4. Form 807 FB206532081265.pdf

PDF 50 KB Posted

Attached to
NSN 1560-01-519-8239 FITTING, STRUCTURE Federal contract opportunity
Solicitation number
FA852223Q0013
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This document is a quality assurance form for a federal contract opportunity. It specifies that the contract is for the procurement of one fitting, structure with national stock number 1560-01-519-8239. The form provides inspection and acceptance requirements, including requiring standard inspection procedures according to FAR 52.246-15 and a certificate of conformance. It names the technical authority and item manager as points of contact and requires the item to meet quality requirements for aerospace standards. The quality provisions specified will ensure the item conforms to technical specifications and must be followed without downgrade unless approved by the technical authority.

View the file

Other files for this federal contract opportunity

Other files attached to NSN 1560-01-519-8239 FITTING, STRUCTURE, newest first.
File Type Posted
AFMC 158.pdf PDF
DD FORM 1653.pdf PDF
FA852223Q0013.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

RECOMMENDED QUALITY ASSURANCE PROVISIONS AND SPECIAL INSPECTION REQUIREMENTS

1. PR/MIPR

2. NATIONAL STOCK NUMBER

3. POINT OF INSPECTION

4. POINT OF ACCEPTANCE

SOURCE

DESTINATION

SOURCE

DESTINATION

SEE DFARS 246.402

5. ITEM MANAGER

PHONE

6. EQUIPMENT SPECIALIST

PHONE

7. CONTRACT QUALITY REQUIREMENTS/SPECIAL INSPECTION REQUIREMENTS

HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS

FAR 52-246-11

ISO 9001:2000

AS 9100

NATO AQAP 2070

(or equivalent)

CERTIFICATE OF CONFORMANCE FAR 52.246-15

CONTRACTOR RESPONSIBILITY FOR INSPECTION FAR 52.246-1

COMMERCIAL ITEM INSPECTION

FAR 52.212-4

STANDARD INSPECTION

FAR 52.246-2, -3, -4, -5 OR -6

AS APPLICABLE TO CONTRACT

OTHER (Describe in Block 8)

8. REMARKS

8a. OZONE DEPLETING SUBSTANCES (ODS)

STATEMENT (BLOCK)

" I HAVE REVIEWED THE REQUIREMENT, INCLUDING AVAILABLE TECHNICAL DOCUMENTATION, AND BELIEVE THAT IT DOES NOT REQUIRE THE CONTRACTOR USE CLASS I OZONE DEPLETING SUBSTANCES (ODS) IDENTIFIED IN AIR FORCE POLICY, NOR IS IT WRITTEN SO THAT IT CAN ONLY

BE MET BY THE USE OF A CLASS I ODS"

WAIVER (BLOCK) (SEE AF FARS

Quality provisions as annotated hereon will not be downgraded without Technical Authority coordination. The Technical Authority must be notified if award selection is made to a new source using Acquisition Method Code (AMC) 3, 4, or 5.

NOTE:

9. QUALITY PRE-AWARD SURVEY

A. I&A

B. CQR

AFMC PARTICIPATION RECOMMENDED

NEW SOURCE

YES

10. J023 CODES

PREVIOUS

NO

11. NAME OF TECHNICAL AUTHORITY

ORGANIZATION/SYMBOL

PHONE

DATE

PREVIOUS EDITION IS OBSOLETE

AFMC FORM 807, 20080416

INSTRUCTION FOR COMPLETING THE AFMC FORM 807

CODE

INSPECTION

ACCEPTANCE

SOURCE

SOURCE

DESTINATION

DESTINATION

SOURCE

DESTINATION

SOURCE BY COC

SOURCE

SOURCE BY COD

DESTINATION

SOURCE

PACKAGING PLANT

(2) BLOCK 10B. CQR (Contract Quality Requirement)

CODE

INSPECTION

A CERTIFICATE OF CONFORMANCE CONTRACTOR RESPONSBILITY FOR INSPECTION STANDARD INSPECTION NO LONGER USED NATO AQAP 2070, ISO 9001:2000 (OR EQUIV) COMMERCIAL ITEM OTHER B C D, E, F G H I

AFMC FORM 807, 20080416

8.2.1.3158.1.475346.466429

CHECK1: 1
CHECK2: 0
CHECK3: 0
CHECK4: 2
CHECK5: 1
CHECK8: 0
CHECK6: 0
CHECK7: 0
CHECK9: 0
CHECK10: 0
CHECK11: 1
CHECK12: 0
CHECK13: 0
CHECK14: 2
CHECK22: 0
CHECK24: 0
CHECK23: 0
prmipr: FD20602301088-00
nstock: 1560-01-519-8239
FIELD1: Timothy Rittman
FIELD3: 478-222-2085
FIELD2: James Hill
FIELD4: 478-222-8607
remark: PNSSR 136125 for part number 389692-8/FITTING ASSY, FLOOR BULKHEAD, END, RH; T.O. 1C-130J-4-53-1, Fig. 06 & Index 100.

Per Drawing 389692, the part number 389692-8 (nonstocklisted) is the next higher assembly for the part number 389692-10.

NSN 1560-01-519-8239 is obsolete and no longer procurable through regular supply system.

PNSSR 136368 was created to procure part number 389692-10, Fitting.

WR-ALC PDM MICAP Requirement - FB206532081265 / 1 EACH / 1560PLC05290F / 4320ND165355LLG

Contract Quality Requirements/Special Inspection Requirements:

Standard inspection Far 52.246-15 (Certificate of Conformance) (AS APPLICABLE TO CONTRACT) The certificate shall read as follows:

I certify that on (insert date), Frazier Aviation Inc., furnished supplies or services called for by Contract Number (insert Contract Number) via (Carrier’s name) on (identify the bill of lading or shipping document) in accordance with all applicable requirements. I further certify that the supplies or services are of the quality specified and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this or on the attached acceptance documents.

Date of Execution:_________________

Signature:________________________

Title:____________________________

jia: 3
FIELD5: A
qasrev: Kevin Phillips
FIELD6: AFLCMC/WLNE
FIELD7: 468-3764
FIELD8: 2023-09-18
FIELD2_2: Quality Assurance provisions must include all inspections (by reference, where appropriate) to be performed to ensure that the item offered conforms to the technical requirements. The technical authority is responsible for providing contract quality requirements for all buys IAW FAR Part 46. Quality provisions as annotated on the AFMC Form 807 will not be downgraded without coordination from the technical authority.

NOTE: The technical authority is the chief engineer of the responsible system or lead engineer of the end-item. Technical authority may be delegated by the chief engineer of the responsible system or lead engineer of the end-item to those having technical competence and capability to perform the required activities. The end-item is defined as equipment that can be used by itself to perform a military function (AFI 63-1201).

The technical authority will complete the AFMC Form 807 as follows: Blocks not identified are self-explanatory.

(Block 3): Point of Inspection - Must be source or destination, where inspection means examining and testing supplies or services by a government representative to determine whether they conform to contract requirements. This will be the location of the inspection or the location of potential inspection by the government as the government always retains the rights to inspect even if you make the contractor responsible for inspection (i.e. applying FAR 52.246-1). Note: Per DFARS 246.402, on contracts less than 250K, the following three requirements must be met before source inspection can be considered. (1) Significant product technical requirements (e.g., drawings or performance requirements) are in the contract. (2) Critical characteristics or acquisition issues are identified in either a quality assurance letter of instruction (QALI) which describes how to identify or determine if these conditions have been met or they are described in the technical requirements portion of the contract. (3) Contract must be for a manufacture or producer and have critical characteristics identified and specific Government verification identified as necessary and feasible to perform at these non manufactures or non producers. If the contract is less than $250K, and all three criteria have not been met, there are no waiver procedures as no waivers are allowed. The only exception is when source inspection is required by DoD regulation or required by Memorandum of Agreement between the acquiring dept or agency and the contract administration agency.

(Block 4): Point of Acceptance - Must be either source or destination. Cannot be both. This is the point of government acceptance, where acceptance means act of an authorized representative of the government by which either the government, or itself or as agent of another, assumes ownership of existing identified supplies tendered or approves specific services rendered as partial or complete performance of contract.

(Block 7): Contract Quality Requirement/Special Inspection Requirements.

Select One: (Note: The appropriate requirement should be selected based on technical description, complexity, application and FAR Part 12, paragraph 12.301, and FAR Part 46, paragraph 46, 402, and 46.403).

CERTIFICATE OF CONFORMANCE FAR 52.246-15: Allows the contractor to ship materiel without or in lieu of Government source inspection. Requires authorization by cognizant contract administration office in writing to ship any supplies for which the contract would otherwise require inspection at the source.

CONTRACTOR RESPONSIBILITY FOR INSPECTION, FAR 52.246-1: Should be used on all small purchase contracts where the contracting officer has determined that the Government does not have a need to inspect the supplies or services in advance of their tender for acceptance. Under this clause we still have a recourse with the contractor if nonconforming materiel is delivered and the Government always retains the rights to inspect, even if there is no initial desire or identified need.

STANDARD INSPECTION FAR 52.246-2, -3, 04, -5 OR -6 AS APPLICABLE TO CONTRACT: Used when the purchasing office determines there is a need for government inspection of supplies or services. Can be used either in conjunction with higher-level contract quality requirements or by themselves. Should be used when a Commercial Technical Description is used for a complex or critical item or when a Military-Federal Technical Description is used for a noncomplex or noncritical item.

HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS, FAR 52-246-11: NATO AQAP 2070, AS9100, ISO 9001:2000 (2000 version or equivalent). Quality Systems - ISO 9001:2000 specifies requirements for a quality management system for any organization that needs to demonstrate its ability to consistenly provide product that meets customer and applicable regulatory requirements and aims to enhance customer satisfaction. The 2000 version of ISO 9001 incorporates the1994 versions of ISO 90001, 9002 and 9003 and the 1995 versions of NATO ACAP 100, 120 and 130. However, the 1994/1995 versions are no longer valid as they expired on 15 Dec 2003. AS9100 is the quality standard for the aerospace industry. NATO AQAP 2070 is the Allied Quality Assurance Publication for use with NATO participants.

COMMERCIAL ITEM INSPECTION, FAR Part 52.212-4: Should be used when items meet description of a commercial item as defined in FAR Part 12.

OTHER: Provide details in block 8. Such as when a higher level of contract quality requirements is desired, but when these higher requirements do not include ISO or equivalent requirements. A Quality Assurance Letter of Instruction (QALI) or specific requirements to be placed in the contract must be identified in block 8 or attached. These are developed by the technical authority and describes critical characteristics or performance requirements and provides guidance on how to identify or address these issues.

(Block 8): Identify if the item is a critical safety item (CSI). If the item's criticality code is "E", F", or "S". If item is CSI, a QALI must be generated for the item.

(Block 8a): For this block (Ozone Depleting Substance (ODS)), the engineering entity signing the IMT 807 must mark one of the the two blocks. Technical entity must decide if an ODS Statement is required or if an ODS Waiver is required. If an ODS Waiver is required, please refer to AF FARS 5323 for appropriate action. If no waiver is required, the engineer must mark the ODS Statement.

(Block 9): Quality Pre-Award Survey Recommended - FAR Part 9, paragraph 9.104-1 requires a contracting officer to determine that a contractor is responsible before awarding a contract. A preaward survey may be requested and used whenever there is not sufficient information to determine responsibility.

- Select yes or no depending on your desire for a pre-award survey.

- Select New Source or Previous Source.

- AFMC Participation Recommended. May be recommended if AFMC participation on the preaward survey would be beneficial.

(Block 10): Codes:

(1) Block 10A: I&A (Inspection and Acceptance Code)

File details come from the government source that posted it. Updated .