Cleveland Rudman Lighting Control System RFIs 6-16-21.pdf

PDF 95 KB Posted

Attached to
Cleveland/Rudman Lighting Control Systems Replacement Federal contract opportunity
Solicitation number
47PB0021R0054
Issued by
General Services Administration Public Buildings Service Region 1

About this file

This document summarizes a federal contract opportunity for lighting control system replacements at two federal buildings in Concord, New Hampshire. The General Services Administration is seeking to upgrade aging lighting fixtures and controls at the WB Rudman Federal Courthouse and JC Cleveland Federal Office Building, including replacement of proprietary control systems that are failing. Optional work may include additional fixture replacements. The estimated price range for mandatory work is $250,000 to $500,000. Proposals are due on June 25, 2021. A site visit was held on June 3, 2021. This is a 100% small business set-aside solicitation under NAICS code 236220.

View the file

Other files for this federal contract opportunity

Other files attached to Cleveland/Rudman Lighting Control Systems Replacement, newest first.
File Type Posted
Solicitation Amendment 47PB0021R0054_0001.pdf PDF
Site Visit Attendence.xlsx XLSX spreadsheet
Past Performance Questionnaire.docx DOCX document
47PB0021R0054 Wage Determination.pdf PDF
GSA527.pdf PDF
47PB0021R0054 1442 Form.pdf PDF
Volume I The Draft Agreement 2021 05 24.pdf PDF
GC Reps and Certs May 2021.pdf PDF
Volume II The Solicitation 2021 05 24.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cleveland-Rudman Lighting Control Systems Project Amendment 0001

Government Responses to Industry’s Questions 6/16/2021

Please provide the sign in sheet.

Sign in sheet uploaded to SAM.gov

Please advise if a second site visit can be arranged.

There are no plans for a second site visit at this time

Please advise if any hazardous materials will be encountered

There is no evidence of hazardous material in any of the work areas within the work areas. A comprehensive Asbestos Management program is available for the JC Cleveland building. There are no known hazardous construction materials in the WB Rudman Courthouse.

Please advise if the project will be phased. If so, what are the phases?

There is no government directed phase plan. The contractor is to provide an implementation plan upon award.

Please advise if an escort will be required in parts of the building. If so, please advise which parts.

All personnel who work in the building on this project will be required to be HSPD-12 cleared. Once personnel are HSPD-

12 cleared, there is no escort required.

Please advise if the areas of construction will be occupied during construction.

It is envisioned that the work CAN be completed during normal building operational hours. Some coordination is required because of the operational nature of the facility.

Should the contractor desire to work various areas after hours, the gov will entertain that possibility.

Please advise dumpster location.

There is no location on the facility for a dumpster. There is the possibility for the contractor to lease parking spaces from the City of Concord on South St. If a dumpster is placed on South

St. the contractor will be responsible for dumpster security.

Please advise if there is off hours work.

Off hours work CAN be coordinated between the government and the contractor.