FINAL_47PM0218R0008_DOC_A_2B_Amend_01.pdf

PDF 311 KB Posted

Attached to
DOC A 2B Tenant Build-Out Construction Federal contract opportunity
Solicitation number
47PM0218R0008
Issued by
General Services Administration Public Buildings Service National Capital Region

View the file

Other files for this federal contract opportunity

Other files attached to DOC A 2B Tenant Build-Out Construction, newest first.
File Type Posted
01_DOC_A_2B_Solicitation_042418.pdf PDF
03_Davis_Bacon_General_Decision_Number_DC180002.pdf PDF
06_GSA527-15b.pdf PDF
02_DOC_A_2B__SBSA_GC_Agreement.pdf PDF
04_SF_1442__47PM0218R0008_05.04.18.pdf PDF
08_PBS_Past_Performance_Form_Rev_6_12_15.pdf PDF
05_SF24-16.pdf PDF
07_DOC_A_2B_GC_REPS_AND_CERTS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF

PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

05/22/2018

REQUISITION/PURCHASE REQ. NO.

EQWPMA-18-0061

PROJECT NO. (If applicable)

NDC00256

6. ISSUED BY CODE WPHBA 7. ADMINISTERED BY (If other than Item 6) CODE WPC

GSA, NCR, PBS,

OFC of Acquisition (WPHBA) 301 7th Streets, SW Washington, DC 20407

GSA, NCR, PBS,

Property Development Division (WPC) 301 7th Streets, SW Washington, DC 20407

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

9.A. AMENDMENT OF SOLICITATION NO.

To All Prospective Small Business Offerors (X)

47PM0218R0008

9B. DATED (SEE ITEM 11)

05/04/2018

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning. copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegraph which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

c. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return _____ copies to the issuing office with proposal.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible).

The Request for Proposals is hereby amended as follows:

The following changes, clarifications, additions and supplements are hereby incorporated into this RFP in their entirety as submitted. Continued on Page 2 of this Amendment Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Bonnie Echoles, Contracting Officer

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY .

(Signature of Contracting Officer)

16C. DATE SIGNED

05/22/2018

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

CONTINUATION OF SF 30: AMENDMENT OF

SOLICITATION/MODIFICATION OF CONTRACT

47PM0218R0008

Amendment No. 1

Solicitation 47PM0218R0008 DOC A 2B Tenant Build-Out Construction, St Elizabeths West Campus, SE, Wash., DC

REQUEST FOR PROPOSAL

ITEM A: PROPOSAL RECEIPT DATE, TIME and PLACE is hereby corrected as follows

[Corrections in RED]:

Tuesday, June 5, 2018 by 4:00 PM, EST (NOON)

EMAIL SUBMISSION IS PREFERRED.

GSA is requesting that all proposals be submitted ELECTRONICALLY by the stated date and time. One completed set of the proposal Volume 1 and Volume 2 is to be submitted electronically to the attention of Ms. Annabelle Contee, Procurement Analyst at Annabelle.Contee@gsa.gov with a cc: to Bonnie Echoles, Contracting Officer, at Bonnie.Echoles@gsa.gov. Proposals must be submitted and received on time to be considered.

ITEM B: Agreement, III.M. Order of Precedence (page 12/32)

DELETE this paragraph in its entirety and INSERT the following revised paragraph in lieu thereof.

Different requirements within this Contract shall be deemed inconsistent only if compliance with both cannot be achieved. In case of inconsistency between Contract Documents, the following order of precedence shall apply:

Contract Order of Precedence:

(1) Section IV of the Agreement

(2) Sections I, II, and III of the Agreement

(3) The Statement of Work (IFC Narrative Volume 1&2)

(4) The Specifications

(5) The Drawings

(6) Exhibits and Other Attachments

ITEM C: Solicitation, II.D Technical Proposal

(2) Key Personnel (page 10 of 27), is hereby corrected as follows [Corrections in RED]:

Years of experience with this firm (in the key personnel’s field of expertise/discipline) and years of experience with other firms (in the key personnel’s field of expertise/ discipline) o Project Manager for Construction – must possess a minimum of 7 years o On-Site Construction Superintendent – must possess a minimum of 7 years o Quality Control Manager – must possess a minimum of 7 years o Project Scheduler – must possess a minimum of 7 years

Education degree(s), year, and institution

Active professional registration, year first registered, if applicable

47PM0218R0008

Other experience and qualifications relevant to same/similar work required under this contract

List of projects in which the individual has worked to include Name of project(s) and project location(s)

ITEM D: Solicitation, VI.B. Lowest Price Technically Acceptable Evaluation Process

(3)(b) Factor 2-Key Personnel Evaluation Criteria (page 25 of 27), is hereby corrected as follows: [Corrections in RED]

Years experience with this firm (in the key personnel’s field of expertise/discipline) and years of experience with other firms (in the key personnel’s field of expertise/ discipline) o Project Manager for Construction – must possess a minimum of 7 years o On-Site Construction Superintendent – must possess a minimum of 7 years o Quality Control Manager – must possess a minimum of 7 years o Project Scheduler – must possess a minimum of 7 years

Education degree(s), year, and institution o Project Manager for Construction – Bachelor's degree in a field such as construction management, architecture, engineering or construction science o On-Site Construction Superintendent - Bachelor's degree in a field such as construction management, architecture, engineering or construction science or a minimum of 10 years of experience without a degree o Quality Control Manager - Bachelor's degree in a field such as construction management, architecture, engineering or construction science o Project Scheduler - Certification in at least one Scheduling Software o Active professional registration, year first registered, if applicable

ITEM E: Solicitation, l.G. FAR 52.236-27 Site Visit – Construction (FEB 95)

DELETE this paragraph in its entirety and INSERT the following revised paragraph in lieu thereof.

(1) The clauses at FAR 52.236-2, Differing Site Conditions, and FAR 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, Offerors are urged and expected to inspect the site where the work will be performed.

(2) Site visits will be held at the following dates and times:

Date: May 23, 2018 (Wednesday)

Time: 11:00 AM, EST

Only those parties listed below who have been cleared via Campus Security will be allowed to attend. To request a reasonable accommodation due to a disability, contact the Contracting Officer.

Participants must have a valid, Government issued picture identification, driver’s license preferred, to gain access for the pre-proposal Site Visit.

http://www.acquisition.gov/far/current/html/52_233_240.html#wp1113365 http://www.acquisition.gov/far/current/html/52_233_240.html#wp1113375

47PM0218R0008

All visitors will access the campus at Gate 4 (Lower Campus) and will be given a temporary parking pass or assignment from the Security Officer to park in the designated area. The Site walk will convene in DOC A and will commence promptly at 11:00 AM.

At the conclusion of the site walk, the pre-proposal conference will convene at GSA Campus Development Project Trailer/Bldg 37A review the project specifics. Departure will be thru Gate 4.

ITEM F: The attached RFI LOG dated 05/22/2018 is hereby incorporated into this

Requirement.

ITEM G: Offerors must acknowledge any and all amendments, giving amendment number and date, on offer form.

END OF AMENDMENT NO. ONE

ATTACHMENTS:

RFI Log (5/22/2018)

47PM0218R0008

ISSUED UNDER AMENDMENT NO. 1

DOC A 2B RFI LOG 5/22/2018

Item No.

Question Response

1. Please clarify how we can receive the contract drawings and specifications.

Contract drawings and specifications are available at www.fbo.gov.

2. Proposal requirements include a DVD that contains electronic formats of both the Technical and Price proposals. Since final pricing from subcontractors and vendors is not received until minutes before the bid time, it is impossible to include a completed price schedule on the DVD. Request that the price need only be included in the hard copies OR submission of pricing be through a secure online website such as AMRDEC Safe Access File Exchange (used by NAVFAC).

GSA does not have access to, nor subscribes to AMRDEC Safe Access File Exchange. The submission may be emailed in lieu of providing hard copies of the submission. The preferred method of receipt is email transmission by date and time of designated proposal receipt.

3. Technical proposal requirements define “similar project” as one that was performed in an occupied and functioning office building. Please clarify if a project performed in an occupied and functioning educational facility would be considered a “similar project”.

Yes.

4. Reference Specification, Drawings (ET series) and Design Review Comments. Specification do not include Physical Security aspects in Division 28. It is unclear who is doing the Physical Security work. Can you please provide any information on how the Division 28 Electronic Security (Access Control, Video/CCTV, Intrusion Detection and Intercom) will be procured for this solicitation at St Elizabeth’s.

As a small business we are interested in providing that scope of work.

The government will install all security devices.

The bidder will be responsible for providing power and conduit pathway for all security devices.

5. On page 8 of 27 of the Solicitation, II.B. Proposal Format, it states Although the PREFERRED method of proposal receipt is through email transmission by date and time stated for proposal receipt, and to the attention of the Contract Specialist and Contracting Officer, you may submit hard copies as follows. After proposal receipt, original signature documents must be provided to the Government upon request. Further down the page it states that for Volume 1 Price Proposal & Related Documents (Original and 3 copies), Volume II Technical (Original and 3 copies) and (1) CD copy is required for submission. Q) Can you please confirm if our entire submission can be emailed in lieu of providing hard copies of our submission?

Yes, entire submission can be emailed.

However, after proposal receipt and if requested, original signature documents must be provided to the Government.

6. On page 10 of 27 of the Solicitation, II.D Technical Proposal (2) Key Personnel, it states the following:

· Project Manager- must possess a minimum of 10 years’ experience

· On-Site Construction Superintendent- must possess a minimum of 10 years’ experience

· Quality Control Manager- must possess a minimum of 10 years’ experience

· Project Scheduler- must possess a minimum of 10 years’ experience

Refer to Items within amendment.

47PM0218R0008

Item No.

Question Response

On page 25 of 27 of the Solicitation, (b) Factor 2-Key Personnel Evaluation Criteria it states the following:

· Project Manager- must possess a minimum of 7 years’ experience & for education must have a Bachelor’s degree in a field such as construction management, architecture, engineering or construction science

· On-Site Construction Superintendent- must possess a minimum of 7 years’ experience & for education it states 10 years’ with a bachelor’s degree OR 15-20 years’ experience without a degree

· Quality Control Manager- must possess a minimum of 7 years’ experience & for education must have a Bachelor’s degree in a field such as construction management, architecture, engineering or construction science

· Project Scheduler- must possess a minimum of 7 years’ experience & certification in at least one Scheduling Software

Q) Can you please confirm which of these instructions we’re to follow regarding our key personnel?

7. On page 10 of 27 of the Solicitation, II.D Technical Proposal (3) Past Performance of Offeror it states the Offeror must provide a GC Reference Form for each reference. On page 25 of 27 © Factor 3 Past Performance of Offeror it also references a GC Reference Form for each reference. As part of the documents that were provided on FBO.gov there is a Past Performance Questionnaire but nothing called a GC Reference Form. Q) Can you please confirm if the Past Performance Questionnaire provided is to be used for this Factor in lieu of the GC Reference Form?

The requirement for a GC Reference form has been DELETED. The Contractor is required to submit only the provided Past Performance Questionnaire.

8. Can we use previously completed Past Performance Questionnaires by GSA for Factor 3 Past Performance?

Yes, as long as it is for a comparable project substantially completed within the last five (5) years and the previously completed questionnaire covers the same information contained on the current Past Performance Questionnaire (Rev. 06/12/15).

9. Can we use CPARS evaluations in lieu of Past Performance Questionnaires for Factor 3 Past Performance?

The preference is for the Past Performance Questionnaires, however, if the CPARS evaluation covers the same information contained on the Past Performance Questionnaire, then, yes, the CPARS evaluation may be submitted in lieu thereof.

NOTE: As of August 2017, GAO mandated a single method for collection of contractor performance information though the consolidation of the Architect-Engineer Contract Administration Support System (ACASS) and Construction Contractor Appraisal Support System (CCASS) modules into the overall

47PM0218R0008

Item No.

Question Response

CPARS application. If you plan to submit ACASS and CCASS evaluations for projects completed within the past five (5) years, these evaluations also must cover the same information contained on the Past Performance Questionnaire.

10. Solicitation doc. (pg. 8, Section II.B)-We have reviewed the solicitation and understand that Email transition is the Governments’ PREFERRED method of proposal receipt.

If we submit the Technical and Price as separate volumes (pdf files) in a single email, will that be acceptable?

YES

11. Solicitation doc. (pg. 8, Section II.B)-Will the Government please confirm that the original, 3 copies, and CD (of the Price and Tech volumes) will only be submitted at a later date, if requested by the Government, if the offeror uses the PREFERRED Email transmission for proposal delivery?

Offerors have a choice: (1) submission by Email transmission (PREFERRED) or (2) delivery of original, 3 copies, and CD (of the Price and Tech volumes) to the designated place of proposal receipt. If the offeror elects to use EMail transmission for proposal delivery, the only information which will need to be requested later, if at all, will be the original SF1442 with original signatures and Bid Guarantee with original signatures for the official procurement files.

12. To minimize the burden on Government POCs who receive an overwhelming number of requests for similar PPQs and reference forms, will it be acceptable to submit copies of CPARs and/or PPQs from prior proposals that have already been completed by the client?

Yes. Remember the projects are to have been substantially completed within the last five (5) years.

13. For “Similar Projects”, can the requirement of the construction contract price of $5.0 million be at the time of completion versus at the time of award? We have successfully completed multiple construction projects which meet the “Similar Projects” characteristics which are over $5.0 million. However, due to the client’s funding requirements, the initial award amounts for some of these were less than $5.0 million but the final contract value was substantially more than $5.0 million ($7.0 million to $8.0 million).

The Government is confident in receiving responses from small business firms which meet the “Similar Projects” capacity of $5.0 million at Award.

14. SF 1442: There is only one unit price listed on the pricing sheet (SF 1442), however there are multiple pricing options on the drawings. Will the Government please clarify how to submit the pricing? If multiple pricing options are desired per the drawings will the Government reissue the SF 1442 to include all options?

Refer to next Amendment

15. We have been provided with a Draft IFC submittal comments and responses. What is the purpose of this document as they appear to be Dr. Check comments developed during the design. Is it a correct assumption that all relevant comments have been incorporated into the IFC drawings issued for construction dated 13 October 2017

Yes

16. The bid form indicates a lump sum price. The contract drawings and the specifications list options and alternate bid items. Is this a lump sum bid or not? If not please

Refer to next Amendment

47PM0218R0008

Item No.

Question Response provide a corrected bid form.

2018-05-22T16:35:20-0400
BONNIE ECHOLES