Plans_-_WI_ERFO_FS_2016-1(3).pdf
PDF 35 MB Posted
- Attached to
- Chequamegon-Nicolet National Forest Federal contract opportunity
- Solicitation number
- 693C73-19-B-000006
About this file
Plans - WI ERFO FS 2016-1(3)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results_of_Bid_Opening_-_WI_ERFO_FS_2016-1(3).pdf | ||
| IFB_Solicitation_-_WI_ERFO_FS_2016-1(3).pdf | ||
| 17M7972A_Geotechnical_Report_FS_194.pdf | ||
| 17M7972E__Geotechnical_Report_FS_371-B_Updated.PDF | ||
| ADV_Subcontracting_plan.doc | DOC document | |
| 17M7972D_Geotechnical_Letter_of_Results_FS_196-A.PDF | ||
| FP14_Eng.pdf | ||
| 17M7972C_Geotechnical_Letter_of_Results_FS_189-A.PDF | ||
| 17M7972G_Geotechnical_Report_FS_189-B.PDF | ||
| NEPA_CE.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| 17M7972B_Geotechnical_Report_FS_377-A.PDF | ||
| VETS-4212_Form.pdf | ||
| Synopsis_-_WI_ERFO_FS_2016-1(3).doc | DOC document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Title Sheet
Symbols And Abbreviations
Location Map
Typical Sections
DESCRIPTION
INDEX TO SHEETS
PLANS FOR PROPOSED
N
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH: 1.1 Miles
ADT (2017)
ADT (2047)
DHV
%Truck
D
V (MPH)
50/50
SPECIFICATIONS:
DESIGN DESIGNATION:
e(max) 8%
C/A None
Project Manager Lead Designer
SHEET
NO
A01
A02
A03
B01
LANE MILES:
and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
STATE PROJECT
NUMBER
SHEET
U.S. DEPARTMENT OF AGRICULTURE
U.S. FOREST SERVICE
NATIONAL FOREST
CHEQUAMEGON-NICOLETN
MILWAUKEE
EAU CLAIRE
DULUTH
APPLETON
DUBUQUE
MADISON
LAKE MICHIGAN
LAKE SUPERIOR
MINNESOTA
WISCONSIN
IOWA
MICHIGAN
LAKE SUPERIOR
BAY
GREEN
53 63
PROJECT WI ERFO FS 2016-1(3)
CHEQUAMEGON-NICOLET NATIONAL FOREST
FS 371
ROUTE NAME WIDTH
FS 194
FS 377
<1%
2.1 Miles
DISASTER No. WI2016-1-FS WSP USAMichael Tessitore
STATE OF WISCONSIN
KEY MAP
0 50 100
SCALE IN MILES
A01WI
D01
D04
D05
D02-D03
D06-D07
M01
N01
R01-R28
T01-T10
U01-U10
V01-V08
FS 377 B3 Cross Sections
FS 194 B1 Cross Sections
Bridge Plans
E01
E02
E03
K02
NCT 100 T16 Plan And Profile
NCT 100 T12 Plan And Profile
K03
NCT 100 T9 Culvert Plan and Profiles
FS 371 S12 Bridge Plan and Profile
18'+/-
16'+/-
20'+/-
SCALE IN MILES
0 2010
Temporary Traffic Control Plan
BRIDGE REPLACEMENT AND RECONSTRUCTION
RECONSTRUCTION OF DAMAGED ROADWAY AND TRAIL SECTIONS,
bridge replacement, and shoulder washouts.
and crashworthy terminal installation. Trail repairs including reconstruction, embankment reconstruction, ditch reconditioning, Timber bridge replacement, bridge approach and road
Gg
Gg
D
C
E05
E06
E07
A05-A08 Horizontal Alignment Information
FS 194 B1 Bridge Plan And Profile
FS 377 B3 Bridge Plan And Profile
FS 189 B5 Bridge Plan
FS 196 B6 Bridge Plan
NCT 100 T3 Plan And Profile
NCT 100 T11 Culvert Plan and Profiles
FS 371 S12 Cross Sections
C01-C03
A04 Survey Information
E04 NCT 100 T4 Plan And Profile
D08 FS 189 S3 Bridge Plan and Profile
FS 189 6" aggregate surface M02-M07 Erosion Control Plans
6" aggregate surface / GACP - 3/8" NMSA, 4-inch depth
6" aggregate surface / GACP - 3/8" NMSA, 4-inch depth
6" aggregate surface / GACP - 3/8" NMSA, 4-inch depth
NCT 100 T5/T10/T14 Plans
NCT 100 T7/T8 Plans
S01-S17 Standards and Details
Tabulation of Quantities, Summaries and Schedules
16'+/-
WI ERFO FS 2016-1(3)
WI ERFO FS 2016-1(3)
PROJECT
Erosion and Sediment Control Narrative
ASHLAND AND BAYFIELD COUNTIES, WISCONSIN
PLANS PREPARED BY
P lo tt e d
B y T o m a
A A 1_ tt l.
d g n
F il e
D a te
SURFACE LAYER TYPES
5-100
9-180
WI ERFO FS 2016-1(3)
PROJECT
PLANS PREPARED FOR
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
U.S. Department of Transportation
Administration
Federal Highway
NOVEMBER, 2018
K01
1-800-252-8511
Dead Horse Trail T13 Plan
Reviewer - Forest Engineer Reviewer - District Ranger Reviewer - Regional Bridge Engineer
Approval - Regional Director of Engineering
FS 189 S3 Stream Profile
R/W R/W
R/W R/W
P/E C/E
No Symbol
TB or TP
P P or
UD UD
W W
P/E C/E
No Symbol
TB or TP
P P or or
UD UD
W W
FOUND
36 31
6 1
36 31
6 1
No Symbol
No Symbol
FOUND
36 31
6 1
36 31
6 1
400 No Symbol x 99.9
T-45
2,645.9
T-3 x 99.9
T-45
2,645.9
T-3
26 25 69426 25 694 c
Average daily traffic ADT
Alternate alt.
Ahead AH
Aggregate aggr.
Abutment Abut.
Footing ftg.
Flange flg.
Finish fin.
Inside diameter ID
West W
High water HW
Hexagon hex.
Headwall hdwl.
Joint jt.
Route Rte.
Roadway Rdwy.
Right-of-way R/W
Right Rt., rt.or RT
Required reqd.
Reinforcement (reinforced) reinf.
Range R.
Radius R
Symmetrical sym.
Superelevation rate e
Structure struc.
Stringer stgr.
Stiffener stiff.
Station Sta.
Standard std.
Spiral central angle s
Spacing, spaces or spaced spa.
South S
Section Sec.
Vertical point of intersection VPI
Vehicle per hour vph
PAVEMENT REMOVAL/ROADWAY OBLITERATION
LAKE, POND or RESERVOIR; MARSHLAND
SLOPE STAKE
PROPOSEDEXISTING
PROJECTED
INTERSTATE U.S. STATE
AREA PATTERN
TREELINE; TREE
BUILDING
UNDERDRAIN
BOX CULVERT
CULVERT with DROP INLET
PIPE CULVERT with HEADWALL
PIPE CULVERT with END SECTION
PIPE CULVERT (arrow shows flow)
BRIDGE
STREET LIGHT
TELEPHONE BOOTH or PEDESTAL
SUPPORT POLE with ANCHOR
RETAINING WALL
SIGNS
PORTABLE
POST MOUNTED
GUARDRAIL
CATTLEGUARD
GATE with FENCE
FENCE
MATERIAL SOURCE
NORTH ARROW
EXISTING PROPOSED
wall facewall face
TB or TP or
P/LP/L
MEDIAN & SIDE (CONCRETE) BARRIER
FOREST BOUNDARY
NATIONAL PARK or
SECTION LINE16
SECTION LINE4
SECTION LINE
COUNTY BOUNDARY
CITY BOUNDARYCITY BOUNDARY
NATIONAL BOUNDARY
STATE BOUNDARY
TOWNSHIP or RANGE LINE
PROPERTY LINE
BRASS CAP
STEEL PIN
Top of Triangle Points North
TRAVERSE POINT (Horizontal & Vertical)
TRAVERSE POINT (Horizontal)
COORDINATE GRID TICK
SPOT ELEVATION
HUB & TACK
BORING LOCATION
RIPRAP/CULVERT RIPRAP
CHECK DAM
DIVERSION BERM
SILT FENCE
MILL AND OVERLAY
SIDEWALK ASPHALT/CONCRETE
FULL DEPTH PAVEMENT
OVERLAY
SECTION CORNER
SECTION CORNER4
SECTION16
PROPERTY CORNER
PARCEL NUMBER
EASEMENT (Permanent - Construction)
ROUTE NUMBERS
RIGHT-OF-WAY LINE
with MONUMENT
RIGHT-OF-WAY LINE
TOP OF CUT
TOE OF FILL
TRANSITION
SINGLE TRACK
ROADWAY, EXISTING
INTERMITTENT DRAINAGE/ SMALL CREEK
SPRING
LARGE CREEK/RIVER
RAILROAD
TRAIL
MULTIPLE TRACK
N
FO=Fibre optics
T=Telephone, E&T=Joint Electrical and Telephone
E=Electrical for distribution line
P=Electrical for transmission line
OVERHEAD(POWER POLE) UTILITIES
DIVERSION CHANNEL
TEST PIT
B-1
TP-1
EOP
EOG
embankment
Mechanically stabilized MSE
Monument mon. or MON
Minimum min.
Mile[Kilometer] post M.P[K.P.]
Maximum max.
Material matl.
Mainline M.L.
Point on tangent POT
Point on spiral POS
Point on curve POC
Point of tangent to spiral PS or TS
Point of tangent PT
Point of spiral to tangent PST or ST spiral
Point of spiral to reverse SRS
Point of spiral to curve PSC or SC
Point of intersection PI
Point of curve to spiral PCS or CS
Point of curve PC
Point of compound curve PCC
Plate pl.
PHTPhoto monument
Pavement pvmt.
Bench mark BM
Beginning beg.
Bearing brg.
Balance point BP
Back BK
Drop Inlet DI
Drawing(s) dwg(s), or drwg(s)
Distance dist.
Diaphragm diaph.
Diameter D, dia., or
Diagonal diag.
Design speed V
Design hourly volume DHV
Low water LW
Longitudinal(longitude) long.
Length of spiral Ls
(spiral curve transition)
Length of curve Lc
Length of curve(simple curve) L
Left lt., Lt. or LT
Latitude lat.
Lamination lam.
Typical typ.
Township T.
Thread thd.
easement
Temporary construction TCE
Temporary benchmark TBM
(spiral curve transition)
Tangent distance Ts
(tangent length)
Tangent distance T
On centers o. c.
Outside diameter OD
Out to out o. to o.
Original ground OG
(curve delta or deflection)
Curve total angle
(spiral curve transitions)
Curve central angle
Culvert culv.
Corrugated metal pipe CMP
Continuous cont.
Construction joint Constr. jt.
Connection conn.
Column col.
Clear clr.
Centers ctrs.
Center to center cc, c-c or c. to c.
Centerline C L
E=electrical, FO=fiber optics SD=storm drain, T=telephone, W=water G=gas, O=oil, P=power, SS=sanitary sewer, UNDERGROUND UTILITIES
Concrete Pavement
GACPGyratory Mix, Asphalt
Gage(gauge) ga.
Galvanized galv.
Expansion joint exp. jt.
Excavation exc.
ESALEquivalent Single Axle Load
Equation EQ or eq.
End section ES
Embankment emb.
[El. 94.16]
Elevation with number El. 94.161
Elevation elev.
Edge of pavement EP or EOP
East E
North N
Normal crown NC or NCR
Nominal Max. Size Aggregate NMSA
FR
A02
ABBREVIATIONS
SYMBOLS AND
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:
DITCH
TURBIDITY CURTAINS
SURVEY BENCHMARK
RIPRAP
WETLAND
FIBER ROLL
NORTH COUNTRY TRAILNCT
CORRUGATED METAL PIPE ARCH CULVERTCMPAC
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT
NUMBER
SHEET
NATIONAL FOREST
CHEQUAMEGON-NICOLET
WI WI ERFO FS 2016-1(3)
P lo tt
T o m a
A A E
F L
H D s y m .d g n
F il e
D a te
ROUTE NAME Station Limits Description
Repair pedestrian trail
Reset pedestrian bridge
240+00 to 249+23
320+00 to 322+24
140+00 to 141+19
130+00 to 135+50
120+00 to 128+63
230+00 to 232+08
280+00 to 281+82
310+00 to 312+34
290+00 to 291+96
300+00 to 301+54
Replace pedestrian bridge
Replace pedestrian bridge
Replace pedestrian bridge
Replace pedestrian bridge
FS 189 B5
FS 194 B1
FS 196 B6
FS 371 S12
FS 377 B3
NCT T3
NCT T4
NCT T5
NCT T7
NCT T8
NCT T9
NCT T11
NCT T12
NCT T14
NCT T16
FS 189 S3 70+00 to 80+19
NCT T10
270+00 to 271+72
N
52.50
Scale in Miles
A03
LOCATION MAP
FS 377 B3
Staging Area, Gravel Pit on FR 202
FS 189 S3
FS 189 B5
Staging Area, Gravel Pit off of GG at FR 193
FS 196 B6
FS 194 B1
Staging Area, Taylor Lake
NCT 100 T16
FS 371 S12
NCT 100 T3
NCT 100 T4
NCT 100 T5
NCT 100 T14
NCT 100 T12
NCT 100 T11
NCT 100 T10
NCT 100 T9
NCT 100 T8
NCT 100 T7
Remove pedestrian trail culvert
DEAD HORSE TRAIL T13
DEAD HORSE TRAIL T13
Replace pedestrian trail culvert
Repair pedestrian trail
Repair pedestrian trail
Repair pedestrian trail
Install concrete open bottom arch culvert
Replace bridge, reconstruct road
Replace bridge, reconstruct road
Replace riprap
Repair bridge, replace riprap
Replace pedestrian trail culvert
Construct bridge, reconstruct road and FS 173, southeast of Clam Lake.
Additional staging site located at the intersection of FS 792 3.
Contractor may use closed roads as a staging area.2.
Contractor may use the specified pre-approved staging areas.1.
NOTES:
Lattitude Longitude
46.34365
46.2459 -90.9440
46.30761
46.30605 -90.9350
46.3054 -90.9309
46.31537 -90.7196
46.3157 -90.71965
46.31798 -90.722933
46.3235 -90.7673
46.32228 -90.76625
-90.81057
46.31764 -90.860861
46.30603 -90.881306
46.3278
46.3316
46.20600
-90.82196
46.28458 -90.93167
46.31497 -91.13971
-91.0392
-90.8419
46.3206 -90.7183
-91.0341
Structure Number Feature Crossing
090202000001025
091302000032391
090204000001022
091302000032390
091302000032392
Whiskey Creek
Eighteen Mile Creek
Twenty Mile Creek
091302000032394
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT
NUMBER
SHEET
NATIONAL FOREST
CHEQUAMEGON-NICOLET
WI WI ERFO FS 2016-1(3)
P lo tt a lu n k a lm
A m a p .d g n
F il e
D a
Date : May, June, July 2018 Geoid Model : GI2A-WI Vert. Datum : NAVD88 (2012) Hor. Datum : NAD 1983 (2011) Zone : Wisoncsin North 4801 Coordinate System : US State Plane 1983 (2011)
PROJECT COORDINATE SYSTEM
A04
SURVEY INFORMATION
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT
NUMBER
SHEET
NATIONAL FOREST
CHEQUAMEGON-NICOLET
WI WI ERFO FS 2016-1(3)
P lo tt
T o m a
A A s u r v e y in f o r m a ti o n .d g n
F il e
D a
Course from PT 377B3_9 to PC 377B3_10 N 80° 21' 35.6" E Dist 169.13 Chord Bear = N 84° 51' 04.3" E Ahead = N 80° 21' 35.6" E Back = N 89° 20' 33.0" E C.C. N 425,763.51 E 1,705,618.74 P.T. Station 121+07.29 N 425,098.04 E 1,705,731.77 P.C. Station 120+01.47 N 425,088.55 E 1,705,626.48 Mid. Ord. = 2.07 Long Chord = 105.72 External = 2.08 Radius = 675.00 Length = 105.82 Tangent = 53.02 Degree = 8° 29' 17.7" Delta = 8° 58' 57.3" (LT) P.I. Station 120+54.49 N 425,089.16 E 1,705,679.50 Curve 377B3_9 Curve Data Course from 5 to PC 377B3_9 N 89° 20' 33.0" E Dist 1.47 Point 5 N 425,088.53 E 1,705,625.01 Sta 120+00.00
Beginning Chain FS 377 B3 description
Point 14 N 409,489.68 E 1,733,002.45 Sta 249+23.39 Course from PT 194B1_3 to 14 N 9° 53' 43.1" W Dist 18.69 Chord Bear = N 0° 56' 23.4" W Ahead = N 9° 53' 43.1" W Back = N 8° 00' 56.4" E C.C. N 409,385.35 E 1,732,513.10 P.T. Station 249+04.70 N 409,471.27 E 1,733,005.66 P.C. Station 247+48.40 N 409,315.63 E 1,733,008.21 Mid. Ord. = 6.10 Long Chord = 155.67 External = 6.17 Radius = 500.00 Length = 156.30 Tangent = 78.79 Degree = 11° 27' 33.0" Delta = 17° 54' 39.4" (LT) P.I. Station 248+27.19 N 409,393.65 E 1,733,019.20 Curve 194B1_3 Curve Data
Course from PT 194B1_2 to PC 194B1_3 N 8° 00' 56.4" E Dist 349.04 Chord Bear = N 7° 41' 36.5" E Ahead = N 8° 00' 56.4" E Back = N 7° 22' 16.7" E C.C. N 408,900.27 E 1,733,454.66 P.T. Station 243+99.36 N 408,969.99 E 1,732,959.54 P.C. Station 243+93.74 N 408,964.42 E 1,732,958.79 Mid. Ord. = 0.01 Long Chord = 5.62 External = 0.01 Radius = 500.00 Length = 5.62 Tangent = 2.81 Degree = 11° 27' 33.0" Delta = 0° 38' 39.7" (RT) P.I. Station 243+96.55 N 408,967.21 E 1,732,959.15 Curve 194B1_2 Curve Data
Course from PT 194B1 1 to PC 194B1 2 N 7° 22' 16.7" E Dist 245.43 Chord Bear = N 7° 41' 01.3" E Ahead = N 7° 22' 16.7" E Back = N 7° 59' 46.0" E C.C. N 408,849.32 E 1,731,935.57 P.T. Station 241+48.31 N 408,721.02 E 1,732,927.30 P.C. Station 241+37.40 N 408,710.21 E 1,732,925.84 Mid. Ord. = 0.01 Long Chord = 10.90 External = 0.01 Radius = 1,000.00 Length = 10.90 Tangent = 5.45 Degree = 5° 43' 46.5" Delta = 0° 37' 29.2" (LT) P.I. Station 241+42.85 N 408,715.61 E 1,732,926.60 Curve 194B1 1 Curve Data
Course from 13 to PC 194B1 1 N 7° 59' 46.0" E Dist 137.40 Point 13 N 408,574.15 E 1,732,906.73 Sta 240+00.00
Beginning Chain FS 194 B1 description
Course from PT 189B5_2 to PC 189B5_3 N 69° 33' 22.5" E Dist 98.07 Chord Bear = N 70° 53' 49.6" E Ahead = N 69° 33' 22.5" E Back = N 72° 14' 16.8" E C.C. N 430,713.69 E 1,760,686.57 P.T. Station 320+93.46 N 430,245.18 E 1,760,861.21 P.C. Station 320+70.06 N 430,237.52 E 1,760,839.10 Mid. Ord. = 0.14 Long Chord = 23.40 External = 0.14 Radius = 500.00 Length = 23.40 Tangent = 11.70 Degree = 11° 27' 33.0" Delta = 2° 40' 54.3" (LT) P.I. Station 320+81.76 N 430,241.09 E 1,760,850.25 Curve 189B5_2 Curve Data
Course from PT 189B5_1 to PC 189B5_2 N 72° 14' 16.8" E Dist 4.33 Chord Bear = N 70° 38' 25.3" E Ahead = N 72° 14' 16.8" E Back = N 69° 02' 33.8" E C.C. N 429,760.03 E 1,760,987.51 P.T. Station 320+65.73 N 430,236.20 E 1,760,834.98 P.C. Station 320+37.84 N 430,226.96 E 1,760,808.67 Mid. Ord. = 0.19 Long Chord = 27.88 External = 0.19 Radius = 500.00 Length = 27.88 Tangent = 13.95 Degree = 11° 27' 33.0" Delta = 3° 11' 43.0" (RT) P.I. Station 320+51.79 N 430,231.94 E 1,760,821.70 Curve 189B5_1 Curve Data
Course from 26 to PC 189B5_1 N 69° 02' 33.8" E Dist 37.84 Point 26 N 430,213.42 E 1,760,773.33 Sta 320+00.00
Beginning Chain FS 189 B5 description
Point 4 N 425,218.62 E 1,706,477.01 Sta 128+62.62 Course from PT 377B3_11 to 4 N 83° 31' 33.7" E Dist 191.63 Chord Bear = N 81° 14' 45.9" E Ahead = N 83° 31' 33.7" E Back = N 78° 57' 58.1" E C.C. N 423,706.58 E 1,706,455.73 P.T. Station 126+70.99 N 425,197.01 E 1,706,286.61 P.C. Station 125+51.61 N 425,178.85 E 1,706,168.65 Mid. Ord. = 1.19 Long Chord = 119.35 External = 1.19 Radius = 1,500.00 Length = 119.38 Tangent = 59.72 Degree = 3° 49' 11.0" Delta = 4° 33' 35.6" (RT) P.I. Station 126+11.33 N 425,190.28 E 1,706,227.27 Curve 377B3_11 Curve Data
Course from PT 377B3_10 to 6 N 78° 57' 36.4" E Dist 169.64 Chord Bear = N 79° 39' 36.0" E Ahead = N 78° 57' 36.4" E Back = N 80° 21' 35.6" E C.C. N 425,791.83 E 1,705,785.48 P.T. Station 122+92.91 N 425,129.32 E 1,705,914.73 P.C. Station 122+76.42 N 425,126.36 E 1,705,898.51 Mid. Ord. = 0.05 Long Chord = 16.49 External = 0.05 Radius = 675.00 Length = 16.49 Tangent = 8.25 Degree = 8° 29' 17.7" Delta = 1° 23' 59.3" (LT) P.I. Station 122+84.67 N 425,127.74 E 1,705,906.64 Curve 377B3_10 Curve Data
Course from PT 371S12_2 to PC 371S12_3 N 89° 44' 31.6" E Dist 133.84 Chord Bear = N 85° 26' 25.9" E Ahead = N 89° 44' 31.6" E Back = N 81° 08' 20.2" E C.C. N 420,568.17 E 1,680,491.58 P.T. Station 132+40.84 N 420,838.17 E 1,680,490.36 P.C. Station 132+00.30 N 420,834.95 E 1,680,449.99 Mid. Ord. = 0.76 Long Chord = 40.50 External = 0.76 Radius = 270.00 Length = 40.54 Tangent = 20.31 Degree = 21° 13' 14.4" Delta = 8° 36' 11.4" (RT) P.I. Station 132+20.60 N 420,838.08 E 1,680,470.05 Curve 371S12_2 Curve Data
Course from PT 371S12_1 to PC 371S12_2 N 81° 08' 20.2" E Dist 18.13 Chord Bear = N 88° 03' 24.3" E Ahead = N 81° 08' 20.2" E Back = S 85° 01' 31.5" E C.C. N 421,523.80 E 1,680,324.25 P.T. Station 131+82.17 N 420,832.15 E 1,680,432.08 P.C. Station 130+13.13 N 420,826.44 E 1,680,263.55 Mid. Ord. = 5.10 Long Chord = 168.62 External = 5.13 Radius = 700.00 Length = 169.03 Tangent = 84.93 Degree = 8° 11' 06.4" Delta = 13° 50' 08.3" (LT) P.I. Station 130+98.06 N 420,819.07 E 1,680,348.16 Curve 371S12_1 Curve Data
Course from 7 to PC 371S12_1 S 85° 01' 31.5" E Dist 13.13 Point 7 N 420,827.58 E 1,680,250.47 Sta 130+00.00 Chain 371S12 description
Beginning Chain FS 371 S12 description
Point 10 N 394,991.77 E 1,729,752.78 Sta 141+19.32
Course from 9 to 10 S 87° 11' 39.4" E Dist 119.32
Point 9 N 394,997.61 E 1,729,633.60 Sta 140+00.00
Beginning Chain FS 196 B6 description
Point 27 N 430,291.25 E 1,760,983.03 Sta 322+23.70
Course from PT 189B5_3 to 27 N 68° 12' 18.4" E Dist 20.37
Chord Bear = N 68° 52' 50.4" E Ahead = N 68° 12' 18.4" E Back = N 69° 33' 22.5" E C.C. N 430,747.94 E 1,760,778.47 P.T. Station 322+03.33 N 430,283.68 E 1,760,964.11 P.C. Station 321+91.54 N 430,279.43 E 1,760,953.11 Mid. Ord. = 0.03 Long Chord = 11.79 External = 0.03 Radius = 500.00 Length = 11.79 Tangent = 5.90 Degree = 11° 27' 33.0" Delta = 1° 21' 04.0" (LT) P.I. Station 321+97.43 N 430,281.49 E 1,760,958.64 Curve 189B5_3 Curve Data
A05
SHEET 1 OF 4
INFORMATION
HORIZONTAL ALIGNMENT
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT
NUMBER
SHEET
NATIONAL FOREST
CHEQUAMEGON-NICOLET
WI WI ERFO FS 2016-1(3)
P lo tt
T o m a
A A a li g n m e n t d a ta .d g n
F il e
D a
Course from PT 100T3_9 to PC 100T3_10 N 28° 36' 23.9" E Dist 7.55 Chord Bear = N 24° 13' 16.6" E Ahead = N 28° 36' 23.9" E Back = N 19° 50' 09.4" E C.C. N 417,691.59 E 1,707,192.76 P.T. Station 230+73.54 N 417,715.53 E 1,707,148.87 P.C. Station 230+65.88 N 417,708.56 E 1,707,145.73 Mid. Ord. = 0.15 Long Chord = 7.65 External = 0.15 Radius = 50.00 Length = 7.65 Tangent = 3.83 Degree = 114° 35' 29.6" Delta = 8° 46' 14.5" (RT) P.I. Station 230+69.72 N 417,712.16 E 1,707,147.03 Curve 100T3_9 Curve Data
Course from PT 100T3_8 to PC 100T3_9 N 19° 50' 09.4" E Dist 4.82
Chord Bear = N 31° 26' 46.6" E Ahead = N 19° 50' 09.4" E Back = N 43° 03' 23.9" E C.C. N 417,720.99 E 1,707,097.06 P.T. Station 230+61.07 N 417,704.03 E 1,707,144.10 P.C. Station 230+40.80 N 417,686.86 E 1,707,133.60 Mid. Ord. = 1.02 Long Chord = 20.13 External = 1.04 Radius = 50.00 Length = 20.26 Tangent = 10.27 Degree = 114° 35' 29.6" Delta = 23° 13' 14.5" (LT) P.I. Station 230+51.08 N 417,694.36 E 1,707,140.61 Curve 100T3_8 Curve Data
Course from PT 100T3_7 to PC 100T3_8 N 43° 03' 23.9" E Dist 5.59 Chord Bear = N 27° 35' 01.9" E Ahead = N 43° 03' 23.9" E Back = N 12° 06' 39.9" E C.C. N 417,648.63 E 1,707,166.31 P.T. Station 230+35.21 N 417,682.77 E 1,707,129.78 P.C. Station 230+08.21 N 417,659.12 E 1,707,117.43 Mid. Ord. = 1.81 Long Chord = 26.68 External = 1.88 Radius = 50.00 Length = 27.01 Tangent = 13.84 Degree = 114° 35' 29.6" Delta = 30° 56' 43.9" (RT) P.I. Station 230+22.05 N 417,672.66 E 1,707,120.33 Curve 100T3_7 Curve Data
Course from 11 to PC 100T3_7 N 12° 06' 39.9" E Dist 8.21 Point 11 N 417,651.10 E 1,707,115.70 Sta 230+00.00
Beginning chain 100 T3 description
Point 9 N 426,226.20 E 1,756,142.54 Sta 80+18.89
Course from PT 189S3_4 to 9 31° 54' 18.6" Dist 2.23
Chord Bear = 40° 26' 41.0" Ahead = 31° 54' 18.6" Back = 48° 59' 03.4" C.C. N 426,594.26 E 1,755,547.11 P.T. Station 80+16.66 N 426,224.30 E 1,756,141.36 P.C. Station 78+08.00 N 426,066.09 E 1,756,006.50 Mid. Ord. = 7.76 Long Chord = 207.89 External = 7.85 Radius = 700.00 Length = 208.66 Tangent = 105.11 Degree = 8° 11' 06.4" Delta = 17° 04' 44.8" (LT) P.I. Station 79+13.11 N 426,135.07 E 1,756,085.80 Curve 189S3_4 Curve Data
Course from PT 189S3_3 to PC 189S3_4 48° 59' 03.4" Dist 267.33
Chord Bear = 50° 29' 36.3" Ahead = 48° 59' 03.4" Back = 52° 00' 09.2" C.C. N 427,399.71 E 1,754,492.25 P.T. Station 75+40.66 N 425,890.65 E 1,755,804.78 P.C. Station 74+35.31 N 425,823.63 E 1,755,723.51 Mid. Ord. = 0.69 Long Chord = 105.34 External = 0.69 Radius = 2,000.00 Length = 105.36 Tangent = 52.69 Degree = 2° 51' 53.2" Delta = 3° 01' 05.7" (LT) P.I. Station 74+88.00 N 425,856.07 E 1,755,765.03 Curve 189S3_3 Curve Data
Course from PT 189S3_2 to PC 189S3_3 52° 00' 09.2" Dist 35.57
Chord Bear = 50° 52' 20.9" Ahead = 52° 00' 09.2" Back = 49° 44' 32.6" C.C. N 424,225.65 E 1,756,926.72 P.T. Station 73+99.73 N 425,801.73 E 1,755,695.47 P.C. Station 73+20.84 N 425,751.95 E 1,755,634.27 Mid. Ord. = 0.39 Long Chord = 78.89 External = 0.39 Radius = 2,000.00 Length = 78.89 Tangent = 39.45 Degree = 2° 51' 53.2" Delta = 2° 15' 36.6" (RT) P.I. Station 73+60.29 N 425,777.44 E 1,755,664.38 Curve 189S3_2 Curve Data
Course from PT 189S3_1 to PC 189S3_2 49° 44' 32.6" Dist 166.00
Chord Bear = 45° 58' 35.9" Ahead = 49° 44' 32.6" Back = 42° 12' 39.3" C.C. N 425,034.15 E 1,756,024.57 P.T. Station 71+54.83 N 425,644.67 E 1,755,507.59 P.C. Station 70+49.67 N 425,571.64 E 1,755,432.03 Mid. Ord. = 1.73 Long Chord = 105.08 External = 1.73 Radius = 800.00 Length = 105.16 Tangent = 52.66 Degree = 7° 09' 43.1" Delta = 7° 31' 53.2" (RT) P.I. Station 71+02.33 N 425,610.64 E 1,755,467.40 Curve 189S3_1
Course from 8 to PC 189S3_1 42° 12' 39.3" Dist 49.67
Point 8 N 425,534.85 E 1,755,398.65 Sta 70+00.00
Beginning chain 189S3 description
8 CUR 189S3_1 CUR 189S3_2 CUR 189S3_3 CUR 189S3_4 9
Chain 189S3 contains:
<* 4 Describe Chain 189S3
Point 8 N 420,795.99 E 1,680,792.86 Sta 135+50.24 Course from PT 371S12 3 to 8 S 67° 08' 29.1" E Dist 44.44 Chord Bear = S 78° 41' 58.7" E Ahead = S 67° 08' 29.1" E Back = N 89° 44' 31.6" E C.C. N 420,513.77 E 1,680,625.66 P.T. Station 135+05.80 N 420,813.25 E 1,680,751.91 P.C. Station 133+74.67 N 420,838.77 E 1,680,624.20 Mid. Ord. = 6.59 Long Chord = 130.24 External = 6.73 Radius = 325.00 Length = 131.12 Tangent = 66.47 Degree = 17° 37' 46.1" Delta = 23° 06' 59.3" (RT) P.I. Station 134+41.14 N 420,839.07 E 1,680,690.66 Curve 371S12 3
Point 12 N 417,842.97 E 1,707,187.83 Sta 232+07.54 Course from PT 100T3_12 to 12 N 12° 23' 34.1" E Dist 32.15 Chord Bear = N 21° 42' 07.0" E Ahead = N 12° 23' 34.1" E Back = N 31° 00' 39.8" E C.C. N 417,833.03 E 1,707,083.26 P.T. Station 231+75.39 N 417,811.57 E 1,707,180.93 P.C. Station 231+42.89 N 417,781.51 E 1,707,168.96 Mid. Ord. = 1.32 Long Chord = 32.35 External = 1.33 Radius = 100.00 Length = 32.49 Tangent = 16.39 Degree = 57° 17' 44.8" Delta = 18° 37' 05.7" (LT) P.I. Station 231+59.29 N 417,795.56 E 1,707,177.41 Curve 100T3_12 Curve Data
Course from PT 100T3_11 to PC 100T3_12 N 31° 00' 39.8" E Dist 0.80 Chord Bear = N 22° 05' 13.0" E Ahead = N 31° 00' 39.8" E Back = N 13° 09' 46.2" E C.C. N 417,767.94 E 1,707,189.98 P.T. Station 231+42.09 N 417,780.82 E 1,707,168.55 P.C. Station 231+34.30 N 417,773.63 E 1,707,165.63 Mid. Ord. = 0.30 Long Chord = 7.76 External = 0.31 Radius = 25.00 Length = 7.79 Tangent = 3.93 Degree = 229° 10' 59.2" Delta = 17° 50' 53.6" (RT) P.I. Station 231+38.23 N 417,777.46 E 1,707,166.53 Curve 100T3_11 Curve Data
Course from PT 100T3_10 to PC 100T3_11 N 13° 09' 46.2" E Dist 45.13 Chord Bear = N 20° 53' 05.0" E Ahead = N 13° 09' 46.2" E Back = N 28° 36' 23.9" E C.C. N 417,736.52 E 1,707,126.14 P.T. Station 230+89.17 N 417,729.69 E 1,707,155.36 P.C. Station 230+81.09 N 417,722.16 E 1,707,152.48 Mid. Ord. = 0.27 Long Chord = 8.06 External = 0.27 Radius = 30.00 Length = 8.09 Tangent = 4.07 Degree = 190° 59' 09.4" Delta = 15° 26' 37.7" (LT) P.I. Station 230+85.16 N 417,725.73 E 1,707,154.43 Curve 100T3_10
A06
SHEET 2 OF 4
INFORMATION
HORIZONTAL ALIGNMENT
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT
NUMBER
SHEET
NATIONAL FOREST
CHEQUAMEGON-NICOLET
WI WI ERFO FS 2016-1(3)
P lo tt
T o m a
A A a li g n m e n t d a ta .d g n
F il e
D a
Point 23 N 416,745.72 E 1,745,839.34 Sta 301+54.21
Course from PT 100T16_6 to 23 N 36° 43' 39.6" E Dist 36.86
Chord Bear = N 74° 00' 19.3" E Ahead = N 36° 43' 39.6" E Back = S 68° 43' 01.1" E C.C. N 416,722.16 E 1,745,809.28 P.T. Station 301+17.35 N 416,716.17 E 1,745,817.29 P.C. Station 301+04.34 N 416,712.84 E 1,745,805.65 Mid. Ord. = 2.04 Long Chord = 12.11 External = 2.57 Radius = 10.00 Length = 13.01 Tangent = 7.61 Degree = 572° 57' 28.1" Delta = 74° 33' 19.3" (LT) P.I. Station 301+11.95 N 416,710.07 E 1,745,812.74 Curve 100T16_6 Curve Data
Course from PT 100T16_5 to PC 100T16_6 S 68° 43' 01.1" E Dist 44.14 Chord Bear = S 77° 32' 21.6" E Ahead = S 68° 43' 01.1" E Back = S 86° 21' 42.2" E C.C. N 416,705.56 E 1,745,755.44 P.T. Station 300+60.20 N 416,728.86 E 1,745,764.52 P.C. Station 300+52.50 N 416,730.51 E 1,745,757.03 Mid. Ord. = 0.30 Long Chord = 7.67 External = 0.30 Radius = 25.00 Length = 7.70 Tangent = 3.88 Degree = 229° 10' 59.2" Delta = 17° 38' 41.1" (RT) P.I. Station 300+56.38 N 416,730.27 E 1,745,760.90 Curve 100T16_5 Curve Data
Course from PT 100T16_4 to PC 100T16_5 S 86° 21' 42.2" E Dist 14.83 Chord Bear = N 77° 44' 03.5" E Ahead = S 86° 21' 42.2" E Back = N 61° 49' 49.3" E C.C. N 416,721.47 E 1,745,741.60 P.T. Station300+37.67 N 416,731.45 E 1,745,742.23 P.C. Station300+32.12 N 416,730.29 E 1,745,736.87 Mid. Ord. = 0.38 Long Chord = 5.48 External = 0.40 Radius = 10.00 Length = 5.55 Tangent = 2.85 Degree = 572° 57' 28.1" Delta = 31° 48' 28.5" (RT) P.I. Station300+34.97 N 416,731.63 E 1,745,739.39 Curve 100T16_4 Curve Data
Course from 22 to PC 100T16_4 N 61° 49' 49.3" E Dist 32.12 Point 22 N 416,715.13 E 1,745,708.56 Sta 300+00.00
Beginning chain 100 T16 description
Point 21 N 422,296.97 E 1,774,994.72 Sta 291+95.69
Course from PT 100T12_15 to 21 N 68° 03' 19.0" E Dist 5.52
Chord Bear = N 72° 56' 52.8" E Ahead = N 68° 03' 19.0" E Back = N 77° 50' 26.6" E C.C. N 422,332.00 E 1,774,974.65 P.T. Station 291+90.17 N 422,294.90 E 1,774,989.60 P.C. Station 291+83.34 N 422,292.90 E 1,774,983.07 Mid. Ord. = 0.15 Long Chord = 6.82 External = 0.15 Radius = 40.00 Length = 6.83 Tangent = 3.42 Degree = 143° 14' 22.0" Delta = 9° 47' 07.5" (LT) P.I. Station 291+86.76 N 422,293.62 E 1,774,986.42 Curve 100T12_15
Course from PT 100T12_14 to PC 100T12_15 N 77° 50' 26.6" E Dist 1.96
Chord Bear = S 87° 02' 13.3" E Ahead = N 77° 50' 26.6" E Back = S 71° 54' 53.2" E C.C. N 422,341.37 E 1,774,970.62 P.T. Station 291+81.37 N 422,292.49 E 1,774,981.15 P.C. Station 291+54.98 N 422,293.84 E 1,774,955.10 Mid. Ord. = 1.73 Long Chord = 26.09 External = 1.79 Radius = 50.00 Length = 26.39 Tangent = 13.51 Degree = 114° 35' 29.6" Delta = 30° 14' 40.2" (LT) P.I. Station 291+68.49 N 422,289.64 E 1,774,967.95 Curve 100T12_14 Curve Data
Course from PT 100T12_13 to PC 100T12_14 S 71° 54' 53.2" E Dist 27.50
Chord Bear = S 76° 25' 44.4" E Ahead = S 71° 54' 53.2" E Back = S 80° 56' 35.6" E C.C. N 422,273.86 E 1,774,919.65 P.T. Station 291+27.48 N 422,302.37 E 1,774,928.96 P.C. Station 291+22.75 N 422,303.48 E 1,774,924.37 Mid. Ord. = 0.09 Long Chord = 4.72 External = 0.09 Radius = 30.00 Length = 4.73 Tangent = 2.37 Degree = 190° 59' 09.4" Delta = 9° 01' 42.4" (RT) P.I. Station 291+25.12 N 422,303.11 E 1,774,926.71 Curve 100T12_13 Curve Data
Course from PT 100T12_12 to PC 100T12_13 S 80° 56' 35.6" E Dist 39.84
Chord Bear = S 49° 15' 38.3" E Ahead = S 80° 56' 35.6" E Back = S 17° 34' 40.9" E C.C. N 422,314.69 E 1,774,885.82 P.T. Station 290+82.92 N 422,309.75 E 1,774,885.03 P.C. Station 290+77.39 N 422,313.18 E 1,774,881.05 Mid. Ord. = 0.75 Long Chord = 5.25 External = 0.88 Radius = 5.00 Length = 5.53 Tangent = 3.09 Degree = 1145° 54' 56.1" Delta = 63° 21' 54.6" (LT) P.I. Station 290+80.47 N 422,310.24 E 1,774,881.98 Curve 100T12_12 Curve Data
Course from PT 100T12_11 to PC 100T12_12 S 17° 34' 40.9" E Dist 27.11
Chord Bear = S 24° 21' 24.5" E Ahead = S 17° 34' 40.9" E Back = S 31° 08' 08.0" E C.C. N 422,323.93 E 1,774,825.20 P.T. Station 290+50.28 N 422,339.03 E 1,774,872.86 P.C. Station 290+38.45 N 422,349.78 E 1,774,868.00 Mid. Ord. = 0.35 Long Chord = 11.80 External = 0.35 Radius = 50.00 Length = 11.83 Tangent = 5.94 Degree = 114° 35' 29.6" Delta = 13° 33' 27.0" (RT) P.I. Station 290+44.39 N 422,344.69 E 1,774,871.07 Curve 100T12_11 Curve Data
Course from 20 to PC 100T12_11 S 31° 08' 08.0" E Dist 38.45
Point 20 N 422,382.69 E 1,774,848.12 Sta 290+00.00
Beginning chain 100T12 description
Course from PT 100T4_10 to PC 100T4_11 S 60° 27' 06.3" E Dist 12.02
Chord Bear = S 73° 54' 58.0" E Ahead = S 60° 27' 06.3" E Back = S 87° 22' 49.8" E C.C. N 416,861.42 E 1,732,214.25 P.T. Station 271+14.87 N 416,865.77 E 1,732,216.72 P.C. Station 271+12.52 N 416,866.41 E 1,732,214.48 Mid. Ord. = 0.14 Long Chord = 2.33 External = 0.14 Radius = 5.00 Length = 2.35 Tangent = 1.20 Degree = 1145° 54' 56.1" Delta = 26° 55' 43.5" (RT) P.I. Station 271+13.72 N 416,866.36 E 1,732,215.68 Curve 100T4_10 Curve Data
Course from PT 100T4_9 to PC 100T4_10 S 87° 22' 49.8" E Dist 30.97
Chord Bear = N 84° 29' 26.7" E Ahead = S 87° 22' 49.8" E Back = N 76° 21' 43.1" E C.C. N 416,847.85 E 1,732,182.63 P.T. Station 270+81.55 N 416,867.83 E 1,732,183.54 P.C. Station 270+75.88 N 416,867.29 E 1,732,177.91 Mid. Ord. = 0.20 Long Chord = 5.66 External = 0.20 Radius = 20.00 Length = 5.67 Tangent = 2.86 Degree = 286° 28' 44.0" Delta = 16° 15' 27.1" (RT) P.I. Station 270+78.73 N 416,867.96 E 1,732,180.69 Curve 100T4_9 Curve Data
Course from PT 100T4_8 to PC 100T4_9 N 76° 21' 43.1" E Dist 8.45
Chord Bear = S 88° 24' 59.2" E Ahead = N 76° 21' 43.1" E Back = S 73° 11' 41.6" E C.C. N 416,962.47 E 1,732,146.12 P.T. Station 270+67.42 N 416,865.29 E 1,732,169.70 P.C. Station 270+14.29 N 416,866.74 E 1,732,117.20 Mid. Ord. = 3.51 Long Chord = 52.51 External = 3.64 Radius = 100.00