QA_2_RFQ 47QSCC21Q0002 (1).xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Pandemic Kits Federal contract opportunity
- Solicitation number
- 47QSCC21Q0002
- Issued by
- GSA Federal Acquisition Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA RFQ 47QSCC21Q0002.xlsx | XLSX spreadsheet | |
| Amendment 001 RFQ 47QSCC21Q0002 SF30.pdf | ||
| Amendment 001 RFQ 47QSCC21Q0002 Continuation Pages.docx | DOCX document | |
| RFQ 47QSCC21Q0002.pdf | ||
| Attachment 1 Subcontracting_Plan_Template.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Questions | Answers | Answers posted to beta.SAM |
| Packaging for each kit of CLIN 003-005 Partition will be packaged separately in a 48” wide x 96” long x 48” high in custom Gaylord Container. Will this be acceptable to FEMA considering the tubes for the frame are 72” long and will not fit on an industry standard pallet? | Yes if the items is too large for the standard pallet. | 6-Nov-20 |
| For CLIN 003 Partitions, it is unclear whether you are requesting caster or not. | The salinet characteristics are provided in the solicitation for each item. Please refer to page 18 to see the characteristics. | 6-Nov-20 |
| In regards to CLINs 4-5 the partition connectors both are the same component from our source. 3 connectors will be needed per wall however. Does the quantity required then need to be multiplied by three? | The salinet characteristics are provided in the solicitation for each item. Please refer to page 18 to see the characteristics. The quantities must meet the quantity of 11 for CLIN 004 and 11 for CLIN 0005 in each kit. | 6-Nov-20 |
| Can the Kit contents be stripped of their manufacturing shipping boxes to save space in the Pallet Pack container? We will pack & secure each kit contents to assure no damage during transit. | Yes | 6-Nov-20 |
| If we can pack the contents of the kit into less than 15 pallet pack containers, does FEMA still require the remaining pallet pack containers? If so, do the extra containers need to be packed a certain way or can they be shipped the way they come from manufacturer with the TOPS, BOTTOMS, and Walls, Shipped all on separate skids? | Yes, please see the solicitation, the vendor shall meet the following packaging requirements: Packaging shall be shipped in one pallet jack containers (57" x 48" x 50" Pallet Pack 2000lb capacity and stackable ). Anything that cannot fit into the one container like partitions shall be shipped on industry standard-size pallets (48 inches in length x 40 inches in width, 4-way). | 6-Nov-20 |
| Now that the COO requirements have changed to TAA from BAA, will the Contracting Officers consider also including and accepting BAA compliant certifications already obtained during the last RFQ? For example the 50% component value of finished product manufactured in USA was a qualifying factor in one or two of our CLINS. Time constraints and sourcing these products have necessitated this request. | Yes so long as the items meet the TAA requirements. | 6-Nov-20 |
| To Contracting officers, may we submit a separate attachment or include an appendix with the entire filled out solicitation RFQ and any related addendums? Intentions here are for the Solicitation requirements to not count against our page count. If not, is it preferred we copy and paste the solicitation requirements and clauses and submit them within the Proposal? | Please refer to Amendment 0001, the page count has increased to 20 pages | 6-Nov-20 |
| Due to time restrictions on the requested Delivered by date, substitutions for some products may be necessary. Will this be acceptable to substitute per our discretion any qualified and similar substitute? Will we need to include a separate description for proposed substitutions in the Technical Conformance submission? | Yes, you must demonstrate what you quote is what you are awarded. The government will terminate the Contract for cause for a bait and switch. | 6-Nov-20 |
| Will the GSA Memorandum Dated 9/4/2020 titled Memorandum for all GSA Contracting Activities SPE Memo SPE-2020-11 Supplement 3 apply for this solicitation? | No | 6-Nov-20 |
| Any kit contents that do not fit into ONE pallet pack container due to size constraints (these containers only have 56 cubic ft.), are the extra contents to be shipped on a separate industry standard pallet and wrapped to be included with the pallet pack to complete the kit? Or would FEMA prefer us to pack everything into Pallet Pack Containers? | Yes please see page 22 of the solicitation. | 6-Nov-20 |
| Now that this RFQ is unrestricted to just Small Business, do we still need to be in compliance of FAR 19.102(f)(2): A concern which purchases items and packages them into a kit is considered to be a non-manufacturer small business and can qualify as such for a given acquisition if it meets the size qualifications of a small non-manufacturer for the acquisition, and if more than 50 percent of the total value of the kit and its contents are accounted for by items manufactured by small business. | Yes, please refer to the RFQ section E.8 | 6-Nov-20 |
| Given that the deadline for the bid submission has changed from Oct. 20, 2020 to Nov. 17, 2020, will there be any leeway on the delivery date of Jan. 29, 2021? | No, the delivery deadline shall remain at November 17, 2020. |