Plans_-_NP-SER_PMS_FY19(2).pdf

PDF 19 MB Posted

Attached to
Southeast Region Pavement Preservation Federal contract opportunity
Solicitation number
693C73-20-B-000002
Issued by
Department of Transportation Federal Highway Administration

About this file

This solicitation is for pavement preservation services at multiple parks within North Carolina's Southeast Region. Small businesses will competitively bid to provide microsurfacing, pavement markings, wheel stop removal and replacement, and other miscellaneous road and parking area work at Guilford Courthouse National Military Park, Cape Lookout National Seashore, and Moores Creek National Battlefield. The total project cost is estimated between $1 million to $5 million, to be awarded in multiple schedules or contract options. Bids are due in November 2019 with award timing unspecified. Annual representations and certifications must be completed through SAM.gov. Questions should be directed to the Department of Transportation Federal Highway Administration Eastern Federal Lands Highway Division.

Plans - NP-SER PMS FY19(2)

View the file

Other files for this federal contract opportunity

Other files attached to Southeast Region Pavement Preservation, newest first.
File Type Posted
Results of Bid Opening - NP-SER PMS FY19(2).pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
FP14_Eng.pdf PDF
VETS-4212_Form.pdf PDF
NEPA_CE.pdf PDF
IFB_Solicitation_-_NP-SER_PMS_FY19(2).pdf PDF
Synopsis_-_NP-SER_PMS_FY19(2).doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(NO PARKING)

(BICYCLE

MARKING)

(PEDESTRIAN

MARKING)(DOUBLE TURN

LANE-USE ARROW)

ROUTE NO.

CALO- 0900

CALO- 0901

MOCR- 0010

MOCR- 0200

MOCR- 0900

MOCR- 0901

c:i z

ROUTE NAME Ill Ill

Pay Item

63401-0300

PAVEMENT

Pay Item

63401-1500

PAVEMENT

MARKINGS, TYPE B, MARKINGS, TYPE H,

Pay Item

63405-0500

PAVEMENT

MARKINGS,

TYPE B,

SCHEDULE B

STRIPING SUMMARY

Pay Item Pay Item

63405-0550 63405-0600

PAVEMENT MARKINGS,

PAVEMENT

MARKINGS, TYPE B,

TYPE B, STRAIGHT

STRAIGHT /TURN

SOLID SOLID ARROW ::E TURN ARROW ARROW COMBINATION IL

Lnft Lnft Each Each Each

White Yellow White Yellow White White White

VISITOR PARKING 54324 2,300 4 3 2

PICNIC AREA PARKING LOT 104546 700

MOORES CREEK DRIVE 65779 138 1,480

PATRIOTS HALL DRIVE 65778 72 2,640

VISITOR CENTER PARKING 68153 1,074 200

PATRIOTS HALL PARKING 68158 1 270 300

Total 5344 500 210 4,120 4 3 2

Subtotal This sheet 5844 4,330 4 3 2

Rounded Total 6,135 4,350 4 3 2

SCHEDULE D

STRIPING SUMMARY

Pay Item Pay Item

63401-0300 63405-0850 c:i

PAVEMENT

z PAVEMENT MARKINGS, ROUTE NO. ROUTE NAME Ill MARKINGS, TYPE B, TYPE B, REMARKS

Ill SOLID ACCESSIBILITY

IL SYMBOL

Lnft Each

White Yellow White

CALO- 0902 STAFF PARKING LOT 54328.0 710 1

CALO- 0903 MAINTENANCE PARKING LOT 54329.0 60

Total 770 1

Subtotal This sheet 770 1

Rounded Tota I 800 1

PMIS NPS

STATE PROJECT

SHEET

NO. NO. NUMBER

:,EE J1.lQ.. NC NP SER PMS FYl 9(2) C06 TITLE

SHEET 14971

NOTE:

Match existing pavement marking configurations, symbols and words, or as directed by the CO and according to Detail E634-01A.

Pay Item Pay Item

63405-0850 63503-0700

PAVEMENT

TEMPORARY TRAFFIC

MARKINGS, TYPE B,

CONTROL,PAVEMENT REMARKS

ACCESSIBILITY

MARKINGS

SYMBOL

Each Lnft

White/Blue White Yellow

138 1,480

72 2,640

11 210 4,120

11 4,330

11 4,350

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

SUMMARIES AND SCHEDULES

SHEET 4 OF 7

PMIS NPS STATE PROJECT SHEET

NO. NO . NUMBER

TITLE ...21!!... NC NP SER PMS FY19(2) C07

SHEET 1149712

NOTES:

1. Replace traffic detector wire loop system during pavement preservation treatment as approved by the CO and according to Detail E636-01, and E636-03.

2. Place whee/stops according to Detail E609-02.

SCHEDULE A

MISCELLANEOUS SUMMARY

Pay Item Pay Item Pay Item Pay Item Pay Item Pay Item

15706-1000 20301-3900 20302-2600 60920-0000 63502-2000 63602-6020

REMOVAL OF TEMPORARY SYSTEM

z

SOIL EROSION PAVEMENT REMOVAL OF TRAFFIC INSTALLATION, ROUTE NO. ROUTE NAME II) REMARKS

II) CONTROL, INLET MARKINGS, PAVEMENT CONTROL, TRAFFIC

:E PROTECTION SYMBOLS AND MARKINGS PORTABLE DETECTOR WIRE

WORDS CHANGEABLE LOOP

Each Each Lnft Each Each Each

GUCO - 00l0E TOUR ROAD EAST 78374 40 2 1

GUCO - 0010W TOUR ROAD WEST 78379 13 832 1

GUCO - 0900 VISITOR PARKING CENTER 69342 3 4 822

GUCO - 0903 OVERFLOW PARKING 69361 6 1108 5 1

GUCO -0904 TOUR STOP #2 78638 186

GUCO - 0905 TOUR STOP #3 78642 123

GUCO -0906 TOUR STOP #4 78644 389

GUCO - 0907 TOUR STOP #5 78646 265

GUCO - 0908 TOUR STOP #6 69350 431

GUCO - 0909 TOUR STOP #7 78648 135

GUCO - 0910 TOUR STOP #8 78649 181 6

GUCO -0911

PARKING AREA COLONIAL

233133 590

HERITAGE CTR.

Subtotal this sheet 3 63 5,062 11 2 3

Rounded Total 3 65 5,315 11 2 3

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

SUMMARIES AND SCHEDULES

SHEET 5 OF 7

RESET

WHEELSTOP

(REMOVE & RESET)

PMIS NPS STATE PROJECT

SHEET

NO. NO NUMBER

TITLE ...21Q_ NC NP SER PMS FY19(2) COB

SHEFT 14971

NOTES:

1. Replace traffic detector wire loop system during micro surfacing treatment as directed by the CO and according to Details £636-01 and £636-03.

2. Place whee/stops according to Detail £609-02.

3. Replace speed hump to match existing.

4. If the existing speed humps are in good working condition, salvage them as directed by the CO.

SCHEDULE B

MISCELLANEOUS SUMMARY

Pay Item Pay Item Pay Item Pay Item Pay Item Pay Item Pay Item

15706-1000 20301-3900 20302-2600 20301-3420 60920-0000 63312-0000 63602-6020 c:i REMOVAL OF SYSTEM z

SOIL EROSION PAVEMENT REMOVAL OF INSTALLATION, ROUTE NO. ROUTE NAME Ul REMOVAL OF RESET REMARKS Ul CONTROL, INLET MARKINGS, PAVEMENT SPEED HUMP TRAFFIC

:E SPEED HUMP WHEELSTOP

IL PROTECTION SYMBOLS AND MARKINGS DETECTOR WIRE

WORDS LOOP

Each Each Lnft Each Each Each Each

CALO- 0900 VISITOR PARKING 54324 12 2300 8 1

CALO- 0901 PICNIC AREA PARKING LOT 104546 2 700 1

MOC R- 0010 MOORES CREEK DRIVE 65779 1618 1 1 1 Remove and Add Speed Hump

MOCR- 0200 PATRIOTS HALL DRIVE 65778 2712 1 1 1 Remove and Add Speed Hump

MOCR- 0900 VISITOR CENTER PARKING 68153 5 3 1274

MOCR- 0901 PATRIOTS HALL PARKING 68158 3 1570 18

Subtotal this sheet 5 20 10,174 2 26 2 4

Rau nded Tota I 5 20 10,680 2 26 2 4

SCHEDULE D

MISCELLANEOUS SUMMARY

Pay Item Pay Item Pay Item Pay Item

15706-1000 20301-3900 20302-2600 60920-0000 c:i REMOVAL OF z

ROUTE NO. ROUTE NAME Ul SOIL EROS ION PAVEMENT REMOVAL OF

REMARKS

Ul CONTROL, INLET MARKINGS, PAVEMENT :E

IL PROTECTION SYMBOLS AND MARKINGS

WORDS

Each Each Lnft

CALO- 0902 STAFF PARKING LOT 54328 1 710

CALO- 0903 MAINTENANCE PARKING LOT 54329 60

MOCR- 0902 ADMINISTRATIVE OFFICE PARKING 74692 3

Subtotal this sheet 3 1 770 13

Rounded Total 3 1 800 13

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

SUMMARIES AND SCHEDULES

SHEET 6 OF 7

(REMOVE & RESET)

RESET

WHEELSTOP

(REMOVE & RESET)

Each

File details come from the government source that posted it. Updated .