621-22-118 Replace Building 160 Switchgear Drawings.pdf

PDF 28 MB Posted

Attached to
N059--Replace BLDG 160 Switchgear Project Number 621-22-118 Federal contract opportunity
Solicitation number
36C24922B0018
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9

About this file

This document outlines a federal contract opportunity for replacing the switchgear in Building 160. The solicitation number is 36C24922B0018 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 for Project Number 621-22-118. The opportunity type is a solicitation to replace the switchgear for Building 160 at the location. No pricing terms, response dates, or other details are provided in this brief description of the federal contract opportunity.

View the file

Other files for this federal contract opportunity

Other files attached to N059--Replace BLDG 160 Switchgear Project Number 621-22-118, newest first.
File Type Posted
621-22-118 Replace Building 160 Switchgear Specifications.pdf PDF
36C24922B0018_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EQD

ELD ATS

HLBC

HLBB

H1C

SPARE

SPACE

PARKING GARAGE

SPACE

EEQE ATS

HLBA

H1B

HLBD

EEQD ATS

KH

MEF36400LSG

MODEL

MEF36400LSG

MEF36150LSG

MEF36150LSG

MEF36150LSG

MEF36175LSG

MEF436LSIG

MEF36400LSG

MEF36400LSG

MEF36400LSG

MEF36400LSG

MEL36800LSG

MEF36400LSG

65000 65000 65000 65000 65000 65000 65000 65000 65000 65000 65000 65000 65000 65000 65000

DS-63265000

4 5

8 9

6 7

10 11

12 13

16 17

14 15

NOTES:

1. HVL SWITCH, TRANSFORMER AND SWITCHGEAR TO BE DEMOED

AND DISPOSED OF BY THE CONTRACTOR.

2. ALL EXISTING WIRING SHALL BE TERMINATED IN THE NEW

SWITCHGEAR AT THE PROPER TERMINATIONS.

3. ANY SPLICING SHALL BE DONE IN A PULL BOX INSTALLED ABOVE

THE NEW SWTICHGEAR.

4. THE NEW MEDIUM VOLTAGE SWITCH SHALL BE INSTALLED IN THE

SAME LOCATION AS THE EXISTING SWITCH WITH NO MODIFICATIONS

REQUIRED TO THE UNDERGROUND MEDIUM VOLTAGE CABLING.

5. IT IS THE CONTRACTORS RESPONSIBILTY TO VERIFY CLEARANCES

REQUIRED FOR THE INSTALLATION OF THE NEW EQUIPMENT AND THE

CONTRACTOR WILL BE REQUIRED TO RELOCATE ANY EXISTING

EQUIPMENT TO ALLOW FOR THE PROPER CLEARANCES.

HVL SWITCH, TRANSFORMER AND SWITCHGEAR

621-B160-G001
621-B160-E101
621-B160-E501
621-B160-E601

File details come from the government source that posted it. Updated .