MAS - Aspen Environmental Group - 47QRAA22D00EH

PDF 1 MB

Attached to
Federal Supply Schedule 47QRAA22D00EH Federal contract IDV
Contract number
47QRAA22D00EH
Issued by
GSA Federal Acquisition Service

About this file

This federal supply schedule contract was awarded on September 8, 2022 to Aspen Environmental Group to provide environmental planning and geographic information systems services through September 7, 2027. Under special item number 541620 for environmental consulting, the contractor offers expertise in environmental impact assessment, planning and documentation services including expertise in the California Environmental Quality Act and National Environmental Policy Act. Labor categories on the schedule include project managers, scientists, engineers, planners and specialists in areas such as biology, archaeology and GIS. Special item number 541370GIS provides geographic information systems services including mapping, data analysis, database design and geospatial modeling. Pricing is provided for 23 labor categories covering areas such as project management, environmental analysis, planning, and GIS specialties.

Aspen Environmental Group Pricelist and/or Vendor Terms and Conditions for 47QRAA22D00EH, a Federal Supply Schedule awarded to Aspen Environmental Group, under Multiple Award Schedule (MAS)

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL SERVICES ADMINISTRATION

FEDERAL ACQUISITION SERVICE

Authorized Federal Supply schedule FSS Price List

Federal Supply Group: Professional Services

Multiple Award Schedule

(MAS)

CONTRACT INFORMATION

Contract No. 47QRAA22D00EH

September 8, 2022 – September 7, 2027

CONTACT INFORMATION

Vicky Tinkjian Chief Financial Officer Tel (818) 597-3407 Fax (818) 597-8001 vtinkjian@aspeneg.com

Aspen Environmental Group 5020 Chesebro Road, Suite 200

Agoura Hills, CA 91301 Business Size: Small Business

For more information on ordering go to the following website: https://www.gsa.gov/schedules

Price list current as of Modification #PA-0005 effective March 10, 2023

Online access to contract ordering information, terms and conditions, up-to-date pricing, and the option to create an electronic delivery order are available through GSA Advantage!, a menu driven database system. The INTERNET address for GSA Advantage! is: www.GSAAdvantage.gov.

mailto:vtinkjian@aspeneg.com http://www.gsaadvantage.gov/

CONTRACT NO. 47QRAA22D00EH i

CONTENTS

1. About Aspen Environmental Group

SIN 541620 Environmental Consulting Services

CEQA

NEPA

CEQA/NEPA Joint Documents

SIN 541370GIS Geographic Information Systems (GIS) Services

Geospatial Services

2. Types of Projects

Transmission and Telecommunication Renewable Energy Oil and Gas Water Supply Restoration Wildfire Prevention and Asset Protection

3. Price Lists

SIN 541620: Environmental Planning Services and Documentation 541620 – Labor Descriptions

Environmental Expert III Principal/Program Manager Senior Project Manager II Senior Project Manager Senior Associate, Air Quality and Greenhouse Gas/Global Climate Change Principal Environmental Consultant I Senior Environmental Scientist VIII Senior Environmental Consultant III Senior Environmental Consultant II Senior Environmental Consultant I Senior Engineer Engineer II Earth Science/Hydrology IV Earth Science/Hydrology III Registered Professional Archaeologist Principal Registered Professional Archaeologist Senior Associate Earth Science/Hydrology II Earth Science/Hydrology I Supervisory Archaeologist Cultural Resource Specialist II

CONTENTS

ii CONTRACT NO. 47QRAA22D00EH

Cultural Resource Specialist I Biologist IV Biologist III Certified Fisheries Biologist, Senior Biologist II Biologist I Environmental Consultant II Social Scientist/Planner IV Social Scientist/Planner III Senior Environmental Planner Social Scientist/Planner II Social Scientist/Planner I Environmental Scientist II Information Technology Document Production Senior GIS Specialist Senior GIS/Info Tech Specialist Graphics/Drafting Staff GIS/Info Tech Specialist Administrative/Project Accounting II Project Accounting I Administrative

4. Price Lists

SIN 541370GIS: Geographic Information Systems (GIS) Services 541370GIS – Labor Descriptions

Principal/Program Manager Information Technology Manager Information Technology Data Analyst Database Manager GIS Manager Senior GIS Specialist GIS Specialist II GIS Technician II GIS Technician I Graphics/Drafting Analyst Document Editing QA/QC Administrative/Project Accounting II Project Accounting I Administrative

5. Order Aspen’s Services

CONTRACT NO. 47QRAA22D00EH iii

Customer Information

1a. Table of awarded special item number(s) with appropriate cross-reference to item descriptions and awarded price(s).

SINs Recovery SIN Title 541620 541620RC Environmental Consulting Service 541370GIS 541370GISRC Geographic Information System (GIS) Services OLM OLMRC/OLMSTLOC Order-Level Materials (OLM’s)

1b. Identification of the lowest priced model number and lowest unit price for that model for each special item number awarded in the contract. This price is the Government price based on a unit of one, exclusive of any quantity/dollar volume, prompt payment, or any other concession affecting price. Those contracts that have unit prices based on the geographic location of the customer, should show the range of the lowest price, and cite the areas to which the prices apply. See Page 13

1c. If the Contractor is proposing hourly rates, a description of all corresponding commercial job titles, experience, functional responsibility and education for those types of employees or subcontractors who will perform services shall be provided. If hourly rates are not applicable, indicate “Not applicable” for this item. See Page 13 thru 27

2. Maximum order: $1,000,000

3. Minimum order: $1,000

4. Geographic coverage (delivery area). Domestic and Overseas

5. Point(s) of production (city, county, and State or foreign country). 5020 Chesebro Road Suite 200, Agoura Hills, CA 91301

6. Discount from list prices or statement of net price. Government Net Prices (discounts already deducted.)

7. Quantity discounts. None

8. Prompt payment terms. Net 30 days. Information for Ordering Offices: Prompt payment terms cannot be negotiated out of the contractual agreement in exchange for other concessions.

10a. Time of delivery. (Contractor insert number of days.) To Be Determined at the Task Order level iv CONTRACT NO. 47QRAA22D00EH

10b. Expedited Delivery. Items available for expedited delivery are noted in this price list. Contact Contractor

10c. Overnight and 2-day delivery. Contact Contractor

10d. Urgent Requirements. Contact Contractor

11. F.O.B. point(s). Destination

12a. Ordering address(es).

Aspen Environmental Group

- 5020 Chesebro Road Suite 200, Agoura Hills, CA 91301 (Headquarters)

- 235 Montgomery Street, Suite 640 San Francisco, CA 94104

- 8801 Folsom Blvd., Suite 275

Sacramento, CA 95826

- 615 N. Benson Ave., Suite E Upland, CA 91786

12b. Ordering procedures: See Federal Acquisition Regulation (FAR) 8.405-3.

13. Payment address(es). Aspen Environmental Group, 5020 Chesebro Road, Suite 200 Agoura Hills, CA 91301

14. Warranty provision. Standard Commercial Warranty Terms & Conditions

15. Export packing charges, if applicable. Not Applicable

16. Terms and conditions of rental, maintenance, and repair (if applicable). Not Applicable

17. Terms and conditions of installation (if applicable). Not Applicable

18a. Terms and conditions of repair parts indicating date of parts price lists and any discounts from list prices (if applicable). Not Applicable

18b. Terms and conditions for any other services (if applicable). Not Applicable

19. List of service and distribution points (if applicable). Not Applicable

CONTRACT NO. 47QRAA22D00EH v

20. List of participating dealers (if applicable). Not Applicable

21. Preventive maintenance (if applicable). Not Applicable

22a. Special attributes such as environmental attributes (e.g., recycled content, energy efficiency, and/or reduced pollutants). Not Applicable

22b. If applicable, indicate that Section 508 compliance information is available for the information and communications technology (ICT) products and services and show where full details can be found (e.g. contractor’s website or other location.) ICT accessibility standards can be found at:

https://www.Section508.gov/.

Not Applicable

23. Unique Entity Identifier (UEI) number. V5ZLCTAWJM28

24. Notification regarding registration in System for Award Management (SAM) database. Contractor registered and active in SAM.

CONTRACT NO. 47QRAA22D00EH 1

1. About Aspen Environmental Group

Aspen is an expert environmental services firm focused on the provision of services to clients responsible for building, maintaining, or regulating infrastructure and public works projects. Since the company’s incep-tion in 1991, Aspen’s multidisciplinary staff has provided environmental compliance, impact assessment, planning, and mitiga-tion services for a wide variety of federal, state, and local clients. Aspen has effectively managed many large, complex, and high-profile projects involving large teams of subconsultants on behalf of public clients.

Aspen’s focus on specific types of projects provides us with the knowledge, insight, and understanding needed to efficiently prepare environmental analyses that meet project needs, disclose important information to the public, and fully conform to all applicable federal, state, and local requirements.

Aspen has provided environmental compliance services for a wide variety of infrastructure, public works, and industrial projects across the western US, including water, energy, flood control, and telecom-munications infrastructure, as well as many types of public facilities. Aspen has extensive experience managing large-scale IDIQ and on-call contracts with such clients as U.S. Army Corps of Engineers, Bureau of Land Management, Western Area Power Administration, and U.S. Fish and Wildlife. One of Aspen’s primary services is compliance with the requirements of the California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA). In addition, Aspen provides expertise needed for successful compliance with the Clean Water Act, Clean Air Act, Endangered Species Act, and other federal and state environmental laws.

Aspen is known for the quality of our work products and has developed an effective Quality Assurance Program. High standards have been a foundation of Aspen’s ongoing commitment to providing quality products and services to our clients. As such, Aspen routinely performs quality audits, performance monitoring, and reviews of project deliverables. Aspen’s Quality Assurance Program has been integral to our developing and producing high-quality work products for agency and private clients and has been tested and refined over several years through our work on numerous on-call projects, and with hundreds of other documents for federal, State and local government agencies.

2 CONTRACT NO. 47QRAA22D00EH

SIN 541620 Environmental Consulting Services

Aspen regularly serves in the role of prime contractor to federal, state, and local agencies for CEQA and NEPA projects and routinely manages a team of specialists for the purpose of conducting detailed and comprehensive environmental impact analyses.

Aspen’s project management and CEQA/NEPA experience is complemented by the expertise and experience of our staff members in collecting data and performing analyses for environmental impact assessment documents and supporting environmental documentation, including specialized services such as biological resources, cultural resources, geographical information systems (GIS) mapping, public participation (noticing, advertising, scoping meetings, public meetings, hearings, etc.), and permit documentation for compliance with the entire range of state and federal environmental regulations. In addition, Aspen prepares Mitigation Plans and has a team of mitigation monitors to ensure adherence to all mitigation requirements during construction.

Aspen specializes in the preparation of environmental impact report (EIR) and environmental impact statement (EIS) documents and has a highly successful track record in producing technically sound and legally defensible environmental analysis documents. We provide all notices, documentation, and ser-vices needed for CEQA and NEPA compliance, as necessary. Aspen also provides comprehensive ser-vices related to regulatory permit acquisition, including expertise in the efforts necessary for project-specific approvals, including providing compliance monitoring required during pre-construction, construction, and post-construction phases.

We have extensive experience in the management and preparation of the entire range of CEQA and NEPA compliance documents and activities, including Initial Studies (ISs), Negative Declarations (NDs), Mitigated NDs (MNDs), EIRs, and public notices and meetings for CEQA, and Environmental Assess-ments (EAs), Findings of No Significant Impact (FONSIs), EISs, Records of Decision (RODs), scoping meetings, public hearings, and Federal Register notices for NEPA. We have successfully prepared all of these types of documents and conducted these activities for many different agencies. The bulk of our experience has come under task-order contracts, so we have developed efficient procedures for managing these contracts.

An understanding of environmental legislation is critical to effectively manage most environmental assessment projects, because most agency projects trigger necessary responses or actions to a wide range of other legislation. Aspen has substantial knowledge regarding the requirements of the following state and federal regulations related to natural resources as a result of our past work with various public agencies:

Coastal Zone Management Act, Federal Coastal Consistency Determination, California Coastal Act

Section 10 of the River and Harbor Act (USACE)

California Fish and Game Code (Sections 1600- 1607) Lake and Streambed Alteration Agreements

Federal Clean Water Act (CWA), Section 404 Permits (Nationwide, Regional General, Standard

Individual), including preparation of Formal Wetland Delineation Reports, which involve Minimum Standard Guidelines

Section 401 Water Quality Certification from the applicable Regional Water Quality Control Board (RWQCB)

CONTRACT NO. 47QRAA22D00EH 3

Section 402 National Pollutant Discharge Elimi-nation System (NDPES) permits from the State Water Resources Control Board, through the local

RWQCB

Federal Endangered Species Act (ESA), Section 7 Consultation and Section 10 Habitat Conservation Plans (HCPs) and Incidental Take Permits, including the preparation of Biological Assessments and HCPs

Farmland Protection Policy Act

Executive Order 11988: Floodplain Management

California Public Resources Code

Clean Air Act (CAA), General Conformity Analysis

California ESA, Section 2081 Permit and other sections (2050 to 2089) of the Fish and Game Code that protect rare and endangered plants and animals, including preparation of Biological Evaluations and Mitigation Monitoring Plans

Magnuson-Stevens Fishery Conservation and Management Act

Senate Bill 610, requiring Water Supply Assess-ments for industrial and other large projects

Section 106 of the National Historic Preservation Act

Numerous mitigation monitoring projects entail-ing compliance with all permitting and mitigation requirements

CEQA

Aspen’s expertise and extensive experience has been gained over many years and is detailed below with respect to CEQA compliance functions, types of projects, our range of clients, and key issue areas:

Categorical Exemption documentation; ISs, NDs, MNDs, and Draft and Final EIRs;

Preparation and distribution of required notices, including Notices of Preparation, Notices of Com-pletion, and Notices of Determination;

Project descriptions and formulation of feasible alternatives;

Field studies and research;

Engineering evaluation of projects to determine specific impact parameters;

Feasibility studies of alternatives and mitigation measures;

Mitigation measure development, evaluation, implementation, and mitigation monitoring; and

Public participation, including website creation and maintenance, notices for mail and media, public workshops and hearings, stakeholder meetings, fact sheets and brochures, graphic displays, and non-English language materials.

Our projects have included all areas of California, from urban areas with concerns related to air quality, traffic, noise, and environmental justice, to rural and wilderness areas where biological resources, recreation use, and scenic vistas were the primary concerns. In each of our completed projects, we demonstrated our ability to perform the following critical functions:

Evaluation and analysis of project alternatives, cum-ulative impacts, and growth-inducing effects;

Comprehensive analyses of all relevant environ-mental issues;

Support to the Lead Agency in CEQA compliance and public participation;

Management of technical specialists from within Aspen and from subcontractor teams; and

4 CONTRACT NO. 47QRAA22D00EH

Production of high-quality environmental documents synthesizing and editing information developed by technical specialists;

NEPA

NEPA requires EIS preparation only for “proposals for legislation and other major federal actions significantly affecting the quality of the human environment.” A federal agency must, therefore, evaluate and screen each proposed action to determine whether NEPA applies, and if it does, whether an EIS must be prepared. First, an agency must determine if the proposed action is categorically excluded or otherwise exempt from NEPA. Second, if the action is not excluded, the agency must determine whether the proposed action may “significantly affect the quality of the human environment.” This step involves preparing an EA to determine whether the proposed action would result in any significant environmental effects. Finally, the agency will either (1) file a FONSI if there are no impacts or they have been suitably mitigated, or (2) prepare an EIS.

Aspen staff are experts in all the technical and procedural requirements of NEPA and supporting federal legislation. Aspen has over 30 years of experience managing, preparing, and processing a wide variety of environmental impact assessment documents for many local, state, and federal government entities.

The factors that differentiate us from other environmental consulting firms include our extensive recent and relevant NEPA process work and our project management process that is designed and adjusted to very efficiently conduct projects. Aspen’s repertoire of experience, expertise, and resources make us more than capable of handling all technical and procedural requirements necessary for successful compliance with NEPA and supporting federal legislation.

CEQA/NEPA Joint Documents

Since Aspen’s formation over 30 years ago, we have gained a reputation for successful management of large and challenging joint document projects. . A project that is subject to CEQA will also be subject to NEPA when it: (1) is jointly carried out by a federal agency; (2) requires a federal discretionary permit, entitlement, authorization, or federal funding; or (3) occurs on federal land. Federal agencies are encour-aged under NEPA to cooperate with State and local agencies when a project is subject to both NEPA and CEQA and to perform an independent review of any prepared CEQA documents when it is preparing its own NEPA document. A joint EIS/EIR or a joint FONSI/Negative Declaration can be produced to satisfy the requirements of both Acts, if the involved lead agencies sign a Memorandum of Understanding to apply whichever requirements are more stringent.

Supporting Environmental Regulations. Aspen has expertise in handling supporting environmental leg-islation (both federal and state) for NEPA and CEQA. Understanding supporting federal regulations is critical to working with agencies because each proposed project triggers a different set of related environmental requirements, depending on the type and location of the activity being proposed. Each federal agency has an obligation to inquire as to which other environmental requirements may be applicable to an action, and to list, in the EIS, all federal permits, licenses, and other entitlements that are needed.

CONTRACT NO. 47QRAA22D00EH 5

SIN 541370GIS Geographic Information Systems (GIS) Services

Aspen Environmental Group is a unique and innovative company providing high-end Geospatial products to local, state, and federal agency clients and has extensive field work expertise throughout the Western US. Aspen’s Geospatial Sciences Group has advanced technical knowledge, work experi-ence, and qualified staff to accomplish any and all required tasks related to applied spatial intelligence gathering and analysis. Aspen also has substantial experience with Geospatial data related to land use planning, transmission, renewable energy, and watershed projects. Aspen has a wealth of experience working for federal, State, and local government agencies, as well as the private sector, performing successfully on large, on-call contracts.

Many of Aspen’s clients, including local government and regulatory agencies and developers of industrial projects, make use of GIS capabilities to enhance the efficiency with which they assess environmental issues and acquire project permits.

GIS increases project understanding, speeds up data collection and analysis, enables compari-son and selection of alternatives, and improves presentation effectiveness. Project managers can reduce budget expenditures by using GIS.

The industry trend is toward digital spatial knowledge replacing paper documents and lower-technological solutions. Pinpointing exact locations in project analysis, project man-agers can increase productivity and can better respond to stakeholders’ inquiries; regulatory agencies can identify and map sensitive resources; and specialists can utilize geographic data for specific analysis.

Geospatial Services

Mapping Cartographic Production Spatial and Imagery Data Analysis Geospatial Data and Project Management Data Quality Assurance/Quality Control Surveys and Data Collection GPS/GNSS Data Collection Spatial Data Modeling Visual and 3D Simulations

Asset Management Operation and Maintenance Support GIS-based Sensitive Resource Modeling Biological and Cultural Surveys, Conservation Measures, & Permitting Database Design and Management Client Training

Aspen can design, develop, and implement geospatial database and management systems. Aspen Team members are experienced in the use of the various regional, state, and federal database systems com-monly utilized in the environmental assessment process, including biological, archaeological, air quality, and hazardous materials databases. Over the last 15 years, Aspen has established several Project Col-

6 CONTRACT NO. 47QRAA22D00EH

laboration Sites to organize and share program- and project-related information among our clients and Aspen Team members. These Collaboration Sites have increased coordination, efficiency, and trans-parency in providing high-quality products within agreed-upon schedules and budgets.

Aspen’s technical GIS and GPS expertise can support long-term infrastructure operation and mainte-nance. Aspen assisted Western’s Sierra Nevada Region Natural Resources Department in implementing the Transmission Asset Management System (TAMS) model, to combine regulatory requirements with operation and maintenance needs on a transmission right-of-way. Western’s Natural Resources Depart-ment now assists the field crews with daily work routines and keeps Western in compliance with land management requirements.

Aspen has extensive spatial database experience with other projects. Aspen was the sole contractor to the CEC to collect all high-kilovolt transmission lines above 115 kV for the entire State of California.

Aspen GIS collected some 120,000 individual tower structures and 20,000 miles of transmission corridors utilizing aerial imagery, GPS, and field reconnaissance, training CEC GIS cartographic staff to update and maintain the CEC’s Comprehensive GIS Database and completing the project on time and under budget. In addition, Aspen GIS performed an erosion and sedimentation spatially distributed GIS analysis from 2008-2010 for Angeles National Forest in support of the Tehachapi Renewable Transmission Project on all access roads, pull sites, and staging areas to determine accelerated sedimentation impacts of the project. Aspen conducted this same analysis after the Station Fire in the Angeles National Forest to determine changes in sedimentation rates after the fire.

CONTRACT NO. 47QRAA22D00EH 7

2. Types of Projects

In the last 30 years, Aspen has focused almost exclusively on the infrastructure and public works sector, and a significant part of that work has involved energy facilities and related infrastructure. We have completed projects in a range of diverse environmental settings, including marine, terrestrial, riparian, and urban environments. Examples of our project experience are listed below.

Aspen is a leader in the provision of environmental services for energy projects. Aspen has analyzed thousands of miles of electrical transmission lines, as well as a variety of other energy facilities, including telecommunication lines. In addition, Aspen has also conducted environmental analysis for numerous oil and gas projects.

Aspen is one of the most accomplished companies in the provision of professional environmental consulting services for water resource projects. Water agencies have relied on Aspen to provide expert environmental services for large capital improvement projects as well as for operations and maintenance activities. Aspen has worked on water projects of all types and scales for some of California’s largest water agencies, including the Department of Water Resources, Metropolitan Water District of Southern California, and Los Angeles Department of Water and Power. Aspen’s water supply experience includes water pipelines, dams, storage reservoirs, treatment facilities, aqueducts, and pumping plants.

Aspen is also accomplished in the provision of environmental consulting services for habitat restoration projects in California and Arizona. Our restoration experience and services extend from initial planning and design to habitat evaluations, biological surveys, hydrologic and hydraulic modeling, cost and incremental benefit analysis, and alternatives analysis.

In addition, Aspen has been assisting public agencies and private organizations in assessing wildfire hazards and implementing wildfire mitigation strategies to reduce the impact of these tragic events.

Some of these strategies include developing wildfire mitigation plans, removing hazard trees, thinning and clearing of vegetated areas for fire breaks, creating fuel modification zones, and expanding and clearing utility line rights-of-ways to reduce fires caused by line strikes. Aspen has also supported rebuild and recovery efforts in areas devastated by wildfire by assisting with permitting and construction monitoring on an expedited schedule and in close coordination with the Federal Emergency Manage-ment Agency (FEMA). Many agencies and construction companies are now required to develop Fire Plans for construction activities and to maintain firefighting equipment during project construction. As part of these important strategies, Aspen is supporting our public and private clients with a variety of wildfire services.

8 CONTRACT NO. 47QRAA22D00EH

Transmission and Telecommunication

Below are some examples of Aspen’s experience related to electrical transmission and telecommuni-cation systems.

West of Devers Upgrade Project. EIR/EIS for the removal and replacement of approximately 48 miles of existing 220-kV transmission lines with new double-circuit, 220-kV transmission lines, between the existing Devers Substation (near Palm Springs), Vista Substation (in Grand Terrace), and San Bernar-dino Substation.

Coolwater-Lugo Transmission Project. Draft EIR/EIS for a 64-mile, 500-kV and 220-kV transmission line and substation in the upper Mojave Desert.

San Luis Transmission Project. EIS/EIR and conducting biological and cultural surveys for this 62-mile transmission line in Central CA.

Sunrise Powerlink. EIR/EIS for a new high-voltage transmission line to provide capacity to interconnect renewable energy projects in Imperial and San Diego Counties.

Tehachapi Renewable Transmission Project. EIR/EIS for this major project to provide transmission capacity for wind energy projects in CA’s upper Mojave Desert.

Devers-Palo Verde No. 2 Transmission Project. EIR/EIS for a 230-mile, high-voltage transmission line traversing the Mojave Desert from AZ to CA’s Coachella Valley.

Antelope Transmission Project. EIR for a series of high-voltage transmission lines to provide capacity interconnect wind energy projects in CA’s Antelope Valley.

Antelope-Pardee Transmission Project. EIR/EIS for a high-voltage transmission line to provide capacity to interconnect wind energy projects in CA’s Antelope Valley.

North Area Right-of-Way Maintenance Project. Prepared O&M plans and procedures and an EA for Western, Sierra Nevada Region.

Sacramento Area Voltage Support. EIS/EIR for a new double-circuit 230-kV circuit and reconstruction of a double-circuit 230kV/115-kV transmission line into a double-circuit 230-kV line.

Jefferson-Martin 230-kV Transmission Project. EIR for a 27-mile 230-kV transmission line from San Mateo County to the City of Brisbane, CA.

CONTRACT NO. 47QRAA22D00EH 9

Renewable Energy

Aspen has experience providing environmental services for the complete range of renewable energy facilities, including solar photovoltaic, solar thermal, wind, biomass, and geothermal energy projects.

Below are some examples of Aspen’s experience related to wind energy.

Ocotillo Wind Energy Facility. EIS/EIR for the BLM and County of Imperial for a 465-megawatt (MW) wind facility on a 12,500-acre site near Ocotillo, CA.

Alta East Wind Project. EIS/EIR for a 318-MW wind facility on a 2,592-acre site in Kern County, CA.

Mesa Wind Re-power Project. EA and technical reports for a 30-MW repower project on BLM land in the San Gorgonio Pass Wind Resource Area.

Alta-Oak Creek Mojave Wind Project. EIR for a 710-MW wind facility on a 9,120-acre site in Kern County, CA.

Alta Infill II Wind Energy Project. EIR for a 530-MW wind facility on a 5,185-acre site in Kern County, CA.

Morgan Hills Wind Energy Project. EIR for a 230-MW wind energy facility on a 3,808-acre site in Kern County, CA.

Pacific Wind Energy Project. EIR for a 151- MW wind energy facility on an 8,300-acre site in Kern County, CA.

North Sky River Wind Energy Project & Jawbone Wind Energy Project. Prepared an EIR for two adjacent wind energy projects capable of generating 339 MW of energy on a combined 13,535-acre site in Kern County, CA.

Lompoc Wind Energy Project. Final EIR for a 97.5-MW wind energy facility and associated 9-mile 115-kV power line in Santa Barbara County, CA.

Pine Tree Wind Development Project. Air quality analysis to determine the impacts associated with changes to this LADWP wind energy project in Kern County, CA.

Tehachapi Wind Resource Area. Programmatic analysis for the development of wind energy in the Tehachapi Wind Resource Area in Kern County, CA, based on the potential development of 4,500 MW of wind generation.

Below are some examples of Aspen’s experience related to solar energy.

Del Sur Solar Project. EIR for the 100 MW photovoltaic facility on 725 acres and associated 2 to 4-mile generation tie-line.

10 CONTRACT NO. 47QRAA22D00EH

Desert Harvest Solar Project. EIS (prepared to a standard that complies with all requirements of the CEQA), as well as supporting technical analyses.

Panoche Valley Solar Farm Project. EIR and supporting technical analyses for San Benito County.

Topaz Solar Farm. EIR for a 550-MW photovoltaic solar power plant in Carrizo Plain, an unincor-porated portion of eastern San Luis Obispo County.

California Valley Solar Ranch. EIR for a 250-MW solar photovoltaic power plant on approximately 4,000 acres of rangeland in the Carrizo Plain.

City of Palmdale Hybrid Power Plant. Assisted the CEC with the Staff Assessment.

Abengoa Mojave Solar Project. Assisted the CEC with the Staff Assessment.

Beacon Solar Energy Project. Assisted the CEC with the Staff Assessment.

Ivanpah Solar Electric Generation System Project. Assisted the CEC with the Staff Assessment.

Blythe Solar Power Project. Assisted the CEC with the Staff Assessment for the Blythe Energy Project Transmission Line Modifications. Conducted an alternative assessment, looking at different locations and technologies of the transmission line modifications.

Palen Solar Power Project. Assisted the CEC with the Staff Assessment.

Genesis Solar Energy Project. Assisted the CEC with the Staff Assessment.

Desert Sunlight Project. Desert Sunlight is a photovoltaic solar farm in the Chuckwalla Valley in eastern Riverside County located on land managed by the BLM. Aspen provided peer review of the EIS prepared by BLM's consultant.

Ridgecrest Solar Power Project. Assisted the CEC with the Staff Assessment.

Carrizo Energy Solar Farm (CESF). Supported the CEC during preparation of its Staff Assessment, for the proposed CESF in San Luis Obispo County. The CESF project was canceled and the project site was acquired by First Solar for the Topaz Solar Farm Project.

Imperial Valley Solar Project. Assisted the CEC with the Staff Assessment.

Rice Solar Energy Project. Assisted the CEC with the Staff Assessment.

San Joaquin Solar 1 & 2 Power Plant. Supported the CEC during preparation of its Staff Assessment.

CONTRACT NO. 47QRAA22D00EH 11

Oil and Gas

Below are some examples of Aspen’s experience related to oil and gas, including exploration, transpor-tation, refining, and storage.

Senate Bill 4 Regulations – Oil and Gas Well Stimulation Treatments in California EIR. EIR that is required by State Public Resources Code 3161(b)(3) and (4) (e.g., one of SB 4’s directives). The EIR includes six Study Regions that are addressed on a programmatic level. Aspen has been responsible for all logistics, execution and facilitation of five public scoping meetings throughout the State that were collectively attended by over 450 people, and logged over 1,300 individual comments.

Hollister Oil and Gas EIS and RMP Amendment. Preparation of a resource management plan (RMP) Amendment and associated EIS to guide management of oil and gas resources on a BLM-administered mineral estate within the Hollister Field Office. The EIS/RMP Amendment analyzes the effects of alternative oil and gas management approaches to update the reasonably foreseeable development scenario and the existing 2007 Hollister RMP in order to incorporate new information about well stimulation technologies, natural resource conditions, and socioeconomic trends.

PXP Tranquillon Ridge Oil and Gas Development Project EIR. EIR for the Santa Barbara County Energy Division. This project involved the development of oil and gas wells from Platform Irene into the Tranquillon Ridge Field using extended reach drilling technology.

California Department of Conservation, Division of Oil, Gas and Geothermal Resources (DOGGR) CEQA Compliance Assessment, Data Gap Analysis, and Initial Study. Comprehensive assessment of DOGGR's compliance with CEQA when issuing well drilling permits.

Kirby Hills Natural Gas Storage Facility. IS/MND for the proposed Kirby Hills natural gas storage facility that involved the conversion of a depleted gas reservoir into a storage facility for resale of natural gas.

City of Hermosa Beach Urban Drill Site. Served as a Permit Process Consultant for the City of Hermosa Beach for an urban drill site that would produce oil and gas from both onshore and offshore fields.

Environmental Information Document and Coastal Consistency Determinations for Federal Oil and Gas Leases. Multidisciplinary environmental document and 10 coastal consistency determinations evaluating the potential effects of development of federal oil and gas leases offshore of Santa Barbara, Ventura, and San Luis Obispo Counties.

Gaviota Marine Terminal/Chevron Tankering Project. EIR/EIS for a Joint Review Panel consisting of the CSLC, Santa Barbara County, USACE, and CALEPA.

Kinder Morgan Concord-to-Sacramento Pipeline Project. EIR and pipeline risk assessment for a proposed 70-mile petroleum products pipeline from Concord (Contra Costa County) to West Sacramento (Yolo County).

Kinder Morgan Carson-to-Norwalk Pipeline Project. EIR for the Sante Fe Pacific 13-mile petroleum products pipeline project through urban Los Angeles (Carson, Long Beach, Bellflower, Norwalk, Artesia, and Cerritos).

12 CONTRACT NO. 47QRAA22D00EH

Pacific Pipeline Project. Prepared two environmental documents for the Pacific Pipeline Project.

Gaviota to Ventura County EIR. Original EIR evaluated an oil pipeline from coastal Santa Barbara County to the Los Angeles Basin, via coastal Ventura County and the Santa Clara River Valley.

Kern County to Los Angeles Refineries EIS/SEIR. Revised project, evaluated in an EIS and Subsequent EIR, originating in the southern San Joaquin Valley and following Interstate 5 over Tejon Pass joining the original route at Castaic Junction in Los Angeles County.

San Joaquin Refining Company Health Risk Assessment. Dispersion modeling using ISCST model.

Analyzed emissions and reported the toxicology for each substance. Risk analysis included pathway-specific data files for plant products, animal products, mothers' milk, and water ingestion.

Yellowstone Pipeline. EIS to evaluate the impacts of Yellowstone Pipeline Company’s proposed 67-mile petroleum products pipeline in western Montana.

Water Supply

Below are some examples of Aspen’s experience related to water supply facilities.

Tehachapi East Afterbay Project. EIR for the DWR for a project to construct and operate a storage afterbay on the East Branch of the CA Aqueduct in the western Mojave Desert.

Taylor Yard Water Recycling Project. IS/MND for this recycled water project for the LADWP.

River Supply Conduit Project - Upper and Lower Reaches. Two EIRs and several associated studies and reports for the LADWP to address the construction of a new major pipeline for water trans-mission.

Littlerock Reservoir Sediment Removal Project. Conducting the CEQA/NEPA environmental review process, providing hydraulic engineering and design services, and preparing a suite of natural re-source studies to support the removal of sediment to provide greater water storage capacity for the Palmdale Water District.

Santa Ana Valley Pipeline Repairs. CEQA environmental review, permitting, and construction mon-itoring. Prepared and filed a CEQA Notice of Exemption with the State Clearinghouse for the repairs.

Horsethief Creek Bridge and Mojave Siphon Maintenance. Strategy development for com-pleting the bridge construction while avoiding the peak season for arroyo toads and other sensitive wildlife present at the bridge site.

Protocol and focused surveys were conducted in addition to wetland delineation, regulatory permit acquisition, pre-construction clearance surveys, worker training, and construction monitoring. Also prepared an IS/MND.

CONTRACT NO. 47QRAA22D00EH 13

Mulholland Pumping Station and Lower Hollywood Reservoir Outlet Chlorination Station Project. IS was prepared in support of a City of Los Angeles General Exemption for the LADWP.

Redmont Pump Station Replacement Project. IS/MND that addressed replacement of a water supply pump station located in the community of Sunland in the City of Los Angeles, for the LADWP.

Lincoln Avenue Water Permit Support and Pipeline Repair. EA/supporting documentation for the Lincoln Avenue Water Company for the renewal of Special Use Permits for existing facilities on National Forest System lands.

Piru Creek Erosion Repairs and Pyramid Dam Bridge Retrofit. CEQA documentation, prepared and processed federal and State environmental permitting, conducted biological surveys for maintenance and repair of facilities on the West Branch of the CA Aqueduct.

Simulation of Natural Flows in Middle Piru Creek. EIR for proposed changes to the seasonal flow release schedule of Pyramid Dam, located at the West Branch of the CA Aqueduct.

Restoration

Below are some examples of Aspen’s restoration experience.

Santa Ana River Main Stem Project. Multiple baseline data reports and environmental documents to support flood control and habitat restoration along the Santa Ana River on behalf of the USACE.

Currently directing restoration efforts for riparian and upland habitats at Prado Dam and Reach 9 of the Santa Ana River.

Santa Maria River Levee Improvement Project. EA and Ecosystem Restoration Plan to support repairs and expansion of the Santa Maria River levee on behalf of the USACE.

Sulphur Creek Ecosystem Restoration Project. Detailed Project Report for riparian restoration planning in the City of Laguna Niguel, CA on behalf of the USACE.

Ormond Beach Wetlands Restoration Feasibility Plan. Managed and prepared the Feasibility Plan for the California State Coastal Conservancy in Ventura County, CA.

Yolo County Cache Creek Supplemental EIR. Supplemental EIR for the Cache Creek Resources Management Plan and Cache Creek Improvement Project in Yolo County, CA.

Bull Creek Ecosystem Restoration Project. EA and Ecosystem Restoration Report to evaluate the USACE’s proposal to restore the lower portion of Bull Creek, located in the Sepulveda Basin, Los Angeles County, CA.

Tucson (Ajo) Detention Basin Ecosystem Restoration Project. Ecosystem Restoration Report and Design Modification Report for the Tucson (Ajo) Detention Basin in the City of Tucson, AZ.

Agua Fria Ecosystem Restoration Project. Integrated Detailed Project Report and EA for three restoration sites along the lower Agua Fria River at its confluence with the Gila River for the USACE.

14 CONTRACT NO. 47QRAA22D00EH

Muranaka Farm Flood Plain Restoration Project. Assisting the landowner with restoration activities including site preparation, planting, and regulatory compliance for the flood plain restoration project (Moorpark, CA).

Rillito River Riparian and Wetland Development Project. Biological baseline conditions report, assist-ed the prime contractor in the development of restoration alternatives and completed the habitat evaluation analysis for the restoration of approximately one mile of the Rillito River in Tucson, AZ.

Matilija Dam Ecosystem Restoration Project. EIS/EIR and a variety of supplemental documents to support the USACE Feasibility Study for the removal of Matilija Dam on Matilija Creek in Ventura County, CA.

Laguna Canyon Creek Initial Study and Conceptual Restoration Plan. IS and Conceptual Restoration Plan for approximately 4,000 lineal feet of Laguna Canyon Creek in the City of Laguna Beach, CA.

Old San Jose Creek Ecosystem Restoration Project. EA and Coastal Consistency Determination, as well as a Habitat Evaluation Procedure Plan for the Old San Jose Creek in San Jose, CA.

Habitat Restoration Economic Impacts Analysis. Economic and fiscal impact analysis from proposed wetlands conversion and restoration of productive agricultural lands in the Cache Slough area from agricultural and wetlands use in Solano County, CA.

Wildfire Prevention and Asset Protection

Below are some examples of Aspen’s experience with Wildfire Prevention and Asset Protection.

Wildfire Risk Reduction and Asset Protection Project (WRAP). EIR/EIS preparation and support to Trinity PUD in obtaining all regulatory permits to support right-of-way clearance and operations and maintenance activities. Extensive assessment and inventory of biological and cultural resources in project area.

Parker-Davis Transmission System Routine Operation and Maintenance Project and Proposed Inte-grated Vegetation Management (IVM) Program. Programmatic EA for Western Area Power Administration’s current operations and maintenance activities and implementation of Integrated Vegetation Management program.

Powerhouse Vegetation and Fuel Treatment Project and Sawmill-Liebre Reforestation Project. Cate-gorical Exclusions for fuel management treatment, including completing a Biological Evaluation/ Biological Assessment (BE/BA).

Laguna Canyon Fuel Modification Professional Services. Biological, cultural, and paleontological resource assessments to support wildfire-prevention projects. IS/MND prepared for fuel modification activities.

Santa Monica Mountains North Area Plan and Community Standards District. Preparation of EIR and public outreach, detailed biological assessment documenting plants and wildlife in the North Area.

CONTRACT NO. 47QRAA22D00EH 15

Border Protection NEPA and Monitoring. Conducted biological and cultural resources surveys and prepared technical reports, EAs and Biological Assessments, construction monitoring of vegetation treatment implementation in resource sensitive areas.

3. Price Lists

SIN 541620: Environmental Planning Services and Documentation

Labor Category Year 1

Including IFF Year 2

Including IFF Year 3

Including IFF Year 4

Including IFF Year 5

Including IFF

Environmental Expert III $331.86 $342.48 $353.44 $364.76 $376.42

Principal / Program Manager $272.30 $281.01 $289.99 $299.27 $308.85

Sr Project Manager II $257.17 $265.40 $273.89 $282.66 $291.71

Sr Project Manager $236.88 $244.46 $252.28 $260.35 $268.69

Sr. Associate, Air Quality and

Greenhouse Gas/Global Climate

Change

$234.66 $242.17 $249.91 $257.91 $266.17

Principal Environ. Consultant I $228.51 $235.83 $243.38 $251.16 $259.20

Sr. Environmental Scientist VIII $222.92 $230.06 $237.42 $245.02 $252.86

Sr. Environmental Consultant III $206.72 $213.34 $220.17 $227.21 $234.49

Sr. Environmental Consultant II $171.28 $176.77 $182.42 $188.25 $194.28

Sr. Environmental Consultant I $154.61 $159.56 $164.66 $169.93 $175.38

Sr. Engineer $199.63 $206.02 $212.60 $219.41 $226.43

Engineer II $158.69 $163.77 $169.01 $174.42 $180.00

Earth Science / Hydrology-IV $277.32 $286.20 $295.36 $304.81 $314.56

Earth Science / Hydrology-III $232.23 $239.66 $247.32 $255.24 $263.42

Registered Professional

Archaeologist Principal

$186.40 $192.36 $198.52 $204.87 $211.43

Registered Professional

Archaeologist Sr. Associate

$162.03 $167.21 $172.56 $178.09 $183.79

Earth Science / Hydrology-II $150.13 $154.93 $159.89 $165.01 $170.29

Earth Science / Hydrology-I $123.92 $127.89 $131.98 $136.20 $140.56

Supervisory Archaeologist $146.10 $150.77 $155.60 $160.57 $165.71

Cultural Resource Specialist II $111.18 $114.74 $118.41 $122.20 $126.11

Cultural Resource Specialist I $87.16 $89.94 $92.83 $95.80 $98.86

Biologist-IV $204.95 $211.52 $218.29 $225.27 $232.47

Biologist-III $186.40 $192.36 $198.52 $204.87 $211.43

16 CONTRACT NO. 47QRAA22D00EH

Labor Category Year 1

Including IFF Year 2

Including IFF Year 3

Including IFF Year 4

Including IFF Year 5

Including IFF

Certified Fisheries Biologist, Senior

$162.03 $167.21 $172.56 $178.09 $183.79

Biologist-II $143.72 $148.31 $153.06 $157.95 $163.01

Biologist-I $130.99 $135.18 $139.51 $143.97 $148.57

Environmental Consultant II $111.18 $114.74 $118.41 $122.20 $126.11

Social Scientist / Planner-IV $210.11 $216.83 $223.77 $230.93 $238.32

Social Scientist / Planner-III $203.12 $209.62 $216.33 $223.25 $230.40

Senior Environmental Planner $166.25 $171.57 $177.06 $182.72 $188.56

Social Scientist / Planner-II $124.83 $128.82 $132.94 $137.19 $141.58

Social Scientist / Planner-I $109.72 $113.23 $116.86 $120.59 $124.45

Environmental Scientist II $106.16 $109.55 $113.06 $116.68 $120.41

Information Technology $144.94 $149.58 $154.37 $159.30 $164.40

Document Production $109.25 $112.75 $116.35 $120.08 $123.92

Sr. GIS Specialist $151.94 $156.81 $161.82 $167.00 $172.34

Senior GIS/Info Tech Specialist $136.02 $140.37 $144.87 $149.50 $154.29

Graphics / Drafting $104.98 $108.34 $111.81 $115.39 $119.07

Staff GIS/Info Tech Specialist $99.45 $102.63 $105.91 $109.30 $112.80

Administrative / Project Acct- II $133.40 $137.67 $142.08 $146.62 $151.31

Project Accounting-I $103.49 $106.80 $110.22 $113.74 $117.38

Administrative $73.17 $75.51 $77.92 $80.41 $82.98

SCLS Matrix

GSA Labor Category SCLS Equivalent Code - Title WD Number

Project Accounting I 01013 – Accounting Clerk III 2015-5645

Administrative 01113 – General Clerk 2015-5645

Document Editing QA/QC 30463 – Technical Writer III 2015-5645

The Service Contract Labor Standards, formerly the Service Contract Act (SCA), apply to this contract and it includes SCLS applicable labor categories. Labor categories and fixed price services marked with a (**) in this pricelist are based on the U.S. Department of Labor Wage Determination Number(s) identified in the SCLS/SCA matrix. The prices awarded are in line with the geographic scope of the contract (i.e., nationwide).

CONTRACT NO. 47QRAA22D00EH 17

541620 – Labor Descriptions

ENVIRONMENTAL EXPERT III

This is a specific subject matter specialist. This position requires general environmental science/ analyti-cal experience including twenty (20) years direct, specialized experience in the specific subject matter area. Specialized experience includes demonstrated experience in environmental/analytical area speci-fically relevant to the order’s tasks. Incumbent must have served as a project manager in directly related experience areas. Applying current disciplines and methodologies to the planning, analysis, evaluation, design, development, implementation, and/or support of environmental/ analytical projects. Also, responsible for establishing and enforcing technical approaches and standards in the environ-mental/analytical process, and the application of automated support tools.

Degrees may emphasize Environmental Science, Biological Science, Physical Science, Computer Science, Chemical Engineering, Civil Engineering, Electrical Engineering, Industrial Engineering, Materials Science Engineering, Agricultural Engineering, Computer/Software Engineering, Environmental Engineering, Systems Engineering and other engineering or scientific disciplines and/or Business Administration.

Minimum Experience: 20 years Minimum Education: Master’s Degree in Environmental Science

PRINCIPAL/PROGRAM MANAGER

A professional with overall corporate management responsibility for the company or for a large pro-gram (a group of projects). The ultimate arbiter of client or subcontractor grievances.

Minimum Experience: 15 years Minimum Education: Master’s Degree in Environmental Science

SENIOR PROJECT MANAGER II

Plans, schedules, and executes a majority of work in a largely unsupervised manner, taking personal responsibility for project quality and client acceptance, with only general guidance from principals.

Accountable for all aspects of a project including negotiating contracts, client relations, defining the scope of work, and working with the client to establish budgets and schedules. Ultimate manager of quality control and quality assurance. Engages subcontractors, monitors their performance, and ensures subcontractor produce quality work. Ensures compliance with schedules and budgets. Develops, reviews, and signs deliverables. Directs projects and coordinates the work of all technical specialists on the organization chart for that project.

Minimum Experience: 10 years Minimum Education: Bachelor’s Degree in Environmental Science

SENIOR PROJECT MANAGER

Plans, schedules, and executes a majority of work in a largely unsupervised manner.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .