Amendment08 06 30 2020.pdf

PDF 1 MB Posted

Attached to
Metcalfe Childcare Renovation Federal contract opportunity
Solicitation number
47PF0020R0055
Issued by
General Services Administration Public Buildings Service Region 5

About this file

This amendment modifies solicitation number 47PF0020R0055 for a renovation project at the Ralph H. Metcalfe Federal Building in Chicago, Illinois. The General Services Administration seeks to renovate and expand the existing 2,000 square foot childcare center to include an additional 6,000 square feet on the second floor. The scope of work includes demolition, construction of three new classrooms, office renovations, ceiling, lighting and control upgrades, new finishes, window film installation, window treatments, HVAC system replacement, restroom renovations, and a new security system. The estimated value is between $1-3 million and the performance period is 443 calendar days from notice to proceed. Responses are due by the date specified in the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Metcalfe Childcare Renovation, newest first.
File Type Posted
Amendment 07 0626.pdf PDF
Amendment06 25 2020.pdf PDF
Amendment04 06 16 2020.pdf PDF
Amendment04 06 11 2020.pdf PDF
Amendment03 06 01 2020.pdf PDF
Amendment02 05 26 2020.pdf PDF
Amendment 02 05 21 2020.pdf PDF
Amendment 01 05 13 2020.pdf PDF
RFP47PF0020R0055 Metcalfe Childcare Renovation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

INSTRUCTIONS (Back Page):

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 11/2016) BACK

(1) Accounting classification Net increase $

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT SOLICITATION NO.

NO.

CONTINUATION OF STANDARD FORM 30 47PF0020R0055

All other terms and conditions remain unchanged.

OF PAGES

PAGE

AMENDMENT

Overhead%+Profit% = Total Evaluated Price Materials + Division 28 Labor) + (Option#1 Materials + Option#1 Labor) +(Option#2 Materials + Option#2 Labor)] + Division 21 Labor) + (Division 23 Materials + Division 23 Labor) +(Division 26 Materials + Division 26 Labor) +(Division 28 Labor) +(Division 10 Materials + Division 10 Labor) + (Division 11 Materials + Division 11 Labor) +(Division 21 Materials + +(Division 7 Materials + Division 7 Labor) +(Division 8 Materials + Division 8 Labor) +(Division 9 Materials + Division 9 Materials + Division 3 Labor) +(Division 5 Materials + Division 5 Labor) +(Division 6 Materials + Division 6 Labor) [(General Requirements Materials + General Requirements Labor)+ (Division 2 Materials + Division 2 Labor) + (Division 3

The formula used to calculate the Total Evaluated Price is the Following:

used for the total evaluated price.

Amendment 08 is being issued to provide answers to received RFI, an updated pricing sheet, and updates the formula

60604.

RFP 47PF0020R0055, Metcalfe Childcare Renovation, Ralph H. Metcalfe Federal Building, 77 W. Jackson St. Chicago IL

Amendment 07, RFP 47PF0020R0055 Metcalfe Childcare Center Renovation RFI Sheet Date: 6/30/2020

RFI

Page A-503 Detail - (PL103-ARPA High Pressure Laminate-Yellow Byzantium 0647) This product is not available per our suppliers within the Chicagoland area as of yet. Due to the product not being fully released.

Answer: Contractors may select an alternate product as long as it meets the requirements in the specification.

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

27. PAYMENT WILL BE MADE BY

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

SOLICITATION NUMBER: 47PF0020R0055 DATE ISSUED 5/13/2020

Firm Name:

DUNS#:

CAGE Code:

Division ITEM Material Labor

Division 1 General Requirements $ $

Division 2 Existing Conditions $ $

Division 3 Concrete $ $

Division 5 Metals $ $

Division 6 Wood, Plastics and Composites $ $

Division 7 Thermal and Moisture Protection $ $

Division 8 Openings $ $

Division 9 Finishes $ $

Division 10 Specialties $ $

Division 11 Equipment $ $

Division 12 Furnishings $ $

Division 21 Fire Suppression $ $

Division 22 Plumbing $ $

Division 23 Heating, ventilating and Air-Conditioning (HVAC) $ $

Division 26 Electrical $ $

Division 28 Electronic Safety and Security $ $

Material Labor

CONTINUATION OF STANDARD FORM 1442

Total Evaluated Price [(General Requirements Materials + General Requirements Labor)+ (Division 2 Materials + Division 2 Labor) + (Division 3 Materials + Division 3 Labor) +(Division 5 Materials + Division 5 Labor) +(Division 6 Materials + Division 6 Labor) +(Division 7 Materials + Division 7 Labor) +(Division 8 Materials + Division 8 Labor) +(Division 9 Materials + Division 9 Labor) +(Division 10 Materials + Division 10 Labor) + (Division 11 Materials + Division 11 Labor) +(Division 21 Materials + Division 21 Labor) + (Division 23 Materials + Division 23 Labor) +(Division 26 Materials + Division 26 Labor) +(Division 28 Materials + Division 28 Labor) + (Option#1 Materials + Option#1 Labor) +(Option#2 Materials + Option#2 Labor)] + Overhead%+Profit% = Total Evaluated Price

Base Bid Total $

OPTION 1 – 2nd Floor Finishes

OPTION 2 – Loft Buildout

Pricing Sheet - Metcalfe Childcare Renovation

Contractor’s Overhead Rate %

Contractor’s Profit Rate %

1.2

C:\PERFORM\FORMS\S30.FRP

Forms Management

C:PERFORMFORMSS30.FRP

Acrobat PDFWriter 2.01 for Windows D:19971010095222 D:19990614133004

C:PERFORMFORMSS30.FRP

Standard Form 30 - Amendment of Solicitation/Modification of Contract Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER

3. EFFECTIVE DATE

4. REQUISITION/PURCHASE REQUISITION NUMBER

5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6)

CODE

STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.

is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY

CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer) Previous edition unusable INSTRUCTIONS (Back Page):

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1) (2) (3) (4) (5) For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a) (b) (c) (d) (e) (f) Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data). When appropriate, indicate the impact of themodification on each affected accounting classification by inserting one of the following entries:

(2) Accounting classification Net decrease $ Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i) NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

Indicate the impact of the modification on the overall total contract price by inserting one ofthe following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g) (h) When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determinedto be due in settlement of the contract.

(1) (2) (3) (4) (5) (6)

STANDARD FORM 30 (REV. 11/2016) BACK

(1) Accounting classification Net increase $

2. AMENDMENT/MODIFICATION NUMBER

0,0,0

6. CODE

0,0,0

CODE

0,0,0

12. ACCOUNTING AND APPROPRIATION DATA (If required) 0,0,0 13A. THIS CHANGE ORDER IS ISSUED PURSUANT TO. Specify authority. THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.

0,0,0

13C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF

0,0,0 13D. OTHER. Specify type of modification and authority.

0,0,0 15A. NAME AND TITLE OF SIGNER. Type or print.

0,0,0 16A. NAME AND TITLE OF CONTRACTING OFFICER. Type or print.

0,0,0

14. DESCRIPTION OF AMENDMENT OR MODIFICATION (Organized by UCF section headings, including solicitation or contract subject matter where feasible.)

0,0,0

FACILITY CODE

0,0,0

7. CODE

0,0,0

6. ISSUED BY

0,0,0

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) 0,0,0

7. ADMINISTERED BY (If other than Item 6) 0,0,0

1. CONTRACT ID CODE

0,0,0

4. REQUISITION/PURCHASE REQUISITION NUMBER

0,0,0

9A. AMENDMENT OF SOLICITATION NUMBER

0,0,0

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

0,0,0

5. PROJECT NUMBER. If applicable.

0,0,0 0,0,0

PAGE

0,0,0

PAGES

0,0,0

3. EFFECTIVE DATE. Enter 2 digit month, 2 digit day and 4 digit year.

0,0,0 9B. DATED. SEE ITEM 11. Enter 2 digit month, 2 digit day and 4 digit year.

0,0,0 10B. DATED. SEE ITEM 13. Enter 2 digit month, 2 digit day and 4 digit year.

9A. AMENDMENT OF SOLICITATION NUMBER

0,0,0

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

0,0,0

11. The above numbered solicitation is amended as set forth in Item 14.

0,0,0 13A. THIS CHANGE ORDER IS ISSUED PURSUANT TO. Specify authority. THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.

0,0,0 13B. THE ABOVE NUMBERED CONTRACT OR ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES. Such as changes in paying office, appropriation date, etc. SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103b.

0,0,0

13C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF

0,0,0 13D. OTHER Specify type of modification and authority.

0,0,0 13E. IMPORTANT: Contractor is not required to sign this document and return copies to the issuing office.

0,0,0 13E. IMPORTANT: Contractor is required to sign this document and return copies to the issuing office.

0,0,0

11. The hour and date specified for receipt of Offers is extended 0,0,0

11. The hour and date specified for receipt of Offers is not extended 0,0,0 16B. UNITED STATES OF AMERICA. Signature of Contracting Officer. Digital Signature.

0,0,0 15B. CONTRACTOR OR OFFEROR. Signature of person authorized to sign. Digital Signature.

0,0,0 0,0,0 15C. DATE SIGNED. Enter 2 digit month, 2 digit day and 4 digit year.

0,0,0 16C. DATE SIGNED. Enter 2 digit month, 2 digit day and 4 digit year.

0,0,0 number of copies 0,0,0 number of copies

1. Enter Accounting Classification Enter Net Increase in dollars.

Enter Net Decrease in dollars.

2. Enter Accounting Classification.

Enter the total (in dollars) the contract price decreased.

Enter the total (in dollars) the contract price increased.

9A. AMENDMENT OF SOLICITATION NUMBER: 08
9A. AMENDMENT OF SOLICITATION NUMBER: 47PF0020R0055
7. CODE: 5P2QCA
12. ACCOUNTING AND APPROPRIATION DATA (If required):
13A. THIS CHANGE ORDER IS ISSUED PURSUANT TO. Specify authority. THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.:
13C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
13D. OTHER. Specify type of modification and authority.:
15A. NAME AND TITLE OF SIGNER. Type or print.:
16A. NAME AND TITLE OF CONTRACTING OFFICER. Type or print.: Kim Bogan-Ridley
14. DESCRIPTION OF AMENDMENT OR MODIFICATION (Organized by UCF section headings, including solicitation or contract subject matter where feasible.): Amendment 07 for solicitation 47PF0020R0055, Metcalfe Childcare Renovation at 77 W. Jackson St. Chicago, IL 60604.

See Attached for More Information

FACILITY CODE:
6. ISSUED BY: R5 AMD Chicagoland Construction Contracting Team

230 S. Dearborn St.

Room 3500 Chicago, IL 60604 USA

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code):
7. ADMINISTERED BY (If other than Item 6):
1. CONTRACT ID CODE:
4. REQUISITION/PURCHASE REQUISITION NUMBER: EQ5P2SS1P-20-0033
10A. MODIFICATION OF CONTRACT/ORDER NUMBER:
5. PROJECT NUMBER. If applicable.:
PAGE: 1
PAGES: 7
3. EFFECTIVE DATE. Enter 2 digit month, 2 digit day and 4 digit year.: 2020-06-30
9B. DATED. SEE ITEM 11. Enter 2 digit month, 2 digit day and 4 digit year.: 2020-05-13
10B. DATED. SEE ITEM 13. Enter 2 digit month, 2 digit day and 4 digit year.:
9A. AMENDMENT OF SOLICITATION NUMBER: 1
10A. MODIFICATION OF CONTRACT/ORDER NUMBER: 0
11. The above numbered solicitation is amended as set forth in Item 14. : 1
13A. THIS CHANGE ORDER IS ISSUED PURSUANT TO. Specify authority. THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.: 0
13B. THE ABOVE NUMBERED CONTRACT OR ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES. Such as changes in paying office, appropriation date, etc. SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103b.: 0
13C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: 0
13D. OTHER Specify type of modification and authority.: 0
13E. IMPORTANT: Contractor is not required to sign this document and return copies to the issuing office.: 0
13E. IMPORTANT: Contractor is required to sign this document and return copies to the issuing office.: 0
11. The hour and date specified for receipt of Offers is extended : 0
11. The hour and date specified for receipt of Offers is not extended : 1
15B. CONTRACTOR OR OFFEROR. Signature of person authorized to sign. Digital Signature.:
16C. DATE SIGNED. Enter 2 digit month, 2 digit day and 4 digit year.:
number of copies:
number of copies:
Enter the total (in dollars) the contract price increased. :

File details come from the government source that posted it. Updated .