Amendment 03 Please acknowledge the amendments with your proposals.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF_30_-_Amendment_04.pdf | ||
| SF30.pdf | ||
| Amendment_01_-_Solicitation_Number_Correction.pdf | ||
| 1_47PF0019R0013_-_Solicitation_Package.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page of Pages 1 4
2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable) 03 2/28/19
6. Issued By Code 7. Administered By (If other than Item 6) Code General Services Administration See Block #6 Acquisition Management Division – 5P1QCA-SF 520 S. Eighth St.
Springfield, IL 62703 Jesse L. Jones (217) 494-1263
8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.
X
47PF0019R0031
9B. Date (See Item 11) 2/14/2019 10A. Modification of Contract/Order No.
10B. Date (See Item 13)
Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers X is extended is not t d dOffers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
13 THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)
Set fourth item 14, pursuant to the authority of FAR 43.103 (b)
C. This supplemental agreement is entered into pursuant to authority of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor X is not, is required to sign this document and return __ copies to the issuing office.
14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Solicitation # USAO 5th & 6th Floor Various Office Renovations - 47PF0019R0031
This solicitation amendment is being issued to: 1. Address contractor inquiries and issue clarifications from the site visit. 2. Amend the solicitation language as described on Page 2 of 4. 3. Incorporate the drawing on Page 4 of 4.
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10 A, as heretofore changed, remains unchanged and in full force and affect.
15A. Name and Title of signer (Type or Print) 16A. Name and title of contracting office (Type or Print)
JESSE L. JONES (217) 494-1263
CONTRACTING OFFICER
jesse.jones@gsa.gov
15B. Contractor/Offeror 15C. Date 16B. United States of America
(Signature of Contracting Officer)
16C. Date Signed
(Signature of person authorized to sign)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243
SCOPE OF WORK AMENDMENTS
SW-4 PRINCIPLE FEATURES
A. GENERAL
3. b. "The wall mount and monitor in Room 526 will remain in place during renovations."
Shall now read: "The wall mount and monitor in Room 526 will be removed by the tenant. Contractor to patch and prepare wall for paint where monitor was removed."
SW-4 PRINCIPLE FEATURES
B. ARCHITECTURAL/FINISHES
6. 5th Floor Kitchenette add "g. Contractor shall install an access panel under the sink to cover existing opening to the plumbing."
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice Properly destroy documents when no longer needed PAGE 1 of 2
SCOPE OF WORK- CLARIFICATIONS FROM PRE-BID
WALKTHROUGH
USAO 5th and 6th Floor - Various Office Renovations Milwaukee Federal Building and Courthouse
517 E. Wisconsin Ave.
Milwaukee, WI 53202
02/26/2019
PROJECT CONTACTS
Project Manager/ COR Kristin Beard Phone Number: (312) 353-4247 Cell Number: (312) 288-1696 Email Address: kristin.beard@gsa.gov
Property Manager Paden Vargo Phone Number: (313) 230-1165 Cell Number: (313) 657-0171 Email Address: douglas.vargo@gsa.gov
SCOPE OF WORK- CLARIFICATIONS FROM
PRE-BID WALK THROUGH
2/28/20192019
GSA REGION 5
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice Properly destroy documents when no longer needed PAGE 2 of 2
1. Suite 510: Tenant will remove all IT equipment. All furniture must be moved by the contractor.
2. Suite 526: Tenant will remove all artwork from the walls. All furniture and video tele-conferencing equipment must be moved by the contractor. The wall mount and monitor on the north wall will be removed by the tenant. Contractor to patch and prepare wall for paint where mount was removed.
3. 5th Floor Kitchenette: The tankless hot water heater shall be installed under the cab-inets.
4. 5th Floor Kitchenette: The nearest electrical closets are located on the east and west corridors (drawing attached).
5. 5th Floor Kitchenette: Contractor shall install an access panel under the sink to cover existing opening to the plumbing.
6. Contractors will have independent access to Suite 510 and Conference Room 526.
All rooms and spaces within the tenant secured suite will require access by a tenant escort.
7. Onsite storage of equipment and materials is limited to the areas of work within the scope.
8. The freight elevator is located on the south hallway (drawing attached).
| 2019-0226_SOW Clarifications_USAO 5th and 6th Floor Various Office Renovations.pdf |
| 1. Suite 510: Tenant will remove all IT equipment. All furniture must be moved by the contractor. |
File details come from the government source that posted it.