Attachment 1 - Statement of work

View the file

Other files for this federal contract opportunity

Other files attached to Marine Evacuation Systems - Purchase and Install, newest first.
File Type Posted
Attachment_3_Vendor_price_sheet.xlsx XLSX spreadsheet
Final_6933A218Q000026_Combined_SynospisSolicitation.pdf PDF
Attachment_2_TSES_MES_Sketch.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Training Ship

EMPIRE STATE

Purchase and installation of two Commercial Item Marine Evacuation Systems (MES).

TABLE OF CONTENTS

SECTION I: GENERAL SERVICES and DESIGN BUILD REQUIREMENTS

ITEM 001 APPLICABILITY OF RULES AND REGULATION

ITEM 002 ACCURACY OF INFORMATION

ITEM 003 SURVEYS AND INSPECTIONS

ITEM 004 ON-SITE CONTRACTOR'S REPRESENTATIVE

ITEM 005 DOCUMENTATION OF OPENINGS, BLANKS AND PLUGS

ITEM 006 ALLOWANCE FOR SCRAP MATERIAL

ITEM 007 HAZARDOUS MATERIALS IDENTIFICATION AND DISPOSAL

ITEM 008 USE OF SHIP'S PARTS AND EQUIPMENT

ITEM 009 USE MAINTAINING SHIP'S CLEANLINESS

ITEM 010 USE SURFACE PREPARATION AND PAINTING/COATING GUIDELINE

ITEM 011 USE SAFE FOR ENTRY AND SAFE FOR HOT WORK CERTIFICATES

ITEM 012 USE STAGING

ITEM 013 USE WELDING / BRAZING PROCEDURES

ITEM 014 CONTRACTOR’S INDUSTRIAL SUPPORT

ITEM 015 SECURITY REQUIREMENTS

ITEM 016 PRODUCTION REPORTING

ITEM 017 DRAWING/DESIGN REQUIREMENTS

ITEM 018 MARINE EVACUATION SYSTEM SPECIFICATIONS

SECTION II: OPTION ITEMS

ITEM 201 SUPPLEMENTAL LABOR (OPTIONAL)

ITEM 202 SUPPLEMENTAL MATERIAL (OPTIONAL)

VESSEL PARTICULARS

NAME: TS EMPIRE STATE (ex OREGON)

TYPE: S5-S-MA1ua Single-screw Steam Powered Training Vessel.

OFFICIAL REGISTRY NUMBER: 287875

RADIO CALL SIGN: KKFW

CLASSIFICATION: ABS

BUILDER: Newport News Shipbuilding

KEEL LAID: 1961

COMMISSIONED: 1962

LENGTH OVERALL: 565 feet

BEAM: 23 feet

DESIGN DRAFT: 28 feet

VERTICAL CLEARANCE (Air Draft): 137 feet eleven inches – Keel to top of Mast

DEADWEIGHT: 14,620 tons

USCG GROSS TONNAGE: 14,557 tons

USCG NET TONNAGE: 4,367 tons

CRUISING SPEED: 15 knots

COMPLEMENT: COI Crew 14, Other Crew 92, and Add’l to Crew

16 plus 666 Cadets

USCG CERTIFICATION: Public Nautical School Ship

ABS CLASSIFICATION: 6204721 A1, AMS

SECTION I: GENERAL SERVICES REQUIREMENTS

ITEM 001 APPLICABILITY OF RULES AND REGULATION

ABSTRACT

It is the intent of this item to define the rules and regulations governing the TS EMPIRE STATE in order that the Contractor is cognizant of these requirements in the performance of this work package.

REFERENCES

46CFR167

SOLAS Cargo Ship (Non-tanker)

LOCATION / DESCRIPTION

The TS EMPIRE STATE was originally constructed as a Cargo Ship (non-tanker) under ABS Rules and the rules of SOLAS 1960. Conversion to a Public Nautical School Ship took place in 1989. As a Public Nautical School Ship, the regulations of 46 CFR 167 in addition to SOLAS rules for a Cargo Ship (non-tanker) applies.

NOTES

None

STATEMENT OF WORK

All work in this SOW must comply with the requirements of the USCG, ABS and SOLAS relative to the area being worked on.

If the Contractor is aware of anything in this work package that shall compromise the Vessel’s compliance, they shall make it known immediately, in writing, to the COR. This work item is Not Separately Priced (NSP).

PERFORMANCE CRITERIA / DELIVERABLES

Prove all the work to the satisfaction of Contracting Officer Representative (COR) and Training Ship Empire States (TSES) Officers and when applicable to the attending USCG Inspectors and/or the ABS Surveyors.

ITEM 002 ACCURACY OF INFORMATION

ABSTRACT:

It is the intent of this item for the Contractor to verify all dimensions and measurements provided in this work package.

REFERENCES:

All contract work items contained within this work package.

LOCATION / DESCRIPTION

N. A.

NOTES

None

STATEMENT OF WORK

Dimensions and measurements in this work package are provided in good faith but are not guaranteed. The Contractor shall be responsible for determining the accuracy of all dimensions, measurements, sizes and shapes provided in any sketches, drawings, plans and specification.

This work item is NSP.

PERFORMANCE CRITERIA / DELIVERABLES

Prove all the work to the satisfaction of COR and TSES Officers and when applicable to the attending USCG Inspectors and/or the ABS Surveyors.

ITEM 003 SURVEYS AND INSPECTIONS

ABSTRACT

It is the intent of this item to provide coordination and scheduling of USCG inspections and ABS surveys during the performance of service. The ship is not in an Alternate Compliance Program (ACP) with the US Coast Guard (as defined by 46 CFR, Part 8 Subchapter D). For this reason, witnessing of all inspections and surveys related to this service must be offered to the US Coast Guard as well as ABS. As this is a Public Nautical School Ship, there will be no attendance charges by USCG. ABS inspection fees shall be the responsibility of MARAD except when an inspection or survey has failed resulting from the Contractor's lack of preparation and planning.

In those instances, the ABS survey fees associated with the subsequent visit shall be borne by the contractor. The Contractor, to the best of his ability, shall condense required ABS/USCG inspections to limit the number of attendances required by Surveyors/Inspectors.

REFERENCES

ABS Rules for Classing Steel Vessels 46 CFR Chapter 1, Sub-Chapter R

LOCATION / DESCRIPTION

N. A.

NOTES

None

STATEMENT OF WORK

The Contractor shall coordinate and schedule all surveys and inspections required by this work package with the COR, USCG and ABS. The Contractor shall maintain a posting of all scheduled survey and inspection dates and times outside of the office door of the Chief Engineer.

PERFORMANCE CRITERIA / DELIVERABLES

• Daily posting of scheduled inspections and surveys.

• Prove all the work to the satisfaction of COR and TSES Officers and when applicable to the attending USCG Inspectors and/or the ABS Surveyors.

ITEM 004 ON-SITE CONTRACTOR'S REPRESENTATIVE

It is the intent of this item for the Contractor to provide an on-site Contractor's Representative to negotiate and execute delivery orders as needed in accordance with section II, Option Items.

REFERENCES

None

LOCATION / DESCRIPTION

N. A.

NOTES

None

STATEMENT OF WORK

A Contractor's Representative must have the authority to fully accept, negotiate, and execute "Delivery Orders" and shall be present during the period of performance of this service. To maintain continuity of responsibility, changes in representatives shall not be made after the start of the availability without prior approval by the COR. This work item is NSP.

PERFORMANCE CRITERIA / DELIVERABLES

Prove all the work to the satisfaction of COR and TSES Officers.

ITEM 005 DOCUMENTATION OF OPENINGS, BLANKS AND PLUGS

It is the intent of this item to define the Contractor's requirements for documenting all tank, valve and piping openings/closings, blanking/un-blanking, and plugging/unplugging to ensure that all tanks, valves and piping are returned to a normal operating status at the completion of this SOW.

REFERENCES

None

LOCATION / DESCRIPTION

Throughout vessel

NOTES

None

STATEMENT OF WORK

The Contractor shall maintain a log of all tank, valve and piping openings/closings, blanking/un-blanking, and plugging/unplugging to ensure that all tanks, valves and piping are returned to a normal operating status at the completion of this service. The log shall be posted at the ship's engine room operating station for inspection by the COR.

PERFORMANCE CRITERIA / DELIVERABLE

• Log of tank, valve, and piping opening and closings

• Prove all the work to the satisfaction of COR and TSES Officers and when applicable to the attending USCG Inspectors and/or the ABS Surveyors.

ITEM 006 ALLOWANCE FOR SCRAP MATERIAL

It is the intent of this item to define the Contractor's requirements relative to the disposal of any scrap generated by this service and the allowance shall be credited to MARAD for each affected work item.

REFERENCES

None

LOCATION / DESCRIPTION

N. A.

NOTES

None

STATEMENT OF WORK

Except as specified otherwise, all scrap material and/or salvaged materials, if any, shall be removed from the ship, become the property of the Contractor, and disposed of in accordance with all Federal, State and local regulations. This material is not property of MARAD or the ship. Credit for scrap and/or materials so taken by the Contractor shall be tracked by the Contractor and a credit provided to the COR just prior to the end of performance. This item is

NSP.

PERFORMANCE CRITERIA / DELIVERABLES

• Documentation tracking and accounting for scrap and salvage materials

• Prove all the work to the satisfaction of COR and TSES Officers.

ITEM 007 HAZARDOUS MATERIALS IDENTIFICATION AND DISPOSAL

It is the intent of this item to define the Contractor's requirements relative to the identification and disposal of any hazardous materials that might be encountered during this service. The Contractor must recognize that ships may contain hazardous materials which require special handling in the performance of any work. These materials include, but are not limited to;

asbestos (used in heat and electrical insulation, brake linings, deck coverings, boiler refractory, joiner work and other areas), mercury, certain hydraulic oils, bilge water and slops containing fuel, grease and lubricating oils, lead, lead-based anti-foulants, etc. The responsibility for identifying, handling and disposing of these materials shall be the Contractor's. Additional charges required for handling and disposing of these materials after award shall not be permitted.

REFERENCES

None

LOCATION / DESCRIPTION

N. A.

NOTES

None

STATEMENT OF WORK

In accordance with all regulatory body requirements, the Contractor shall provide all labor, materials and services to accomplish the intent of this item. Additionally, and at a minimum, the Contractor shall remove and dispose of all hazardous waste in accordance with all applicable Federal, state, and local rules and regulations.

PERFORMANCE CRITERIA / DELIVERABLES

• Prior to the end of performance period, the Contractor shall submit documented evidence of compliance. Evidence shall include the following:

types and quantities of hazardous waste generated, procedures followed for custody and disposal and copies of receipts for same, disposal sites, name of Contractor personnel responsible for hazardous waste.

NOTE: MARAD reserves the right to audit Contractor and Sub-Contractors for compliance.

ITEM 008 USE OF SHIP'S PARTS AND EQUIPMENT

It is the intent of this CLIN to define the requirements relative to the use of ship's equipment and/or parts.

REFERENCES

None

LOCATION / DESCRIPTION

N. A.

NOTES

None

STATEMENT OF WORK

Unless specifically stated otherwise, the Contractor shall not use any of the ship's spare parts, equipment, material, etc. in the execution of this service unless authorized in writing by the COR or specifically stated elsewhere in another section of this statement of work. If permitted by the COR, any spare parts, equipment, material authorized shall be inventoried and replaced at the Contractor's expense. This work item is NSP.

ITEM 009 MAINTAINING SHIP'S CLEANLINESS

It is the intent of this item to define the Contractor's requirements for maintaining cleanliness of the ship throughout this period of performance.

REFERENCES

None

LOCATION / DESCRIPTION

Throughout the ship.

NOTES

None

STATEMENT OF WORK

The Contractor shall provide all labor, materials and services to accomplish the intent of this work item. Additionally, and at a minimum, the Contractor shall:

• Walk the spaces of the ship with the COR as soon as possible after arrival to document its condition upon your arrival.

• Remove all garbage, trash and debris from the ship daily.

• Provide trash receptacles in all work areas to prevent trash from being littered on the ship.

• Provide dumpsters and garbage/debris removal services throughout the performance period. At no time shall garbage and debris be allowed to become hazardous to the protection of personnel or the ship.

• Provide separate containers for both trash and hazardous waste and clearly identify both containers. Remove and properly dispose of the contents of these containers frequently enough to ensure that they never reach a point of being full and spilling over. These containers shall be placed close to the gangway.

• Remove all dirt, soil, or debris generated during this service from all decks, bulkheads, overheads, and fixtures both inside and outside of the ship.

The Contractor and COR shall make a joint survey of the entire ship shortly before re-delivery to MARAD to determine that all requirements in this item have been met.

PERFROMANCE CRITERIA / DELIVERABLES

ITEM 010 SURFACE PREPARATION AND PAINTING/COATING GUIDELINE

It is the intent of this item to define the general requirements regarding all paint preparation and application of coatings as part of this work package.

REFERENCES

Maritime Administration Coating Guidelines

LOCATION / DESCRIPTION

Throughout ship.

STATEMENT OF WORK

The Contractor shall provide all labor, materials and services to accomplish the intent of this item. Additionally and at a minimum, the Contractor shall:

• Provide all paint needed for this work package.

• Receive all paints from the paint vendor and with the knowledge of the COR or his designated person, have it inventoried, stored under cover, and its distribution controlled to eliminate waste or improper use.

• Provide a Paint Manufacturer's Technical Representative to oversee the preparation and application of all paints/coatings needed for this work package. All coatings shall be applied under the direct supervision of the Paint Manufacturer's Technical Representative. No application of coatings shall be made until the prepared surfaces are approved by the Paint Manufacturer's Technical Representative. The Contractor shall arrange for such inspections prior to the initial coating and prior to each subsequent coating.

• Ensure that all paint shall be completely mixed; ensuring bottom sediments are in suspension. Thinning shall only be done in accordance with manufacturer's instructions.

Coverage and final thickness shall be specified by the paint manufacturer's representative.

• Protect all structures and equipment not to be blasted which are in way of the blast pattern. Protect depth sounder plates, hull anodes, propellers, tail-shaft and other vulnerable areas while the blasting operation is being carried out. Plug all deck scuppers and/or install temporary extension shields on the scuppers to the hull dry during blasting and coating operations.

• Ensure that steel temperatures are a minimum of four (4) degrees Fahrenheit above the dew point of the air prior to the application of any coatings. COATINGS SHALL NOT

BE APPLIED WHEN CONDENSATION IS PRESENT ON THE SURFACE.

• Ensure that any grit abrasive used for blasting shall be dry, have the proper pH, and meet the requirements of the paint manufacturer's product data sheet and be acceptable to the on-site Paint Manufacturer's Technical Representative.

• Ensure that all coatings are applied in accordance with the paint manufacturer's instructions. Every attempt should be made to minimize overspray. Areas found to contain runs; overspray, roughness or any other film irregularities shall be repaired or recoated as directed.

• Ensure that the final dry film thickness (DFT) readings be taken and recorded using an ultrasonic thickness instrument. A detailed report outlining the preparation, coating system and quantities of material shall be provided to the COR and a copy retained on board in the Chief Mate's office.

• Ensure that staging for painting shall be absolutely free from grit when any coating is being applied.

• Ensure that outdoor coatings shall be applied only under favorable weather conditions.

• Ensure that freshly applied coatings are protected from blasting in adjacent areas.

• Ensure that the steel temperature is a minimum of five (5) degrees Fahrenheit above the dew point of the air prior to the application of any and all coatings.

• Ensure that coatings do not take place when the relative humidity is above 85%.

• No coatings shall be applied to surfaces on which oxidation has commenced.

• Ensure that all paint manufacture's drying and recoating times are strictly adhered to.

• Ensure that when working localized areas or spots, removal of old paint shall extend beyond the edges of the spot until an area of completely intact and adherent paint film is present. The edges of the remaining tightly adherent paint around the area to be repainted shall be feathered down sufficiently to avoid a "patch work" effect. Overlap new paint over existing coating by at least 2 to 3 cm.

• Warrantee the coating system free of defects in material and workmanship for a period of sixty (60) months.

• The Contractor shall include the cost for adherence to this item within the individual items requiring surface preparation and coating. This work item is NSP.

PERFROMANCE CRITERIA / DELIVERABLES

• A detailed report outlining the preparation, coating system and quantities of material shall be provided to the COR

ITEM 011 SAFE FOR ENTRY AND SAFE FOR HOT WORK CERTIFICATES

The intent of this item is to define the Contractor's requirements for obtaining "Safe for Entry" and "Safe for Hot Work" certificates before any tanks or voids are entered or any hot work is to be performed.

REFERENCES

OSHA 29 CFR, Part 1915

LOCATION / DESCRIPTION

Throughout the ship.

NOTES

None

STATEMENT OF WORK REQUIRED

Any confined spaces, including tanks, must be certified "Safe for Entry" by a Certified Marine Chemist prior to the entry of any person. Any space or location in which hot work is to be performed, any space adjacent or having a common boundary to a location in which hot work is to be performed, and any piping system within a space in which hot work is to be performed shall be certified "Safe for Hot Work" by a Certified Marine Chemist prior to the commencement of hot work. Hot work shall include but not be limited to welding, brazing, heating, cutting, and grinding. Maintain certificates, daily, by use of a Marine Chemist or qualified Designated Competent Person who will visually inspect the ship to ensure that the ship's safety condition is unchanged for the continuation of hot work and entry. Remove any fluids or other substances necessary to achieve and maintain a "Safe-for-Entry" and / or "Safe for Hot Work" condition.

Provide clean fresh-air ventilation when and where required to achieve and maintain a "Safe for Entry" or "Safe for Hot Work" condition. Locations shall include but not be limited to:

All ballast tanks, cofferdams and voids All fuel oil, waste oil and lube oil tanks All potable-water tanks All sewage tanks When the ship's ventilation system is secured, provide clean fresh-air ventilation for the following working areas:

All levels of the engine room including the shaft alley All accommodation spaces All machinery spaces All navigation levels

All additional costs and re-certification due to shifting the ship within yard, ballasting or de-ballasting, growth work and/or additional works and sea trial departure/arrival shall be included in this work item. Post the original "Marine Chemist's Certificates" and "Log of Inspection and Tests by a Competent Person" (OSHA Form #74) and reissue certificates in a protected cover in a conspicuous location at the ship's gangway and at the entrance to each gas free tank or space.

One copy shall be furnished to the attending COR.

Provide copies of Designation of Competent Persons (OSHA Forms 73) to the attending COR.

The Contractor shall include the cost for adherence to this CLIN within the individual CLINs requiring tank entry or hot work.

PERFORMACE CRITERIA / DELIVERABLES

• Post the original "Marine Chemist's Certificates" and Log of Inspection and Tests by a Competent Person"

• (OSHA Form #74) and reissued certificates in a protected cover in a conspicuous location at the ship's gangway and at the entrance to each gas-free tank or space. Also, one copy is to be furnished to the attending COR.

• Provide copies of Designation of Competent Persons (OSHA Forms 73) to the COR

ITEM 012 STAGING

This item describes the Contractor's requirement to furnish staging for any work requiring it.

REFERENCES

United States Occupational Safety & Health Agency Regulator.

LOCATION / DESCRIPTION

Contractor facility and onboard ship

NOTES

None

STATEMENT OF WORK

The Contractor shall furnish all necessary staging to enable accomplishment of this work.

Staging shall comply with all applicable safety regulations.

ITEM 013 WELDING / BRAZING PROCEDURES

The intent of this item is to provide the COR with a copy of all the Contractor's certified welding and brazing procedures that will be used in the execution of this service.

REFERENCES

ABS Rules for Building and Classing Steel Ship: Part 1, Classification, Testing and Surveys.

Part 2, Material and Welding CFR (Code of Federal Regulations) Title 46, Subchapter F "Marine Engineering" Subpart 57 "Welding and Brazing"

LOCATION / DESCRIPTION

Contractor facility and onboard ship

NOTES

None

STATEMENT OF WORK

The Contractor shall provide the COR with a copy of all Regulatory Body approved welding and brazing procedures to be used during this service prior to performing any welding or brazing.

This item is NSP.

PERFORMANCE CRITERIA / DELIVERABLES

• Copy of the Contractor's welding and brazing procedures and certifications. Certifications are due with the company quote.

ITEM 014 CONTRACTOR INDUSTRIAL SUPPORT

Provide and maintain all needed utilities and support services to accomplish the work contained in this statement of work.

REFERENCES

None

ITEM LOCATION / DESCRIPTION

LOCATION: Ship’s pier.

NOTES

None

STATEMENT OF WORK

The contractor shall be responsible for providing and maintaining any needed utilities and equipment necessary to accomplish the work items in this specification. Utilities and equipment to be furnished shall be at the contractor’s expense to accomplish work items that include but are not limited to:

• Electricity,

• portable lighting,

• compressed air,

• welding machines,

• cranes,

• rigging equipment such as:

chain falls and come-a-longs,

• ventilation fans and ducting,

• portable fire extinguishers, etc.

PERFORMANCE CRITTERIA / DELIVERABLES

N.A.

ITEM 015 SECURITY REQUIRMENTS

The contractor shall comply with all SUNY Maritime Academy security requirements.

REFERENCES

None

ITEM LOCATION / DESCRIPTION

Vessel and pier.

NOTES

None

STATEMENT OF WORK

The contractor shall comply with all SUNY Maritime Academy security requirements. All workers shall have a Transportation Worker Identification Credential (TWIC) to gain access to the vessel. All workers shall sign on and off the vessel in the vessel's visitor's log daily.

The contractor shall comply with all SUNY Maritime Academy parking requirements. Parking on the pier shall be limited to the loading and off-loading of equipment and materials. There are only 6 parking spaces available at the head of the pier for contractor’s use. There is street parking on campus, but it is not guaranteed, so the contractor should plan on busing workers to and from the ship. This work item is NSP.

PERFORMANCE CRITTERIA / DELIVERABLES

Compliance with all SUNY Maritime security and parking regulations.

ITEM 016 PRODUCTION REPORTING

This work item describes the various production reports that the Contractor shall prepare for the COR during performance.

REFERENCES

None

LOCATION / DESCRIPTION

N. A.

NOTES

None

STATEMENT OF WORK

Contractors shall demonstrate their ability to complete the project within the required performance period by submitting, with quote, a commercial off-the-shelf critical path management schedule/Gantt chart, equal to Microsoft Project©, which clearly shows that all contract work items have been considered, included and can be successfully completed as stated in this statement of work. It is understood that management tools such as Microsoft Project© may require items to be combined and progressed as groups, but quoters must be able to demonstrate how such grouping has been done and that the grouping does not reduce their ability to use the management product, continually and accurately throughout the life of the performance period.

Quoters will be required to provide this project management schedule as a part of the quotation submission instructions which will be reviewed for technical acceptability.

This project management schedule cannot be a one-time submission but must be used by the successful contractor to demonstrate physical progress vs. planned progress frequently during the performance period (as often as weekly), indicate any changes in critical path, jeopardizing events and the contractor's plan to correct those events.

CONDITION-REPORT STATUS REPORT

Prepare and submit a condition-report status report. The report shall, at a minimum, list each condition report, its associated item/work item number(s), the date each report was submitted, the date of reply from the COR, and the delivery order number (if issued) that is associated with each condition report.

SUB-CONTRACTOR LIST

Quoters shall submit a listing of subcontractors who are expected to provide sub-contractor support during the performance of this service. Upon award of a purchase order, the contractor shall submit a final list of sub-contractors to the COR no later than five (5) days after award.

PROGRESS MEETINGS

Progress meetings shall be conducted between the Contractor and the COR on a weekly basis.

The Contractor shall utilize the same critical path management schedule/Gantt chart in Microsoft Project 2003 or equal, to determine degree of progress payments.

PERFORMANCE CRITERIA / DELIVERABLES

• Project Management Schedule

• Condition-Report Status Report

• Sub-Contractor List

• Prove all the work to the satisfaction of COR and TSES Officers.

• The Contractor shall maintain a log documenting the hours used. This log is to be updated and provided to the COR every Friday afternoon by 1500 hrs.

ITEM 017 DRAWING/DESIGN REQUIREMENTS

ABSTRACT:

It is the intent of this item for the Contractor to provide drawings and specifications for individual projects listed in this work package.

REFERENCES:

All contract work items contained within this work package.

LOCATION / DESCRIPTION

N. A.

NOTES

None

STATEMENT OF WORK

1. The contractor shall assume the following for all work items in this work package:

a. No electronic copies of drawings exist for the vessel either in CAD or PDF.

b. All dimensions shall be verified onboard vessel.

2. Provide detailed drawings (electrical, mechanical, structural and general arrangement) for all designs. Drawing submittals shall be at the 30, 60 and 90% completed for government review.

3. All drawings shall be ABS and USCG approved. The government will pay for ABS review under a separate contract with ABS. The contractor shall address all ABS and USCG comments and correct drawing and resubmit as required to gain approval.

4. Provide detailed removal and demolition drawings.

5. Provide detailed shop drawings for review by MARAD, ABS and USCG

6. The contractor shall provide 100% design drawings, manuals and as built drawings in hard copy and electronic format.

7. The proposed contractor is responsible for contracting with an Architecture and Engineering firm to ensure that all drawings shall be stamped and submitted to ABS and USCG by a state licensed Professional Engineer.

Prove all the work to the satisfaction of COTR and TSES Officers and when applicable to the attending USCG Inspectors and/or the ABS Surveyors.

ITEM 018 MARINE EVACUATION SYSTEM

Provide two (2) commercial off-the-shelf USCG/ SOLAS approved Marine Evacuation Systems (MES) onboard the TSES.

REFERENCES

A). 46 CFR 199.145 - Marine evacuation system launching arrangements.

LOCATION/DESCRIPTION

1. Location: Forward of house

2. Two (2) MESs. One each Port and Stbd

STATEMENT OF WORK

In accordance with all regulatory body requirements, the Contractor shall provide all required labor, materials and services to accomplish the intent of this work item is to provide and install two (2) MES onboard the TSES. The projected period of performance is from date of award (prior to September 30, 2018) with installation completed by March 15, 2019.

1.1 Scope of Material and Equipment

a) Two (2) 20m MES Double path inflatable slides, with pre-connected 100-person Self

Righting “slide” Liferafts (USCG Approved) (SOLAS “A” emergency pack).

Including aluminum stowage / launching rack, inflation systems, browsing lines, installation hardware and hydrostatic release units.

b) Two (2) 50-person Self Righting “Link” Liferafts (USCG Approved) (SOLAS “A” emergency pack) including installation hardware and hydrostatic release units.

c) Two (2) MES Deckhouses including Automatic Release Exterior Doors built from marine grade aluminum with steel frame, including hydrostatic release units, installation rigging and hardware, inboard roller shutter door.

d) Two (2) “Link” single liferaft stowage / launching racks, built from marine grade aluminum, including hydrostatic release units and installation rigging.

e) Commissioning of Two (2) MES and Two (2) “Link” Liferafts shall be included in the scope of work.

f) Testing of One (1) MES and one (1) 50p Link liferafts, must be approved by the USCG before installation of MES on TSES. The recovery, service post deployment and re-installation of one (1) MES and one (1) link liferaft shall also be approved by the USCG.

1.2 General Requirements.

1. The Marine Evacuation System (MES) shall be Slide based and arranged as autonomous units with no connection of ships’ power and have no electrical or hydraulically operated components.

2. The specified MES and 100-Person Liferafts provided shall be in accordance with:

a. The applicable requirements of the vessels Class and Flag (ABS/USCG)

b. The applicable requirements of SOLAS

c. Meet the requirements of 46 CFR 199.145

3. Each MES shall consist of a 20m long evacuation slide and a USCG/SOLAS approved, pre-connected 100-person liferaft (SOLAS Scale ‘A’ emergency pack), stowage, fixed-length browsing lines with no operational requirement for winches, rope clutches, or turning blocks. Browsing line hard points and retrieval line flat bars, shall also be provided.

4. Each MES shall be stowed in a Deckhouse, build from marine grade aluminium, steel base, consisting of an automatically releasing exterior door and inboard roller shutter door (aluminium un-painted, steel primed). The Deck house and base, as well as the MES foundation shall also be fabricated and installed.

5. The liferaft, pre-connected to each MES, slide shall be a 50- person Scale ‘A’ emergency pack SOLAS approved self-righting liferaft.

6. The liferaft, shall be stowed in a single stowage / launching rack, build from marine grade aluminium(un-painted), including hydrostatic release units and installation rigging. The stowage / launching rack, as well as the steel foundation (unpainted) shall fabricated and installed.

7. Provision shall be incorporated into the design of each MES to allow the connection of additional 50-person Link liferafts to the 100-person pre-connected Slide liferaft which is deployed with the MES slide.

8. The MES shall be fully USCG and SOLAS approved and be supplied with a certificate of conformity.

9. The operationally packed MES, is to include the inflation system having aluminium cylinders, 100-person pre-connected slide liferaft on a cradle. All necessary retaining straps, MES cradle bolts, float-free wires, protective covers, hydrostatic release units and vacuum operated remote release units shall also be included.

10. The remote release system for the MES, including outer door shall include all required hand operated pumps, pump mounting brackets, and all necessary small bore stainless steel pipe work with fittings.

11. All MES shall be easily utilised with the minimal amount of training in its use required.

12. Each link liferaft shall be a 100-person self-righting inflatable type, packed in a GRP container and complete with a SOLAS ‘A’ scale emergency pack. The inflation system of the liferafts, having aluminium cylinders and high pressure hoses, shall be interchangeable with the MES inflation system for ease of maintenance and interchangeability of spare parts. Each 100-person link liferaft shall be supplied complete with a stowage/launching rack ready for mounting to the ship’s structure. The stowage/launching rack shall come complete with webbing retaining straps, stainless steel shackles, hydrostatic release units and vacuum remote release units. The remote release system for the 50-person link liferafts shall include all required hand operated pumps, pump mounting brackets, signage, and all necessary small bore stainless steel pipe work with fittings.

13. Equipment Performance

A. Each MES shall be capable of evacuating (600 Max) persons in 30 minutes.

B. Worldwide MES Service is required and a OEM service facility within CONUS.

C. Prior to submittal of design and approval by ABS Houston and USCG Marine Safety Center conduct a meeting and walk thru of design with local NY ABS and USCG personnel.

D. Upon completion of design and approval by ABS Houston and USCG Marine Safety Center and MARAD commence procurement, fabrication and installation of the MESs.

The contractor is required to design, fabricate and commission an approved ABS and USCG approved MES system.

E. All work will be performed onboard the Training Ship Empire State located pierside at SUNY Maritime College, 6 Pennyfield Ave, Bronx, NY 10465. The cost of breasting, floating cranes and pier cranes shall be responsibility of the contractor.

F. Provide onboard training to ship’s officers. Assist ship’s Officers with USCG required drills for MES. Provide a familiarization training course for ship’s cadets. Provide an update for the vessel’s SMS manual.

G. Demonstrate proper operation to COR.

PERFORMANCE CRITERIA / DELIVERABLES

• Provide ABS and USCG Drawings.

• All operational tests performed to satisfaction of surveyor and / or C/E

SECTION II: OPTION ITEMS

ITEM 201 SUPPLEMENTAL LABOR (OPTIONAL)

ABSTRACT

It is the intent of this item to provide supplemental labor to accomplish additional work if authorized.

REFERENCES

N. A.

LOCATION /DESCRIPTION

N. A.

NOTES:

NA.

STATEMENT OF WORK

The Contractor shall furnish a unit price quote based on the Government estimate of not to exceed 100 man-hours of supplemental labor. This rate shall be fully burdened, and is applicable seven days a week (i.e. no overtime, penalty time or other escalations will apply). These hours will only be allocated for industrial labor. Supervision, management, QA, yard maintenance and other such labor is considered part of the rate burden. When Supplemental Labor is required by the MARAD, a Contractor-submitted Condition Report with fully documented price quotations shall be documented by a work structure breakdown on a Contractor-developed estimating form, as an attachment to the Condition Report.

Supplemental hours, if authorized, will be allocated by the COR via Delivery Orders. No oral directions shall be accepted by the Contractor or its personnel from any individual other than the COR. Any oral direction provided by the COR other than guidance on existing tasking shall be documented via Delivery Order Request for Pricing within 24 hours. All tasking provided by the COR will normally be in writing, and no work shall begin on any tasking, other than emergency nature, until received by the Contractor, negotiated and settled by the COR and/or the Contracting Officer. Any questions, concerns or disputes of tasking given (including challenges as to whether items are within scope or genuine new work) shall be presented to the Contracting Officer in writing for resolution.

None additional

ITEM 202 SUPPLEMENTAL MATERIAL (OPTIONAL)

The Government will authorize up to $20,000.00 for material charges, in the event this is needed and ordered by the COR for supplemental growth.

REFERENCES

N. A.

LOCATION /DESCRIPTION

N. A.

NOTES:

N. A.

STATEMENT OF WORK

An allowance of a not to exceed amount of $20,000.00 will be provided for any Supplemental Material charges. There shall be no burden on these charges for either subcontracted costs or material charges. If Supplemental Material is required, it will be allocated by the COR via a Delivery Order. The Contractor shall provide to the COR invoices for goods or services applicable to Supplemental Material charges for each Delivery Order with material charges exceeding $250.00. Once the actual invoice is received by the COR, negotiations based on material estimates will be credited or debited accordingly. All material invoices must be received no later than the completion of each Delivery Order. Retain age will not be released until all material invoices have been received and approved by the COR. The contract cannot be closed out until all material invoices are submitted, or Delivery Orders will be debited accordingly.