Binder_Solicitation_47PE0218R0013_1449_10.pdf
PDF 3 MB Posted
- Attached to
- Atlanta Solid Waste Federal contract opportunity
- Solicitation number
- 47PE0218R0013
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_Amendment_47PE0218R0013_0002.pdf | ||
| Solicitation_Amendment_47PE0218R0013_0001.pdf | ||
| Binder_Q_and_A_for_Metro_Atlanta_Pest_Control_Solicitation_Number.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NUMBER: 47PE0218R0013
SERVICE: SOLID WASTE REMOVAL SERVICES
LOCATION(S): ATLANTA, GEORGIA
Richard B. Russell FB-CT Martin Luther King, Jr. FB Sam Nunn Atlanta Federal Center Peachtree Summit Federal Building U.S. Court of Appeals J.C. Godbold FB
CHAMBLEE, GEORGIA
IRS Customer Service Center
GAINESVILLE, GEORGIA
Federal Building-Courthouse
NEWNAN, GEORGIA
Lewis R. Morgan FB-CT
PERIOD OF PERFORMANCE: November 1, 2018 – October 31, 2019
SOLICITATION ISSUE DATE: May 31, 2018
OFFER RECEIPT DATE/TIME: July 16, 2018, 04:30 PM EST
Page 1 of 153 Solid Waste Removal Services 5/31
SOLICITATION TABLE OF CONTENTS
(Sections A through M)
A. SOLICITATION/CONTRACT FORM
A.1 STANDARD FORMS
B. SERVICES, ORDERING AND PRICES
B.1 DESCRIPTION OF SERVICES
B.2 BID/OFFER/BASIC SERVICES BENCHMARK DATA
B.3 ALTERNATE BID/OFFER FOR ADDITIONAL SERVICES
B.4 PRICING OF OPTIONS FOR CONTRACT SERVICES
C. DESCRIPTION/SPECIFICATION/STATEMENT OF WORK
C.1 DEFINITIONS
C.1.0 GENERAL PROGRAM
C.1.0.0 Above Standard Services C.1.0.1 Acceptance C.1.0.2 Approval C.1.0.3 Contracting Officer (CO) C.1.0.4 Contracting Officer's Representative (COR) C.1.0.5 Contractor C.1.0.6 Modification C.1.0.7 Ordering Official C.1.0.9 Quality Assurance Surveillance Plan (QASP) C.1.0.11 Standard Services
C.2 OBJECTIVES AND SCOPE
C.2.1 Supplies, Materials, Equipment and Utilities C.2.1.1 Furnished by the Government C.2.1.2 Furnished by the Contractor
C.3 TRASH AND SOLID WASTE DISPOSAL AND REMOVAL
C.3.0 Extent of Work C.3.1 Container Requirements C.3.2 Compactor Equipment C.3.3 Container Location C.3.4 Container Maintenance C.3.5 Compactor Maintenance C.3.6 Disposal Facility C.3.7 Solid Waste Records and Reports C.3.8 Miscellaneous Services
C.4 COMMUNICATION REQUIREMENTS
C.5 FEDERAL REQUIREMENTS
C.6 SUBMITTALS CHART (CONTRACTOR DELIVERABLES)
D. PACKAGING & MARKING
D.1 PAYMENT OF POSTAGE AND FEES
D.2 MARKING
E. INSPECTION & ACCEPTANCE
E.1 CONTRACTOR RESPONSIBILITY
E.2 GOVERNMENT QUALITY ASSURANCE
E.3 FAILURE TO PERFORM
Page 2 of 153 Solid Waste Removal Services 5/31
F. DELIVERIES OR PERFORMANCE
F.1 PLACE OF PERFORMANCE
F.2 TERM OF CONTRACT
F.3 OPTION TO EXTEND THE TERM OF THE CONTRACT
G. CONTRACT ADMINISTRATION DATA
G.1 PAYMENT (GENERAL)
G.2 PAYMENT FOR ADDITIONAL SERVICES
G.3 SUBMISSION OF INVOICES FOR SERVICES
G.4 SUSPENSION OF WORK
G.5 APPLICATION OF CRITERIA FOR DEDUCTIONS (NON-PERFORMANCE)
G.6 ADDITION AND DELETION OF WORKLOAD
H. SPECIAL CONTRACT REQUIREMENTS
H.1 CONTRACTOR RESPONSIBILITIES
H.1.0 Supervisors H.1.1 Communication H.1.6 Qualifications of Personnel
H.2 STRIKE CONTINGENCY PLAN (SCP)
H.3 ORDINANCES, TAXES, PERMITS AND LICENSES
H.4 DISCREPANCY IN THE SPECIFICATIONS
I. CONTRACT CLAUSES
J. LIST OF ATTACHMENTS (LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS)..90
J-1 SOLID WASTE REMOVAL AND DISPOSAL GUIDELINES
J-2 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
J-3 GSA FORM 1181A –CONTRACT INSPECTION REPORT
J-4 QUALITY DEFICIENCY NOTICE
J-5 QASP MONTHLY INSPECTION REPORT
J-6 COR’S CHECKLIST FOR INSPECTIONS
J.7. RELATED COMPANY EXPERIENCE
J.8. PERFORMANCE EVALUATION
J.9. WAGE DETERMINATIONS
K. REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF
BIDDERS/OFFERORS
L. INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS/OFFERORS
L.1. INSPECTION OF FACILITY
L.2. INSTRUCTIONS FOR SUBMITTING PROPOSAL
L.3. INSURANCE REQUIREMENTS
L.4. SUBCONTRACTING
L.5. BIDDERS INTERESTED IN MORE THAN ONE BID
L.6. PREPARATION, RECEIPT AND OPENING OF OFFER
L.7. SMALL BUSINESS ASSISTANCE
M. EVALUATION FACTORS FOR AWARD
M.1. FACTORS FOR AWARD
M.2. FORMULA FOR EVALUATION – PRICE PROPOSALS
M.3. FIXED PRICE CONTRACT PROVISIONS
M.4. UNBALANCED BIDS
Page 3 of 153 Solid Waste Removal Services 5/31
A. SOLICITATION/CONTRACT FORM
A.1 STANDARD FORMS
Standard Forms 1449 will used for submission of quote.
Page 4 of 153 Solid Waste Removal Services 5/31
Table Of Contents
Section Description Page Number Section A Solicitation Form 1 Section B Schedule 3 Section J - Appendix List of Attachments 12
Page 5 of 153 Solid Waste Removal Services 5/31
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
RFQ IFB RFP
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF. OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NAICS:
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8 (A)
EDWOSB
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
Please see attached
Georgia Branch AMD 77 Forsyth Street SW Atlanta, GA 30303-3490
4PQG
BCFA
4:30 AM (EST)
EQ4PMO-18-0017
4PQG
vincent.d.butler@gsa.gov
Georgia Branch AMD 77 Forsyth Street SW Atlanta, GA 30303-3490
Georgia Branch AMD 77 Forsyth Street SW Atlanta, GA 30303-3490
Wanda George-James
47PE0218R0013 5/31/2018
562111
7/16/2018
PBS Payments Branch P.O. Box 17181 Ft. Worth, TX 76102-0181
See below for additional information
38.5
4PQG
404-331-3203
Section A Page 1
Page 6 of 153 Solid Waste Removal Services 5/31
STANDARD FORM 1449 (REV. 2/2012) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE 42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
Section A Page 2
Page 7 of 153 Solid Waste Removal Services 5/31
PAGE
GENERAL SERVICES ADMINISTRATION
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
Summit FB, 401 W. PEACHTREE ST, PoP: 11/01/2018 - 10/31/2019
GA1007ZZ - Sam Nunn AFC, 35 cy
GA0121ZZ - RBR FB, 42 cy
GA0010AE IRS, 40 cy w/compactor
GA 30303-8701 On-Call
MO
GA1007ZZ - Sam Nunn AFC, 35 cy
120005 w/compactor LOCATION: Peachtree
GA0010AE IRS, 40 cy w/compactor
EA
GA0087AD - Summit FB, 30 cy w/compactor w/compactor
AFC, 100 ALABAMA ST. SW, ATLANTA
PoP: 11/01/2018 - 10/31/2019
PoP: 11/01/2018 - 10/31/2019 w/compactor, LOCATION: Sam Nunn
GA1007ZZ - Sam Nunn AFC, 35 cy
GA 30341-3446
GA 30303-8701
PoP: 11/01/2018 - 10/31/2019
GA0087AD - Summit FB, 30 cy
CHAMBLEE TUCKER ROAD, CHAMBLEE,
MO
AFC, 100 ALABAMA ST. SW, ATLANTA
MO
GA1007ZZ - Sam Nunn AFC, 35 cy
MO
ATLANTA GA 30308-3510
w/compactor, On-Call w/compactor
LOCATION: IRS Annex, 2385 w/compactor LOCATION: Sam Nunn
Section B Page 3
Page 8 of 153 Solid Waste Removal Services 5/31
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
(2)2c
GA0007ZZ - MLK FB, 8 c LOCATION:
cafeteria LOCATION: Richard B.
30303-0000
PoP: 11/01/2018 - 10/31/2019
GA0007ZZ - MLK FB, 8 c
Russell, 75 SPRING ST, ATLANTA
MO
GA0008ZZ - Elbert Tuttle USCOA, GA0121ZZ - RBR FB, 8 cy, FAIRLIE STREET, ATLANTA GA
30303-0000
MO
w/compactor LOCATION: Richard B.
PoP: 11/01/2018 - 10/31/2019
MO
GA0121ZZ - RBR FB, 8 cy, cafeteria
LOCATION: John C. Godbold FB, 70
Tuttle, 56 FORSYTH ST ATLANTA GA
PoP: 11/01/2018 - 10/31/2019
GA0121ZZ - RBR FB, 42 cy
GA0030ZZ - JC Godbold FB, (3)2c
MO
(2)2c LOCATION: Elbert P.
MO
GA 30303-0000
GA0030ZZ - JC Godbold FB, (3)2c
120010
MLK FB, 77 FORSYTH ST, ATLANTA
PoP: 11/01/2018 - 10/31/2019
GA 30303-3309
GA0008ZZ - Elbert Tuttle USCOA, Russell, 75 SPRING ST, ATLANTA
PoP: 11/01/2018 - 10/31/2019
GA 30303-3309
Section B Page 4
Page 9 of 153 Solid Waste Removal Services 5/31
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
GA1007ZZ - Sam Nunn AFC, 35 cy
1001 GA1007ZZ - Sam Nunn AFC, 35 cy 12
GA0125ZZ - Newnan FB-CT, 6 c
121004 c LOCATION: Gainesville FB-CT, GA0125ZZ - Newnan FB-CT, 6 c
PoP: 11/01/2019 - 10/31/2020
PoP: 11/01/2019 - 10/31/2020
PoP: 11/01/2019 - 10/31/2020
GA0044ZZ - Gainesville FB-CT, 8 w/compactor
PoP: 11/01/2018 - 10/31/2019 w/compactor w/compactor, On-Call
NEWNAN, GA 30263-2602
GA0044ZZ - Gainesville FB-CT, 8 c
GA0087AD - Summit FB, 30 cy
MO
PoP: 11/01/2018 - 10/31/2019
MO
__________MO
GA1007ZZ - Sam Nunn AFC, 35 cy
GA1007ZZ - Sam Nunn AFC, 35 cy
GA0010AE IRS, 40 cy w/compactor w/compactor w/compactor
GAINESVILLE GA 30501-3734
FB-PO-CT, 18 GREENVILLE STREET,
w/compactor, On-Call
EA
LOCATION: Lewis R. Morgan
GA0010AE IRS, 40 cy w/compactor
GA0087AD - Summit FB, 30 cy
126 WASHINGTON STREET SE,
MO
Section B Page 5
Page 10 of 153 Solid Waste Removal Services 5/31
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
PoP: 11/01/2019 - 10/31/2020
PoP: 11/01/2019 - 10/31/2020
GA0121ZZ - RBR FB, 8 cy, cafeteria
GA0125ZZ - Newnan FB-CT, 6 c
GA0007ZZ - MLK FB, 8 c
GA0121ZZ - RBR FB, 42 cy
MO
(2)2c
MO
GA0125ZZ - Newnan FB-CT, 6 c
PoP: 11/01/2019 - 10/31/2020
MO
GA0008ZZ - Elbert Tuttle USCOA, (2)2c
MO
MO
GA0007ZZ - MLK FB, 8 c
PoP: 11/01/2019 - 10/31/2020
MO
GA0030ZZ - JC Godbold FB, (3)2c
PoP: 11/01/2019 - 10/31/2020
PoP: 11/01/2019 - 10/31/2020 w/compactor
GA0030ZZ - JC Godbold FB, (3)2c
GA0008ZZ - Elbert Tuttle USCOA, GA0044ZZ - Gainesville FB-CT, 8 c
122001
MO
GA0121ZZ - RBR FB, 42 cy
PoP: 11/01/2019 - 10/31/2020
GA0121ZZ - RBR FB, 8 cy, cafeteria
PoP: 11/01/2019 - 10/31/2020
GA0044ZZ - Gainesville FB-CT, 8 c w/compactor
MO
Section B Page 6
Page 11 of 153 Solid Waste Removal Services 5/31
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
PoP: 11/01/2020 - 10/31/2021
GA0087AD - Summit FB, 30 cy
GA1007ZZ - Sam Nunn AFC, 35 cy w/compactor
122007 w/compactor
GA1007ZZ - Sam Nunn AFC, 35 cy
GA0010AE IRS, 40 cy w/compactor
MO
w/compactor, On-Call
PoP: 11/01/2020 - 10/31/2021
GA0121ZZ - RBR FB, 42 cy
2004 GA0010AE IRS, 40 cy w/compactor w/compactor
MO
MO
GA0087AD - Summit FB, 30 cy
GA1007ZZ - Sam Nunn AFC, 35 cy
GA0121ZZ - RBR FB, 8 cy, cafeteria
MO
w/compactor
GA1007ZZ - Sam Nunn AFC, 35 cy
GA0121ZZ - RBR FB, 8 cy, cafeteria
MO
EA
GA0121ZZ - RBR FB, 42 cy
PoP: 11/01/2020 - 10/31/2021
GA0007ZZ - MLK FB, 8 c w/compactor
PoP: 11/01/2020 - 10/31/2021
PoP: 11/01/2020 - 10/31/2021 w/compactor, On-Call
GA0007ZZ - MLK FB, 8 c
PoP: 11/01/2020 - 10/31/2021 w/compactor
Section B Page 7
Page 12 of 153 Solid Waste Removal Services 5/31
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
GA1007ZZ - Sam Nunn AFC, 35 cy
PoP: 11/01/2020 - 10/31/2021
GA0030ZZ - JC Godbold FB, (3)2c
123003
GA0044ZZ - Gainesville FB-CT, 8 c
GA0008ZZ - Elbert Tuttle USCOA, PoP: 11/01/2021 - 10/31/2022
PoP: 11/01/2021 - 10/31/2022
MO
PoP: 11/01/2020 - 10/31/2021 GA0125ZZ - Newnan FB-CT, 6 c
2008 MO
GA0044ZZ - Gainesville FB-CT, 8 c
PoP: 11/01/2020 - 10/31/2021 w/compactor, On-Call
MO
w/compactor
PoP: 11/01/2020 - 10/31/2021
GA1007ZZ - Sam Nunn AFC, 35 cy
MO
(2)2c
GA1007ZZ - Sam Nunn AFC, 35 cy
GA0125ZZ - Newnan FB-CT, 6 c w/compactor w/compactor, On-Call
MO
GA0008ZZ - Elbert Tuttle USCOA, PoP: 11/01/2020 - 10/31/2021 w/compactor
MO
GA0030ZZ - JC Godbold FB, (3)2c
GA0087AD - Summit FB, 30 cy
GA1007ZZ - Sam Nunn AFC, 35 cy
(2)2c
EA
Section B Page 8
Page 13 of 153 Solid Waste Removal Services 5/31
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
MO
PoP: 11/01/2021 - 10/31/2022
3006 GA0121ZZ - RBR FB, 8 cy, cafeteria 12
GA0121ZZ - RBR FB, 42 cy
(2)2c
123010
PoP: 11/01/2021 - 10/31/2022
GA0007ZZ - MLK FB, 8 c
MO
PoP: 11/01/2021 - 10/31/2022
GA0008ZZ - Elbert Tuttle USCOA, MO
3007 GA0007ZZ - MLK FB, 8 c w/compactor
MO
MO
PoP: 11/01/2021 - 10/31/2022
PoP: 11/01/2021 - 10/31/2022
GA0030ZZ - JC Godbold FB, (3)2c
(2)2c w/compactor
GA0087AD - Summit FB, 30 cy
GA0030ZZ - JC Godbold FB, (3)2c
MO
GA0010AE IRS, 40 cy w/compactor
MO
GA0008ZZ - Elbert Tuttle USCOA, PoP: 11/01/2021 - 10/31/2022
GA0044ZZ - Gainesville FB-CT, 8 c
GA0121ZZ - RBR FB, 8 cy, cafeteria
GA0010AE IRS, 40 cy w/compactor
GA0121ZZ - RBR FB, 42 cy w/compactor
GA0044ZZ - Gainesville FB-CT, 8 c
PoP: 11/01/2021 - 10/31/2022
Section B Page 9
Page 14 of 153 Solid Waste Removal Services 5/31
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
GA0087AD - Summit FB, 30 cy
GA1007ZZ - Sam Nunn AFC, 35 cy
GA1007ZZ - Sam Nunn AFC, 35 cy w/compactor
GA0010AE IRS, 40 cy w/compactor w/compactor, On-Call
MO
GA0125ZZ - Newnan FB-CT, 6 c w/compactor w/compactor
GA0121ZZ - RBR FB, 42 cy
GA0010AE IRS, 40 cy w/compactor
4003 GA0087AD - Summit FB, 30 cy
MO
MO
MO
MO
GA1007ZZ - Sam Nunn AFC, 35 cy
GA1007ZZ - Sam Nunn AFC, 35 cy w/compactor
EA
PoP: 11/01/2021 - 10/31/2022
GA0121ZZ - RBR FB, 42 cy
MO
PoP: 11/01/2022 - 10/31/2023
PoP: 11/01/2022 - 10/31/2023
124006 w/compactor, On-Call
PoP: 11/01/2021 - 10/31/2022
PoP: 11/01/2022 - 10/31/2023 w/compactor w/compactor
PoP: 11/01/2022 - 10/31/2023
PoP: 11/01/2022 - 10/31/2023
GA0125ZZ - Newnan FB-CT, 6 c
Section B Page 10
Page 15 of 153 Solid Waste Removal Services 5/31
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
MO
PoP: 11/01/2022 - 10/31/2023
4009 GA0030ZZ - JC Godbold FB, (3)2c 12
GA0008ZZ - Elbert Tuttle USCOA, 12
PoP: 11/01/2022 - 10/31/2023
GA0044ZZ - Gainesville FB-CT, 8 c
MO
PoP: 11/01/2022 - 10/31/2023
MO
4010 GA0044ZZ - Gainesville FB-CT, 8 c
GA0121ZZ - RBR FB, 8 cy, cafeteria
MO
PoP: 11/01/2022 - 10/31/2023
PoP: 11/01/2022 - 10/31/2023
GA0125ZZ - Newnan FB-CT, 6 c
(2)2c
GA0121ZZ - RBR FB, 8 cy, cafeteria
GA0007ZZ - MLK FB, 8 c
MO
GA0125ZZ - Newnan FB-CT, 6 c
PoP: 11/01/2022 - 10/31/2023
GA0030ZZ - JC Godbold FB, (3)2c
GA0007ZZ - MLK FB, 8 c
GA0008ZZ - Elbert Tuttle USCOA, (2)2c
Section B Page 11
Page 16 of 153 Solid Waste Removal Services 5/31
47PE0218R0013 - Section J - Appendix - List of Attachments Documents Table of Contents
Attachment Number
Document Title
ECF
1 DeKalb WD 5 - Wage Determinations/Labor Agreements
2 FULTON WD
5 - Wage Determinations/Labor Agreements
3 Hall WD 5 - Wage Determinations/Labor Agreements
4 Coweta WD 5 - Wage Determinations/Labor Agreements
Section J - Appendix Page 12
Page 17 of 153 Solid Waste Removal Services 5/31
B. SERVICES, ORDERING AND PRICES
B.1 DESCRIPTION OF SERVICES
The Contractor shall provide all management, supervision, labor, materials, supplies and equipment (except as otherwise provided), and shall plan, schedule, coordinate and assure effective performance of all services described herein. The Contractor will be required to provide solid waste removal services during the initial year of service in accordance with the requirements of this solicitation and prices for basic and alternate services. It is estimated that approximately 43,992 cubic yards of debris will be generated per year.
Provision for the exercise of _4_ additional twelve-month periods, which may be exercised upon 30 days written notice to the Contractor at the Government’s option and shall be contained in the resulting contract awarded. Evaluation of options does not obligate the government to extension of the contract term past the initial year of service.
B.2 BID/OFFER/BASIC SERVICES BENCHMARK DATA
General Services Administration will utilize the BOMA Experience Exchange Report (BEER) and/or Logistics Management Institute (LMI) Benchmark Data and Regional market analysis to determine a reasonable per square foot cost for these services.
B.3 ALTERNATE BID/OFFER FOR ADDITIONAL SERVICES
Offerors must quote a cost for providing on-call pick-ups of the open top containers located at the Russell FB-CT, 75 Spring Street and the Sam Nunn AFC, 61 Forsyth Street as well as the 35 cubic yard container w/compactor also located at the Sam Nunn AFC, when ordered by the Contracting Officer’s Representative in addition to the services specified as “basic services” in Section C.
Orders for additional services may be placed orally by the COR. All orders for each month will be confirmed via an invoice submitted by the contractor. Monthly orders totaling $2,500 or less will be processed via use of the Government Visa credit card or direct pay system as shown in Section G, and will not be confirmed in writing.
B.4 PRICING OF OPTIONS FOR CONTRACT SERVICES
Offerors shall price the option year requirements for each additional twelve-month period by assuming that the minimum hourly wages and fringe benefits will apply to all additional twelve-month periods. The minimum wage rates and fringe benefits applicable to the initial twelve-month period of performance are outlined on:
1. County DeKalb No.: 2015-5831 Revision No.: 6 Date Of Revision: 01/10/2018
2. County Coweta No.: 2015-4471 Revision No.: 8 Date Of Revision: 01/10/2018
3. County Fulton No.: 2015-4471 Revision No.: 8 Date Of Revision: 01/10/2018
4. County Hall No.: 2015-4483 Revision No.: 7 Date Of Revision: 01/10/2018
In the event the Government exercises the option(s), the contract price(s) will be adjusted upward or downward at the time the option is exercised in accordance with the clause entitled FAR 52.222-43 Fair Labor Standards Act and Service Contract Act - Price Adjustment (Option Contract).
Offerors are cautioned that any bid/offer may be rejected as non-responsive if it is materially unbalanced as to prices for the options and the initial base period. A bid/offer is unbalanced when it based on prices, which are significantly less than cost for some work, and prices, which are significantly overstated for other work.
Page 18 of 153 Solid Waste Removal Services 5/31
C. DESCRIPTION/SPECIFICATION/STATEMENT OF WORK
C.1 DEFINITIONS
C.1.0 GENERAL PROGRAM
C.1.0.0 Above Standard Services
Above Standard Services are services not covered in the monthly price of the contract. Contractor prices include all applicable labor, materials, supplies, equipment (except as otherwise provided), supervision, and management.
C.1.0.1 Acceptance
Constitutes acknowledgment that the supplies or services conform to applicable contract quality and quantity requirements.
C.1.0.2 Approval
"Approval" means the Government has reviewed submittals, deliverables, or administrative documents (e.g., insurance certificates, MSDS Sheets, etc.), and has determined the documents conform to contract requirements. Government approval shall not relieve the Contractor of responsibility for complying with Federal, State, and local laws and regulations.
C.1.0.3 Contracting Officer (CO)
Contracting Officer (CO) has the overall responsibility for the administration of this contract. The CO alone, without delegation, is authorized to take actions on behalf of the Government to amend, modify or deviate from the contract terms, conditions, requirements, specifications, details and/or delivery schedules. However, the CO may delegate certain other responsibilities to authorized Government representatives.
C.1.0.4 Contracting Officer's Representative (COR)
Contracting Officer's Representatives (COR) shall be appointed by letter from the CO. CORs will be the primary Government representatives for the administration of Contract, shall have proper training and experience in inspecting contracts, but will not have the authority to modify the contract.
C.1.0.5 Contractor
Reference to “Contractor” throughout the SOW even for those references to subcontracted type tasks shall mean the responsibility of the contract service provider.
C.1.0.6 Modification
Modification is a bilateral or unilateral change in the terms of a contract.
C.1.0.7 Ordering Official
Ordering Officials shall be appointed by letter from the CO. Ordering Officials will be the Government’s representative for the ordering of supplies and services.
C.1.0.9 Quality Assurance Surveillance Plan (QASP)
The Government’s surveillance method of monitoring and evaluating the Contractor's performance under a Performance Statement of Work (PSOW).
C.1.0.11 Standard Services
A standard service is defined as all services that are included in the monthly price or as defined in the Contract document. Prices are to include all applicable labor, materials, supplies, equipment (except as otherwise provided), supervision, and management.
Page 19 of 153 Solid Waste Removal Services 5/31
C.2 OBJECTIVES AND SCOPE
This contract is a Statement of Work (SOW) for solid waste removal services for the following location:
Richard. B. Russell FB-CT Martin Luther King, Jr. FB Sam Nunn AFC Peachtree Summit FB 75 Spring Street, SW 77 Forsyth Street, SW 61 Forsyth Street, SW 401 W Peachtree Street Atlanta, GA 30303 Atlanta, GA 30303 Atlanta, GA 30303 Atlanta, GA 30308
Elbert Tuttle USCOA J. C. Goldbold FB IRS Customer Service Center FB-CTHSE 56 Forsyth Street, SW 70 Fairlie Street, SW 2385 Chamblee-Tucker 126 Washington Street Atlanta, GA 30303 Atlanta, GA 30303 Chamblee, GA 30341 Gainesville, GA 30501
Lewis R. Morgan FB-CT 18 Greenville ST Newnan, GA 30263
The requirements are stated in terms of desired results with associated quality standards. .
Services provided by the Contractor are arranged and oversight is provided through one or more of the following entities: GSA’s Regional Office, Service Centers, Field Offices, or Local Offices. These entities represent the Occupancy Management (formerly Property Management) organizations that have been adopted by GSA’s Regional leadership.
The Contractor shall furnish all personnel, labor, equipment, material, tools, supplies, supervision, management, and services, except as may be expressly set forth as Government furnished, and otherwise do all things necessary to or incident to, perform and provide the work efforts described in this Section C.
All references incorporated herein as Web pages (URL’s) are accurate as of June 21, 2007, and may be subject to change by their web publisher. Web pages are provided to the Contractor for additional clarity. A change to any Web page specified in this contract does not change or alter the Contract Objectives identified above.
C.2.1 Supplies, Materials, Equipment and Utilities
C.2.1.1 Furnished by the Government
The Government shall furnish the equipment located at the Richard B. Russell FB-CT and one container located at the Atlanta Federal Center. Reference Section J, Exhibit 1 for details of government furnished equipment.
C.2.1.2 Furnished by the Contractor
The Contractor shall furnish all other supplies, materials, equipment, and employee training necessary for the performance of the work of this contract unless otherwise specified herein. Training shall include all applicable OSHA and other related standards. All equipment must be properly guarded and meet all applicable OSHA standards.
C.3 TRASH AND SOLID WASTE DISPOSAL AND REMOVAL
C.3.0 Extent of Work
The Contractor shall furnish all necessary labor, equipment, and supervision to provide waste removal/disposal as described herein at the facilities indicated in Section J, Exhibit 1. All waste shall have been removed from the premises. There shall be no overflow around containers. It is estimated that approximately 43,992 cubic yards of debris will be generated per year. Removal and disposal of items earmarked for recycling will be accomplished under a separate contract. All work shall be performed during the hours and on the days as specified in Section J, Exhibit 1.
The overflow of materials from containers and dumpsters shall be picked up from the ground. The Contractor shall remove all hydraulic fluid and oil spillage caused either by the collection vehicles, or released from containers at the designated centralized collection site (loading dock, etc.). Spill residue and clean-up materials
Page 20 of 153 Solid Waste Removal Services 5/31 shall be disposed in accordance with the Environmental Protection Agency, and State and local regulatory agency requirements.
C.3.1 Container Requirements
Except as indicated in Section J, Exhibit 1, the Contractor shall furnish fireproof containers with capacities as specified herein. Each container shall be equipped for automatic dumping into the enclosed body of a refuse truck. All containers shall be subject to approval by the Contracting Officer or his designated representative.
Front-end load containers located at the Russell FB-CT, Sam Nunn AFC, MLK, Jr. FB, IRS, Chamblee, FB, Gainesville and FB, Newnan must be equipped with a locking mechanism to prevent unauthorized use.
C.3.2 Compactor Equipment
Compactors must be capable of delivering at least 1850 lbs of line pressure. The compactors must be tested periodically for correct pressure setting. The Government reserves the right to test and/or monitor line pressure.
Each compactor must be equipped with multi-cycle timer ram stop forward and hinged breaker bar teeth.
NOTE: CONTRACTORS ARE CAUTIONED THAT THEY MUST FURNISH THE NUMBER OF SERVICEABLE
AND ACCEPTABLE CONTAINERS SPECIFIED EVEN THOUGH ALL CONTAINERS MAY NOT BE
EMPTIED.
C.3.3 Container Location
The Contractor will be required to remove waste from locations established by the Service Center Manager.
C.3.4 Container Maintenance
The Contractor shall perform routine maintenance on all containers not less than once a month. This shall include thorough mechanical inspections, replacing defective parts, lubricating and necessary adjustments in alignment of defective wheels, hitcher, or other component parts. Additional maintenance service shall be provided by the Contractor as requested and shall be performed within twenty-four (24) hours after verbal notification from the Service Center Director’s office. Spare or replacement containers shall be provided for those containers out of service for repairs or beyond repair when requested by the Service Center Director.
IF AT ANY TIME DURING THE TERM OF THIS CONTRACT A CONTAINER BECOMES UNUSABLE, IT
SHALL BE REMOVED AND REPLACED AT NO ADDITIONAL COST TO THE GOVERNMENT
C.3.5 Compactor Maintenance
In the event of failure of government furnished equipment, the contractor will notify GSA. All necessary repairs will be performed by the contractor and reimbursed by GSA via the method as shown in Section G, paragraph 2.
Equipment furnished by the contractor shall be maintained in proper working order at no additional cost to the Government.
C.3.6 Disposal Facility
Selection of a certified disposal facility shall be the responsibility of the Contractor. The Contractor shall be responsible for all dumping and disposal fees. It is the desire of the Government that all waste collected as a requirement of this contract shall be removed from the premises and transported to a processing facility for the purpose of manufacturing or recycling to the extent available.
Page 21 of 153 Solid Waste Removal Services 5/31
Waste not transported to a facility for manufacture or recycling shall be disposed of only through a waste disposal facility that has been certified by the appropriate State agency for waste management or by the Environmental Protection Agency.
NOTE: BIDDERS ARE CAUTIONED THAT THEY SHOULD ASCERTAIN IF THE DISPOSAL FACILITY THEY PROPOSE TO USE IS CERTIFIED PRIOR TO SUBMISSION OF THEIR OFFER. THE CONTRACTOR MAY
BE REQUIRED TO SUBMIT EVIDENCE OF INITIAL DISPOSAL FACILITY CERTIFICATION WHTHIN
FIFTEEN (15) DAYS AFTER THE DATE OF RECEIPT OF NOTICE BY THE GOVERNMENT
C.3.7 Solid Waste Records and Reports
The Contractor shall submit a monthly report showing the total weight or cubic yards of trash hauled and shall be provided to the COR, so that the report can be submitted as required by the Resource Conservation and Recovery Act.
If the Contractor cannot provide total weight or cubic yards of trash hauled, the Contractor shall provide to the COR the container size, the number of containers, and the number of pickups and/or tips for each month.
Reports prepared by the Contractor shall be submitted to the Government electronically. When electronic submittals are not available, hard copy reports shall be used. Paper used by the Contractor shall be double printed paper containing a minimum of 30 percent post consumer recycled content.
C.3.8 Miscellaneous Services
As requested by the COR or a designated representative, other items for removal may include but not be limited to, fluorescent tubes, ballast, un-recyclable pallets, wooden crates, construction debris, etc.
C.4 COMMUNICATION REQUIREMENTS
The Contractor shall attend at least one partnering session with GSA after the Post-Award conference. Other sessions may take place during the course of the contract at the option of either GSA or the Contractor.
Partnering is working together towards a common interest or goal. Both parties will re-visit the idea of having a partnering session on the anniversary date of the contract. Each partnering session will be held at a mutually agreed time and location.
C.5 FEDERAL REQUIREMENTS
A. The Contractor shall comply with all applicable Federal, state and local laws, regulations and codes, including any supplements or revisions. The following list includes, but is not limited to, those publications required by this contract. The Contractor is responsible for procuring the ANSI Z245.1 “Mobil Refuse Collection and Compactor Equipment-Safety Requirements.” The COR shall provide the Contractor with a hard copy or electronic access to the “GSA Property Management Business Practice Handbook (PBS P 5800.36A).” The Contractor shall obtain all applicable licenses and permits. If a change in law and regulation requires the Contractor to implement an action that will result in an increase or decrease in Contract price, the Contractor shall implement the required action and within 30 calendar days submit to the CO a price proposal for such change. If the CO determines an equitable adjustment is substantiated a modification to the Contract will be issued.
Page 22 of 153 Solid Waste Removal Services 5/31
PUBLICATION TITLE PORTION
29 CFR Part 1910 OSHA General Industry Standards (http://www.access.gpo.gov/nara/cfr/waisidx_06/29 cfr1910a_06.html), ALL
41 CFR Part 102-74, Subpart C. - FMR
Facility Management http://www.access.gpo.gov/nara/cfr/waisidx_06/41c fr102-74_06.html
ALL
40 CFR Protection of the Environment http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?sid=cb067c6143d1efa48ac4d1222120a7b6&c =ecfr&tpl=/ecfrbrowse/Title40/40tab_02.tpl
All Applicable Sections of Chapter I
ANSI Z245.1 Mobil Refuse Collection and Compactor Equipment-Safety Requirements http://webstore.ansi.org/ansidocstore/product.asp?
sku=ANSI+Z245.1-2007
ALL
Recovered Materials Advisory Notices http://www.epa.gov/cpg ALL
C.6 SUBMITTALS CHART (CONTRACTOR DELIVERABLES)
ITEM SUBMIT DATE or N/A RECEIVED Section C YES NO Trash Report Monthly Section H Written Notice of Designation of Contractor’s Representative
Submit to COR within 15 calendar days of award.
List of Names, Phone Nos, and Addresses of key personnel
Submit to COR within 15 calendar days of award.
Strike Contingency Plan
5 calendar days prior to contract start date and updated annually
Page 23 of 153 Solid Waste Removal Services 5/31 http://www.access.gpo.gov/nara/cfr/waisidx_06/29cfr1910a_06.html http://www.access.gpo.gov/nara/cfr/waisidx_06/29cfr1910a_06.html http://www.epa.gov/cpg
D. PACKAGING & MARKING
D.1 PAYMENT OF POSTAGE AND FEES
The Contractor shall pay all postage and fees related to submitting information forms, reports, etc.
D.2 MARKING
All information submitted to the Contracting Officer or the contracting Officer’s Representative shall clearly indicate the contract number of the contract for which the information is being submitted.
Page 24 of 153 Solid Waste Removal Services 5/31
E. INSPECTION & ACCEPTANCE
E.1 CONTRACTOR RESPONSIBILITY
The Contractor is responsible for the day-to-day examination and monitoring of all work performed to ensure compliance with the contract requirements. The examinations conducted shall be documented. The Contractor shall follow through to assure that all defects or omissions are corrected.
E.2 GOVERNMENT QUALITY ASSURANCE
Quality Assurance Evaluators (QAE) are subordinates of the COR and are responsible for periodic inspection and monitoring of the Contractor's work. The responsibilities of the QAE include, but are not limited to, inspecting the work to ensure compliance with the contract requirements; documenting through written inspection reports the results of all inspections conducted; following through to assure that all defects or omissions are corrected; recommending deductions from contract payment for nonperformance or unsatisfactory performance; conferring with representatives of the Contractor regarding any problems encountered in the performance of the work; and generally assisting the COR in carrying out COR responsibilities.
Each phase of the services rendered under this contract is subject to Government inspection, during the Contractor’s operations and after completion of the tasks. The Government’s Quality Assurance Surveillance Program is not a substitute for Quality Control by the Contractor. All costs associated with rework are the responsibility of the Contractor. The Government reserves the right to choose the inspection methods to be used in implementing its Quality Assurance Program and to vary the inspection methods utilized during the work, without notice to the Contractor.
E.3 FAILURE TO PERFORM
In the event work is performed unsatisfactorily, the Contractor will be requested in writing to correct the deficiencies within 10 calendar days. If the work remains deficient, the COR may have the work accomplished by other means and deduct the cost thereof from the monthly payment due the Contractor.
Page 25 of 153 Solid Waste Removal Services 5/31
F. DELIVERIES OR PERFORMANCE
F.1 PLACE OF PERFORMANCE
The services to be provided under this contract shall be accomplished at the following building(s):
Richard. B. Russell FB-CT Martin Luther King, Jr. FB Sam Nunn AFC Peachtree Summit FB 75 Spring Street, SW 77 Forsyth Street, SW 61 Forsyth Street, SW 401 W Peachtree Street Atlanta, GA 30303 Atlanta, GA 30303 Atlanta, GA 30303 Atlanta, GA 30308
Elbert Tuttle USCOA J. C. Goldbold FB IRS Customer Service Center FB-CTHSE 56 Forsyth Street, SW 70 Fairlie Street, SW 2385 Chamblee-Tucker 126 Washington Street Atlanta, GA 30303 Atlanta, GA 30303 Chamblee, GA 30341 Gainesville, GA 30501
Lewis R. Morgan FB-CT 18 Greenville ST Newnan, GA 30263
F.2 TERM OF CONTRACT
After award, and upon acceptance of the Contractors approved Quality Control Plan, the successful Contractor will be given a written notice to proceed, and shall provide contractual services for a twelve-month period. This service requirement is subject to the availability of appropriations commencing on the date specified in the notice to proceed. Work under this contract is expected to commence on or about November 1, 2018. If possible, the notice to proceed will provide for at least 30 working days preparation time before commencement of work.
F.3 OPTION TO EXTEND THE TERM OF THE CONTRACT
The Government shall have the unilateral option of extending the term of this contract for:
A. The Government shall have the unilateral option of extending the term of this contract (see clause FAR 52.217-9, OPTION TO EXTEND THE TERM OF THE CONTRACT - SERVICES, Part II, Section I). The same terms and conditions contained in this contract shall apply to each option exercised. Options shall be exercised upon written notification (mailed or otherwise furnished) to the Contractor at least thirty (30) calendar days prior to the expiration of the contract
The exercise of options is a Government prerogative, not a contractual right on the part of the Contractor. If the Government exercises an option(s) within the prescribed time frames, the Contractor shall be bound to perform the services for the option period(s) or be subject to the default provisions of the contract
B. One (1) six-month extension (see clause FAR 52.217-8, OPTION TO EXTEND SERVICES). The same terms and conditions contained in this contract shall apply to the six-month period. This option shall be used to insure continuous service in the event of a delay in award of a subsequent contract or for other administrative reasons. Such notice of intent to extend service shall be given the Contractor in writing at the earliest possible time, but not less than 15 days prior to the contract expiration date. The option shall be exercised upon written notification (mailed or otherwise delivered) to the Contractor at least 15 calendar days prior to the expiration of the contract.
The Government shall reserve the right to exercise “no cost” termination of the service upon 15 days written notice to the Contractor at any time during the six-month extension period. The exercise of options is a Government prerogative, not a contractual right on the part of the Contractor. If the Government exercises the option(s) within the prescribed time frames, the Contractor shall be bound to perform the services for the option periods or be subject to the default provisions of this contract.
Page 26 of 153 Solid Waste Removal Services 5/31
G. CONTRACT ADMINISTRATION DATA
G.1 PAYMENT (GENERAL)
Payment will be made on a calendar month basis in arrears upon submission of an invoice. Payment will be due on the 30th calendar day after receipt of a proper invoice, or date of receipt of services, whichever is later.
Payment will be made in the form of a Department of Treasury check with the letters GSA shown below the dollar amount of the check. Do not mail the check back. In the event the contract begins or ends during the month, payments will be prorated based on the number of calendar days in that month. It is the objective of the Government to obtain complete and satisfactory performance in accordance with the terms of the specifications and quality requirements of this contract. Payment for any service rendered will be due in accordance with the Prompt Payment clause in Section I.
General Services Administration Greater Southwest Finance Center Director, PBS Payments Branch (BCFA) P.O. Box 17181 Ft. Worth, TX 76102-0181 Telephone: (817) 978-2408
Web site address: www.finance.gsa.gov
(For any other information regarding this contract, contact the CO or the COR.)
G.2 PAYMENT FOR ADDITIONAL SERVICES
Payment for Additional Services as described in Part I, Section B, shall be made on the basis of an invoice that the Contractor must submit as follows:
A. For service valued at $2,500 or less, the invoice must be sent to the COR and will be paid by use of the Government Visa credit card or direct pay system. Invoices for on-call service containers must be submitted to the following address for payment:
40 yard open-top
30 and 35 yard open top and compactor
General Services Administration General Services Administration Atlanta (Central) Service Center, 4PSAC Atlanta (South) Service Center, 4PSAS 75 Spring Street, Box 54 100 Alabama Street SW, Rm GR40 Atlanta, GA 30303 Atlanta, GA 30303
B. For service valued at more than $2,500, the invoice must be sent to the address in paragraph G-1 above.
G.3 SUBMISSION OF INVOICES FOR SERVICES
Payment for recurring monthly services will be made on the basis of a monthly invoice, in arrears. Invoices must be submitted to GSA's Office of Finance, below:
General Services Administration Greater Southwest Finance Center (BCFA) P. O. Box 17181 Fort Worth, TX 76102-0181
Contractors interested in submitting electronic invoices may access the web site indicated in paragraph G1.
Detailed instructions and customer support is provided at the web site.
G.4 SUSPENSION OF WORK
In the event services are not provided or required by the Government because the building(s) is closed due to inclement weather, the contractor shall provide the service immediately as building access becomes available.
Page 27 of 153 Solid Waste Removal Services 5/31 file://E04R4S-FS01/DA$/4PM.F/4PMOC/FY-2011%60SOW/www.finance.gsa.gov
G.5 APPLICATION OF CRITERIA FOR DEDUCTIONS (NON-PERFORMANCE)
If the Contractor fails to perform satisfactorily or omits work required for performance the Contractor’s attention shall be called to this failure or omission. Deductions may be made from any monies due or to become due to the Contractor to cover the cost of the service omitted or not satisfactorily performed.
G.6 ADDITION AND DELETION OF WORKLOAD
The Government may add or delete individual containers during the term of this contract upon approval of the CO. The cost/price for any addition will be subject to negotiations after this office is in receipt of a detailed cost proposal based upon the current Wage Determination available at the time of the addition.
Page 28 of 153 Solid Waste Removal Services 5/31
H. SPECIAL CONTRACT REQUIREMENTS
H.1 CONTRACTOR RESPONSIBILITIES
H.1.0 Supervisors
No on-site supervision is required; however, the Contractor shall supply office and cell phone number and email address to the COR for use in contacting the Contractor should the need occur.
H.1.1 Communication
Contractor shall provide key operational personnel (managers or supervisors) with a means to communicate with GSA for service calls, emergencies, status of projects, etc. Electronic receiving and transmitting methods may include the following:
A. A text-messaging device used to send and receive messages. Contractor is responsible for all costs associated with electronic messaging device. Some examples are two-way radio, cell phone with text messaging, BlackBerry, etc.
B. Fax receiving and sending is acceptable only as secondary communication method for locations that have problems with no or poor quality wireless device signal strength. Delayed receipt due to combined usage of voice and fax on the same line is not acceptable.
H.1.6 Qualifications of Personnel
Qualifications of Contractor Personnel The personnel employed by the Contractor shall be capable employees, trained and qualified in the related type service requirements.
H.2 STRIKE CONTINGENCY PLAN (SCP)
The Contractor shall prepare a Strike Contingency Plan to be used in the event of a strike by his employees.
The Strike Contingency Plan (SCP) shall be submitted to the COR 5 calendar days prior to contract start date and updated annually. At a minimum, the SCP shall include the following information:
A. Support Personnel: The SCP shall describe in detail how the Contractor shall staff the building to provide the services defined in this specification in the event of strikes by his employees. This includes HSPD-12.
B. Training and Certifications: The SCP shall describe in detail how the Contractor shall provide personnel that meet experience requirements, assuring the Government that all temporary or replacement employees (including sub-contractor employees) shall meet the experience and certification requirements defined in this contract.
H.3 ORDINANCES, TAXES, PERMITS AND LICENSES
Without additional expense to the Government, the Contractor shall fully comply with: (a) all local, city, state and Federal laws, regulations and ordinances, (b) be liable for all applicable Federal, state and local taxes and (c) obtain and pay for all permits and licenses governing performance under the contract.
H.4 DISCREPANCY IN THE SPECIFICATIONS
In any case of discrepancy in the specifications, the matter shall be immediately submitted to the Contracting Officer. The decision of the Contracting Officer as to the proper interpretation of the specifications shall be final in accordance with the “Disputes” clause of this contract.
Page 29 of 153 Solid Waste Removal Services 5/31
I. CONTRACT CLAUSES
52.212 -- Acquisition of Commercial Items Provisions and Clauses.
A. 52.212-1 -- Instructions to Offerors -- Commercial Items.
As prescribed in 12.301(b)(1), insert the following provision:
Instructions to Offerors -- Commercial Items (Jan 2017)
(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF 1449). However, the small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.
(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show --
(1) The solicitation number;
(2) The time specified in the solicitation for receipt of offers;
(3) The name, address, and telephone number of the offeror;
(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;
(5) Terms of any express warranty;
(6) Price and any discount terms;
(7) “Remit to” address, if different than mailing address;
(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically);
(9) Acknowledgment of Solicitation Amendments;
(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and
Page 30 of 153 Solid Waste Removal Services 5/31 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/12.htm#P120_20016
(11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.
(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.
(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of offers. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender’s request and expense, unless they are destroyed during preaward testing.
(e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions, including alternative line items (provided that the alternative line items are consistent with subpart 4.10 of the Federal Acquisition Regulation), or alternative commercial items for satisfying the requirements of this solicitation. Each offer submitted will be evaluated separately.
(f) Late submissions, modifications, revisions, and withdrawals of offers.
(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that offers or revisions are due.
(2)
(i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and—
(A) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of offers; or
(B) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government’s control prior to the time set for receipt of offers; or
(C) If this solicitation is a request for proposals, it was the only proposal received.
Page 31 of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.