Pavement Report Addendum
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| VETS-4212_Form.pdf | ||
| NEPA_CE.pdf | ||
| Iron_River_RIP_Report_Redacted.pdf | ||
| IFB_Solicitiation_-_FW_IRRI-10(1).pdf | ||
| Pavement_Memo.pdf | ||
| FP14_Eng.pdf | ||
| Plans_-_FW_IRRI-10(1).pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| Synopsis_-_FW_IRRI-10(1).doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 of 2 Pages
Form FHWA-201 (Rev. 11-67)
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
Use this form in lieu of transmittal slips within Dept. of Trans. When message comment is to be retained as file material. Do not prepare carbons. Not to be used in lieu of Form FHWA- 121 for informal correspondence. MINUTE-MEMO
\\fhfl15fileserve.flhd.fhwa.dot.gov\Data\PROJECTS\_FWS\IRRI\10(1)\Techserv\Pavement\Correspondence\IRRI 10(1) Pavement Report Addendum_ME_knb.doc
SUBJECT: Addendum - Pavement Recommendations for Project FWS IRRI 10(1)
TO MESSAGE/COMMENT FROM/DATE
R. Kotadia Project Manager
And:
C. Burnell Highway Design Manager
This addendum to the pavement report FY-19-01 for FWS IRRI 10(1), Iron River National Fish Hatchery, provides additional recommendations based on revised design information, and should be used in conjunction with the project Pavement Report.
Main and Lower Level Entrance Roads (Routes 10AZ & BZ) The revised rehabilitation pavement section omits the initial tack coat application in accordance with the table below. Table 1 will replace Table 7 in the report.
Table 1. IRRI Road Rehabilitation – SAMI & Asphalt Overlay
Layer Minimum Thickness
(in)
Comments
Asphalt Surface Course
Asphalt Concrete Pavement – Gyratory Method (GACP), 0.3 to 3 x 106 ESAL’s, PG 58-34, ½” Nominal
Maximum Size Aggregate (NMSA), Type IV roughness
Asphalt Tack Coat
AC Tack Coat as per Section 412 of the
FP-14 Specifications
Chip Seal 1B --- Single Course Chip Seal Type 1B, per
Section 407 of the FP-14 Specifications, Table 407-2
Main and Lower Level Hatchery Parking Lots (Routes-900AZ & BZ) Portions of the parking areas may be milled prior to the asphalt overlay placement. Recommended crack sealing and filling is not necessary in milled areas. In addition, spot repair, or patching can be performed after milling operations in accordance with the table below. Table 2 will replace Table 4 in the report.
Table 2. Full Depth Asphalt Patch, Type 1
Layer Minimum Thickness
Asphalt Intermediate
Asphalt Concrete Type II, 0.3 to 3 x 106 ESAL’s, ½” NMSA per Section
403 of the FP-14 Specifications
Aggregate Base Course
Base Aggregate, Grading C or D, as per Section 301 of the FP-14 Specifications
Geotextile --- Separation and Stabilization
Geotextile Class 2 – Type E, per Section 207 of FP-14 Specifications
Asphalt wedge and level course will be required in parking areas to achieve
K. Ngozi- Bullock Pavement Engineer
Through:
M. Elias Pavement Team Leader
3/13/2018
Page 2 of 2 Pages
Form FHWA-201 (Rev. 11-67)
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
Use this form in lieu of transmittal slips within Dept. of Trans. When message comment is to be retained as file material. Do not prepare carbons. Not to be used in lieu of Form FHWA- 121 for informal correspondence. MINUTE-MEMO
\\fhfl15fileserve.flhd.fhwa.dot.gov\Data\PROJECTS\_FWS\IRRI\10(1)\Techserv\Pavement\Correspondence\IRRI 10(1) Pavement Report Addendum_ME_knb.doc
TO MESSAGE/COMMENT FROM/DATE
final grades. Wedge and level course should be placed in maximum 3-inch lifts using the same asphalt concrete used for full depth asphalt, type 1 patching.
Fish Loading and Parking Lot (Route-800) Route 800 will be reconstructed as an asphalt paved loading dock, parking and drive. The new pavement section should be constructed in accordance with the table below, also shown as Table 8 in the report.
Table 3. New Construction
Layer Minimum Thickness
Asphalt Surface
Asphalt Concrete Pavement – Gyratory Method (GACP), 0.3 to 3 x 106 ESAL’s, PG 58-34, ½” NMSA, Type IV roughness
Asphalt Tack Coat -- AC Tack Coat as per Section 412 of the FP-14 Specifications
Asphalt Base Course 2 GACP, 0.3 to 3 x 106 ESAL’s, ½”
NMSA
Aggregate Base Course
Base Aggregate, Grading C or D, as per Section 301 of the FP-14 Specifications
Geotextile --- Separation and Stabilization
Geotextile Class 2 – Type E, per Section 207 of FP-14 Specifications
A polymer modified (PG 58-34) asphalt binder is recommended to minimize future thermal cracking.
| 2019-03-13T09:44:39-0400 | |
| KHADIJA NGOZI-BULLOCK |
| 2019-03-13T16:30:42-0400 | |
| MOHAMMED B ELIAS |
File details come from the government source that posted it.