Boiler Replacement To Replace Boiler - Addendum #2 Replace Boiler State and local contract opportunity
Solicitation number
50014-0003A
Issued by
Orleans Parish, New Orleans City, Louisiana

About this file

This is Addendum #2 to the contract documents for the SUNO Boiler Replacement project located at 6400 Press Drive, New Orleans, Louisiana, issued by Parish Engineering, LLC on November 5, 2025. The addendum modifies the mechanical specifications and drawings for the boiler replacement at the Arts & Humanities Building and Gymnasium at Southern University of New Orleans (SUNO), identified as Parish Project No. 25-040. The primary modification requires replacement of drawing sheet M2.0 in its entirety with the attached mechanical details sheet. Additionally, Section 232113 of the specifications regarding chemical treatment has been revised to require coordination of all water treatment with the owner's designated water treatment provider, Thornton, Musso, & Bellemin, Inc., with contact information provided for Jeff LeJeune.

The addendum establishes prior approval requirements for specific manufacturers and product models to ensure compliance with contract specifications. Approved manufacturers include Fulton for hydronic boilers and modulating boiler sequencing systems, Taco or Paterson for air separators, PRM Filtration for magnetic filters/separators, and Taco for compression tanks. The document clarifies that manufacturer acceptance does not waive compliance with plans and specifications, and manufacturers remain responsible for meeting all contract requirements. The replacement drawing sheet M2.0 includes mechanical details encompassing boiler piping diagrams, air control system piping, duct/pipe hanger anchors, and refrigerant pipe support hangers, along with detailed sequence of operation parameters for boiler run and stop conditions, pump interlock provisions, and lead-lag pump operation protocols.

View the file

Other files for this state and local contract opportunity

Other files attached to Boiler Replacement To Replace Boiler - Addendum #2 Replace Boiler, newest first.
File Type Posted
50014-0003A-1.pdf PDF
50014-0003A.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1450 Seabord Drive

Baton Rouge, LA 70810

P: 225.332.0222 parisheng.com | contact@parisheng.com

Date: November 5, 2025

Project Name: SUNO Boiler Replacement at Arts & Humanities & Gymnasium Project Address: 6400 Press Drive, New Orleans, LA 70126 Parish Project No.: 25-040

ADDENDUM # 2

The following items shall be considered part of the Contract Documents for the above referenced project and shall take precedence over any conflicting statements contained therein. Revise all other notes, schedules, details, elevations, and sections as required.

MECHANICAL ITEMS:

Drawings:

1. Sheet Number: M2.0

a. Replace this sheet in its entirety with the attached.

Specifications:

1. Section Number: 232113

a. 3.7 Chemical Treatment/E shall read:

Coordinate all water treatment with the Owners Water Treatment Provider:

Thornton, Musso, & Bellemin, Inc. Contact: Jeff LeJeune, Cell 225-938-6522.

PRIOR APPROVAL:

NOTE: Acceptance of a particular manufacturer does not excuse that manufacturer from meeting the plans and specifications. Compliance with specifications is the responsibility of the prior approval manufacturer.

The following Manufacturers are approved:

Product Model

Hydronic Boilers Fulton Air Separator Taco , Paterson Magnetic Filter/Separator PRM Filtration Compression Tank Taco Modulating Boiler Seq System Fulton

If you have any questions, please contact our office.

Parish Engineering, LLC

HANGER ROD SCHEDULE

PIPE SIZE ROD DIA.

1/4" - 2"

2-1/2" - 3-1/2"

3/8"

1/2"

GENERAL NOTES:

1. HANGERS IN CONTACT WITH COPPER SHALL BE COPPER PLATED OR TEFLON COATED.

2. MAXIMUM HORIZONTAL PIPE HANGER AND SUPPORT SPACING IS 5'-0".

ADJUSTABLE WROUGHT CLEVIS HANGER

16 GA. GALVANIZED SHEETMETAL PIPE INSULATION

PROTECTION SADDLE, MINIMUM 12" LONG

PROVIDE NON-METALLIC INSULATING MATERIAL IF PIPING AND

HANGER ARE DISSIMILAR METALS AND PIPING IS NOT INSULATED

ALL THREAD HANGER ROD

HEX HEAD NUT

REFRIGERANT PIPING

CONCRETE DECK ANCHORS

BAR JOIST ANCHORSI-BEAM ANCHORS

WOOD ANCHORS

WOOD TRUSS/JOIST

1/4"X1-1/4" HEX HEAD LAG

BOLT TO BE SECURED TO TOP

CHORD OF TRUSS/JOIST

HEX HEAD NUT

STEEL SIDE BEAM

BRACKET

ALL THREAD

HANGER ROD

ALL THREAD

HANGER ROD

HEX HEAD NUT

WITH WASHER

ADJUSTABLE SIDE

BEAM CLAMP

STEEL BEAM

ALL THREAD

HANGER ROD

C-CLAMP WITH

SET SCREW AND

LOCK NUT

RETAINING CLIP

UNIVERSAL C-CLAMP

WITH SET SCREW

AND JAM NUT

TOP/BOTTOM

FLANGE OF BAR

JOIST

ALL THREAD

HANGER ROD

UNIVERSAL C-CLAMP

WITH SET SCREW

AND JAM NUT

CONCRETE DECK

CONCRETE WEDGE

ANCHOR WITH HEX

HEAD NUT AND WASHER

WITH HANGER STRAP

STEEL BEAM

CONCRETE LAG SHIELD

ANCHOR OR CONCRETE

EXPANSION ANCHOR

WITH ALL THREAD ROD

LEGEND

AIR SEPARATOR

CIRCULATION

PUMP

FLOW CHECK VALVE

PRESSURE GAUGE

TEMPERATURE &

PRESSURE GAUGE

SYSTEM SUPPLY

SENSOR

BACKFLOW

PREVENTER

MAGNETIC SEPARATOR WATER METER

PRESSURE STRAINER / FILTER

REDUCING VALVE

PRESSURE RELIEF

VALVE

BALL VALVE EXPANSION TANK

PIPING

DRAIN PORT

DIFFERENTIAL

PRESSURE

BYPASS VALVE

2 WAY MOTORIZED

VALVE

MIXING VALVE

ANTI SCALD

FLOW SWITCH

OPTIONAL

WIRING

TO

SYSTEM

FROM

SYSTEM

P

MAKE UP

WATER

T P T P

BOILER 1 BOILER 2

SYSTEM SUPPLY

SENSOR

P

T P

AIR CONTROL TANK

FITTING TYPICAL

BALL

VALVE

PRESSURE RELIEF

75 P.S.I. SETTING

PRESSURE REDUCING

VALVE, SET TO 10 PSI

CONNECT

HW FILL LINE

SLOPE DOWN

NEW AIR

SEPARATOR

TO PUMPS

TO DRAIN

BALL

VALVE

TO DRAIN

3/4" VALVE WITH

GARDEN HOSE

CONNECTION

N.C.

STRAINER

SHUT-OFF BALL

VALVE (TYP)

BACKFLOW

PREVENTER

COMPRESSION TANK

CENTRAL HEATING WATER:

A. RUN CONDITIONS:

a. BOILER SHALL BE IN STANDBY MODE & ENABLE TO RUN UPON A CALL FOR HEATING, INDICATED BY TIME OF DAY SCHEDULE AND OUTSIDE AIR

TEMPERATURE SETPOINT.

b. BOILER SHALL RUN SUBJECT TO ITS OWN INTERNAL CONTROLS & SAFETIES TO MAINTAIN A SUPPLY TEMPERATURE SETPOINT OF 180°F

(ADJUSTABLE).

c. BOILER SHALL NOT BE ENABLED WHEN OUTSIDE AIR TEMPERATURE IS ABOVE 70°F (ADJUSTABLE).

B. STOP CONDITIONS:

a. BOILER SHALL SHUT DOWN AND ENTER STANDBY MODE WHEN NO CALL FOR HEATING, INDICATED BY TIME OF DAY SCHEDULE AND OUTSIDE AIR

TEMPERATURE SETPOINT.

b. BOILER SHALL SHUT DOWN & GENERATE ALARM UPONE RECEIVING A REFRIGERANT LEAK DETECTION STATUS, CARBON MONOXIDE DETECTION OR

HYDROCARBON DETECTION.

c. BOILER SHUT DOWN & GENERATE ALARM SUBJECT TO OWN INTERNAL CONTROLS & SAFETIES & MANUAL BOILER SHUTDOWN SWITCH.

C. BOILER - PUMP INTERLOCK:

a. LEAD HOT WATER PUMP SHALL RUN WHEN BOILER IS ENABLED. UPON PROOF OF FLOW OBTAINED BY CURRENT SENSING RELAY ON PUMP, BOILER

SHALL BE ENABLED.

b. WHEN BOILER IS DISABLED, BOILER SHALL STOP & PUMP SHALL STOP AFTER TIME DELAY.

D. SECONDARY PUMPS - LEAD - STANDBY OPERATION:

a. LEAD PUMP SHALL RUN FIRST. PUMPS SHALL BE EVALUATED FOR LEAD POSITION BASED ON RUNTIME OR DAILY, WEEKLY, MONTHLY SWAP OVER

AS SELECTED BY OWNER.

b. ON FAILURE OF A PUMP, STANDBY PUMP SHALL RUN & PUMP FAILURE - ALARM SHALL TURN OFF.

E. BOILER:

a. BOILER SHALL UTLIZE INTERNAL CONTROLS TO MAINTAIN ADJUSTABLE LEAVING WATER TEMPERATURE SETPOINT. SETPOINT SHALL BE MANUALLY

ADJUSTABLE BY OPERATOR.

b. TO PREVENT SHORT CYCLING, THE BOILER SHALL RUN FOR & BE OFF FOR MINIMUM ADJUSTABLE TIMES (BOTH USER DEFINED) UNLESS

SHUTDOWN ON SAFETIES.

c. INTERCONNECT WITH CARBON MONOXIDE MONITOR, HYDROCARBON GAS MONITOR & MANUAL EMERGENCY SHUT OFF SWITCH.

d. BOILER SHALL USE INTERNAL CONTROLS FOR LEAD/LAG SCHEDULING.

SEQUENCE OF OPERATION

N.T.S.1 DETAIL - REFRIGERANT PIPE SUPPORT HANGERS

N.T.S.3 DETAIL - DUCT/PIPE HANGER ANCHORS

SHEET NUMBER

SHEET NAME

DATE:

REVISIONS

DRAWN BY:

CHECKED BY:

PROJECT #:

SHEET INFORMATION

SEAL

PROJECT INFORMATION

All drawings and written material appearing herein constitute original and unpublished work of the engineer and may not be duplicated, used, or disclosed without written consent of the engineer. Do not scale drawings. Contractor is responsible for verifying any and all quantities included in these documents when bidding and during construction.

7600 Innovation Park Drive

Baton Rouge, LA 70820

225.332.0222 parisheng.com

M2.0

MECHANICAL DETAILS

CTD

LJB

06-18-2025

25-040

B O

IL

E

R R

E P

L A

C E

M E

N T

A R

T S

H

U M

A N

IT

IE

S

S O

C

IA

L S

C

IE

N C

E

B U

IL

D

IN

G

G

Y M

N A

S

IU

M S

U N

O N

E W

O R

L E

A N

S

L A

1 Revision 1 11-05-25

N.T.S.4 DETAIL - BOILER PIPING DIAGRAM

N.T.S.2 DETAIL - AIR CONTROL SYSTEM PIPING

11/05/2025

251027_Addendum_02
M2.0 - REVISED

File details come from the government source that posted it. Updated .