5-Prototypical K-8 - Conceptual Gymnasium Building Floor Plan 09.30.2025.pdf

PDF 4 MB Posted

Attached to
Construction Management at Risk Services for Green Zone K8 State and local contract opportunity
Solicitation number
RFQ 26-04
Issued by
St. Lucie County, Florida

About this file

The document is a floor plan for a K-8 School Gymnasium Building III, showing a detailed architectural layout with color-coded sections indicating different functional areas. The gymnasium is purple-colored and occupies a significant portion of the floor plan, with adjacent green-colored lobby and classroom areas, and blue-colored group bathroom and locker room spaces. The plan includes a comprehensive room schedule listing 25 different rooms with their names, student stations, and square footage, ranging from ticket booths and storage areas to specific rooms like coaches' offices, gym storage, and various toilet facilities.

The floor plan provides a total gross square footage of 20,201 square feet, with dimensions of 187'-5" at the widest point. The layout is meticulously designed to accommodate multiple functions within a school gymnasium complex, including athletic spaces, support areas, administrative zones, and student facilities. The color-coded legend helps quickly identify different areas: green for lobby and classrooms, purple for the gymnasium, and blue for supporting spaces like bathrooms and locker rooms. The detailed room schedule offers precise information about each space's purpose, capacity, and size, indicating a comprehensive approach to facility design that considers both functional requirements and spatial efficiency.

View the file

Other files for this state and local contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .