $68,900.00 Staker & Parson Companies $6,260.00 $66,356.00 Hooker Creek, Inc. $6,400.00 $67,840.00 Engineer's Estimate 10.600 MILE $4,000.00 $42,400.00

A0160 15301-0000 CONTRACTOR QUALITY CONTROL

DSB-GRP TSB Joint Venture Lump Sum $300,000.00 Brown Brothers Construction Lump Sum $145,000.00 ROAD AND HIGHWAY BUILDERS, LLC Lump Sum $800,000.00 Skyview Excavation & Grading, Inc. Lump Sum $45,000.00 Staker & Parson Companies Lump Sum $49,800.00 Hooker Creek, Inc. Lump Sum $395,000.00 Engineer's Estimate ALL LPSM Lump Sum $200,000.00

A0180 15401-0000 CONTRACTOR TESTING

DSB-GRP TSB Joint Venture Lump Sum $140,000.00 Brown Brothers Construction Lump Sum $410,000.00 ROAD AND HIGHWAY BUILDERS, LLC Lump Sum $400,000.00 Skyview Excavation & Grading, Inc. Lump Sum $85,000.00 Staker & Parson Companies Lump Sum $352,400.00 Hooker Creek, Inc. Lump Sum $508,000.00 Engineer's Estimate ALL LPSM Lump Sum $150,000.00

A0200 15501-0000 CONSTRUCTION SCHEDULE

DSB-GRP TSB Joint Venture Lump Sum $4,500.00 Brown Brothers Construction Lump Sum $29,151.00 ROAD AND HIGHWAY BUILDERS, LLC Lump Sum $10,000.00 Skyview Excavation & Grading, Inc. Lump Sum $8,000.00 Staker & Parson Companies Lump Sum $21,750.00 Hooker Creek, Inc. Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00

4 out of 21

Project No: UT FLAP 3108(1)

Project Name: Cascade Springs Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0220 15705-0100 SOIL EROSION CONTROL, SILT FENCE

DSB-GRP TSB Joint Venture $1.70 $5,950.00 Brown Brothers Construction $10.00 $35,000.00

ROAD AND HIGHWAY BUILDERS, LLC $2.25 $7,875.00

Skyview Excavation & Grading, Inc. $2.50 $8,750.00 Staker & Parson Companies $2.45 $8,575.00 Hooker Creek, Inc. $2.00 $7,000.00 Engineer's Estimate 3,500 LNFT $5.00 $17,500.00

A0240 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

DSB-GRP TSB Joint Venture $2.70 $61,830.00 Brown Brothers Construction $4.25 $97,325.00

ROAD AND HIGHWAY BUILDERS, LLC $4.00 $91,600.00

Skyview Excavation & Grading, Inc. $4.00 $91,600.00 Staker & Parson Companies $2.65 $60,685.00 Hooker Creek, Inc. $3.50 $80,150.00 Engineer's Estimate 22,900 LNFT $4.00 $91,600.00

A0260 15706-0200 SOIL EROSION CONTROL, CHECK DAM

DSB-GRP TSB Joint Venture $4.00 $3,200.00 Brown Brothers Construction $75.00 $60,000.00

ROAD AND HIGHWAY BUILDERS, LLC $110.00 $88,000.00

Skyview Excavation & Grading, Inc. $150.00 $120,000.00 Staker & Parson Companies $157.00 $125,600.00 Hooker Creek, Inc. $81.00 $64,800.00 Engineer's Estimate 800 EACH $200.00 $160,000.00

A0280 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION

DSB-GRP TSB Joint Venture $75.00 $1,200.00 Brown Brothers Construction $500.00 $8,000.00

ROAD AND HIGHWAY BUILDERS, LLC $170.00 $2,720.00

Skyview Excavation & Grading, Inc. $200.00 $3,200.00 Staker & Parson Companies $74.00 $1,184.00 Hooker Creek, Inc. $150.00 $2,400.00 Engineer's Estimate 16 EACH $300.00 $4,800.00

A0300 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

DSB-GRP TSB Joint Venture $2,000.00 $8,000.00 Brown Brothers Construction $1,500.00 $6,000.00

ROAD AND HIGHWAY BUILDERS, LLC $5,500.00 $22,000.00

Skyview Excavation & Grading, Inc. $3,000.00 $12,000.00 Staker & Parson Companies $4,000.00 $16,000.00 Hooker Creek, Inc. $2,200.00 $8,800.00 Engineer's Estimate 4 EACH $3,000.00 $12,000.00

5 out of 21

Project No: UT FLAP 3108(1)

Project Name: Cascade Springs Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0320 15802-0000 WATERING FOR DUST CONTROL

DSB-GRP TSB Joint Venture Lump Sum $85,000.00 Brown Brothers Construction Lump Sum $253,680.00 ROAD AND HIGHWAY BUILDERS, LLC Lump Sum $300,000.00 Skyview Excavation & Grading, Inc. Lump Sum $200,000.00 Staker & Parson Companies Lump Sum $270,650.00 Hooker Creek, Inc. Lump Sum $130,000.00 Engineer's Estimate ALL LPSM Lump Sum $65,000.00

A0340 20101-0000 CLEARING AND GRUBBING

DSB-GRP TSB Joint Venture $16,550.00 $496,500.00 Brown Brothers Construction $10,175.00 $305,250.00

ROAD AND HIGHWAY BUILDERS, LLC $15,000.00 $450,000.00

Skyview Excavation & Grading, Inc. $4,000.00 $120,000.00 Staker & Parson Companies $10,400.00 $312,000.00 Hooker Creek, Inc. $7,500.00 $225,000.00 Engineer's Estimate 30.0 ACRE $6,000.00 $180,000.00

A0360 20202-0000 SELECTIVE CLEARING

DSB-GRP TSB Joint Venture $12.00 $4,800.00 Brown Brothers Construction $40.00 $16,000.00

ROAD AND HIGHWAY BUILDERS, LLC $60.00 $24,000.00

Skyview Excavation & Grading, Inc. $20.00 $8,000.00 Staker & Parson Companies $53.90 $21,560.00 Hooker Creek, Inc. $9.00 $3,600.00 Engineer's Estimate 400 SQYD $20.00 $8,000.00

A0380 20220-1000 REMOVAL, INDIVIDUAL TREE

DSB-GRP TSB Joint Venture $550.00 $1,100.00 Brown Brothers Construction $600.00 $1,200.00

ROAD AND HIGHWAY BUILDERS, LLC $1,500.00 $3,000.00

Skyview Excavation & Grading, Inc. $1,200.00 $2,400.00 Staker & Parson Companies $3,000.00 $6,000.00 Hooker Creek, Inc. $2,500.00 $5,000.00 Engineer's Estimate 2 EACH $400.00 $800.00

A0400 20301-1100 REMOVAL OF GATE

DSB-GRP TSB Joint Venture $250.00 $500.00 Brown Brothers Construction $500.00 $1,000.00

ROAD AND HIGHWAY BUILDERS, LLC $600.00 $1,200.00

Skyview Excavation & Grading, Inc. $1,000.00 $2,000.00 Staker & Parson Companies $863.00 $1,726.00 Hooker Creek, Inc. $240.00 $480.00 Engineer's Estimate 2 EACH $400.00 $800.00

6 out of 21

Project No: UT FLAP 3108(1)

Project Name: Cascade Springs Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0420 20301-1900 REMOVAL OF PIPE CULVERT

DSB-GRP TSB Joint Venture $1,000.00 $23,000.00 Brown Brothers Construction $800.00 $18,400.00

ROAD AND HIGHWAY BUILDERS, LLC $900.00 $20,700.00

Skyview Excavation & Grading, Inc. $2,000.00 $46,000.00 Staker & Parson Companies $862.00 $19,826.00 Hooker Creek, Inc. $750.00 $17,250.00 Engineer's Estimate 23 EACH $1,000.00 $23,000.00

A0440 20301-2400 REMOVAL OF SIGN

DSB-GRP TSB Joint Venture $75.00 $5,100.00 Brown Brothers Construction $100.00 $6,800.00

ROAD AND HIGHWAY BUILDERS, LLC $60.00 $4,080.00

Skyview Excavation & Grading, Inc. $100.00 $6,800.00 Staker & Parson Companies $108.00 $7,344.00 Hooker Creek, Inc. $110.00 $7,480.00 Engineer's Estimate 68 EACH $50.00 $3,400.00

A0460 20302-0400 REMOVAL OF CURB, ASPHALT

DSB-GRP TSB Joint Venture $0.60 $3,540.00 Brown Brothers Construction $10.00 $59,000.00

ROAD AND HIGHWAY BUILDERS, LLC $2.00 $11,800.00

Skyview Excavation & Grading, Inc. $5.00 $29,500.00 Staker & Parson Companies $2.20 $12,980.00 Hooker Creek, Inc. $4.00 $23,600.00 Engineer's Estimate 5,900 LNFT $1.25 $7,375.00

A0480 20302-0700 REMOVAL OF FENCE

DSB-GRP TSB Joint Venture $3.50 $175.00 Brown Brothers Construction $50.00 $2,500.00

ROAD AND HIGHWAY BUILDERS, LLC $100.00 $5,000.00

Skyview Excavation & Grading, Inc. $3.00 $150.00 Staker & Parson Companies $32.40 $1,620.00 Hooker Creek, Inc. $9.50 $475.00 Engineer's Estimate 50 LNFT $15.00 $750.00

A0490 20303-1200 REMOVAL OF PAVED WATERWAY, ASPHALT

DSB-GRP TSB Joint Venture $125.00 $750.00 Brown Brothers Construction $100.00 $600.00

ROAD AND HIGHWAY BUILDERS, LLC $100.00 $600.00

Skyview Excavation & Grading, Inc. $30.00 $180.00 Staker & Parson Companies $101.00 $606.00 Hooker Creek, Inc. $65.00 $390.00 Engineer's Estimate 6 SQYD $8.00 $48.00

7 out of 21

Project No: UT FLAP 3108(1)

Project Name: Cascade Springs Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0500 20303-1600 REMOVAL OF PAVEMENT, ASPHALT

DSB-GRP TSB Joint Venture $6.40 $64,000.00 Brown Brothers Construction $1.50 $15,000.00

ROAD AND HIGHWAY BUILDERS, LLC $4.00 $40,000.00

Skyview Excavation & Grading, Inc. $10.00 $100,000.00 Staker & Parson Companies $4.20 $42,000.00 Hooker Creek, Inc. $11.00 $110,000.00 Engineer's Estimate 10,000 SQYD $8.00 $80,000.00

A0520 20401-0000 ROADWAY EXCAVATION

DSB-GRP TSB Joint Venture $20.00 $2,640,000.00 Brown Brothers Construction $10.39 $1,371,480.00

ROAD AND HIGHWAY BUILDERS, LLC $10.00 $1,320,000.00

Skyview Excavation & Grading, Inc. $20.00 $2,640,000.00 Staker & Parson Companies $14.50 $1,914,000.00 Hooker Creek, Inc. $18.50 $2,442,000.00 Engineer's Estimate 132,000 CUYD $14.00 $1,848,000.00

A0540 20402-0000 SUBEXCAVATION

DSB-GRP TSB Joint Venture $110.00 $220,000.00 Brown Brothers Construction $30.00 $60,000.00

ROAD AND HIGHWAY BUILDERS, LLC $30.00 $60,000.00

Skyview Excavation & Grading, Inc. $52.00 $104,000.00 Staker & Parson Companies $32.35 $64,700.00 Hooker Creek, Inc. $130.00 $260,000.00 Engineer's Estimate 2,000 CUYD $30.00 $60,000.00

A0560 20425-1000 DITCH, EXCAVATION

DSB-GRP TSB Joint Venture $27.00 $6,075.00 Brown Brothers Construction $15.00 $3,375.00

ROAD AND HIGHWAY BUILDERS, LLC $20.00 $4,500.00

Skyview Excavation & Grading, Inc. $10.00 $2,250.00 Staker & Parson Companies $22.00 $4,950.00 Hooker Creek, Inc. $11.00 $2,475.00 Engineer's Estimate 225 LNFT $45.00 $10,125.00

A0580 20441-0000 WASTE

DSB-GRP TSB Joint Venture $60.00 $90,000.00 Brown Brothers Construction $3.02 $4,530.00

ROAD AND HIGHWAY BUILDERS, LLC $5.00 $7,500.00

Skyview Excavation & Grading, Inc. $24.00 $36,000.00 Staker & Parson Companies $5.40 $8,100.00 Hooker Creek, Inc. $43.00 $64,500.00 Engineer's Estimate 1,500 CUYD $5.25 $7,875.00

8 out of 21

Project No: UT FLAP 3108(1)

Project Name: Cascade Springs Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0600 20720-0300 REINFORCEMENT GEOSYNTHETIC, TYPE 3

DSB-GRP TSB Joint Venture $4.20 $71,820.00 Brown Brothers Construction $25.64 $438,444.00

ROAD AND HIGHWAY BUILDERS, LLC $30.00 $513,000.00

Skyview Excavation & Grading, Inc. $3.00 $51,300.00 Staker & Parson Companies $30.55 $522,405.00 Hooker Creek, Inc. $4.50 $76,950.00 Engineer's Estimate 17,100 SQYD $4.50 $76,950.00

A0620 20720-0400 REINFORCEMENT GEOSYNTHETIC, TYPE 4

DSB-GRP TSB Joint Venture $5.00 $48,500.00 Brown Brothers Construction $27.10 $262,870.00

ROAD AND HIGHWAY BUILDERS, LLC $42.00 $407,400.00

Skyview Excavation & Grading, Inc. $4.00 $38,800.00 Staker & Parson Companies $42.00 $407,400.00 Hooker Creek, Inc. $7.50 $72,750.00 Engineer's Estimate 9,700 SQYD $5.25 $50,925.00

A0640 20802-0000 FOUNDATION FILL

DSB-GRP TSB Joint Venture $75.00 $10,500.00 Brown Brothers Construction $50.00 $7,000.00

ROAD AND HIGHWAY BUILDERS, LLC $60.00 $8,400.00

Skyview Excavation & Grading, Inc. $35.00 $4,900.00 Staker & Parson Companies $59.25 $8,295.00 Hooker Creek, Inc. $62.00 $8,680.00 Engineer's Estimate 140 CUYD $100.00 $14,000.00

A0660 21101-2000 ROADWAY OBLITERATION, METHOD 2

DSB-GRP TSB Joint Venture $15.00 $39,000.00 Brown Brothers Construction $5.00 $13,000.00

ROAD AND HIGHWAY BUILDERS, LLC $6.00 $15,600.00

Skyview Excavation & Grading, Inc. $4.00 $10,400.00 Staker & Parson Companies $9.70 $25,220.00 Hooker Creek, Inc. $5.50 $14,300.00 Engineer's Estimate 2,600 SQYD $4.00 $10,400.00

A0680 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2

DSB-GRP TSB Joint Venture $165.00 $61,875.00 Brown Brothers Construction $100.00 $37,500.00

ROAD AND HIGHWAY BUILDERS, LLC $120.00 $45,000.00

Skyview Excavation & Grading, Inc. $95.00 $35,625.00 Staker & Parson Companies $119.00 $44,625.00 Hooker Creek, Inc. $190.00 $71,250.00 Engineer's Estimate 375 CUYD $150.00 $56,250.00

9 out of 21

Project No: UT FLAP 3108(1)

Project Name: Cascade Springs Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0700 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3

DSB-GRP TSB Joint Venture $170.00 $34,000.00 Brown Brothers Construction $100.00 $20,000.00

ROAD AND HIGHWAY BUILDERS, LLC $120.00 $24,000.00

Skyview Excavation & Grading, Inc. $95.00 $19,000.00 Staker & Parson Companies $119.00 $23,800.00 Hooker Creek, Inc. $160.00 $32,000.00 Engineer's Estimate 200 CUYD $175.00 $35,000.00

A0720 25125-0000 BOULDER

DSB-GRP TSB Joint Venture $240.00 $28,800.00 Brown Brothers Construction $30.00 $3,600.00

ROAD AND HIGHWAY BUILDERS, LLC $55.00 $6,600.00

Skyview Excavation & Grading, Inc. $300.00 $36,000.00 Staker & Parson Companies $147.00 $17,640.00 Hooker Creek, Inc. $170.00 $20,400.00 Engineer's Estimate 120 EACH $250.00 $30,000.00

A0740 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED

DSB-GRP TSB Joint Venture $175.00 $210,000.00 Brown Brothers Construction $74.37 $89,244.00

ROAD AND HIGHWAY BUILDERS, LLC $110.00 $132,000.00

Skyview Excavation & Grading, Inc. $95.00 $114,000.00 Staker & Parson Companies $113.00 $135,600.00 Hooker Creek, Inc. $220.00 $264,000.00 Engineer's Estimate 1,200 CUYD $40.00 $48,000.00

A0760 25305-1000 REVET MATTRESS, GALVANIZED OR ALUMINIZED COATED

DSB-GRP TSB Joint Venture $420.00 $546,000.00 Brown Brothers Construction $320.00 $416,000.00

ROAD AND HIGHWAY BUILDERS, LLC $350.00 $455,000.00

Skyview Excavation & Grading, Inc. $440.00 $572,000.00 Staker & Parson Companies $346.00 $449,800.00 Hooker Creek, Inc. $490.00 $637,000.00 Engineer's Estimate 1,300 SQYD $80.00 $104,000.00

A0800 30101-0000 AGGREGATE BASE

DSB-GRP TSB Joint Venture $35.00 $980,000.00 Brown Brothers Construction $35.00 $980,000.00

ROAD AND HIGHWAY BUILDERS, LLC $18.00 $504,000.00

Skyview Excavation & Grading, Inc. $30.00 $840,000.00 Staker & Parson Companies $23.65 $662,200.00 Hooker Creek, Inc. $27.00 $756,000.00 Engineer's Estimate 28,000 TON $27.00 $756,000.00

10 out of 21

Project No: UT FLAP 3108(1)

Project Name: Cascade Springs Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0820 30302-1000 DITCH RECONDITIONING

DSB-GRP TSB Joint Venture $6.50 $31,200.00 Brown Brothers Construction $10.00 $48,000.00

ROAD AND HIGHWAY BUILDERS, LLC $2.00 $9,600.00

Skyview Excavation & Grading, Inc. $12.00 $57,600.00 Staker & Parson Companies $4.30 $20,640.00 Hooker Creek, Inc. $3.50 $16,800.00 Engineer's Estimate 4,800 LNFT $10.00 $48,000.00

A0840 30402-1500 FULL DEPTH RECLAMATION, METHOD 1, 8-INCH DEPTH

DSB-GRP TSB Joint Venture $1.75 $168,000.00 Brown Brothers Construction $0.96 $92,160.00

ROAD AND HIGHWAY BUILDERS, LLC $2.00 $192,000.00

Skyview Excavation & Grading, Inc. $3.00 $288,000.00 Staker & Parson Companies $1.90 $182,400.00 Hooker Creek, Inc. $2.00 $192,000.00 Engineer's Estimate 96,000 SQYD $4.50 $432,000.00

A0860 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE

AGGREGATE, 0.3 TO <3 MILLION ESAL

DSB-GRP TSB Joint Venture $92.00 $2,732,400.00 Brown Brothers Construction $101.00 $2,999,700.00

ROAD AND HIGHWAY BUILDERS, LLC $100.00 $2,970,000.00

Skyview Excavation & Grading, Inc. $107.00 $3,177,900.00 Staker & Parson Companies $98.30 $2,919,510.00 Hooker Creek, Inc. $110.00 $3,267,000.00 Engineer's Estimate 29,700 TON $90.00 $2,673,000.00

A0900 40105-3000 ANTISTRIP ADDITIVE, TYPE 3

DSB-GRP TSB Joint Venture $280.00 $84,000.00 Brown Brothers Construction $230.00 $69,000.00

ROAD AND HIGHWAY BUILDERS, LLC $130.00 $39,000.00

Skyview Excavation & Grading, Inc. $120.00 $36,000.00 Staker & Parson Companies $214.00 $64,200.00 Hooker Creek, Inc. $250.00 $75,000.00 Engineer's Estimate 300 TON $250.00 $75,000.00

A0940 40601-0000 FOG SEAL

DSB-GRP TSB Joint Venture $375.00 $30,000.00 Brown Brothers Construction $600.00 $48,000.00

ROAD AND HIGHWAY BUILDERS, LLC $300.00 $24,000.00

Skyview Excavation & Grading, Inc. $300.00 $24,000.00 Staker & Parson Companies $612.00 $48,960.00 Hooker Creek, Inc. $670.00 $53,600.00 Engineer's Estimate 80 TON $500.00 $40,000.00

11 out of 21

Project No: UT FLAP 3108(1)

Project Name: Cascade Springs Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0960 41102-1000 PRIME COAT, METHOD 1

DSB-GRP TSB Joint Venture $0.75 $135,750.00 Brown Brothers Construction $0.95 $171,950.00

ROAD AND HIGHWAY BUILDERS, LLC $0.75 $135,750.00

Skyview Excavation & Grading, Inc. $1.00 $181,000.00 Staker & Parson Companies $0.86 $155,660.00 Hooker Creek, Inc. $0.97 $175,570.00 Engineer's Estimate 181,000 SQYD $0.75 $135,750.00

A0980 41105-0000 BLOTTER

DSB-GRP TSB Joint Venture $35.00 $49,000.00 Brown Brothers Construction $34.00 $47,600.00

ROAD AND HIGHWAY BUILDERS, LLC $28.00 $39,200.00

Skyview Excavation & Grading, Inc. $35.00 $49,000.00 Staker & Parson Companies $32.35 $45,290.00 Hooker Creek, Inc. $36.00 $50,400.00 Engineer's Estimate 1,400 TON $60.00 $84,000.00

A1000 41201-0000 TACK COAT

DSB-GRP TSB Joint Venture $325.00 $26,000.00 Brown Brothers Construction $875.00 $70,000.00

ROAD AND HIGHWAY BUILDERS, LLC $350.00 $28,000.00

Skyview Excavation & Grading, Inc. $350.00 $28,000.00 Staker & Parson Companies $832.00 $66,560.00 Hooker Creek, Inc. $930.00 $74,400.00 Engineer's Estimate 80 TON $600.00 $48,000.00

A1020 60103-0140 CONCRETE, HEADWALL FOR 24-INCH PIPE CULVERT

DSB-GRP TSB Joint Venture $2,800.00 $8,400.00 Brown Brothers Construction $12,000.00 $36,000.00

ROAD AND HIGHWAY BUILDERS, LLC $13,000.00 $39,000.00

Skyview Excavation & Grading, Inc. $4,000.00 $12,000.00 Staker & Parson Companies $12,950.00 $38,850.00 Hooker Creek, Inc. $6,400.00 $19,200.00 Engineer's Estimate 3 EACH $5,750.00 $17,250.00

A1040 60103-0180 CONCRETE, HEADWALL FOR 36-INCH PIPE CULVERT

DSB-GRP TSB Joint Venture $3,500.00 $10,500.00 Brown Brothers Construction $20,000.00 $60,000.00

ROAD AND HIGHWAY BUILDERS, LLC $20,000.00 $60,000.00

Skyview Excavation & Grading, Inc. $4,200.00 $12,600.00 Staker & Parson Companies $19,400.00 $58,200.00 Hooker Creek, Inc. $6,700.00 $20,100.00 Engineer's Estimate 3 EACH $9,000.00 $27,000.00

12 out of 21

Project No: UT FLAP 3108(1)

Project Name: Cascade Springs Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1060 60201-0400 12-INCH PIPE CULVERT

DSB-GRP TSB Joint Venture $80.00 $3,600.00 Brown Brothers Construction $100.00 $4,500.00

ROAD AND HIGHWAY BUILDERS, LLC $110.00 $4,950.00

Skyview Excavation & Grading, Inc. $60.00 $2,700.00 Staker & Parson Companies $108.00 $4,860.00 Hooker Creek, Inc. $150.00 $6,750.00 Engineer's Estimate 45 LNFT $100.00 $4,500.00

A1080 60201-0600 18-INCH PIPE CULVERT

DSB-GRP TSB Joint Venture $75.00 $11,250.00 Brown Brothers Construction $110.00 $16,500.00

ROAD AND HIGHWAY BUILDERS, LLC $125.00 $18,750.00

Skyview Excavation & Grading, Inc. $75.00 $11,250.00 Staker & Parson Companies $124.00 $18,600.00 Hooker Creek, Inc. $150.00 $22,500.00 Engineer's Estimate 150 LNFT $100.00 $15,000.00

A1100 60201-0800 24-INCH PIPE CULVERT

DSB-GRP TSB Joint Venture $85.00 $127,500.00 Brown Brothers Construction $135.00 $202,500.00

ROAD AND HIGHWAY BUILDERS, LLC $150.00 $225,000.00

Skyview Excavation & Grading, Inc. $80.00 $120,000.00 Staker & Parson Companies $151.00 $226,500.00 Hooker Creek, Inc. $160.00 $240,000.00 Engineer's Estimate 1,500 LNFT $100.00 $150,000.00

A1120 60201-1000 36-INCH PIPE CULVERT

DSB-GRP TSB Joint Venture $85.00 $144,500.00 Brown Brothers Construction $155.00 $263,500.00

ROAD AND HIGHWAY BUILDERS, LLC $170.00 $289,000.00

Skyview Excavation & Grading, Inc. $95.00 $161,500.00 Staker & Parson Companies $172.00 $292,400.00 Hooker Creek, Inc. $200.00 $340,000.00 Engineer's Estimate 1,700 LNFT $120.00 $204,000.00

A1140 60210-0400 END SECTION FOR 12-INCH PIPE CULVERT

DSB-GRP TSB Joint Venture $275.00 $1,100.00 Brown Brothers Construction $200.00 $800.00

ROAD AND HIGHWAY BUILDERS, LLC $270.00 $1,080.00

Skyview Excavation & Grading, Inc. $300.00 $1,200.00 Staker & Parson Companies $269.00 $1,076.00 Hooker Creek, Inc. $180.00 $720.00 Engineer's Estimate 4 EACH $400.00 $1,600.00

13 out of 21

Project No: UT FLAP 3108(1)

Project Name: Cascade Springs Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1160 60210-0500 END SECTION FOR 15-INCH PIPE CULVERT

DSB-GRP TSB Joint Venture $310.00 $1,240.00 Brown Brothers Construction $300.00 $1,200.00

ROAD AND HIGHWAY BUILDERS, LLC $370.00 $1,480.00

Skyview Excavation & Grading, Inc. $500.00 $2,000.00 Staker & Parson Companies $377.00 $1,508.00 Hooker Creek, Inc. $180.00 $720.00 Engineer's Estimate 4 EACH $1,500.00 $6,000.00

A1180 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT

DSB-GRP TSB Joint Venture $350.00 $4,200.00 Brown Brothers Construction $400.00 $4,800.00

ROAD AND HIGHWAY BUILDERS, LLC $490.00 $5,880.00

Skyview Excavation & Grading, Inc. $800.00 $9,600.00 Staker & Parson Companies $485.00 $5,820.00 Hooker Creek, Inc. $180.00 $2,160.00 Engineer's Estimate 12 EACH $1,900.00 $22,800.00

A1200 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT

DSB-GRP TSB Joint Venture $515.00 $26,265.00 Brown Brothers Construction $650.00 $33,150.00

ROAD AND HIGHWAY BUILDERS, LLC $700.00 $35,700.00

Skyview Excavation & Grading, Inc. $1,000.00 $51,000.00 Staker & Parson Companies $700.00 $35,700.00 Hooker Creek, Inc. $300.00 $15,300.00 Engineer's Estimate 51 EACH $600.00 $30,600.00

A1220 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT

DSB-GRP TSB Joint Venture $1,150.00 $56,350.00 Brown Brothers Construction $900.00 $44,100.00

ROAD AND HIGHWAY BUILDERS, LLC $1,000.00 $49,000.00

Skyview Excavation & Grading, Inc. $1,400.00 $68,600.00 Staker & Parson Companies $970.00 $47,530.00 Hooker Creek, Inc. $450.00 $22,050.00 Engineer's Estimate 49 EACH $750.00 $36,750.00

A1240 60212-0800 ELBOW, 24-INCH

DSB-GRP TSB Joint Venture $825.00 $6,600.00 Brown Brothers Construction $500.00 $4,000.00

ROAD AND HIGHWAY BUILDERS, LLC $900.00 $7,200.00

Skyview Excavation & Grading, Inc. $1,500.00 $12,000.00 Staker & Parson Companies $862.00 $6,896.00 Hooker Creek, Inc. $230.00 $1,840.00 Engineer's Estimate 8 EACH $600.00 $4,800.00

14 out of 21

Project No: UT FLAP 3108(1)

Project Name: Cascade Springs Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1260 60212-1000 ELBOW, 36-INCH

DSB-GRP TSB Joint Venture $1,050.00 $1,050.00 Brown Brothers Construction $800.00 $800.00

ROAD AND HIGHWAY BUILDERS, LLC $1,100.00 $1,100.00

Skyview Excavation & Grading, Inc. $2,500.00 $2,500.00 Staker & Parson Companies $1,080.00 $1,080.00 Hooker Creek, Inc. $300.00 $300.00 Engineer's Estimate 1 EACH $1,000.00 $1,000.00

A1280 60404-1000 CATCH BASIN, FLH TYPE 1

DSB-GRP TSB Joint Venture $2,450.00 $41,650.00 Brown Brothers Construction $2,700.00 $45,900.00

ROAD AND HIGHWAY BUILDERS, LLC $2,800.00 $47,600.00

Skyview Excavation & Grading, Inc. $2,400.00 $40,800.00 Staker & Parson Companies $2,965.00 $50,405.00 Hooker Creek, Inc. $2,700.00 $45,900.00 Engineer's Estimate 17 EACH $3,600.00 $61,200.00

A1300 60409-0200 INLET TOP, METAL FRAME AND GRATE, FLH TYPE B

DSB-GRP TSB Joint Venture $1,850.00 $31,450.00 Brown Brothers Construction $1,300.00 $22,100.00

ROAD AND HIGHWAY BUILDERS, LLC $1,700.00 $28,900.00

Skyview Excavation & Grading, Inc. $1,250.00 $21,250.00 Staker & Parson Companies $1,615.00 $27,455.00 Hooker Creek, Inc. $890.00 $15,130.00 Engineer's Estimate 17 EACH $1,600.00 $27,200.00

A1320 60501-0000 STANDARD UNDERDRAIN SYSTEM

DSB-GRP TSB Joint Venture $54.00 $91,800.00 Brown Brothers Construction $90.00 $153,000.00

ROAD AND HIGHWAY BUILDERS, LLC $120.00 $204,000.00

Skyview Excavation & Grading, Inc. $65.00 $110,500.00 Staker & Parson Companies $119.00 $202,300.00 Hooker Creek, Inc. $89.00 $151,300.00 Engineer's Estimate 1,700 LNFT $30.00 $51,000.00

A1340 60602-0300 PIPE ANCHOR ASSEMBLY, 12-INCH

DSB-GRP TSB Joint Venture $1,150.00 $2,300.00 Brown Brothers Construction $800.00 $1,600.00

ROAD AND HIGHWAY BUILDERS, LLC $600.00 $1,200.00

Skyview Excavation & Grading, Inc. $1,200.00 $2,400.00 Staker & Parson Companies $593.00 $1,186.00 Hooker Creek, Inc. $570.00 $1,140.00 Engineer's Estimate 2 EACH $400.00 $800.00

15 out of 21

Project No: UT FLAP 3108(1)

Project Name: Cascade Springs Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1360 60703-0000 CLEANING CULVERTS IN PLACE

DSB-GRP TSB Joint Venture $12.00 $4,800.00 Brown Brothers Construction $40.00 $16,000.00

ROAD AND HIGHWAY BUILDERS, LLC $80.00 $32,000.00

Skyview Excavation & Grading, Inc. $25.00 $10,000.00 Staker & Parson Companies $75.45 $30,180.00 Hooker Creek, Inc. $8.50 $3,400.00 Engineer's Estimate 400 LNFT $50.00 $20,000.00

A1380 60801-0500 PAVED WATERWAY, TYPE 5

DSB-GRP TSB Joint Venture $160.00 $5,600.00 Brown Brothers Construction $400.00 $14,000.00

ROAD AND HIGHWAY BUILDERS, LLC $600.00 $21,000.00

Skyview Excavation & Grading, Inc. $100.00 $3,500.00 Staker & Parson Companies $269.00 $9,415.00 Hooker Creek, Inc. $300.00 $10,500.00 Engineer's Estimate 35 SQYD $300.00 $10,500.00

A1400 60901-1700 CURB, CONCRETE, 18-INCH DEPTH

DSB-GRP TSB Joint Venture $20.00 $224,000.00 Brown Brothers Construction $44.78 $501,536.00

ROAD AND HIGHWAY BUILDERS, LLC $36.00 $403,200.00

Skyview Excavation & Grading, Inc. $25.00 $280,000.00 Staker & Parson Companies $36.45 $408,240.00 Hooker Creek, Inc. $21.00 $235,200.00 Engineer's Estimate 11,200 LNFT $20.00 $224,000.00

A1420 60901-2300 CURB, ASPHALT, 6-INCH DEPTH

DSB-GRP TSB Joint Venture $6.00 $36,600.00 Brown Brothers Construction $35.00 $213,500.00

ROAD AND HIGHWAY BUILDERS, LLC $25.00 $152,500.00

Skyview Excavation & Grading, Inc. $35.00 $213,500.00 Staker & Parson Companies $33.40 $203,740.00 Hooker Creek, Inc. $38.00 $231,800.00 Engineer's Estimate 6,100 LNFT $15.00 $91,500.00

A1440 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS

DSB-GRP TSB Joint Venture $27.00 $64,125.00 Brown Brothers Construction $35.00 $83,125.00

ROAD AND HIGHWAY BUILDERS, LLC $30.00 $71,250.00

Skyview Excavation & Grading, Inc. $25.00 $59,375.00 Staker & Parson Companies $24.00 $57,000.00 Hooker Creek, Inc. $25.00 $59,375.00 Engineer's Estimate 2,375 LNFT $40.00 $95,000.00

16 out of 21

Project No: UT FLAP 3108(1)

Project Name: Cascade Springs Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1460 61702-0000 TERMINAL SECTION (UDOT TYPE 1)

DSB-GRP TSB Joint Venture $1,500.00 $6,000.00 Brown Brothers Construction $1,500.00 $6,000.00

ROAD AND HIGHWAY BUILDERS, LLC $3,000.00 $12,000.00

Skyview Excavation & Grading, Inc. $1,400.00 $5,600.00 Staker & Parson Companies $1,015.00 $4,060.00 Hooker Creek, Inc. $1,040.00 $4,160.00 Engineer's Estimate 4 EACH $2,300.00 $9,200.00

A1480 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT

DSB-GRP TSB Joint Venture $2,300.00 $9,200.00 Brown Brothers Construction $4,500.00 $18,000.00

ROAD AND HIGHWAY BUILDERS, LLC $2,000.00 $8,000.00

Skyview Excavation & Grading, Inc. $4,000.00 $16,000.00 Staker & Parson Companies $3,665.00 $14,660.00 Hooker Creek, Inc. $3,750.00 $15,000.00 Engineer's Estimate 4 EACH $3,500.00 $14,000.00

A1500 61902-0000 GATE

DSB-GRP TSB Joint Venture $6,000.00 $6,000.00 Brown Brothers Construction $30,000.00 $30,000.00

ROAD AND HIGHWAY BUILDERS, LLC $5,000.00 $5,000.00

Skyview Excavation & Grading, Inc. $3,000.00 $3,000.00 Staker & Parson Companies $11,600.00 $11,600.00 Hooker Creek, Inc. $6,000.00 $6,000.00 Engineer's Estimate 1 EACH $8,000.00 $8,000.00

A1520 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY

DSB-GRP TSB Joint Venture $140.00 $11,200.00 Brown Brothers Construction $90.00 $7,200.00

ROAD AND HIGHWAY BUILDERS, LLC $95.00 $7,600.00

Skyview Excavation & Grading, Inc. $110.00 $8,800.00 Staker & Parson Companies $118.00 $9,440.00 Hooker Creek, Inc. $160.00 $12,800.00 Engineer's Estimate 80 HOUR $110.00 $8,800.00

A1540 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH

DSB-GRP TSB Joint Venture $105.00 $8,400.00 Brown Brothers Construction $125.00 $10,000.00

ROAD AND HIGHWAY BUILDERS, LLC $101.00 $8,080.00

Skyview Excavation & Grading, Inc. $100.00 $8,000.00 Staker & Parson Companies $105.00 $8,400.00 Hooker Creek, Inc. $98.00 $7,840.00 Engineer's Estimate 80 HOUR $110.00 $8,800.00

17 out of 21

Project No: UT FLAP 3108(1)

Project Name: Cascade Springs Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1560 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY

DSB-GRP TSB Joint Venture $145.00 $11,600.00 Brown Brothers Construction $150.00 $12,000.00

ROAD AND HIGHWAY BUILDERS, LLC $111.00 $8,880.00

Skyview Excavation & Grading, Inc. $125.00 $10,000.00 Staker & Parson Companies $148.00 $11,840.00 Hooker Creek, Inc. $166.00 $13,280.00 Engineer's Estimate 80 HOUR $135.00 $10,800.00

A1580 62201-1450 BULLDOZER, 350HP MINIMUM FLYWHEEL POWER

DSB-GRP TSB Joint Venture $265.00 $21,200.00 Brown Brothers Construction $170.00 $13,600.00

ROAD AND HIGHWAY BUILDERS, LLC $161.00 $12,880.00

Skyview Excavation & Grading, Inc. $275.00 $22,000.00 Staker & Parson Companies $205.00 $16,400.00 Hooker Creek, Inc. $227.00 $18,160.00 Engineer's Estimate 80 HOUR $140.00 $11,200.00

A1600 62201-2750 MOTOR GRADER

DSB-GRP TSB Joint Venture $165.00 $13,200.00 Brown Brothers Construction $175.00 $14,000.00

ROAD AND HIGHWAY BUILDERS, LLC $146.00 $11,680.00

Skyview Excavation & Grading, Inc. $130.00 $10,400.00 Staker & Parson Companies $153.00 $12,240.00 Hooker Creek, Inc. $150.00 $12,000.00 Engineer's Estimate 80 HOUR $160.00 $12,800.00

A1620 62201-3000 HYDRAULIC EXCAVATOR

DSB-GRP TSB Joint Venture $160.00 $12,800.00 Brown Brothers Construction $175.00 $14,000.00

ROAD AND HIGHWAY BUILDERS, LLC $146.00 $11,680.00

Skyview Excavation & Grading, Inc. $130.00 $10,400.00 Staker & Parson Companies $194.00 $15,520.00 Hooker Creek, Inc. $218.00 $17,440.00 Engineer's Estimate 80 HOUR $190.00 $15,200.00

A1640 62301-0000 GENERAL LABOR

DSB-GRP TSB Joint Venture $60.00 $4,800.00 Brown Brothers Construction $55.00 $4,400.00

ROAD AND HIGHWAY BUILDERS, LLC $43.00 $3,440.00

Skyview Excavation & Grading, Inc. $40.00 $3,200.00 Staker & Parson Companies $57.55 $4,604.00 Hooker Creek, Inc. $40.00 $3,200.00 Engineer's Estimate 80 HOUR $50.00 $4,000.00

18 out of 21

Project No: UT FLAP 3108(1)

Project Name: Cascade Springs Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1660 62302-0100 SPECIAL LABOR, SLOPE SCALING

DSB-GRP TSB Joint Venture $400.00 $48,000.00 Brown Brothers Construction $150.00 $18,000.00

ROAD AND HIGHWAY BUILDERS, LLC $390.00 $46,800.00

Skyview Excavation & Grading, Inc. $410.00 $49,200.00 Staker & Parson Companies $419.50 $50,340.00 Hooker Creek, Inc. $156.00 $18,720.00 Engineer's Estimate 120 HOUR $275.00 $33,000.00

A1680 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES

DSB-GRP TSB Joint Venture $250.00 $20,000.00 Brown Brothers Construction $100.00 $8,000.00

ROAD AND HIGHWAY BUILDERS, LLC $100.00 $8,000.00

Skyview Excavation & Grading, Inc. $160.00 $12,800.00 Staker & Parson Companies $102.00 $8,160.00 Hooker Creek, Inc. $165.00 $13,200.00 Engineer's Estimate 80 HOUR $275.00 $22,000.00

A1700 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES

DSB-GRP TSB Joint Venture $150.00 $12,000.00 Brown Brothers Construction $180.00 $14,400.00

ROAD AND HIGHWAY BUILDERS, LLC $200.00 $16,000.00

Skyview Excavation & Grading, Inc. $150.00 $12,000.00 Staker & Parson Companies $237.00 $18,960.00 Hooker Creek, Inc. $210.00 $16,800.00 Engineer's Estimate 80 HOUR $225.00 $18,000.00

A1720 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH

DSB-GRP TSB Joint Venture $1.50 $202,500.00 Brown Brothers Construction $1.65 $222,750.00

ROAD AND HIGHWAY BUILDERS, LLC $2.00 $270,000.00

Skyview Excavation & Grading, Inc. $1.50 $202,500.00 Staker & Parson Companies $3.80 $513,000.00 Hooker Creek, Inc. $0.42 $56,700.00 Engineer's Estimate 135,000 SQYD $1.50 $202,500.00

A1740 62510-2000 SEEDING, HYDRAULIC METHOD

DSB-GRP TSB Joint Venture $550.00 $14,300.00 Brown Brothers Construction $480.00 $12,480.00

ROAD AND HIGHWAY BUILDERS, LLC $1,600.00 $41,600.00

Skyview Excavation & Grading, Inc. $2,000.00 $52,000.00 Staker & Parson Companies $491.00 $12,766.00 Hooker Creek, Inc. $1,500.00 $39,000.00 Engineer's Estimate 26.0 ACRE $1,200.00 $31,200.00

19 out of 21

Project No: UT FLAP 3108(1)

Project Name: Cascade Springs Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1760 62515-3000 MULCHING, HYDRAULIC METHOD, BONDED FIBER MATRIX

DSB-GRP TSB Joint Venture $4,200.00 $101,640.00 Brown Brothers Construction $3,480.00 $84,216.00

ROAD AND HIGHWAY BUILDERS, LLC $2,000.00 $48,400.00

Skyview Excavation & Grading, Inc. $2,000.00 $48,400.00 Staker & Parson Companies $3,755.00 $90,871.00 Hooker Creek, Inc. $2,100.00 $50,820.00 Engineer's Estimate 24.2 ACRE $1,400.00 $33,880.00

A1780 62901-1000 ROLLED EROSION CONTROL PRODUCT, TYPE 3.B

DSB-GRP TSB Joint Venture $2.35 $18,800.00 Brown Brothers Construction $2.40 $19,200.00

ROAD AND HIGHWAY BUILDERS, LLC $3.00 $24,000.00

Skyview Excavation & Grading, Inc. $3.75 $30,000.00 Staker & Parson Companies $1.90 $15,200.00 Hooker Creek, Inc. $1.50 $12,000.00 Engineer's Estimate 8,000 SQYD $6.00 $48,000.00

A1800 63301-0000 SIGN SYSTEM

DSB-GRP TSB Joint Venture $700.00 $44,800.00 Brown Brothers Construction $650.00 $41,600.00

ROAD AND HIGHWAY BUILDERS, LLC $260.00 $16,640.00

Skyview Excavation & Grading, Inc. $650.00 $41,600.00 Staker & Parson Companies $673.00 $43,072.00 Hooker Creek, Inc. $670.00 $42,880.00 Engineer's Estimate 64 EACH $450.00 $28,800.00

A1820 63308-0000 OBJECT MARKER

DSB-GRP TSB Joint Venture $100.00 $19,400.00 Brown Brothers Construction $100.00 $19,400.00

ROAD AND HIGHWAY BUILDERS, LLC $60.00 $11,640.00

Skyview Excavation & Grading, Inc. $100.00 $19,400.00 Staker & Parson Companies $62.50 $12,125.00 Hooker Creek, Inc. $92.00 $17,848.00 Engineer's Estimate 194 EACH $150.00 $29,100.00

A1840 63309-0100 DELINEATOR, TYPE 1

DSB-GRP TSB Joint Venture $85.00 $10,285.00 Brown Brothers Construction $100.00 $12,100.00

ROAD AND HIGHWAY BUILDERS, LLC $55.00 $6,655.00

Skyview Excavation & Grading, Inc. $100.00 $12,100.00 Staker & Parson Companies $63.00 $7,623.00 Hooker Creek, Inc. $79.00 $9,559.00 Engineer's Estimate 121 EACH $50.00 $6,050.00

20 out of 21

Project No: UT FLAP 3108(1)

Project Name: Cascade Springs Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1860 63316-1000 REMOVE AND RESET SIGN

DSB-GRP TSB Joint Venture $740.00 $5,180.00 Brown Brothers Construction $630.00 $4,410.00

ROAD AND HIGHWAY BUILDERS, LLC $210.00 $1,470.00

Skyview Excavation & Grading, Inc. $675.00 $4,725.00 Staker & Parson Companies $673.00 $4,711.00 Hooker Creek, Inc. $670.00 $4,690.00 Engineer's Estimate 7 EACH $300.00 $2,100.00

A1880 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID

DSB-GRP TSB Joint Venture $625.00 $62,500.00 Brown Brothers Construction $612.00 $61,200.00

ROAD AND HIGHWAY BUILDERS, LLC $910.00 $91,000.00

Skyview Excavation & Grading, Inc. $560.00 $56,000.00 Staker & Parson Companies $550.00 $55,000.00 Hooker Creek, Inc. $570.00 $57,000.00 Engineer's Estimate 100.0 MILE $1,000.00 $100,000.00

A1900 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

DSB-GRP TSB Joint Venture $375.00 $3,375.00 Brown Brothers Construction $1,000.00 $9,000.00

ROAD AND HIGHWAY BUILDERS, LLC $500.00 $4,500.00

Skyview Excavation & Grading, Inc. $1,000.00 $9,000.00 Staker & Parson Companies $304.00 $2,736.00 Hooker Creek, Inc. $150.00 $1,350.00 Engineer's Estimate 9 EACH $300.00 $2,700.00

A1920 63502-1050 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER

DSB-GRP TSB Joint Venture $100.00 $20,000.00 Brown Brothers Construction $50.00 $10,000.00

ROAD AND HIGHWAY BUILDERS, LLC $60.00 $12,000.00

Skyview Excavation & Grading, Inc. $200.00 $40,000.00 Staker & Parson Companies $32.70 $6,540.00 Hooker Creek, Inc. $30.00 $6,000.00 Engineer's Estimate 200 EACH $45.00 $9,000.00

A1940 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

DSB-GRP TSB Joint Venture $25.00 $7,500.00 Brown Brothers Construction $50.00 $15,000.00

ROAD AND HIGHWAY BUILDERS, LLC $10.00 $3,000.00

Skyview Excavation & Grading, Inc. $100.00 $30,000.00 Staker & Parson Companies $13.05 $3,915.00 Hooker Creek, Inc. $52.00 $15,600.00 Engineer's Estimate 300 SQFT $30.00 $9,000.00

21 out of 21

Project No: UT FLAP 3108(1)

Project Name: Cascade Springs Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1960 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

DSB-GRP TSB Joint Venture $30.00 $90,000.00 Brown Brothers Construction $45.00 $135,000.00

ROAD AND HIGHWAY BUILDERS, LLC $20.00 $60,000.00

Skyview Excavation & Grading, Inc. $42.00 $126,000.00 Staker & Parson Companies $38.15 $114,450.00 Hooker Creek, Inc. $43.00 $129,000.00 Engineer's Estimate 3,000 HOUR $45.00 $135,000.00

A1980 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR

DSB-GRP TSB Joint Venture $74.00 $37,000.00 Brown Brothers Construction $55.00 $27,500.00

ROAD AND HIGHWAY BUILDERS, LLC $75.00 $37,500.00

Skyview Excavation & Grading, Inc. $100.00 $50,000.00 Staker & Parson Companies $62.40 $31,200.00 Hooker Creek, Inc. $74.00 $37,000.00 Engineer's Estimate 500 HOUR $60.00 $30,000.00

A2000 65501-0000 ANCHORED WIRED MESH SYSTEM

DSB-GRP TSB Joint Venture $370.00 $925,000.00 Brown Brothers Construction $313.00 $782,500.00

ROAD AND HIGHWAY BUILDERS, LLC $300.00 $750,000.00

Skyview Excavation & Grading, Inc. $500.00 $1,250,000.00 Staker & Parson Companies $280.80 $702,000.00 Hooker Creek, Inc. $330.00 $825,000.00 Engineer's Estimate 2,500 SQYD $360.00 $900,000.00

Total Schedule - All Items

DSB-GRP TSB Joint Venture $13,528,513.00 Brown Brothers Construction $13,728,885.00

ROAD AND HIGHWAY BUILDERS, LLC $14,040,040.00

Skyview Excavation & Grading, Inc. $14,040,535.00 Staker & Parson Companies $14,675,000.00 Hooker Creek, Inc. $14,827,812.00 Engineer's Estimate $11,945,130.00