plans_ak-11004_Pre-Ad.pdf
PDF 15 MB Posted
- Attached to
- AK DOT 110(4), Community - Refuge Trail Project Federal contract opportunity
- Solicitation number
- 69056719B000015
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_AK_DOT_110(4).pdf | ||
| Amendment_A001.pdf | ||
| Plan_Request.pdf | ||
| Physical_Data.zip | ZIP file | |
| IFB_Refuge_Trail.pdf | ||
| plans_ak-11004.pdf | ||
| AK_DOT_110(4)_Community_Refuge_Trail_Pre-Ad_Letter.pdf | ||
| PROJECT_DESCRIPTION.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R. Johnson
PROJECT MANAGER
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
9 10
KENAI
FJORDS
N.P.
LAKE CLARK
NAT'L PARK
WRANGELL-
ST. ELIAS
NAT'L PARK
DENALI
NATIONAL
PARK
ALASKA KEY MAP
SOUTH CENTRAL
C A
N A
D A
U N I T
E D
S T
A T
E S
Junction
Delta
FAIRBANKS
Tok
Glennallen
Valdez
Cordova
Whittier
ANCHORAGE
Palmer
Kenai
Homer
Seward
Hot Springs
Manley Hot Springs
Circle
A.1
STATE PROJECT
NUMBER
SHEET
AK DOT 110(4)
K
H a r r is o n
N
P h a
C h e c k e d b y
D e s ig n e d b y
INDEX TO SHEETS
K. PERMANENT TRAFFIC CONTROL PLAN
J. TEMPORARY TRAFFIC CONTROL PLAN
I. RESERVED
H. DRAINAGE
G. RESERVED
F. EROSION CONTROL
E. APPROACH ROADS AND PARKING AREAS
D. PLAN-PROFILE
C. TYPICAL SECTION(S)
B. SUMMARIES
A. GENERAL INFORMATION
U
S S u r ft c p w w o r k d a k a a .d g n
DETAILS
SIGN INSTALLATION AND PAVEMENT MARKING
LAYOUT AND SIGN LOCATIONS
PERMANENT TRAFFIC CONTROL STRIPING
TABULATION OF QUANTITIES
DETAILS
STANDARD TEMPORARY TRAFFIC CONTROL
TABULATION OF QUANTITIES
STANDARD DRAINAGE DETAILS
TABULATION OF DRAINAGE QUANTITIES
STANDARD EROSION CONTROL DETAILS
FIBER ROLL CHECK DAM DETAILS
SWPPP NOTICE SIGN DETAILS
EROSION & SEDIMENTATION CONTROL PLAN
TABULATION OF QUANTITIES
PRECAST CONCRETE WHEELSTOP DETAILS
SOUTH PARKING TURNOUT AREA
NORTH PARKING TURNOUT AREA
SURVEY CONTROL
PLAN AND PROFILE
TYPICAL SECTION
SUMMARY OF QUANTITIES
VICINITY MAP
PLAN SYMBOLS AND ABBREVIATIONS
TITLE SHEET
K.4
K.2-3
K.1
J.2-5
J.1
H.2-7
H.1
F.9-10
F.8
F.7
F.2-6
F.1
E.3
E.2
E.1
D.10
D.2-9
D.1
C.1-3
B.1-2
A.3
A.2
A.1
A
M
M a y
FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
e (max)
V
ADT (2038)
ADT (2018)
NA
NA
NA
NA
APPROVED:
DATE
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
SPECIFICATION:
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PLANS PREPARED BY
ALASKA
KENAI PENINSULA BOROUGH
KENAI NATIONAL WILDLIFE REFUGE
PLANS FOR PROPOSED PROJECT
AK DOT 110(4)
COMMUNITY - REFUGE TRAIL PROJECT
LENGTH 1.715 MILES
Western Federal Lands Highway Division
Chief of Engineering, Location
Project
See Vicinity Map Sheet A.3
0 25 50 7525 100
Approximate Scale in Miles
N
Surfacing
Clearing, Grading, Drainage and Aggregate on Federal Highway Projects, FP-14
Construction of Roads and Bridges
Standard Specifications for
PRELIMINARY
CP GPS
JH
BH
TP
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
E
RIP
G G
W W
DI
T
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
P e p te m b e r
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2 DOT 110(4) AK
DI
T
NO SCALE
- no symbol -wall face
N
U
C p w w o r k d a k a b .d g n
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
NOTE:
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
VICINITY MAP
Approximate Scale in Miles
0.5 0.25 0 0.5 1.0
N
A.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k a c .d g n
AK DOT 110(4)
F e b r u a r y
H a r r is
P h
C h e c k e d b y
D e s ig n e d b y
VISITOR CENTER
WILDLIFE REFUGE
KENAI NATIONAL
9+55
AK DOT 110(4)
PROJECT
COMMUNITY - REFUGE TRAIL
BEGIN PROJECT
93+50 (Equation Station)
AK DOT 110(4)
PROJECT
COMMUNITY - REFUGE TRAIL
END PROJECT
144+40
ACCESS TRAIL
VISITOR CENTER
BEGIN WORK
253+15 (Equation Station)
ACCESS TRAIL
VISITOR CENTER
END WORK
Tu rf es tab lis hmen t l im its
NO SCALE
SHEET 1 OF 3
TYPICAL SECTIONS
stimil tnemhsilbatse fruT
C.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k c a .d g n
AK DOT 110(4)
J u n e
H a r r is
P h
C h e c k e d b y
D e s ig n e d b y
12+09 - 83+27
144+40 - 148+43
[3]
C le a r in g l im it
C le a r in g l im it
LC
Profile grade
5'
Existing ground
ROUNDING DETAIL
CUT SLOPE
S lo p e s ta k e
D
0.25 D
ROUNDING DETAIL
FILL SLOPE
C le a r in g l im it
C le a r in g l im it
D
5'5' B=5'5'
5'
Existing ground0.25 D
Slope stake
[2]
Va ria ble
Aggregate surface course, 6-inch depth
FOOTNOTE:
[2]
Va ria ble
4'4' Trail tread width
Va rie d
[2
Va rie d
COMMUNITY REFUGE TRAIL
VISITOR CENTER ACCESS TRAIL
conserved topsoil over all cuts and fills
Place minimum 6-inch depth layer of
1:2
1:2 [1]
3% Inslope/Outslope proportionally.
dimension and reduce the front slope rounding distance
For cut heights less than "B" reduce "B" to the cut height[3]
Construct slopes as shown in the Staking Report.[2]
Report.
Construct trail tread cross slope as shown in the Staking[1]
Turf establishment limits
CUT SIDE
FILL SIDE
[2]
[2]
NO SCALE
SHEET 2 OF 3
TYPICAL SECTIONS
stimil tnemhsilbatse fruT
C.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k c b .d g n
AK DOT 110(4)
u n e
H a r r is
P h
C h e c k e d b y
D e s ig n e d b y
83+25 - 90+00 (Reference Stations)
249+00 - 253+15 (Reference Stations)
C le a r in g l im it
LC
Trail tread width
COMMUNITY REFUGE TRAIL
VISITOR CENTER ACCESS TRAIL
[1
Va rie d Reference CenterlineExisting grade conserved topsoil over all cuts and fills
Place minimum 6-inch depth layer of
Trail tread width
Reference CenterlineExisting grade
C le a r in g l im it
5'
Existing ground
[1]
Varied conserved topsoil over all cuts and fills
Place minimum 6-inch depth layer of
FOOTNOTE:
3% Outslope
3% Outslope
See Sheet C.1 for cut and fill slope rounding details.[2]
Construct slopes as shown in the Staking Report.[1]
Varied
Varied
Existing roadway width
Existing roadway width of existing pavement Sawcut at the edge of existing pavement Sawcut at the edge
1:2
1:2
8'
8'
NO SCALE
SHEET 3 OF 3
TYPICAL SECTIONS
sti mil t nemhsil batse fruT stimil tnemhsilbatse fruT
C.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k c c .d g n
AK DOT 110(4)
u n e
H a r r is
P h
C h e c k e d b y
D e s ig n e d b y
9+55 - 11+25 (Reference Stations)
91+75 - 93+50 (Reference Stations)
C le a r in g l im it
[1
Va rie d
Reference CenterlineExisting grade conserved topsoil over all cuts and fills
Place minimum 6-inch depth layer of
FOOTNOTE:
3% Outslope
See Sheet C.1 for cut and fill slope rounding details.[2]
Construct slopes as shown in the Staking Report.[1]
NORTH PARKING TURNOUT
SOUTH PARKING TURNOUT
Parking Turnout
Varied
57' Max.
C le a r in g l im it
[1]
Varied
Reference Centerline Existing grade conserved topsoil over all cuts and fills
Place minimum 6-inch depth layer of
Parking Turnout
Varied
57' Max.
3% Inslope
Varied
Varied
Existing roadway width
Existing roadway width
Existing ground
1:2
1:2 of existing pavement Sawcut at the edge of existing pavement Sawcut at the edge
[2]
FOOTNOTE:
in the field.
The CO will identify exact hazardous trees to be removed [2]
Visitor Center Access Trail construction.
Quantities include North and South Parking Turnouts, and [1]
D.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k fa .d g n
AK DOT 110(4)
u n e
H a r r is
P h
C h e c k e d b y
D e s ig n e d b y
17102
ACAC
P
17101
P O
T
.0
P O
T
.0
5 1
P O
T
.0
.8
.2
.3
.6
P O
T
.0
P C
.9
P R
C
.2
P T
.4
.8
.1
+1.810 0%
+0.9800%
100' VC
.6
N
NWR Entry Sign
Curve= KCT-2
D
R= 300.00'
T= 45.95'
L= 91.19'
D
Curve= KCT-1
R= 300.00'
T= 46.05'
L= 91.39'
Guide sign 35 mph speed limit
CUYD
EXC.
CUYD
EMB.
15+0013+5011+00
75 75
80 80
85 85
90 90
95 95
100 100
105 105
110 110
115 115
D.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k fb .d g n
AK DOT 110(4)
u n e
H a r r is
P h
C h e c k e d b y
D e s ig n e d b y
Existing ground
Profile grade
BEGIN PROJECT
3.
D
T E
E H
S E
N I
L H
C T
A M
(907) 283-7535
Kenai, AK 99611
210 Fidalgo Ave.
City of Kenai
WATER & SEWER:
907-262-9334
Soldotna, AK 99669
36225 Kenai Spur Hwy
Enstart Natural Gas Company
NATURAL GAS:
(907) 262-5731
Soldotna, AK 99669
29220 Kowakan St, Communications Alaska
TELEPHONE:
FAX (907) 283-2353
(800) 478-8551
(907) 283-5831
Kenai, AK 99611
280 Airport Way
Homer Electric Association, Inc.
POWER:
Line to be constructed
Water line
Overhead power lines
Underground telephone line
Underground gas line
Sewer line
SKI HILL RD
Reference centerline
To Soldotna
Begin trail construction
Building
Utility
689 CUYD (Included 648 CUYD of conserved topsoil)
See Section E
Parking Turnout
Construct North
E= 1445032.83
N= 2366084.65
I n s ta ll p ip e c u lv e r t
9+55
AK DOT 110(4)
I n s ta ll p ip e c u lv e r t
See cross sections)
(Special ditches on right.
See Section E
Parking Turnout
Construct North
12+09.03 Begin Trail Construction
Offset= 53.00 RT
10+93.61( Reference centerline)
E= 1445001.14
N= 2365939.68
E Q S
T A
T I O
N B
K
A H
B K
A H
E Q S
T A
T I O
N
Trail centerline existing ground
Projected reference
Parking. See Section E
Tie in with North Turnout
El. 95.80'
12+09.03PRELIMINARY
5 1
P C
.3
P T
.7
P C
.7
PT 24+41.87
+0.9800%
.5
-3.5000%
160' VC
.9
160' VC
.9
8.
.9
8.
8.
.9
.9
8.
N
D
Curve= KENAI_T3-3
R= 1,000.00'
T= 85.43'
L= 170.44'
Curve= KENAI_T3-4
D
R= 235.00'
T= 235.00'
L= 369.14'
CUYD
EXC.
CUYD
EMB.
25+0022+5020+0017+5015+00
D.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k fc .d g n
AK DOT 110(4)
u n e
H a r r is
P h
C h e c k e d b y
D e s ig n e d b y
Existing ground
Profile grade
Profile grade
Existing ground
4.D TEEHS ENILHCTAM
2.
D
T E
E H
S E
N I
L H
C T
A M
3200 CUYD (Included 1008 CUYD of conserved topsoil)
Line to be constructed
DAOR LLIH IKS
5 19
5 19
Next Left Sign
Visitor Center
P C
.8
P T
.8
P C
.3
P R
C
.4
P T
.1
P C
.1
.9
.9
.9
8.
.9
8.
100' VC
.9
+3.8
0%
+3.8
0%
100' VC
CUYD
EXC.
CUYD
EMB.
35+0032+5030+0027+5025+00
N Curve= KENAI_T3-7
D
R= 200.00'
T= 40.90'
L= 80.69'
D
Curve= KENAI_T3-5
R= 400.00'
T= 120.47'
L= 234.03'
D
Curve= KENAI_T3-6
R= 200.00'
T= 57.56'
L= 112.09'
D.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k fd .d g n
AK DOT 110(4)
u n e
H a r r is
P h
C h e c k e d b y
D e s ig n e d b y
Profile grade
Existing ground
Existing ground
Profile grade
5.
D
T E
E H
S E
N I
L H
C T
A M
3.
D
T E
E H
S E
N I
L H
C T
A M
Line to be constructed
DR LLIH IKS
I n s ta ll p ip e c u lv e r t
I n s ta ll p ip e c u lv e r t
I n s ta ll p ip e c u lv e r t
1368 CUYD (Included 930 CUYD of conserved topsoil)
Approximate overhead powerlines, typ.
25+25 to 31+50 (Estimated 925 CUYD)
Use imported unclassified borrow for backfill
0 2
0 2
0 2
5 19
5 19
5 2
0 2
PC 34+78.19
P T
.7
P C
.0
P R
C
.3
P T
.6
P C
.5
P R
C
.7
P T
.0
.9
8.
.9
.3
8.
-3.9965%
120' VC
.6
200' VC
.9
.9
.9
8.
.9
8.
.3
.3
.9
8.
.9
8.
N
SKI HILL RD
D
Curve= KENAI_T3-8
R= 175.00' T= 263.47' L= 344.57'
D
Curve= KENAI_T3-9
R= 200.00' T= 81.83' L= 155.34'
D
R= 200.00'
L= 136.29'
T= 70.91'
Curve= KENAI_T3-10
D
Curve= KENAI_T3-11
R= 200.00' T= 70.88' L= 136.23'
D
Curve= KENAI_T3-12
R= 200.00' T= 87.68' L= 165.27' e= 0.030 e= 0.030
PC 34+78.19
CUYD
EXC.
CUYD
EMB.
50+0047+5045+0042+5040+0037+5035+00
190 245
195 250
200 255
205 260
210 265
215 270
220 275
225 280
230 285
D.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k fe .d g n
AK DOT 110(4)
u n e
H a r r is
P h
C h e c k e d b y
D e s ig n e d b y
Profile grade
Existing ground
Existing ground
Profile grade
2637 CUYD (Included 1627 CUYD of conserved topsoil)
Line to be constructed
D R
L
LI
H I K
S
4.D TEEHS ENILHCTAM
6.
D
T E
E H
S E
N I
L H
C T
A M
NWR Entrance Sign
Stop Sign
Next Right Sign
Visitor Center
Existing ground Profile grade
I n s ta ll p ip e c u lv e r t
I n s ta ll p ip e c u lv e r t
I n s ta ll p ip e c u lv e r t
36+75 to 41+00 (Estimated 5177 CUYD)
Use imported unclassified borrow for backfill
See Sheet D.9
Construct Visitor Access Trail
44+35
10 2
0 2
P T
.0
P C
.0
PRC 5
2+
99.
P C
C
.2
P R C
.6
P T
.5
P C
.7
P T
.7
P C
.1
P T
.8
P C
.6
P T
.4
.8
+0.7500%
-3.5000%
200' VC
.3
.3
-8.0000%
.3
.3
-8.0000%
-8.0000%
-8.0000%
.3
.3
-8.0000%
.3
.3
-5.0000%
200' VC
N
D
Curve= KENAI_T3-13
R= 100.00'
T= 41.58'
L= 78.81' D
R= 100.00'
T= 34.71'
L= 66.82'
Curve= KENAI_T3-16
D
Curve= KENAI_T3-14
R= 100.00'
T= 58.20'
L= 105.41'
Curve= KENAI_T3-15
R= 100.00'
L= 91.39'
T= 49.17'
D
Curve= KENAI_T3-17
R= 800.00'
T= 168.43'
L= 332.02'
D
Curve= KENAI_T3-18
R= 400.00'
T= 52.66'
L= 104.72'
D
Curve= KENAI_T3-19
R= 400.00'
T= 52.66'
L= 104.72'
D
CUYD
EXC.
CUYD
EMB.
65+0062+5060+0057+5055+0052+5050+00
230 190
235 195
240 200
245 205
250 210
255 215
260 220
265 225
270 230
D.6
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k ff .d g n
AK DOT 110(4)
u n e
H a r r is
P h
C h e c k e d b y
D e s ig n e d b y
Profile grade
Existing ground
Existing ground
Profile grade
7.
D
T E
E H
S E
N I
L H
C T
A M
5.
D
T E
E H
S E
N I
L H
C T
A M
2694 CUYD (Included 1311 CUYD of conserved topsoil)
Line to be constructed
DR
LL
IH I
KS
I n s ta ll p ip e c u lv e r t
I n s ta ll p ip e c u lv e r t
Approximate overhead powerlines
5195 19
5 19
Li m it
Si gn m ph S pe ed
P C
.0
PR
C .9
P T
.7
P C
.8
P T
.7
.4
.9
+5.
.9
.7
8.
-8.0000%
100' VC
.7
.7
.7
-7.5000%
+2.00 00%
400' VC
200' VC
+2.00 00%
N
D
Curve= KENAI_T3-20
R= 200.00'
T= 56.86'
L= 110.80'
D
Curve= KENAI_T3-21
R= 200.00'
T= 56.86'
L= 110.80'
Curve= KENAI_T3-22
D
R= 600.00'
T= 323.80'
L= 593.85'
CUYD
EXC.
CUYD
EMB.
80+0077+5075+0072+5070+0067+5065+00
185 185
190 190
195 195
200 200
205 205
210 210
215 215
220 220
225 225
D.7
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k fg .d g n
AK DOT 110(4)
u n e
H a r r is
P h
C h e c k e d b y
D e s ig n e d b y
Profile grade
Existing ground
8.
D
T E
E H
S E
N I
L H
C T
A M
6.
D
T E
E H
S E
N I
L H
C T
A M
2955 CUYD (Included 1312 CUYD of conserved topsoil)
DR LLIH IKS
Line to be constructed
Profile grade
Existing ground
I n s ta ll p ip e c u lv e r t
I n s ta ll p ip e c u lv e r t
(Estimated 1931 CUYD) for backfill 68+00 to 70+00
Use imported unclassified borrow
ERW
210 210
P C
.0
PRC
.7
P T
.5
.5
+2.00 00%
7.
100' VC
P O
T
.0
P C
.6
P T
.1
P C
.0
P T
.7
.1
7.
.8
.7
7.
.0
7.
.5
6.
6.
.4
6.
% -5.2000%
225' VC
.2
-5.2000%
-5.5000%
.7
+0.0250%
160' VC
.8
.3
+0.8000% +0.5000%
.6
-1.0500%
110' VC
.0
-1.2850%
.4
N
Curve= STP-2
D
R= 1,000.00'
L= 19.68'
T= 9.84'
Curve= KENAI_T3-24
D
R= 100.00'
T= 52.57'
L= 96.80'
Curve= KENAI_T3-23
D
R= 100.00'
T= 52.47'
L= 96.64'
D
Curve= STP-1
R= 540.00'
T= 172.28'
L= 333.54'
.9
CUYD
EXC.
CUYD
EMB.
95+0092+5090+0087+5085+0082+5080+00
180 215
185 220
190 225
195 230
200 235
205 240
210 245
215 250
220 255
D.8
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k fh .d g n
AK DOT 110(4)
u n e
H a r r is in h P h
C h e c k e d b y
D e s ig n e d b y
Profile grade
Existing ground
Line to be constructed
DR LLIH IKS
7.
D
T E
E H
S E
N I
L H
C T
A M
S T E R L
IN
G H
IG
H W
A Y
T o S o ld o tn a
Reference Trail Centerline
END PROJECT
93+50
AK DOT 110(4)
E= 1442411.47
N= 2360626.57
E= 1443275.56
N= 2361109.71
E= 1443270.42
N= 2361127.66
See Section E
Parking Turnout
Construct South and curves are approximate)
Existing ground (vertical grades
Reference Trail Centerline
Trail to be constructed
83+40. Perform work under Section 622
Construct 5-feet long landing
Section 622
87+50. Perform work under
Construct 5-feet long landing
Section 622
85+45. Perform work under
Construct 5-feet long landing
800 CUYD (Included 454 CUYD of conserved topsoil)
End Trail Construction
E= 1442641.48
N= 2360889.14
90+00
Resume Trail Construction
83+25
END PROJECT 93+50
83+26.81
Suspend Trail Construction
83+25 = 83+26.81
Resume Trail Construction
See Section E
Parking Turnout
Construct South
473 CUYD (Included 130 CUYD of conserved topsoil)
72520
I n s ta ll p ip e c u lv e r t
PARKI
NG
LOT
AC
P
17103
P
17104
AC
0 26
0 26
T
T
T
T
T
Next Right Sign
Visitor Center
Stop Sign
Stop Sign
P O
T
.0
P C
.0
P R
C
.0
P T
.4
P C
.8
P T
.4
P C
.8
P T
.3
P O
T
.0
P O
T
.0
P C
.0
P R
C
.8
PT 252+78.63
POT 253+15.00
.8
.9
.2
+1.0000% -2.5000%
50' VC
.0
+3.4
2%
50' VC
.9
.8
.3
.7
.0
+2.22 5%
+3.2
.5
.4
.8
+1.87 5%
.4
-1.45% +1.45%
+2.10 % +0.45%
D
Curve= KVC2-2
R= 30.00'
T= 51.79'
L= 62.75'
D
Curve= KVC2-1
R= 250.00'
T= 133.24'
L= 244.83'
D
Curve= KVC1-4
R= 25.00'
T= 14.62'
L= 26.46'
D
Curve= KVC1-3
R= 50.00'
T= 27.71'
L= 50.60'
Curve= KVC1-2
D
R= 75.00'
T= 43.21'
L= 78.41'
D
Curve= KVC1-1
R= 100.00'
T= 32.06'
L= 62.05'
N
ACCESS TRAIL
VISITOR CENTER
CUYD
EXC.
CUYD
EMB.
248+00147+50145+00142+50
250 250
255 255
260 260
265 265
270 270
275 275
280 280
250+50 253+00 e= 0.030 e= 0.030 e= 0.030 e= 0.030
D.9
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k fi .d g n
AK DOT 110(4)
u n e
H a r r is h P h
C h e c k e d b y
D e s ig n e d b y
Begin Construction of
Suspend Trail Construction
Resume Trail Construction
Reference Trail Centerline
End Trail Construction
Profile grade
NWR Entrance Sign
E= 1445927.07
N= 2363625.55
148+42.85
Visitor Center Access Trail
E= 1445599.24
N= 2363799.13
144+40
Access Trail
Visitor Center
E= 1445972.98
N= 2363587.29
249+00
Visitor Center Access Trail
E= 1446182.16
N= 2363301.19
253+15
Visitor Center Access Trail
Line to be constructed
Trail to be constructed
Existing ground
Suspend Trail Construction
Begin Trail Construction
El. 264.88 ft
144+40
El. 270.01 ft
148+42.85 grades are approximate)
Existing ground (vertical
Reference Trail Centerline
Resume Trail Construction
El. 269.06 ft
249+00
End Trail Construction
El. 277.40 ft
253+15
300 CUYD (Included 203 conserved topsoil)
109 CUYD (Included 86 CUYD conserved topsoil)
Remove and reset gate
I n s ta ll p ip e c u lv e r t
Offset= 8.78 RT
Sta.= 251+98.67
E= 1446168.50
N= 2363372.89
Offset= 12.50 RT
Sta.= 252+10.86
E= 1446180.11
N= 2363366.54
Offset= 16.20 RT
Sta.= 252+56.89
E= 1446196.09
N= 2363348.77
Offset= 11.97 RT
Sta.= 252+78.25
E= 1446196.32
N= 2363337.00
20' R
12' R
9' R
8'
DETAIL A
See detail A for Layout
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
17101 2366284.782 1445020.932 93.220 60°28'21.852180"N 151°04'58.626741"W 112.6458 0.99993808 5/8" ir w/FHWA alum cap 1.
17102 2365932.605 1445072.624 96.076 60°28'18.392537"N 151°04'57.480054"W 115.5313 0.99993792 5/8" ir w/FHWA alum cap
17103 2363285.469 1446292.451 274.211 60°27'52.522052"N 151°04'32.284630"W 293.9058 0.99992887 5/8" ir w/FHWA alum cap
17104 2363348.911 1446462.131 279.107 60°27'53.174074"N 151°04'28.921294"W 298.8051 0.99992856 5/8" ir w/FHWA alum cap
17105 2360356.824 1442071.788 239.585 60°27'22.996392"N 151°05'55.483605"W 259.2962 0.9999324 5/8" ir w/FHWA alum cap
17106 2360010.808 1441951.386 234.802 60°27'19.569269"N 151°05'57.769022"W 254.5297 0.99993268 5/8" ir w/FHWA alum cap
17107 2363849.963 1444723.781 253.568 60°27'57.827470"N 151°05'03.754472"W 273.1513 0.99993055 5/8" ir w/FHWA alum cap
17108 2364173.062 1445039.127 210.470 60°28'01.060246"N 151°04'57.571105"W 230.0467 0.99993247 5/8" ir w/FHWA alum cap
PROJECT :Kenai Refuge Community Trail DATE OF FIELD WORK : June 2017
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM : Alaska zone 4 SPCS NAD83 (2011)
EPOCH DATE :2010.0000
VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID 12b
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
c:
\p w -w or k\ d0
Ke ni R ef ug e C om m un it y
Tr ai l C on tr ol
S he et .x ls x]
Sh ee t
-M ay
-2
4:
PN
co nt ra ct or
PN
D co nt ra ct or
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.10
SHEET
NUMBER
DOT 110(4)AK
SURVEY CONTROLPRELIMINARY
202201
TURNOUT AREA
NORTH PARKING
PARKING
RESERVED
and sign R7-8P (12" x 6")
Install sign R7-8 (18" x 12")
VAN
ACCESSIBLE
Existing edge of pavement
Guide line, typ.
90°0'
35'-0"R
Reference centerline wheel stop, typ.See Sheet E.3
Install precast concrete
35'-0"R
20'-0" 12'-0" 8'-0"
57'-0"
20'-0"
Typ. Typ.
graveled driveway
Existing edge of
E.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k g a .d g n
AK DOT 110(4)
u n e
H a r r is
P h
C h e c k e d b y
D e s ig n e d b y
Edge of parking
Offset= 13.92 RT
Sta.= 9+55.00
E= 1445019.07
N= 2366082.57
North Parking Turnout Begin construction of
Offset= 14.50 RT
Sta.= 11+25.00
E= 1445043.91
N= 2365914.40
North Parking Turnout
End construction of
See Sheet D.2
Begin Trail Construction
5'-0"R
P
N
TURNOUT AREA
SOUTH PARKING
PARKING
RESERVED
VAN
ACCESSIBLE
and sign R7-8P (12" x 6")
Install sign R7-8 (18" x 12")
Guide line, typ.
'0
See Sheet E.3wheel stop, typ.
Install precast concrete
P C
.0
P T
.7
P T
.1
35'-0"R
35'-0"R 12'-0"8'-0" 20'-0"
57'-0" turnout parking 91+75
Begin construction of turnout parking 93+50
End construction of
Offset= 12.33 LT
E= 1442530.29
N= 2360755.63
Offset= 14.61 LT
E= 1442423.00
N= 2360617.59
Existing edge of pavement
E.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k g b .d g n
AK DOT 110(4)
M a y
H a r r is
P h
C h e c k e d b y
D e s ig n e d b y
AFormed hole for pin Formed hole for pin
1'-0"1'-0"
7'-6"
A"
SECTION A-A
WHEELSTOP
"4
4"
"8
2"
1" R" R8
1" R
"4
"4
" Grout4 area surface
Parking of wheel stop
Extend to within 1" of ends
No. 4 reinforcing bar, typ.
pin, 3' long
" Ø steel4 3or
No.6 reinforcing bar
NOTE:
1.
WHEELSTOP DETAILS
PRECAST CONCRETE
NO SCALE
the CO to meet manufacturer's standards.
Variations in wheel stops will be allowed with the approval of
7'-6"
Edge of pavement
TYPICAL HEAD-ON PARKING
Guide line, typ.
Minor concrete
E.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k g c .d g n
AK DOT 110(4)
M a y
H a r r is
P h
C h e c k e d b y
D e s ig n e d b y
F.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k d a .d g n
AK DOT 110(4)
M a y
H a r r is
P h
C h e c k e d b y
D e s ig n e d b y
FOOTNOTE:
See sheet F.2 and F.5 for locations.
[2] by the CO.
Locations for plastic lining are not shown. Use as directed [1]
NOTE:
construction activities have ceased.
Apply temporary soil stabilization within 14 days where to accomodate permits and actual operations.
Contractor may modify the erosion control plans as necessary field conditions as approved by the CO.
Final location and spacing of devices may be changed to fit
Erosion control devices and plans as shown are approximate.
3.
2.
1.
[1]
Guide sign
NWR Entry Sign speed limit
35 mph
5 9
5 1
N
N
9+55 TO 25+00
CONTROL PLAN
EROSION & SEDIMENTATION
F.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k d b .d g n
AK DOT 110(4)
u n e
H a r r is
P h
C h e c k e d b y
D e s ig n e d b y
STOP
5 2
BEGIN PROJECT
Existing edge of road
Existing edge of road
MATCHLINE SHEET F.3
M A
T C
H L I
N E
M A
T C
H L I
N E
9+55
SKI HILL ROAD
SKI HILL
ROAD
GEND:LE
NOTE: Legends shown are not in scale.
12+09.03
Community Refuge Trail
Begin Construction of Kenai
Parking Turnout
Construct North
Kenai Community Refuge Trail
Temporary Check Dam
Fiber Roll
Riprap
Pipe Culvert and Outlet
Construct stabilized construction exit
See Section J
Install stop sign R1-1
BK 15+00 = AH 14+00
EQ STATION
0 2
N e x t L e ft S ig n
V is ito r C e n te r
0 19
5 19
N W
R E n tr a n c e S ig n
5 19
5 19
5 2
270 2
0 2
5 2
N N
25+00 TO 50+00
CONTROL PLAN
EROSION & SEDIMENTATION
F.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k d c .d g n
AK DOT 110(4)
u n e
H a r r is
P h
C h e c k e d b y
D e s ig n e d b y
M A
T C
H L I
N E S
H E
E T F .2
Existing edge of road
M A
T C
H L I
N E S
H E
E T F .4
MATCHLINE
M A
T C
H L I N
E
Kenai Community Refuge Trail
Kenai Community Refuge Trail
See Sheet F.6
Visitor Center Access Trail
SKI HIL
L RD.
S K I H
ILL R
D
SKI HILL RD.
0 2
0 2
5 19
0 2
5 19
N N
50+00 TO 80+00
CONTROL PLAN
EROSION & SEDIMENTATION
F.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k d d .d g n
AK DOT 110(4)
u n e
H a r r is
P h
C h e c k e d b y
D e s ig n e d b y
M A
T C
H L I N
E S
H E E T F .3
Existing edge of road
M A
T C
H L I N
E S
H E E T F .5
Existing edge of road
M A
T C
H L I
N E
M A
T C
H L I N
E
SKI HILL RO
AD
SKI
H
ILL
R
OAD
Kenai Community Refuge Trail
Kenai Community Refuge Trail
0 28
0 28
0 2
5 20
5 22
S to p
S ig n
S no w m ob ile S ig n
N W
R E nt ry S ig n
235245
5 2
N
N
80+00 TO 93+50
CONTROL PLAN
EROSION & SEDIMENTATION
P O
T
.0
0STOP
F.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k d e .d g n
AK DOT 110(4)
u n e
H a r r is
P h
C h e c k e d b y
D e s ig n e d b y
M A
T C
H L I
N E S
H E
E T F .4
Existing edge of road
Existing edge of road
END PROJECT
M A
T C
H L I N
E
M A
T C
H L I
N E
SKI HILL ROAD
SKI HILL ROAD
93+50
Kenai Community Refuge Trail
Construct South Parking Turnout
90+00
Community Refuge Trail
End Construction of Kenai
STERLING HIG
HWAY
STERLIN
G H
IGHWAY
Construct stabilized construction exist
See Section J
Install stop sign R1-1
260 260
260 260
280280
215215
230230
265 265
285285
290 290
0 290
290290
295 295
N W
R E n tr a n c e S ig n
S to p S ig n
S to p S ig n
N e x t R ig h t S ig n
V is ito r C e n te r
N
VISITOR CENTER ACCESS TRAIL
CONTROL PLAN
EROSION & SEDIMENTATION
POT 2
+00 .0
SKI
HIL
L R
OAD
S K I
H
IL
L R O
A D
PARKING LOT
VISITOR CENTER
VISITOR CENTER ENTRANCE
F.6
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k d f.
d g n
AK DOT 110(4)
M a y
H a r r is h P h
C h e c k e d b y
D e s ig n e d b y
Kenai Community Refuge Trail
Visitor Center Access Trail
Visitor Center Access Trail
253+15
Visitor Center Access Trail
End Construction of
144+40
Visitor Center Access Trail
Begin Construction of
249+00
Visitor Center Access Trail
Resume Construction of
148+42.85
Visitor Center Access Trail
Suspend Construction of
FOOTNOTE:
SWPPP NOTICE SIGN
project information. Install signs in accordance to Section 635.
sign panel from aluminum. Adjust text as needed for specific locations. Black border and text on white background. Fabricate
See SCR Subsection 107.01A(d) and plans for installation[1]
DETAILS
SWPPP NOTICE SIGN
F.7
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d S
W P P P S ig n .d g n
AK DOT 110(4)
a r c h
H a r r is
P h
C h e c k e d b y
D e s ig n e d b y
3"
4"C
3"
2"C
2"
2"C
14"
"2
"B2
42"
"8
3" IN = 8
5" TH = 8
1BORDER R = 1
POST DETAIL
CL
Bottom of sign panel
Long side of post
H 2H
0.2X
0.6X
0.2X
TWO POST SIGN
4" X 6" Post " dia. bolts 4 1Attach sign panels with a minimum of 2 -
X=42"
NOTE:
Select post lengths to fit field conditions.
H1 and H2 = Overall post length.
per post.
2.
1.
parallel to sign face. 1.5" hole size
Field drill holes through post
≥10%
8% and 9%
7%
6%
5%
4%
3%
2%
F.8
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k d g .d g n
AK DOT 110(4)
a r c h
H a r r is
P h
C h e c k e d b y
D e s ig n e d b y
GRADE
DITCH
(See Note 7)
CHECK DAM SPACING*
FIBER ROLL
SPACING (max.)
CHECK DAM
9" Ø minimum fiber roll.
* Spacing calculated based on
Se e N ote
7.
6.
5.
4.
3.
2.
1.
Adjust check dam spacing based on site-specific conditions.
around the ends of the fiber roll.
Provide sufficient length to prevent water from flowing
Expose stakes 2-inches (min.) above top of fiber roll.
Drive stakes into undisturbed soil of trench bottom.
2-foot (max.) spacing.
stakes. Drive stakes at each end of the fiber roll and at
-inch wood 8
-inch x 1 8
Stake fiber rolls in place with 1
Install check dams in ditches perpendicular to the flowline.
installation.
Repair all rills or gullies and properly compact prior to device.
CO, to meet the functional requirements of the check dam
Construct check dams from fiber rolls as approved by the
Fiber roll 9" Ø (min.)
(FT)
Trench 2" (min.)
m in
Trench 2" (min.)
CROSS SECTION
STAKING DETAIL
FIBER ROLL
PLAN
are similar for flat-bottom ditches
Check dam installation details
V-ditch design shown.
Flow line the ends. See Note 6 to prevent flow around
Curve ends upstream
FIBER ROLL CHECK DAM
See Note 5 uphill side of fiber roll trench material on
Place excavated
Flow
F lo w
NOTE:
DETAILS
FIBER ROLL CHECK DAMPRELIMINARY
NO SCALE
REVISED: 7/2016
DETAIL APPROVED FOR USE --/----
WESTERN FEDERAL LANDS HIGHWAY DIVISION
CONSTRUCTION EXIT
STABILIZED
W157-19
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
F.9
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DOT 110(4) AK
U S
C c p w w o r k d
W .d g n a r c h
STABILIZED CONSTRUCTION EXIT
NOTE:
4.
3.
2.
1.
Existing paved roadway
Adjust length to fit field conditions as approved.
built up sediment.
Minimize tracking onto paved roadway by removing crosses existing drainage ditches.
Provide temporary drainage culvert where entrance
Construct drainage ditches along entrance as directed.
Use this entrance for construction vehicles only.
movement of typical truck using exit
Construct radius to allow turning geotextile, class 2, type E
Separation-stabilization
Filter rock in gr es s / e gr es s ar ea
Pr ov id e fu ll w id th o f ty p.
50' (typ.)
6" (min.)
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter for each roll
Stakes required
FIBER ROLL SPACING
Fiber roll length
DRAFT: 7/2016
REVISED:
DETAIL APPROVED FOR USE 10/2014
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FIBER ROLL
(FT)
(FT)
W157-21
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
F.10
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DOT 110(4) AK
U S
C c p w w o r k d
W .d g n a r c h
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
disturbed areas
Runoff from
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction of runof f from distur bed area s sp ac in g ch ar t
S ee F ib er R ol l
Fiber roll ff o n ur f o n oi t c er i
D along contours
Install fiber rolls
Fiber roll
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated material Stagger joints (typ.)
2.
1.
permanent installations. Do not crush fiber roll while staking.
roll is secure to slope. Live stakes may be used for and install fiber rolls
Step 1: Excavate trench Step 2: Backfill soil against fiber rolls
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø ove rlap
12" (m in.)
t o m in m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.
6-inches from fiber roll end angles towards the adjacent
Overlap fiber rolls 12-inch minimum. Drive stakes at
NOTE:
10.4 x 16 25101 -0200
60201 -0600
Station
ES
TI
M
A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
-I
N C
H P
IP
E
C U
LV
ER
T
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD CUYD LNFT Lt Rt 12+75 1 1 4 24 x/P 2.5 2.5 14+75 4 1 4 36 x/P 2.5 2.5 25+25 3 2 4 20 x/P 1.75 28+25 3 1 6 20 x/P 1.75 30+75 5 1 4 26 x/P 1.75 1.75 38+00 7 1 4 36 x/P 1.75 1.75 41+40 1 4 4 14 x/P 43+75 1 4 4 14 x/P 58+50 2 3 4 18 x/P 2.5 61+00 1 1 4 18 x/P 2.5 65+50 1 1 4 24 x/P 2.5 2.5 73+50 3 1 4 28 x/P 2.5 2.5 82+25 5 1 4 38 x/P 2.5 2.5 148+00 2 1 4 22 x/P 2.5 2.5
PROJECT TOTAL 23 58 338
Allowable Pipe Material A Aluminum AS Aluminized steel C Concrete GS Galvanized steel P Plastic (blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
H.1 c:
\p w -w or k\ d0 ak
_1
_D ra in ag e.
xl sx
]S he et 4-
Ju n-
0:
A
M N
Ph an 3/
K H ar ri so n 3/
D es ig ne d by
C he ck ed b y:
NUMBER
SHEET
DOT 110(4)AK
METAL ROUND PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVERSPAN x RISE
PIPE ARCH
SIZE
PIPE ARCH
SIZE
SPAN x RISE
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVER
MINIMUM
COVERDIAMETER
PIPE
SIZE
PIPE
SIZE
DIAMETER
MINIMUM
COVER
ALUMINUMSTEEL
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
602-1
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
METAL PIPE CULVERT
Fill heights exceeding 100 feet require
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES
INCHES
INCHES
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
INCHES
3.5
INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
5" x 1" CORRUGATIONS
0.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.109/120.138/10 0.168/8
INCHES INCHES INCHES
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
3.5
" CORRUGATIONS2
1" x 3
METAL THICKNESS (INCH/GAGE)
3" x 1" CORRUGATIONS
0.135/100.105/120.075/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.060/160.135/100.105/120.075/140.060/16
STATE PROJECT
NUMBER
SHEET
H.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DOT 110(4) AK
U S
C c p w w o r k d S td
.d g n
S e p te m b e r
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.
2.
3.
4.
special analysis by the CO.
The fill heights in the table are for helical lockseam and welded seam pipe only.
Fill heights for culvert pipe with annular corrugations are more restrictive than those of helical lockseam and welded seam pipe.
Obtain approval before furnishing annular corrugation pipe.
Measure minimum cover from the top of the pipe culvert to the subgrade for flexible pavements, and to the top of the pavement for rigid pavements. Measure maximum fill height from the top of the pipe to the top of the pavement for both flexible and rigid pavement.
ROUND PIPE
DIAMETER
PIPE ARCH
SPAN × RISE
CORRUGATION
[1] Fabricate annular, helical and semi-corrugated type coupling bands from the same metal as
[2] For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the dimension of the end corrugation in the pipe.
COUPLING BANDS FOR METAL PIPE CULVERT [1]
[3] Use annular corrugated bands with pipes having annular corrugations or with helical pipe the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses
ANNULAR
CORRUGATED
HELICALLY
CORRUGATED
BANDS [4]
SEMI-
CORRUGATEDSIZE [2]
BANDS [3] BANDS [5]
602-2
MINIMUM BAND WIDTH (INCHES)
1 × 2
1 × 3
3 × 1
5 × 1 78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
87 × 64 to 142 × 91
60 × 46 to 81 × 59
87 × 64 to 142 × 91
60 × 46 to 81 × 59
49 × 33 to 83 × 57
17 × 13 to 42 × 29
10.5
10.5
10.5
10.5
10.5
10.5
10.5
INCHESINCHESINCHES
COUPLING BAND
METAL PIPE CULVERT
" corrugations. A 12 inch band is acceptable on pipe ends 2 1" × 3
2pipe ends rerolled with 2 corrugations on rerolled pipe ends.
STATE PROJECT
NUMBER
SHEET
H.3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DOT 110(4) AK
U S
C c m y fi le s p w p r o d u c ti o n d S td
.d g n
F e b r u a r y
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.
2.
SMOOTH SLEEVE BAND FLAT BAND
SEMI-CORRUGATED BAND
HELICAL BANDANNULAR BANDSTANDARD BAND CONNECTIONS
SLEEVE JOINT
SIDE VIEW SIDE VIEW SIDE VIEW
END VIEW
END VIEWEND VIEW
Oval Lug
Band Angle
Bar & Strap
Integral Flange Wedge and Strap
Smoother sleeve with center stop.
Stab type joint
W
Band Band
Band Bolts
Pipe
Band
Bolts
Angle
Pipe
BandBand
Bolts
Pipe heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or
Angle
Wedge
Watertight pipe joints are not required unless specified in the Special Contract Requirements.
Other types of coupling bands or fastening devices that comply with the joint performance criteria of AASHTO Standard specifications for
Highway Bridges, Division II Section 26 may be used.
of corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest strap connector
Bolt, bar and
Band corrugation in pipe end with second annular around band meshes
Continuous corrugation
W
BoltsBand
WW
rerolled with 3" × 1" pipe corrugations.
having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
Use a matching metal having a nominal thickness of not less than 0.040 inch for steel, Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or less.
"2 1" × 3
2The minimum band widths shown for 3" × 1" and 5" × 1" corrugated sizes apply to 2 diameter, required above 42" diameter
Second angle connection optional to 42" diameter, required above 42" diameter
Second angle connection optional to 42"
NOTE:
underdrain [6]
[4] Use helical corrugated bands with pipes having helically corrugated ends.
[5]
[6]
" for 18" round culvert (21" × 15" pipe arch) or less8
" for 21" round culvert (24" × 18" pipe arch) or more2
LEGEND:
BEDDING DEPTH
MINIMUM SPACING
SPACING
DIAMETER
or SPAN
PIPE SIZE (H) DEPTH
602-3
STANDARD APPROVED FOR USE 12/1993
DRAFT: 10/2017
REVISED: 4/1994 6/2005
> 54"
12" to 54"
6"
4"
UP to 48"
48" and UP
24" span or 36", PIPE CULVERT BEDDING
METAL AND PLASTIC
STATE PROJECT
NUMBER
SHEET
H.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DOT 110(4) AK
U S
C c m y fi le s p w p r o d u c ti o n d S td
.d g n
S e p te m b e r
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
H equals the diameter of all round pipe culverts or the rise dimension of all pipe arch culverts.
See Section 704 for bedding and backfill requirements.
1.
2.
3.
Construct piping plug of impermeable backfill material at the pipe culvert inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material.
MULTIPLE PIPE INSTALLATION
PIPING PLUG
BELOW NATURAL GROUND OR
TRENCH EXCAVATION IN EMBANKMENT
ON UNSTABLE MATERIAL
ABOVE AND BELOW
NATURAL GROUND
ON NATURAL GROUND
ABOVE NATURAL GROUND
ON UNYIELDING MATERIAL
PIPE BEDDING
ELEVATION
SECTION A-A
Bedding material (uncompacted)
Impermeable backfill material.
Roadway embankment Roadway embankment
Natural ground
Toe plate Toe plate
Natural ground Natural ground
Roadway embankment
Roadway excavation
Natural ground
H
Width
H H
H H
H H
H H
H
H
H
H
Finished subgrade Finished subgrade
Natural ground
Finished subgrade
Pipe culvert
Embankment slope
High water elevation treatment
Culvert end
Piping plug before trench excavation embankment height
Finished subgrade or
Original natural ground surface
A
A
Finished subgrade
Roadway embankment
Roadway embankment
Finished subgrade trench excavations
Embankment material placed in layers
Compacted backfill material placed in layers not backfill in accordance with Section 614.
depth table
See bedding excavation in trench
HH
compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove unstable material to
Bedding
Bedding
Bedding
Bedding
H
Half diameter or whichever is less
(see table)
Minimum spacing or Span
Diameter or Span
Diameter section
Metal endMetal end section or 36" (max.) for embankment installations not exceeding 6" compacted depth.
exceeding 6" compacted depth; or lean concrete
18" (min.)
6" in uncompacted depth.
* Reduce to 18" for
2'-0" ±
1'-0" ±
18" ±
18" ±18"±
(min.)
6"
(min.)
6"
12" (min.), 24" (max.)
"/foot of cover,2 minimum
1'-0"
NOTE:
2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.)
2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.)
PIPE SIZE (D) WIDENING
DITCH WIDENING
602-6
TREATMENT IN CUT SLOPES
PIPE CULVERT INLET 30"
24"
18"
7'
6'
5'
STATE PROJECT
NUMBER
SHEET
H.5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DOT 110(4) AK
U S
C c m y fi le s p w p r o d u c ti o n d S td
.d g n
F e b r u a r y
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
dimension of all pipe arch culverts.
D equals the diameter of all round pipe or the rise 1.
TYPE II
TYPE I
SECTION B-B
SECTION A-A
N o r m a l d it c h l in e
S u b g r a d e s h o u ld e r
Pipe culvert
E n d o f p ip e
FLOW
Flat b ottom di tch a t culv ert in let
FLOW
Tape r at 1
0:1 r atio
Taper a t 10:1 ratio
FLOW
2D or
FLOW
Taper at 10
:1 rat io
2D or
N o r m a l d it c h l in e subgrade elevation
Maximum 2D or
S u b g r a d e s h o u ld e r o r e n d s e c ti o n
E n d o f p ip e b e v e l
Flat b ottom ditc h at c ulvert inlet
A
A
B
B section
End
PLAN PLAN
Original ground in mountainous terrain flat terrain. Taper at 5:1
Taper at 10:1 in rolling or 5:1 in mountainous terrain.
or flat terrain. Taper at
Taper at 10:1 in rolling
Normal ditch line
Pipe culvert
Original ground cut slope
Normal
(See table)
Ditch widening
Subgrade shoulder Normal ditch lineSubgrade shoulder
Pavement surface
Berm
Pavement surface
Subgrade
End section
Berm pipe as staked
Slope at ditch at end section
Flow line of pipe as staked
Slope at cut slope
Normal
D in lieu of 45° pipe elbow
30° pipe elbows may be required
At skewed pipe locations, 22.5° or
Standard 45° pipe elbow.
slope
1:3 max ditch line
Normal maximum slope
1:1.5
Cut Slope slope
1:3 max maximum slope
1:1.5
Cut Slope
D ditch line
Normal
Subgrade
1'
1'
NOTE:
B e r m
D
B e r m
D
(min.)
4' d ip a t c e n te r
(Min.)
4'PRELIMINARY
CONCRETE ROUND PIPE CULVERT
FILL HEIGHT AND PIPE CLASS TABLE
BEDDING DEPTH
SIZE
PIPE
MINIMUM SPACING
EMBANKMENT TRENCHDIAMETER
DEPTHPIPE SIZE (H)
CLASS VCLASS IVCLASS IIICLASS II
TRENCH
CLASS VCLASS IVCLASS IIICLASS II
EMBANKMENT
602-7
STANDARD APPROVED FOR USE 12/1993
DRAFT: 6/2008
REVISED: 4/1994 6/2005
CULVERT INSTALLATION
CONCRETE PIPE
INCHES
DIAMETER
INCHES
COVER
MINIMUM
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE IN FEET
> 54"
12" TO 54"
6"
4"
OVER 96"
36"-96"
12"-36"
48"
0.5H
15"
72"
72"
2H
STATE PROJECT
NUMBER
SHEET
H.6
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DOT 110(4) AK
U S
C c p w w o r k d S td
.d g n
S e p te m b e r
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
6.
5.
4.
3.
2.
1.
MULTIPLE ROUND PIPE INSTALLATION SUPPLEMENTAL CONCRETE PIPE TIE
PIPING PLUG
TRENCH INSTALLATIONEMBANKMENT INSTALLATION
LEGEND:
Bedding material (uncompacted).
Embankment material placed in layers
Impermeable backfill material.
adjusted to tie into impervious material.
material is used for backfill. Width may be material at the pipe inlet where granular
Construct a piping plug of impermeable backfill
Roadway embankment
Limits of pipe compaction
SECTION A-A
install the pipe culvert according to the limits of pipe
Where unyielding or unstable material is encountered, the compaction limits shall be the walls of the trench.
in an embankment. For pipe installation in a trench, Pipe compaction limits shown are for pipe installation and rigid pavements.
pipe to the top of the pavement for both flexible
Measure maximum fill height from the top of the to the top of the pavement for rigid pavements.
culvert to the subgrade for flexible pavements, and
Measure minimum cover from the top of the pipe of camber or increase the pipe culvert gradient.
the elevation of the inlet invert, reduce the amount elevation on the parabolic curve as designed exceeds
Develop camber on a parabolic curve. If the midpoint ordinate amount equal to 1% of the pipe length.
a chord through the inlet and outlet inverts an
When directed, camber pipe culverts upwards from in the contract documents.
Use Supplemental Concrete Pipe Tie when specified
AASHTO Standard Specifications for Highway Bridges.
structural pipe designs meeting the criteria of may be increased on approval of site-specific
Maximum fill heights for pipe culvert installations
A
A lean concrete backfill in accordance with Section 614
Compacted backfill material placed in layers
Bedding (See table)Bedding (See table)
H
Width
° 60°
H
H
H
H
(See table)
Minimum spacing
H
Finished subgrade before trench excavation embankment height
Finished subgrade or to springline backfill
Compacted
Piping plug end treatment
Culvert
Embankment slope
High water elevation
Pipe culvert holes (typ.)
Concrete pipe tie when precast
Tapered holes permitted over pipe joint
Do not install fastener
O Ring if required
2H2H compaction shown on Standard 602-3.
" min.2 12'-6 not exceeding 6" compacted depth.
not exceeding 6" compacted depth, or
1'-0" (min.)
" dia. hole for4
" max.2 12'-9 ty p ic a l m a x
1'-0"±
1'-3" min.
1'-5" max.
1" dia. Joint tie
NOTE:
H H
H H
QUANTITY
RIPRAP
ESTIMATED
CLASS
RIPAP
QUANTITY
GEOTEXTILE
ESTIMATED
SECTION
END
WITH
SECTION
END
WITHOUT
D
SIZE
CULVERT
QUANTITY
RIPRAP
ESTIMATED
CLASS
RIPAP
QUANTITY
GEOTEXTILE
ESTIMATED
SECTION
END
WITH
SECTION
END
WITHOUT
D
SIZE
CULVERT
NO SCALE
FOR INFORMATION ONLY
PROTECTIVE APRON DIMENSIONS AND QUANTITIES
OUTLET WITHOUT DITCH
FOR INFORMATION ONLY
PROTECTIVE APRON DIMENSIONS AND QUANTITIES
OUTLET WITH DITCH
L
LENGTH
APRON
H
DEPTH
APRON
L
LENGTH
APRON
H
DEPTH
APRON
REVISED: 8/2016
DETAIL APPROVED FOR USE --/----
WESTERN FEDERAL LANDS HIGHWAY DIVISION
CULVERT OUTLETS
PLACED RIPRAP AT
W251-1
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
H.7
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DOT 110(4) AK
U S
C c m y fi le s p w p r o d u c ti o n d
W .d g n
A u g u s t
Variable slopeVariable slope
D
4D m in
H m in
H
D
H ditch slope
Match existing ditch slope
Match existing
D or Span
Dia.
or Span
Dia.
or Span
Dia.
or Span
Dia.
(INCHES) (FEET) (CUYD) (SQYD)
(INCHES) (FEET) (CUYD) (SQYD)
2' (min.)
2' (min.)
(INCHES)
(INCHES)
14.5
12.5
49.8
38.7
18.5
13.2
5.2
3.2
1.7
44.4
34.0
15.6
10.8
3.9
2.2
1.0
14.5
12.5
38.5
29.8
15.1
10.7
4.4
2.7
1.3
35.6
27.2
13.3
9.3
3.6
2.0
0.9
3.
2.
1.
SECTION A-A SECTION B-B
SECTION C-C SECTION D-D SECTION E-E
PROTECTIVE APRON AT CULVERT OUTLET WITH DITCH
PROTECTIVE APRON AT CULVERT OUTLET WITHOUT DITCH
END SECTION
CULVERT WITH STANDARD
PLAN VIEW
END SECTION
CULVERT WITHOUT STANDARD
PLAN VIEW
END SECTION
CULVERT WITH STANDARD
PLAN VIEW
END SECTION
CULVERT WITHOUT STANDARD
PLAN VIEW
NOTE:
A
1 1
A B B
C C DD
E
E
E
E b o tt o m w id th b o tt o m w id th for payment.
Do not measure riprap placement excavation
Furnish separation and stabilization geotextile.
less than 10%.
Use for aprons serving culverts with slopes or flatter
Sloped 1V:2H
Original ground
Geotextile m in
H
L
D it c h
D ground
Original
Geotextile Flowline m in
D
Geotextile m in
D m in
D ground
Original
Geotextile
D it c h
D
L ground
Original
Geotextile m in
H Original ground
L L
21/8"
3"D
13/4"
3"D
21/8"
BORDER
R=11/8"
TH=05/8"
IN=03/8"
24"
TABULATION OF QUANTITIESTRAIL CLOSED SIGN DETAIL
FOOTNOTE:
Install signs with Barricade type 1 or type 3.
[4]
See Sheet F.2 and F.5 for Stop sign locations.
[3]
Install lights with Barricade type 1 or type 3.
[2]
The CO will locate the location in the field.
[1]
J.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k n a .d g n
AK DOT 110(4)
p r il
H a r r is h P h
C h e c k e d b y
D e s ig n e d b y
[3]
[4]
[1]
[1]
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
Expressway / Freeway
ROAD NAME
ROAD NAME
ROAD WORK
NEXT xx MILES
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
W13-1P
(optional)
W13-1P
(optional) xx
MPH
xx
MPH
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2014
REVISED:
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
635-1
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
J.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DOT 110(4) AK
U S
C c m y fi le s p w p r o d u c ti o n d S td
.d g n
S e p te m b e r
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
G20-2
G20-2
G20-2
G20-1
See Note 11
G20-1
See Note 11
M in o r R o a d
M a jo r R o a d
W20-1
See Note 10
W20-1
See Note 10
W20-1 over
W16-8P
See Note 9
W20-1 over
W16-…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.