Attmt_2_Final_Vendor_price_sheet.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- Training Ship Empire State FY19 Dry Docking Federal contract opportunity
- Solicitation number
- 6933A219Q19000008
About this file
Attmt 2 Final Vendor price sheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0001_6933A219Q000008.pdf | ||
| 6933A219Q19000008_Comb._Syn_Sol.pdf | ||
| Attmt_1_Rev_I_SOW_TSES_DRYDOCK_2019.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2 vendor quote sheet
| 6933A219Q000008 | ||
| VENDOR QUOTE ABSTRACT FOR FY19 TS EMPIRE STATE DRYDOCK | ||
| SECTION 100 | 100 GENERAL SERVICE / REQUIREMENTS | TOTAL PRICE |
| ITEM 101 | Applicability of Rules and Regulations | N/A |
| ITEM 101 | Accuracy of Information | N/A |
| ITEM 103 | Security | |
| ITEM 104 | Fire Potection and Safety | |
| ITEM 105 | Office and Administrative Services | |
| ITEM 106 | Wharfage | |
| ITEM 107 | Surveys and inspections | |
| ITEM 108 | On-site contractor's representatives | N/A |
| ITEM 109 | Documentation of openings, blanks and plugs | |
| ITEM 110 | Allowance for scrap material | N/A |
| ITEM 111 | Maintain ship's lighting | |
| ITEM 112 | Hazardous materials identification and disposal | |
| ITEM 113 | Use of ship's parts and equipment | N/A |
| ITEM 114 | Provide shore power | |
| ITEM 115 | Disable C02 and halon systems | |
| ITEM 116 | Maintaining ship's cleaniness | |
| ITEM 117 | Maintain clean bilges and drain wells | |
| ITEM 118 | Protective floor covering | |
| ITEM 119 | Surface preparation and painting/coating guideline | N/A |
| ITEM 120 | Safe for entry and safe for hot work certificates | |
| ITEM 121 | Production reporting | |
| ITEM 122 | Crane service | |
| ITEM 123 | Staging | |
| ITEM 124 | Oil boom | |
| ITEM 125 | Welding/brazing procedures | N/A |
| ITEM 126 | Soundings | |
| ITEM 127 | Sanitary system | |
| ITEM 128 | Waste water and oils | |
| ITEM 129 | Portable toilets/temporary facilities | |
| ITEM 130 | Compressed air | |
| ITEM 131 | Shore Steam | |
| ITEM 132 | Temp. Heaters | |
| TOTAL | SECTION I00 TOTAL |
| SECTION 200 | DRYDOCK WORK ITEMS | TOTAL PRICE | ||
| ITEM 201 | Dry dock ship | |||
| ITEM 202 | Tailshaft examination | |||
| ITEM 203 | Rudder pintle clearances | |||
| ITEM 204 | Rudder test | |||
| ITEM 205 | Sea chests | |||
| ITEM 206 | Sea valves | |||
| ITEM 207 | Blasting and coating of hull | |||
| ITEM 208 | Ultrasonic thickness gaugings | |||
| ITEM 209 | Propeller cleaning and inspection | |||
| ITEM 210 | Internal structural exams and testing of fuel tank | |||
| ITEM 211 | Internal structural exams of ballast, potable & feed water tanks | |||
| ITEM 212 | Internal structural exams of voids and cofferdams | |||
| ITEM 213 | Fathometer trunks and speed log | |||
| ITEM 214 | Anchor chains & lockers | |||
| ITEM 215 | Zinc anodes | |||
| ITEM 216 | Rivet inspection | |||
| Item 217 | Mud Ballast Analysis | |||
| TOTAL | SECTION 200 TOTAL | |||
| SECTION 300 | OPTIONAL AND UNIT PRICED ITEMS | QUANTITY | RATE | TOTAL PRICE |
| ITEM 301 | Tow ship from NY Maritime Academy to Drydock location (optional) | |||
| ITEM 302 | Move ship from pilot station and place in drydock (optional) | |||
| ITEM 303 | Shift to wet layberth following dry docking (optional) | |||
| ITEM 304 | Provide wet layberth (optional) | |||
| ITEM 305 | Tow ship from drydock location back to NY Maritime Academy (optional) | |||
| ITEM 306 | Supplemental Labor (optional) (Government given NTE 4000 Hrs) | 4000 | ||
| ITEM 307 | Supplemental Material (optional) (Government given NTE amount) | $300,000.00 | ||
| ITEM 308 SUPPLEMENTAL STEEL (OPTIONAL) | Unit | |||
| ITEM 308AA | Flat Steel - unit of issue is pounds | 10000 | $0.00 | |
| ITEM 308AB | Rolled Steel - unit of issue is pounds | 10000 | $0.00 | |
| ITEM 308AC | Service to weld 20 rivets | |||
| ITEM 308AD | Service to renew 20 rivets | |||
| ITEM 308AE | Service to prep and re-weld 100 feet of external hull seams | |||
| ITEM 309 | Audio Gaugings - Pricing shall be based on 15000 readings (shots) | |||
| TOTAL | SECTION 300 TOTAL | |||
| SECTION 400 | REPAIR ITEMS | TOTAL PRICE | ||
| ITEM 401 | Main & Auxillary Condenser Repairs | |||
| ITEM 402 | Forepeak coating touch-up | |||
| ITEM 403 | Coatings touch-up for ballast double bottms | |||
| ITEM 404 | Tank Vent overhaul | |||
| ITEM 405 | Steel Renewal | |||
| ITEM 406 | New Valve installation | |||
| ITEM 407 | Shafting Analysis | |||
| ITEM 408 | Shafting Analysis | |||
| TOTAL | SECTION 400 TOTAL |
| GRAND TOTAL SECTION | TOTAL | |
| TOTALS | SECTION 100 | |
| SECTION 200 | ||
| SECTION 300 | ||
| SECTION 400 | ||
| GRAND TOTAL | ||
| GRAND TOTAL | PROVIDE GRAND TOTAL FOR SEC 100 - 400 (INCLUDING THE GOV'T NTE MATERIAL TOTAL) | |
| Complete the following information: | ||
| Firm: | ||
| Mailing Address: | ||
| Point of Contact (Name, Phone, Email Address): | ||
| Dun and Bradstreet Number | ||
| Cage Code |
File details come from the government source that posted it.