PROJECT DESCRIPTION.pdf
PDF 194 KB Posted
- Attached to
- MT Phillips 364(1), Short Oil Road Federal contract opportunity
- Solicitation number
- 69056720B000007
About this file
This document provides a project description and details for the MT Phillips 364(1), Short Oil Road federal contract opportunity. The opportunity involves asphalt pavement milling, aggregate base, and asphalt concrete pavement work along 4 miles of road south of Malta, MT. The project description lists various construction requirements and estimates, including earthwork, aggregate courses, asphalt paving, traffic control items, and an estimated price range of $1-2 million. The related federal contract opportunity further identifies this as a pre-solicitation by the Department of Transportation Federal Highway Administration for the work. The tentative completion date is Fall 2020.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT Phillips 364(1), Short Oil Road
The work consists of Asphalt pavement milling, aggregate base, and asphalt concrete pavement and other small items of work.
Project length: 4 Miles
Tentative Fixed Completion Date: Fall 2020 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $1 million to $2 million
Location: 4 Miles South of Malta, MT.
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
On e S ch ed ul e
Sc h
Na m e
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 158 Watering for Dust Control 50 GAL
DIVISION 200 – Earthwork 204 Excavation & Embankment 900 CUYD 207 Earthwork Geosynthetics 4,200 SQYD
DIVISION 300 – Aggregate and Base Courses 301 Untreated Aggregate Courses (crushed aggregate) 8,000 TON 302 Minor Crushed Aggregate Roadway Agg – Method 2 Roadway Agg – Shoulder Finishing
165 TONS
7.74 MILES
DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete 9,150 TONS 412 Asphalt Tack Coat (asphalt surface treatment) 35 GAL
On e S ch ed ul e
Sc h
Na m e
413 Asphalt Pavement Milling 55,000 SQ
YD
418 Asphalt Concrete Pavement Patching Yes
DIVISION 600 – Incidental Construction 621 Monuments & Markers (construction survey & staking) (yes/no) No 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 633 Permanent Traffic Control (traffic control devices) - Delineators 150 EA 634 Permanent Pavement Markings (traffic pavement markings)
83,720
LNFT
635 Temporary Traffic Control – Flagger 800 hours 635 Temporary Traffic Control – Pilot Car 100 hours 635 Temporary Traffic Control –
CONSTRUCTION SIGN 126 SQ FT
635 Temporary Traffic Control – TUBULAR
MARKER, TYPE 42-INCH 100 EA
| DIVISION 200 – Earthwork |
| DIVISION 300 – Aggregate and Base Courses |
| DIVISION 400 – Asphalt Pavements & Surface Treatments |