Plans_-_NP-SER_PMS_FY19(2).pdf
PDF 19 MB Posted
- Attached to
- Southeast Region Pavement Preservation Federal contract opportunity
- Solicitation number
- 693C73-20-B-000002
About this file
This solicitation is for pavement preservation services at multiple parks within North Carolina's Southeast Region. Small businesses will competitively bid to provide microsurfacing, pavement markings, wheel stop removal and replacement, and other miscellaneous road and parking area work at Guilford Courthouse National Military Park, Cape Lookout National Seashore, and Moores Creek National Battlefield. The total project cost is estimated between $1 million to $5 million, to be awarded in multiple schedules or contract options. Bids are due in November 2019 with award timing unspecified. Annual representations and certifications must be completed through SAM.gov. Questions should be directed to the Department of Transportation Federal Highway Administration Eastern Federal Lands Highway Division.
Plans - NP-SER PMS FY19(2)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - NP-SER PMS FY19(2).pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| FP14_Eng.pdf | ||
| VETS-4212_Form.pdf | ||
| NEPA_CE.pdf | ||
| IFB_Solicitation_-_NP-SER_PMS_FY19(2).pdf | ||
| Synopsis_-_NP-SER_PMS_FY19(2).doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(NO PARKING)
(BICYCLE
MARKING)
(PEDESTRIAN
MARKING)(DOUBLE TURN
LANE-USE ARROW)
ROUTE NO.
CALO- 0900
CALO- 0901
MOCR- 0010
MOCR- 0200
MOCR- 0900
MOCR- 0901
c:i z
ROUTE NAME Ill Ill
Pay Item
63401-0300
PAVEMENT
Pay Item
63401-1500
PAVEMENT
MARKINGS, TYPE B, MARKINGS, TYPE H,
Pay Item
63405-0500
PAVEMENT
MARKINGS,
TYPE B,
SCHEDULE B
STRIPING SUMMARY
Pay Item Pay Item
63405-0550 63405-0600
PAVEMENT MARKINGS,
PAVEMENT
MARKINGS, TYPE B,
TYPE B, STRAIGHT
STRAIGHT /TURN
SOLID SOLID ARROW ::E TURN ARROW ARROW COMBINATION IL
Lnft Lnft Each Each Each
White Yellow White Yellow White White White
VISITOR PARKING 54324 2,300 4 3 2
PICNIC AREA PARKING LOT 104546 700
MOORES CREEK DRIVE 65779 138 1,480
PATRIOTS HALL DRIVE 65778 72 2,640
VISITOR CENTER PARKING 68153 1,074 200
PATRIOTS HALL PARKING 68158 1 270 300
Total 5344 500 210 4,120 4 3 2
Subtotal This sheet 5844 4,330 4 3 2
Rounded Total 6,135 4,350 4 3 2
SCHEDULE D
STRIPING SUMMARY
Pay Item Pay Item
63401-0300 63405-0850 c:i
PAVEMENT
z PAVEMENT MARKINGS, ROUTE NO. ROUTE NAME Ill MARKINGS, TYPE B, TYPE B, REMARKS
Ill SOLID ACCESSIBILITY
IL SYMBOL
Lnft Each
White Yellow White
CALO- 0902 STAFF PARKING LOT 54328.0 710 1
CALO- 0903 MAINTENANCE PARKING LOT 54329.0 60
Total 770 1
Subtotal This sheet 770 1
Rounded Tota I 800 1
PMIS NPS
STATE PROJECT
SHEET
NO. NO. NUMBER
:,EE J1.lQ.. NC NP SER PMS FYl 9(2) C06 TITLE
SHEET 14971
NOTE:
Match existing pavement marking configurations, symbols and words, or as directed by the CO and according to Detail E634-01A.
Pay Item Pay Item
63405-0850 63503-0700
PAVEMENT
TEMPORARY TRAFFIC
MARKINGS, TYPE B,
CONTROL,PAVEMENT REMARKS
ACCESSIBILITY
MARKINGS
SYMBOL
Each Lnft
White/Blue White Yellow
138 1,480
72 2,640
11 210 4,120
11 4,330
11 4,350
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
SUMMARIES AND SCHEDULES
SHEET 4 OF 7
PMIS NPS STATE PROJECT SHEET
NO. NO . NUMBER
TITLE ...21!!... NC NP SER PMS FY19(2) C07
SHEET 1149712
NOTES:
1. Replace traffic detector wire loop system during pavement preservation treatment as approved by the CO and according to Detail E636-01, and E636-03.
2. Place whee/stops according to Detail E609-02.
SCHEDULE A
MISCELLANEOUS SUMMARY
Pay Item Pay Item Pay Item Pay Item Pay Item Pay Item
15706-1000 20301-3900 20302-2600 60920-0000 63502-2000 63602-6020
REMOVAL OF TEMPORARY SYSTEM
z
SOIL EROSION PAVEMENT REMOVAL OF TRAFFIC INSTALLATION, ROUTE NO. ROUTE NAME II) REMARKS
II) CONTROL, INLET MARKINGS, PAVEMENT CONTROL, TRAFFIC
:E PROTECTION SYMBOLS AND MARKINGS PORTABLE DETECTOR WIRE
WORDS CHANGEABLE LOOP
Each Each Lnft Each Each Each
GUCO - 00l0E TOUR ROAD EAST 78374 40 2 1
GUCO - 0010W TOUR ROAD WEST 78379 13 832 1
GUCO - 0900 VISITOR PARKING CENTER 69342 3 4 822
GUCO - 0903 OVERFLOW PARKING 69361 6 1108 5 1
GUCO -0904 TOUR STOP #2 78638 186
GUCO - 0905 TOUR STOP #3 78642 123
GUCO -0906 TOUR STOP #4 78644 389
GUCO - 0907 TOUR STOP #5 78646 265
GUCO - 0908 TOUR STOP #6 69350 431
GUCO - 0909 TOUR STOP #7 78648 135
GUCO - 0910 TOUR STOP #8 78649 181 6
GUCO -0911
PARKING AREA COLONIAL
233133 590
HERITAGE CTR.
Subtotal this sheet 3 63 5,062 11 2 3
Rounded Total 3 65 5,315 11 2 3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
SUMMARIES AND SCHEDULES
SHEET 5 OF 7
RESET
WHEELSTOP
(REMOVE & RESET)
PMIS NPS STATE PROJECT
SHEET
NO. NO NUMBER
TITLE ...21Q_ NC NP SER PMS FY19(2) COB
SHEFT 14971
NOTES:
1. Replace traffic detector wire loop system during micro surfacing treatment as directed by the CO and according to Details £636-01 and £636-03.
2. Place whee/stops according to Detail £609-02.
3. Replace speed hump to match existing.
4. If the existing speed humps are in good working condition, salvage them as directed by the CO.
SCHEDULE B
MISCELLANEOUS SUMMARY
Pay Item Pay Item Pay Item Pay Item Pay Item Pay Item Pay Item
15706-1000 20301-3900 20302-2600 20301-3420 60920-0000 63312-0000 63602-6020 c:i REMOVAL OF SYSTEM z
SOIL EROSION PAVEMENT REMOVAL OF INSTALLATION, ROUTE NO. ROUTE NAME Ul REMOVAL OF RESET REMARKS Ul CONTROL, INLET MARKINGS, PAVEMENT SPEED HUMP TRAFFIC
:E SPEED HUMP WHEELSTOP
IL PROTECTION SYMBOLS AND MARKINGS DETECTOR WIRE
WORDS LOOP
Each Each Lnft Each Each Each Each
CALO- 0900 VISITOR PARKING 54324 12 2300 8 1
CALO- 0901 PICNIC AREA PARKING LOT 104546 2 700 1
MOC R- 0010 MOORES CREEK DRIVE 65779 1618 1 1 1 Remove and Add Speed Hump
MOCR- 0200 PATRIOTS HALL DRIVE 65778 2712 1 1 1 Remove and Add Speed Hump
MOCR- 0900 VISITOR CENTER PARKING 68153 5 3 1274
MOCR- 0901 PATRIOTS HALL PARKING 68158 3 1570 18
Subtotal this sheet 5 20 10,174 2 26 2 4
Rau nded Tota I 5 20 10,680 2 26 2 4
SCHEDULE D
MISCELLANEOUS SUMMARY
Pay Item Pay Item Pay Item Pay Item
15706-1000 20301-3900 20302-2600 60920-0000 c:i REMOVAL OF z
ROUTE NO. ROUTE NAME Ul SOIL EROS ION PAVEMENT REMOVAL OF
REMARKS
Ul CONTROL, INLET MARKINGS, PAVEMENT :E
IL PROTECTION SYMBOLS AND MARKINGS
WORDS
Each Each Lnft
CALO- 0902 STAFF PARKING LOT 54328 1 710
CALO- 0903 MAINTENANCE PARKING LOT 54329 60
MOCR- 0902 ADMINISTRATIVE OFFICE PARKING 74692 3
Subtotal this sheet 3 1 770 13
Rounded Total 3 1 800 13
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
SUMMARIES AND SCHEDULES
SHEET 6 OF 7
(REMOVE & RESET)
RESET
WHEELSTOP
(REMOVE & RESET)
Each
File details come from the government source that posted it. Updated .