- Boiler Replacement To Replace Boiler - Addendum #2 Replace Boiler State and local contract opportunity
- Solicitation number
- 50014-0003A
- Issued by
- Orleans Parish, New Orleans City, Louisiana
About this file
This is Addendum #2 to the contract documents for the SUNO Boiler Replacement project located at 6400 Press Drive, New Orleans, Louisiana, issued by Parish Engineering, LLC on November 5, 2025. The addendum modifies the mechanical specifications and drawings for the boiler replacement at the Arts & Humanities Building and Gymnasium at Southern University of New Orleans (SUNO), identified as Parish Project No. 25-040. The primary modification requires replacement of drawing sheet M2.0 in its entirety with the attached mechanical details sheet. Additionally, Section 232113 of the specifications regarding chemical treatment has been revised to require coordination of all water treatment with the owner's designated water treatment provider, Thornton, Musso, & Bellemin, Inc., with contact information provided for Jeff LeJeune.
The addendum establishes prior approval requirements for specific manufacturers and product models to ensure compliance with contract specifications. Approved manufacturers include Fulton for hydronic boilers and modulating boiler sequencing systems, Taco or Paterson for air separators, PRM Filtration for magnetic filters/separators, and Taco for compression tanks. The document clarifies that manufacturer acceptance does not waive compliance with plans and specifications, and manufacturers remain responsible for meeting all contract requirements. The replacement drawing sheet M2.0 includes mechanical details encompassing boiler piping diagrams, air control system piping, duct/pipe hanger anchors, and refrigerant pipe support hangers, along with detailed sequence of operation parameters for boiler run and stop conditions, pump interlock provisions, and lead-lag pump operation protocols.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 50014-0003A-1.pdf | ||
| 50014-0003A.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1450 Seabord Drive
Baton Rouge, LA 70810
P: 225.332.0222 parisheng.com | contact@parisheng.com
Date: November 5, 2025
Project Name: SUNO Boiler Replacement at Arts & Humanities & Gymnasium Project Address: 6400 Press Drive, New Orleans, LA 70126 Parish Project No.: 25-040
ADDENDUM # 2
The following items shall be considered part of the Contract Documents for the above referenced project and shall take precedence over any conflicting statements contained therein. Revise all other notes, schedules, details, elevations, and sections as required.
MECHANICAL ITEMS:
Drawings:
1. Sheet Number: M2.0
a. Replace this sheet in its entirety with the attached.
Specifications:
1. Section Number: 232113
a. 3.7 Chemical Treatment/E shall read:
Coordinate all water treatment with the Owners Water Treatment Provider:
Thornton, Musso, & Bellemin, Inc. Contact: Jeff LeJeune, Cell 225-938-6522.
PRIOR APPROVAL:
NOTE: Acceptance of a particular manufacturer does not excuse that manufacturer from meeting the plans and specifications. Compliance with specifications is the responsibility of the prior approval manufacturer.
The following Manufacturers are approved:
Product Model
Hydronic Boilers Fulton Air Separator Taco , Paterson Magnetic Filter/Separator PRM Filtration Compression Tank Taco Modulating Boiler Seq System Fulton
If you have any questions, please contact our office.
Parish Engineering, LLC
HANGER ROD SCHEDULE
PIPE SIZE ROD DIA.
1/4" - 2"
2-1/2" - 3-1/2"
3/8"
1/2"
GENERAL NOTES:
1. HANGERS IN CONTACT WITH COPPER SHALL BE COPPER PLATED OR TEFLON COATED.
2. MAXIMUM HORIZONTAL PIPE HANGER AND SUPPORT SPACING IS 5'-0".
ADJUSTABLE WROUGHT CLEVIS HANGER
16 GA. GALVANIZED SHEETMETAL PIPE INSULATION
PROTECTION SADDLE, MINIMUM 12" LONG
PROVIDE NON-METALLIC INSULATING MATERIAL IF PIPING AND
HANGER ARE DISSIMILAR METALS AND PIPING IS NOT INSULATED
ALL THREAD HANGER ROD
HEX HEAD NUT
REFRIGERANT PIPING
CONCRETE DECK ANCHORS
BAR JOIST ANCHORSI-BEAM ANCHORS
WOOD ANCHORS
WOOD TRUSS/JOIST
1/4"X1-1/4" HEX HEAD LAG
BOLT TO BE SECURED TO TOP
CHORD OF TRUSS/JOIST
HEX HEAD NUT
STEEL SIDE BEAM
BRACKET
ALL THREAD
HANGER ROD
ALL THREAD
HANGER ROD
HEX HEAD NUT
WITH WASHER
ADJUSTABLE SIDE
BEAM CLAMP
STEEL BEAM
ALL THREAD
HANGER ROD
C-CLAMP WITH
SET SCREW AND
LOCK NUT
RETAINING CLIP
UNIVERSAL C-CLAMP
WITH SET SCREW
AND JAM NUT
TOP/BOTTOM
FLANGE OF BAR
JOIST
ALL THREAD
HANGER ROD
UNIVERSAL C-CLAMP
WITH SET SCREW
AND JAM NUT
CONCRETE DECK
CONCRETE WEDGE
ANCHOR WITH HEX
HEAD NUT AND WASHER
WITH HANGER STRAP
STEEL BEAM
CONCRETE LAG SHIELD
ANCHOR OR CONCRETE
EXPANSION ANCHOR
WITH ALL THREAD ROD
LEGEND
AIR SEPARATOR
CIRCULATION
PUMP
FLOW CHECK VALVE
PRESSURE GAUGE
TEMPERATURE &
PRESSURE GAUGE
SYSTEM SUPPLY
SENSOR
BACKFLOW
PREVENTER
MAGNETIC SEPARATOR WATER METER
PRESSURE STRAINER / FILTER
REDUCING VALVE
PRESSURE RELIEF
VALVE
BALL VALVE EXPANSION TANK
PIPING
DRAIN PORT
DIFFERENTIAL
PRESSURE
BYPASS VALVE
2 WAY MOTORIZED
VALVE
MIXING VALVE
ANTI SCALD
FLOW SWITCH
OPTIONAL
WIRING
TO
SYSTEM
FROM
SYSTEM
P
MAKE UP
WATER
T P T P
BOILER 1 BOILER 2
SYSTEM SUPPLY
SENSOR
P
T P
AIR CONTROL TANK
FITTING TYPICAL
BALL
VALVE
PRESSURE RELIEF
75 P.S.I. SETTING
PRESSURE REDUCING
VALVE, SET TO 10 PSI
CONNECT
HW FILL LINE
SLOPE DOWN
NEW AIR
SEPARATOR
TO PUMPS
TO DRAIN
BALL
VALVE
TO DRAIN
3/4" VALVE WITH
GARDEN HOSE
CONNECTION
N.C.
STRAINER
SHUT-OFF BALL
VALVE (TYP)
BACKFLOW
PREVENTER
COMPRESSION TANK
CENTRAL HEATING WATER:
A. RUN CONDITIONS:
a. BOILER SHALL BE IN STANDBY MODE & ENABLE TO RUN UPON A CALL FOR HEATING, INDICATED BY TIME OF DAY SCHEDULE AND OUTSIDE AIR
TEMPERATURE SETPOINT.
b. BOILER SHALL RUN SUBJECT TO ITS OWN INTERNAL CONTROLS & SAFETIES TO MAINTAIN A SUPPLY TEMPERATURE SETPOINT OF 180°F
(ADJUSTABLE).
c. BOILER SHALL NOT BE ENABLED WHEN OUTSIDE AIR TEMPERATURE IS ABOVE 70°F (ADJUSTABLE).
B. STOP CONDITIONS:
a. BOILER SHALL SHUT DOWN AND ENTER STANDBY MODE WHEN NO CALL FOR HEATING, INDICATED BY TIME OF DAY SCHEDULE AND OUTSIDE AIR
TEMPERATURE SETPOINT.
b. BOILER SHALL SHUT DOWN & GENERATE ALARM UPONE RECEIVING A REFRIGERANT LEAK DETECTION STATUS, CARBON MONOXIDE DETECTION OR
HYDROCARBON DETECTION.
c. BOILER SHUT DOWN & GENERATE ALARM SUBJECT TO OWN INTERNAL CONTROLS & SAFETIES & MANUAL BOILER SHUTDOWN SWITCH.
C. BOILER - PUMP INTERLOCK:
a. LEAD HOT WATER PUMP SHALL RUN WHEN BOILER IS ENABLED. UPON PROOF OF FLOW OBTAINED BY CURRENT SENSING RELAY ON PUMP, BOILER
SHALL BE ENABLED.
b. WHEN BOILER IS DISABLED, BOILER SHALL STOP & PUMP SHALL STOP AFTER TIME DELAY.
D. SECONDARY PUMPS - LEAD - STANDBY OPERATION:
a. LEAD PUMP SHALL RUN FIRST. PUMPS SHALL BE EVALUATED FOR LEAD POSITION BASED ON RUNTIME OR DAILY, WEEKLY, MONTHLY SWAP OVER
AS SELECTED BY OWNER.
b. ON FAILURE OF A PUMP, STANDBY PUMP SHALL RUN & PUMP FAILURE - ALARM SHALL TURN OFF.
E. BOILER:
a. BOILER SHALL UTLIZE INTERNAL CONTROLS TO MAINTAIN ADJUSTABLE LEAVING WATER TEMPERATURE SETPOINT. SETPOINT SHALL BE MANUALLY
ADJUSTABLE BY OPERATOR.
b. TO PREVENT SHORT CYCLING, THE BOILER SHALL RUN FOR & BE OFF FOR MINIMUM ADJUSTABLE TIMES (BOTH USER DEFINED) UNLESS
SHUTDOWN ON SAFETIES.
c. INTERCONNECT WITH CARBON MONOXIDE MONITOR, HYDROCARBON GAS MONITOR & MANUAL EMERGENCY SHUT OFF SWITCH.
d. BOILER SHALL USE INTERNAL CONTROLS FOR LEAD/LAG SCHEDULING.
SEQUENCE OF OPERATION
N.T.S.1 DETAIL - REFRIGERANT PIPE SUPPORT HANGERS
N.T.S.3 DETAIL - DUCT/PIPE HANGER ANCHORS
SHEET NUMBER
SHEET NAME
DATE:
REVISIONS
DRAWN BY:
CHECKED BY:
PROJECT #:
SHEET INFORMATION
SEAL
PROJECT INFORMATION
All drawings and written material appearing herein constitute original and unpublished work of the engineer and may not be duplicated, used, or disclosed without written consent of the engineer. Do not scale drawings. Contractor is responsible for verifying any and all quantities included in these documents when bidding and during construction.
7600 Innovation Park Drive
Baton Rouge, LA 70820
225.332.0222 parisheng.com
M2.0
MECHANICAL DETAILS
CTD
LJB
06-18-2025
25-040
B O
IL
E
R R
E P
L A
C E
M E
N T
A R
T S
H
U M
A N
IT
IE
S
S O
C
IA
L S
C
IE
N C
E
B U
IL
D
IN
G
G
Y M
N A
S
IU
M S
U N
O N
E W
O R
L E
A N
S
L A
1 Revision 1 11-05-25
N.T.S.4 DETAIL - BOILER PIPING DIAGRAM
N.T.S.2 DETAIL - AIR CONTROL SYSTEM PIPING
11/05/2025
| 251027_Addendum_02 |
| M2.0 - REVISED |
File details come from the government source that posted it. Updated .