4. Statement of Work.pdf
PDF 216 KB Posted
- Attached to
- 129JGP20R0036 - Pinehurst Work Center Building Federal contract opportunity
- Solicitation number
- 129JGP20R0036
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A00002 - RFI Official Responses.pdf | ||
| RFI Official Responses.pdf | ||
| Pinehurst Project Drawings.pdf | ||
| A00001 - Drawings.pdf | ||
| 6. RFI Form.docx | DOCX document | |
| 5. Davis-Bacon Act WD # CA20200018.pdf | ||
| 3. Schedule of Items.pdf | ||
| 1. Supplemental Specifications.pdf | ||
| 129JGP20R0036 - Pinehurst Work Center Building.pdf | ||
| 2. Fire Plan.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION C – DESCRIPTION/SPECIFICATION/STATEMENT OF WORK
C.1 DESCRIPTION OF WORK
Furnish all labor, equipment and material to accomplish the work under this contract.
Work includes but is not limited to complete or partial siding replacement on five (5) buildings at Pinehurst Work Center as specified, including repairs to wall substrates
(framing and sheathing) as needed, replacement of wood trim only on one (1) building, replacement of two exterior doors on one (1) building, and complete painting of the six
(6) buildings.
Optional Work Items include replacement of existing windows with dual pane energy efficient windows in one (1) building.
The Contractor should refer to the SCHEDULE OF ITEMS and project plans and specifications when making estimates of quantities of work.
The Contractor is advised to submit technical proposals and pricing in accordance with Section M, Evaluation Factors for Award.
C.2 PROJECT LOCATION
The project site is located on the Hume Lake Ranger District of the Sequoia National
Forest at Pinehurst work center, street address 53921 Hwy 245, Miramonte, CA. 93641;
location as follows:
1. Location: State of California, County of Fresno, Section 23, Township 14 South, Range 27
East, Mount Diablo Meridian
2. From Fresno, CA, and State Hwy 99, drive east on State Hwy 180, approximately
53 miles to the junction of State Hwy 180 and State Hwy 245. Turn right onto
State Hwy 245 and proceed approximately 4.8 miles to the project site, just past the
Pinehurst Lodge on the right.
3. From Visalia, CA drive east on State Hwy 198 19 miles (through Lemon Cove, CA) to a Texaco gas Station and store on the left. Take County Road 216W (Woodlake
Road) west for 0.5 miles crossing the Kaweah River. At the west end of the bridge, turn right and proceed north on Dry Creek Road for 17 miles to SH 245, turn right.
Continue north on SH 245 for approximately 7.2 miles. Pinehurst Work Center will be on the left.
C.3 CONTRACT TIME
Estimated start work date is June 8, 2020. The contract time will be 75 days. Contract time includes delays for weather; locating and transporting supplies and materials; and final sites cleanups.
C.4 PROJECT SITE CLEAN UP
Any excess material generated from this project shall be disposed of as described in the contract or off of National Forest Lands and according to all state and local laws that apply. No materials of any kind are to be placed in any government or private trash bins or dumpsters.
C.5 PRICE RANGE
The price range for this project is between $25,000 and $250,000.
C.6 SPECIAL CONDITIONS AFFECTING THE WORK
a. Physical Conditions. The indications of physical conditions on the drawings and in the specifications are the result of site investigations and surveys performed by the Government.
b. Weather. Low temperatures at the project site range from temperatures of less than 20 ºF in December and January to lows of 65 ºF in July and August. High temperatures range from 45 ºF in December and January to over 90 ºF in July and
August Icy conditions on local roads and highways can occur during the fall, winter and spring. Highway curves in shaded areas will remain covered with ice or frost for weeks.
c. Work Hours. Work hours are from 7:00 am to 5:00 pm Monday through Friday.
Weekend equipment work is not allowed at any time during the Work. Dogs and pets are not allowed on the project sites at any time.
d. Safety, Emergency Communications and Evacuation. Contractor is responsible for the safety of the Contractor’s employees including Subcontractors employees, Government employees associated with the project, and any visitors to the site both Government and private. The Contractor shall submit a project safety plan to the Contracting Officer for review prior to commencement of
Work. The project safety plan shall comply with the appropriate California
OSHA and Federal OSHA rules and regulations and must include a medical evacuation and emergency communications plan.
e. Highway Permits. Contractor is responsible for securing any overload or over width limit permits required for the transport of building materials to the project sites. The Contractor is responsible for conducting a thorough reconnaissance of all routes leading to the sites. The Government will not be responsible for any building materials that can not be transported to the sites.
f. Temporary Site Utilities. Contractor may install temporary site utilities to support work on the project. The installation of temporary utilities is the responsibility of the Contractor and shall be paid for by the Contractor. The
Contractor shall provide the Contracting Officer with written certification that all temporary site utilities have been properly disconnected and final utility bills are paid in full. The Contractor may make a temporary hookup to the existing Forest
Service water line to provide water for construction.
g. Toilets. Contractor may use toilets at the work centers. No shower facilities are available. Contractor shall provide toilet facilities for its employees if the toilet buildings are not utilized.
h. Camping. There is no camping available at the job site.
i. Security. Contractor is responsible for the Contractor’s equipment and building materials supplied to the sites. All equipment not equipped with a key lock system shall be secured in such a manner as to make it inoperable to the average person at the end of each working day. All hand tools, ladders and other equipment shall be secured at the end of each working day. On Fridays all construction debris, trash, and refuse shall be properly stored in dumpsters or trash bins or removed from the sites.
j. Burning Permits. Contractor is subject to all rules and regulations governing the on site burning of slash and other debris. Contractor shall obtain a burning permit from the jurisdiction having control over burning. The Contractor shall comply with Fire Plan for Construction and Service Contracts included in the Contract.
k. Protection of Resources. Contractor shall thoroughly clean all equipment prior to delivery to the project sites to remove weeds, mud, grease and oil buildup from the tires, wheels, tracks, engines and engine compartments, and other surfaces.
Spills of petroleum products and other hazardous substances shall be reported, contained, and removed in accordance with all applicable rules, regulations and laws. Contractor shall submit a project spill response plan at the pre-work meeting for review by the Contracting Officer.
C.7 PRE-BID CONFERENCE OR TOURS
No pre-bid tour is scheduled for this project. Contractors are advised to visit the site on their own and make the necessary site investigations prior to submitting proposals.