SF30 Amendment 001.pdf

PDF 673 KB Posted

Attached to
Homer Thornberry Judicial Building Elevator Modernization Project Federal contract opportunity
Solicitation number
47PH0920R0028
Issued by
General Services Administration Public Buildings Service Region 7

About this file

This document contains a solicitation for the Homer Thornberry Judicial Building Elevator Modernization Project. The General Services Administration seeks to modernize four existing hydraulic passenger elevators and one existing geared traction elevator. Offerors must provide new AC motors, solid state microprocessor controls, cabs, doors, door operators and all associated work to complete the modernizations. The project must meet ASME A17.1 and UFAS accessibility standards. The performance period is 550 calendar days with a notice to proceed, with 50 days for design/procurement and 500 days for construction. Proposals are due by July 30, 2020 with award made to the responsible offeror providing the best value based on technical evaluation and price. The solicitation is available on SAM.gov with amendments to be monitored by offerors. Payment and performance bonds as well as security clearances are required.

View the file

Other files for this federal contract opportunity

Other files attached to Homer Thornberry Judicial Building Elevator Modernization Project, newest first.
File Type Posted
SF30 Amendment 002.pdf PDF
Proposal Summary and Detail Page.xlsx XLSX spreadsheet
47PH0920R0028 1442 Form with attachments.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Homer Thornberry Judicial Building Elevator Modernization Project

GSA Solicitation #47PH0920R0028

Pre-Bid Questions

1. 14210, 12.1 - Schedule states Overall Platform Size, Width and Depth. Shows "Provide

New". 32.1 states "Retain existing car frame and Platform. Are the platforms and slings new or retained? RETAIN

2. 14210, 33 - Items marked 37.1 and 37.2 should read 33.2 and 33.3. Is that correct?

Correct

3. 14210, 33 - The cab shell and canopy are retained. The return walls, transom, and columns are new. Are the other cab interiors new? Retain existing cab interior panels.

4. 2.0 RELATED WORK, 2.1, I - Does GSA want new HVAC for each of the elevator machine rooms (4 Total)? Yes, Correct. New HVAC units in all Elevator M/R’s.

5. 10.0 INSTRUCTIONS, 10.1 - Can the elevator contractor provide one (1) 8-hour instruction period for all the cars since they are similar? Yes they can.

6. 13.0 ELECTRIC FEEDERS AND WIRING, 13.1 - Since removal of all sprinkler heads and sprinkler piping is required by the specification, do we need to provide Shunt Trip

Devices for all cars? Sprinklers in the elevator machine rooms must remain in operation, therefore new shunt trip disconnects will be required.

7. 37.1, A - Retain Existing Wall Panels. Does this statement pertain to the Interior panels mounted on the inside of the cab shell or the panels that make up the cab shell walls?

Retain the decorative interior wall panels, and also the cab shell.

8. Does the sound proofing in the machine room walls for car #3 (Judges Car) need to be removed or is it fire rated? If the sound proofing cannot be proven to be fire rated, it must be removed to maintain the M/R fire rating.

File details come from the government source that posted it. Updated .