4. Request for Technical Literature.pdf

PDF 109 KB Posted

Attached to
Work Stand Platform Federal contract opportunity
Solicitation number
W911KF-21-Q-0031
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to Work Stand Platform, newest first.
File Type Posted
1. Statement of Work.pdf PDF
2. Evidence of Authority To Sign Offers.pdf PDF
W911KF-21-Q-0031 Solicitation.pdf PDF
3. SioanForm380-2 Personal Data Questionnaire.pdf PDF
5. Past Performance Questionnaire.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Technical Literature

A. The bidder shall provide, with its bid, descriptive literature that has previously been used to market the proposed Work Stand Platform. The literature will be used to technically evaluate the bid and shall describe how the machining center meets requirements of the specification; specifically the paragraphs:

Ref. Paragraph Information Furnished

2.1 Requirements

3.1 Compliance

3.2 Capacity

3.3 Dimensions

3.4 Elevation

3.5 Stairs

3.6 Mobility

3.7 Material

3.8 Design

3.9 Miscellaneous

3.10 Supporting Information

3.11 Supporting Documentation

3.12 Equivalent Substitutions

4.0 Warranty

5.0 Delivery and Points of Contact (POC)

6.0 Scope Changes

b. The features, which must be addressed in the descriptive literature, are necessary to consider the bid responsive.

If the bidder’s preprinted literature does not show all these features, the bidder must attach a letter of supplemental information to the literature describing in detail those required features.

c. The failure of descriptive literature to show that the product offered conforms to the requirements of this solicitation will require rejection of the bid.

Conditions’, or ‘prices are subject to change without notice’ shall not be considered for an award. The government has no assurance the products offered will conform to the specification; therefore, the bid is not considered a firm bid and will not be considered for an award.