6851 SOW WSL HDPE - eSigned.pdf

PDF 172 KB Posted

Attached to
Water Service Line Inola, OK Federal contract opportunity
Solicitation number
246-25-Q-0062
Issued by
Department of Health and Human Services Indian Health Service

About this file

This Statement of Work (SOW) details the requirements for installing a water service line in Inola, Oklahoma for the Indian Health Service. The project involves furnishing and installing a 2-inch ultra-high molecular weight polyethylene (PE) water service line at 31727 S 4160 Rd, with specific technical requirements including non-flare compression fittings, a brass ball valve, and a polyethylene valve box. The work must be performed Monday through Friday between 8:00 a.m. and 5:00 p.m., with a minimum trench depth of 30 inches, and requires maintaining specific separations from sewer lines and carefully managing backfill procedures.

The project is set for completion in 60 calendar days from the Notice to Proceed, with a one-year warranty on materials and labor. The solicitation (246-25-Q-0062) is a 100% Indian-owned business set-aside under NAICS code 237110, with an estimated award amount under $15,000. Quotes are due by May 16, 2025, and will be evaluated on an acceptable/non-acceptable basis, with the award going to the lowest-priced, technically acceptable offeror. Interested vendors must submit a firm fixed-price quote, technical specifications, past performance references, and an Indian Economic Enterprise Representation Form.

View the file

Other files for this federal contract opportunity

Other files attached to Water Service Line Inola, OK, newest first.
File Type Posted
Construction Clauses-DEVIATION FEB 2025.docx DOCX document
6851 Bid Sheet WSL.xlsx XLSX spreadsheet
SF18-95a Request for Quote.docx DOCX document
6851 OEH8 Proposed Signed AFB.pdf PDF
IHS IEE Representation Form_Jan 2022_508 Compliant.pdf PDF
OK30Wage determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Water Tap and Meter Date: April 2025

Author: Dalton Barnes Water Service Lines PE

STATEMENT OF WORK

1.01 SUMMARY OF WORK TO BE DONE BY CONTRACTOR

A. Furnish and install a water service line as shown on the drawing.

1.02 SITE LOCATION

A. 31727 S 4160 Rd, Inola, OK 74036 B. Latitude: 36.1532575 (N) Longitude: -95.5971761 (W) C. Finding Directions: From Inola head west on E 590 Rd for 4.5mi, turn south on S 4160

Rd for 0.7mi and property is on ESOR.

1.03 CONSTRUCTION SCHEDULE

A. Contact the Project Oversight three business days before the start of any work.

B. Failure to perform work on the date scheduled shall require 24-hour notice for rescheduling the work.

C. Leave all work exposed until inspected and approved. Work not inspected before it is covered shall be re-exposed at the Contractor’s expense.

D. All work shall be performed Monday – Friday ONLY between the hours of 8:00 a.m. –

5:00 p.m. No work is to be performed on the weekends and/or federal holidays unless other work schedule arrangements are approved by the Project Oversight.

E. Project Oversight: Dalton Barnes, Project Engineer Office: (918) 586-8402 Cell: (405) 659-4280 Email: dalton.barnes@ihs.gov

1.04 WARRANTY

A. Provide a minimum one-year warranty for all materials and labor, covering defects in the materials or workmanship.

1.05 WATER SERVICE LINES

A. References (use latest versions)

1. ASTM D2609 Standard Specification for Plastic Insert Fittings for Polyethylene (PE) Plastic Pipe.

2. ASTM D2737 Standard Specification for Polyethylene (PE) Plastic Tubing.

3. ASTM D2774 Standard Practice for Underground Installation of Thermoplastic

Pressure Piping.

4. AWWA C651 Disinfecting Water Lines

5. AWWA C901 Polyethylene (PE) Pressure Pipe and Tubing, ½ in. Through 3 in.

for Water Service.

6. NSF Standard 014 Plastic Piping System Components and Related Materials.

7. NSF Standard 061 Drinking Water System Components – Health Effects.

B. PE Pipe Material Requirements

1. Ultra-high molecular weight polyethylene pipe.

2. PE 4710 IPS DR 11 (pressure rating 200 psi).

3. Diameter: 2-inch.

4. 500-foot coil.

5. Recommended Manufacturer: Silver-Line Plastics Sil-O-Flex OD DR 11 or approved equal.

C. Fittings:

1. Non-flare compression type fittings with stainless steel pipe stiffeners at each joint, heat (butt) fused, or electro-fused fittings will be accepted.

D. Isolation Valve

1. Ball valve:

a. Brass

b. ¼ turn-handle type.

E. Valve Box

1. Polyethylene box and cover.

2. Minimum dimensions:

a. Length: 21 inches.

b. Width: 16 inches.

c. Height: 12 inches.

3. Recommended Manufacturer: NDS or approved equal.

1.06 INSTALLATION

A. Install water service lines and appurtenances in the locations, sizes and materials shown on the drawings or staked in the field.

B. Water and sewer service crossing and parallel installation.

1. Maintain a 30-inch horizontal separation between water and sewer services.

2. Maintain a 12-inch vertical separation for crossing water and sewer services. The water service is to be placed above the sewer service whenever possible.

3. Water service line splices or joints will not be permitted within 10 feet of a sewer line crossing.

C. Thrust blocking is to be provided at all changes in direction.

D. All existing fencing shall be undisturbed by construction activities. Any fencing that is disturbed shall be replaced in kind or exceed existing conditions.

E. Any utilities damaged during the installation shall be repaired by the Contractor.

1.07 TRENCH

A. Depth: Minimum 30 inches to the top of the pipe.

B. Bottom: Free from stones greater than 3 inch, large dirt clods, and any frozen material.

C. Backfill: restore trenches to initial grade.

1. Initial Backfill

a. Work material under and around the pipe to ensure full pipe support.

b. Hand tamp to prevent movement of the pipe during placement of material, avoiding contact between the pipe and compaction equipment.

c. Compact in lifts not to exceed 6 inches in loose measurement until 12 inches of backfill covers the top of the pipe.

2. Final Backfill

a. Compact in lifts not to exceed 12 inches in loose measurement with mechanical compacting equipment.

b. Compact all backfill to a density not less than the density of the surrounding undisturbed soil.

c. Surplus materials shall be disposed of in accordance with federal, state and local regulations.

d. Any excessive settlement, exceeding 3 inches, shall be corrected by the contractor.

D. Rock Excavation

1. Definition:

a. Solid rock: large masses or rock which cannot be excavated without hammering, ripping, or other specialized equipment.

b. Loose rock: boulders and/or detached stone having a volume of one cubic yard or more.

2. Execution:

a. Rock excavation may be accomplished by any or all of the following methods:

excavation with earthmoving equipment specialized for rock removal, ripping with a bull dozer, or jack hammering.

b. Remove excavated rock from site unless otherwise directed by the Project Oversight.

1.08 TESTING

A. Before joints are covered, test pipe for leaks.

B. Visually inspect all connections and fittings for leaks in the presence of the Project

Oversight.

C. Repair all leaks before backfilling.

1.09 CLOSEOUT ACTIVITIES

A. Restore the site as close as is practical to its original condition.

2025-04-11T11:56:08-0500
ANDREW F. BANTA -S

Date2_af_date: 4/11/25