3780710_ATTACH_EDA.PDF

PDF 922 KB Posted

Attached to
f-16 AIRCRAFT RUDDER Federal contract opportunity
Solicitation number
SPRHA424Q1000
Issued by
Defense Logistics Agency Aviation

About this file

This document package includes an engineering data requirements list (EDRL) and related federal contract opportunity for the procurement of an F-16 aircraft rudder. The EDRl provides the technical data package required for the rudder assembly, including over 150 applicable drawings, specifications, process requirements and material standards. It also identifies the incumbent supplier and contracting agency. The related opportunity is a solicitation from the Defense Logistics Agency Aviation to provide F-16 aircraft rudders. The solicitation number, item description and contracting agency are provided.

View the file

Other files for this federal contract opportunity

Other files attached to f-16 AIRCRAFT RUDDER, newest first.
File Type Posted
SPRHA424Q1000.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

**Please DOWNLOAD PDF file to local computer and open with Adobe Reader to view contract documents!**

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM: (Bulgaria) E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY: (Data Manager) H. DATE I. APPROVED BY: (Engineer) J. DATE

Page of Pages

1102660737C

Cross-Out

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, AUG 96

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor’s performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s right to use the data shall be governed by the pertinent provisions of the contract.

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4;

Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FD2020-20-00663 FAT 6150015559783WF

3rd page CDRL

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

A_CONTRACT_LINE_ITEM_NO:

B_EXHIBIT:

xTDP: Off xTM: Off

OTHER:

DSYSTEMITEM:

E_CONTRACTPR_NO:

FCONTRACTOR:

16_REMARKS_Continued: s. Original drawings are not required. If applicable, reproducible stable base copies of unidimensional drawings and master pattern drawings are required. See Block 14.

Page2: 2 of_pages:

Reset:

xtm: Off

1_DATA_ITEM_NO: A001

2_TITLE_OF_DATA_ITEM: Test/Inspection Report

3_SUBTITLE: First Article Test Report

4_AUTHORITY_Data_Acquisit: DI-NDTI-80809B/T

5_CONTRACT_REFERENCE: CLIN for Data

6_REQUIRING_OFFICE: 416 SCMS/GUEAA

7_DID_250_REQ: SD

8_APP_CODE: N/A

DIST_STATEMENT: B

10_FREQUENCY: 1TIME

11_AS_OF_DATE: SEE BLK 16

12_DATE_OF_FIRST_SUBMISSI: SEE BLK 16

13_DATE_OF_SUBSEQUENT_SUB: SEE BLK 16

addressee1: 416 SCMS/ draft1:

reg1: 1 repro1:

addressee2: GUEAA draft2:

reg2:

repro2:

addressee3: 6070 Gum LN draft3:

reg3:

repro3:

addressee4: Bldg. 1213 draft4:

reg4:

repro4:

addressee5: Hill AFB, UT draft5:

reg5:

repro5:

addressee6: 84056-5825 draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8: SEE BLK 16 draft8:

reg8: 1 repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 reg38t: 2 total_repro: 0

16_REMARKS: NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the CO/ACO without further revision to this CDRL.

NSN: 1560-01-077-1314WF

1. Block 4: Contractor's format is acceptable. Paragraph 10.2 of DI-NDTI-80809B is clarified as follows:

a. All dimensions and tolerances specified on the manufacturing data shall be listed in one column, with the actual corresponding reading obtained from the inspection of the part listed in another column.

b. Materials utilized in the manufacture of "First Article" item shall be identified and certified along with a copy of material purchase requests as conforming to applicable data requirements.

c. Material processing, including finish requirements (plating, heat treatment, welding, inspecting, anodize, painting, etc.) utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable requirements. A copy of the purchase order certifying the process accomplished at other than contractor facility shall be included.

d. Other requirements as called out on Engineering Data Requirement (HILL AFB Form 462).

2. Block 9: Distribution Statement and Export Control Warning shall be IAW DoD Instruction 5230.24.

The following Distribution Statement shall be placed on the first sheet of each document and/or Associated Lists.

DISTRIBUTION STATEMENT "B"" Distribution authorized to U.S. Government agencies. (Test & Evaluation) (Sep 2023). Other requests for this document shall be referred to (416 SCMS/GUEAA, Hill AFB, UT 84056-5825).

17_PRICE_GROUP: NSP

ESTIMATED_TOTAL_PRICE: 0.00

G_PREPARED_BY:

H_DATE: 27 Sep 2023

1_APPROVED_BY:

J_DATE: 27 Sep 2023

Page: 1

2023-09-27T15:00:48-0600

PINNEGAR.STEPHANIE.A.1102660737

2023-09-27T15:08:05-0600

LUCAS.TIMOTHY.JAMES.1388593373

A_CONTRACT_LINE_ITEM_NO:

B_EXHIBIT: A

xTDP: Off xTM: Off

OTHER: NDTI

DSYSTEMITEM: Rudder, Aircraft

E_CONTRACTPR_NO: FD2020-23-01000

FCONTRACTOR:

16_REMARKS_Continued: EXPORT CONTROL WARNING: All printed and electronic, including digital, technical documents that are determined to contain export-controlled technical data shall be marked with the following statement:

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

3. Blocks 10, 11, 12, 13, 14:

a. For Government Testing - Report to assist in "First Article" testing by the Air Force shall be submitted concurrently with the "First Article" item either in the packaging of the shipping container or separately if the report will not fit within the container packaging unfolded. When shipped in the "First Article" container, the report shall be enclosed in a paper or plastic envelope.

b. SHIP TO: Non-Accountable Bay Transportation Officer Building 849 West Hill AFB, UT 84056-5999

MARK FOR: 809 MXSS/MXDEB

7278 4th Street (Bldg. 100, Bay D) Hill AFB, UT 84056-5205

NOTE: If report is shipped separate from "First Article" item, send report to "MARK FOR" address listed above.

c. Contractor shall deliver the Test/Inspection Report via e-mail to the following e-mail address: timothy.lucas.3@us.af.mil

Page2: 2 of_pages: 2

Reset:

MANUFACTURING QUALIFICATION REQUIREMENTS

NSN: 1560-01-077-1314WF

P/N: 16T7302-805 Noun: RUDDER ASSEMBLY Application: F-16

13 Feb 2019 Section C 1/3

SECTION C:

1. QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE

a. Prequalification Notice/Sources Sought: The offeror shall notify the appropriate government Small Business Office or, if responding to a solicitation, the contracting officer in the appropriate government contracting office, of intent to qualify as a source for this RUDDER ASSEMBLY.

b. Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that they have, or have access to, the required facilities and equipment to manufacture, inspect, test, package, and store the item. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.

c. Data Verification: The offeror must verify that he has a complete data package. This verification must include a complete list of all procedures, drawings, and specifications, including change notices, in the offeror’s possession including, at a minimum, drawing 16T7302 (CAGE 81755).

The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.

d. Manufacture/Process Verification: The offeror must manufacture this item to conform to the government requirements as prescribed within the ESA-approved engineering/technical data package. The offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the government requirements as prescribed by 416th SCMS/GUEAA. The offeror shall also identify its sources for materials and its standards for internally used processes.

e. Test and Evaluation and/or Verification: The offeror, at their own expense, shall prepare and submit to 416th SCMS/GUEAA for their prior approval, a qualification test plan/procedure detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawing 16T7302. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 416th SCMS/GUEAA for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in advance of the occurrence of any testing that will be used as a basis for qualification. The offeror’s facilities shall be made available for government inspection during these tests.

f. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract award qualification article for evaluation by the government. This article must comply with all of the requirements of Drawing 16T7302. This article shall be subjected to a form, fit, and

P/N: 16T7302-805

13 Feb 2019 Section C 2/3 function evaluation to demonstrate compatibility with the weapon system and to evaluate the manufacturing capability of the offeror. Offerors will be notified whether or not their qualification article passed or failed the required qualification testing within 90 days of submitting a product for qualification testing. Note that successful completion of the qualification testing does not guarantee any contract award. If the offeror is deemed qualified and awarded the contract, a post-contract award first article exhibit may be required to verify production capability.

g. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified: $12,200.

h. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 180 days. This is based on complexity of the RUDDER ASSEMBLY and other factors.

i. Qualification Time Limitation: An offeror may not be denied the opportunity to submit and have considered an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the vendor with an opportunity to demonstrate its ability to meet the standards specified in this qualification requirement.

j. Evaluation of Proposals Not Previously Qualified: The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in the qualification requirement before the date specified for award of the contract. Once all requirements are met, the offeror will be listed as an approved source for this item. Approval, however, does not guarantee subsequent contract award.

P/N: 16T7302-805

13 Feb 2019 Section C 3/3

2. SOURCE QUALIFICATION WAIVER REQUIREMENTS

Sources who meet any of the following source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify production capability:

a. QWC1: The potential source submits written certification that the articles have been supplied to the government or original equipment manufacturer (e.g., DD Form 250, Material Inspection and Receiving Report, Purchase Order invoice, etc).

b. QWC2: The potential source is qualified on the right-hand article and requests to be qualified on the left-hand article. If the right-and left-hand articles are mirror images of each other, then approval can generally be given.

c. QWC3: A source qualified to provide an assembly is usually qualified to provide subassemblies, major components, and items of that assembly.

d. QWC4: A source qualified to provide earlier dash numbers of a basic P/N may be qualified to provide other dash numbers of that same basic P/N, provided there is no increase in complexity, criticality, or other relevant requirements.

e. QWC5: A source qualified to provide a similar or like item can be qualified to provide the required item. However, for approval, the engineering authority must verify that there is no increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written proof, such as purchase orders, shipping documents, etc., to show that the similar item was provided to the original equipment manufacturer or DoD.

f. QWC6: A source previously qualified to provide an item, but which has been purchased, sold, merged, absorbed, reformed, split, etc., may qualify if it can be established that the qualification is currently with the requester and that the requester has the same or equivalent facilities, tooling, equipment, personnel, and utilizes the original forging, castings, etc., in the manufacturing process.

DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY, ADMINISTRATIVE OR OPERATIONAL USE, 05 FEBRUARY 2018. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO 406 SCMS/GULAA, (PACKAGING

DIVISION), HILL AFB, UTAH 84056.

DESTRUCTION NOTICE: FOLLOW THE PROCEDURES IN DOD 5220.22-M, NATIONAL INDUSTRIAL SECURITY PROGRAM OPERATING MANUAL (NISPOM), SECTION 5-705, OR DOD 5200.1-R, INFORMATION SECURITY PROGRAM, CHAPTER VI. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE DOCUMENT.

NOTES

1. WRAP ITEM IN REF.-11 TO ENSURE THAT BARE ITEM DOES NOT MAKE DIRECT CONTACT WITH CUSHIONING, REF.-10.

2. NAIL MOUNTING BLOCKS, REF.-2, TO REF.-3 AND REF.-4 PRIOR TO CUTTING BLOCKS OUT USING NAILS OR STAPLES

CONFORMING TO ASTM F1667. USE ASTM F1667 TO SECURE IN PLACE REF.-8 & REF.-12, REF.-9.

3. USE ADHESIVE A-A-59692, TYPE II, TO SECURE CUSHIONING, REF.-10, TO MOUNTING BLOCKS, REF.-3, -4, -9, AND

SADDLES, REF.-13 & -14.

INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES

REVISION OF ISPM NO. 15

REVISION OF WOOD PACKAGING MATERIAL FOR INTERNATIONAL TRADE

THE FOLLOWING STATEMENT IS IN COMPLIANCE WITH THE UNITED NATIONS-IMPLEMENTED RESTRICTIONS ON WOOD

PACKAGING MATERIAL (WPM). THIS REQUIREMENT IS SPECIFICALLY CONCERNED WITH INVASIVE SPECIES SUCH AS THE

PINEWOOD NEMATODE. WPM IS DEFINED AS WOOD PALLETS, SKIDS, LOAD BOARDS, PALLET COLLARS, WOODEN BOXES, REELS, DUNNAGE, CRATES, FRAMES, AND CLEATS. THE STATEMENT BELOW CITES THE REQUIREMENTS IN DETAIL AND

COVERS LUMBER FOR BUILDING CONTAINERS AND PALLETS USED FOR DELIVERIES, RESULTING IN SHIPMENTS WORLDWIDE

(DIRECT, OR THROUGH AIR LOGISTICS CENTERS (ALC), CONTAINER CONSOLIDATION POINTS (CCP), OR OTHER BASES).

WOODEN LUMBER, WOODEN PALLET AND PACKAGING/CONTAINER STATEMENT:

ALL WOODEN LUMBER, WOODEN PALLETS, AND WOODEN CONTAINERS PRODUCED ENTIRELY OR IN PART OF WOOD

PACKAGING MATERIAL (WPM) SHALL BE CONSTRUCTED FROM DEBARKED WOOD IN ADDITION TO THE APPLICATION OF

HEAT-TREATED (HT) MATERIAL (HT TO 56 DEGREES CENTIGRADE OR 133 DEGREES FAHRENHEIT FOR 30 MINUTES).

CERTIFICATION/MARKING IS REQUIRED BY AN ACCREDITED AGENCY RECOGNIZED BY THE AMERICAN LUMBER STANDARDS

COMMITTEE (ALSC). FOR REFERENCE DOCUMENTATION, SEE LATEST REVISION OF "INTERNATIONAL STANDARDS FOR

PHYTOSANITARY MEASURES (ISPM NO. 15), "REGULATION OF WOOD PACKAGING MATERIAL IN INTERNATIONAL TRADE."

CAUTION NOTICES

Statement of Work June 2020

PRESERVATION, PACKAGING & MARKING REQUIREMENTS

The contractor shall develop, implement and maintain the preservation, packaging and packing of all items to be delivered under the terms of this contract. Packaging procedures will be established in accordance with AFMCI 24- 201, specifically Paragraph 3.7 and MIL-STD-2073-1, Standard Practice for Military Packaging, Packaging requirements are identified in the AFMC Form 158, Packaging Requirements submitted by the responsible packaging specialist. All “markings and labeling” of shipments shall conform to MIL-STD-129, DoD Standard Practice, Military Marking for Shipment and Storage. The contractor shall affix a completed DD Form 1574, Serviceable Tag-Materiel or DD Form 1574-1, Serviceable Label- Materiel to each unit pack or intermediate container and prime outer container(s). The tag or label will indicate the condition(s) of the materiel and to identify the individual article or contents, bundle, container to which they are securely attached.

INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES

(ISPM 15) REQUIREMENTS

The contractor shall use the wood packaging material regulation for international trade which describes Phytosanitary (including treatments) that have been approved for wood packaging material and provides for the approval of new or revised treatments. Use the latest revision of (ISPM 15), and the following statement complies with the United Nations-implemented restrictions on wood packaging material (WPM).

“This requirement is specifically concerned with invasive species such as pinewood nematode. WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames, and cleats. The statement below cites the requirements in detail and covers lumber for building containers and pallets used for deliveries resulting in worldwide shipments (direct vendor deliveries, Air Logistics complex (ALC), Container Consolidation Points (CCP), Aerial Ports, Water Ports, or other DoD installations).

ELECTROSTATIC MATERIAL (When Applicable)

The Contractor shall apply provisions of MIL-STD-2073-1, when identifying all solid state devices and modules containing diodes, translators, integrated circuits and/or other microelectronic components sensitive to electrostatic forces. All such items shall be packaged IAW MIL- STD-2073- 1 using electrostatic free barrier materials and shall clearly bear “Electrostatic Sensitive Device” labels IAW MIL-STD-129, Department of Defense Standard Practice Military Marking for Shipment and Storage.

PALLETIZED UNIT LOADS

The Contractor shall apply provisions and methods of MIL-STD-147, Palletized Unit Loads to contracts requiring the preparation and shipment of bonded palletized unit loads for DoD facilities when applicable.

SPECIALIZED SHIPPING CONTAINERS

The contractor shall apply provisions of MIL-STD-648, Department of Defense Design Criteria Standard, Specialized Shipping Containers. This standard establishes general design guidelines and associated tests for specialized shipping containers used by the Department of Defense. Definitive requirements for specific containers will be defined by the individual specification, acquisition, or task order. This standard is intended to be used as the basic reference document in all specifications and standards prescribing performance requirements to be applied to a specialized shipping container. Compliance with this intent is expected through normal application of the specification or standard preparation and revision processes.

Statement of Work (Cont)

HAZARDOUS MATERIALS (When Applicable)

The contractor shall ensure Hazardous shipments comply with International Civil Aviation Organization (ICAO), U.S. Code of Federal Regulations (CFR) Title 49, International Air Transport Association (IATA) Dangerous Goods Regulation, International Maritime Dangerous Goods Code (IMDG, Annex 1), and AFMAN 24-204, Preparing Hazardous Materials for Military Air Shipments. Packaging shall meet “DOT specification or a United Nation (UN) specification ” manufactured in accordance with 49 CFR, Part 178 and the final packages assembled IAW 49 CFR, Parts 100-185 as applicable. A Competent Authority Approval (CAA) shall be acquired from the responsible Associate Administrator or other designated Department official to perform a function requiring prior consent under the Hazardous Material Regulation (HMR). Package(s) shall be marked IAW MIL-STD-129, DoD Standard Practice, Military Marking for Shipment and Storage.

The contractor shall affix a completed DD Form 1574, Serviceable Tag-Materiel or DD Form 1574-1, Serviceable Label- Materiel to each unit pack or intermediate container and prime outer container(s). The tag or label will indicate the condition(s) of the materiel and to identify the individual article or contents, bundle, container to which they are securely attached. If a symbol is used to represent the manufacturer or the approval agency certifying compliance with 49 CFR 178, subparts L and M, the symbol must be registered with the U.S. Department of Transportation. A copy of the Contractor’s Test Report and signed certification that the package configuration meets both CFR and UN requirements shall be made available to the procuring contract office, as required, prior to acceptance or shipment of any portion of the product IAW Contract Data Requirements List (CDRL DI-PACK-81059A) (Reference AFMC Form 158). Safety Data Sheets (SDS) are required for known hazardous items and applicable items shown in FED-STD-313, Tables I and II. The SDS shall have any applicable identification number, such as National Stock Number or Special Item Number. A copy of the SDS shall be mailed or e-mailed no later than five (5) days prior to contractual delivery of items:

FAR clause 52.223-3, Hazardous Material Identification and Material Safety Data

SPECIAL PACKAGING INSTRUCTIONS RETRIEVAL & EXCHANGE SYSTEM

(SPIRES)

Contractors may request the use of SPIRES website to view item packaging requirements or search for Special Packaging Instruction drawings via the following website: https://lts.cce.af.mil/SPIRES/.

REUSABLE CONTAINERS

The contractor shall safeguard all received reusable shipping containers that meet the requirements of the AFMC Form 158 and are suitable for return shipment of serviceable assets. The contractor shall dispose of and replace unserviceable containers with new containers that meet requirements of the AFMC Form 158.

Contact the Product Support Manager and Administering Contracting Office (ACO) for disposition instructions and replacement when Long Life Reusable Container(s) are received in an unserviceable condition.

REPORTING DISCREPANCIES

The contractor shall use Web Supply Discrepancy Report (WebSDR) to submit/reply to a Supply Discrepancy Report (SDR), when improperly packed assets are received/shipped in other than the contracted packaging requirements (coded data or Special Packaging Instructions (SPI) drawings) from Department of Defense (DoD) components or contractor activities. The contractor shall request a WebSDR account via the following website: https://www.transactionservices.dla.mil/daashome/homepage.asp

(See Defense Logistics Management (DLM) 4000.25-M, Volume 2, Supply Standard and Procedures, Chapter 17, Supply Discrepancy Reporting) http://www.dla.mil/HQ/InformationOperations/DLMS/

Exceptions when no damage has occurred are as follows:

- Items packaged before the current SPIdate.

- An alternate pack may be used, provided the prime Air Force Sustainment Complex, Packaging Office at the Air Logistics Complex (ALC) approves and issues a waiver, deviation number, which would be annotated on the exterior container on the lower right hand portion of the identification side of the container.

- In accordance with Technical Order (TO) 00-85B-3, How to Package Air Force Spares, the contractor may substitute the next larger size fast pack, of the type I or type II to ship transportation priorities 1 and 2 shipments as long as there is no decrease in any of the container dimensions without the requirement of a waiver deviation. TO 00- 85B-3, para 4.2 can be accessed via the website:

- https://www.tinker.af.mil/Portals/106/Documents/Technical%20Orders/AFD-082416-00-85B-3.pdf

ASSIST Documents for Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions The contractor shall use the ASSIST website to access specification, standards, data item descriptions documents listed in this contract solicitation:

FAR 52-211-2 Availability of Specifications, Standards, and Data Item Descriptions listed in the Acquisition Streamlining and Standardization Information System https://quicksearch.dla.mil/

AFSC

406 SCMS/GULAA

Attn: Keith Restorff

DSN: 777-9192

COMM: 801-777-9192

E-mail: keith.restorff@us.af.mil

APPLICABLE GOVERNMENT PACKAGING DOCUMENTS

NOTE: UTILIZE THE MOST RECENT REVISION

AFI 24-602V2_AFGM2018-01, Preparation and Movement of Air Force Cargo

AFMAN 24-204, Preparing Hazardous Materials for Military Air Shipments

DLMS 4000.25, Defense Logistics Management Systems, Volume 2, Change 10, Supply Standards and Procedures, Chapter 17, Supply Discrepancy Reporting

DOT Title 29, Occupational Safety and Health Administration, Labor

DOT Title 49, Code of Federal Regulations (49 CFR), Transportation

International Civil Aviation Organization (ICAO) Technical Instructions

International Air Transport Association (IATA) Dangerous Goods Regulation

International Maritime Dangerous Goods (IMDG) Code

ISPM 15, International Standard Phytosanitary Measure Note: Marking Requirements may be found in the American Lumber Standards Committee, Incorporated Wood Packaging Material Enforcement Regulations dated November 07, 2014 and ISPM 15.

MIL-STD-2073-1E, Change 3, Standard Practice, for Military Packaging

MIL-STD-129R, Change 1, Department of Defense Standard Practice Military Marking for Shipment and Storage

MIL-STD-648E, Department of Defense Design Criteria Standard, Specialized Shipping Containers

MIL-STD-147E, Change 1, Palletized Unit Loads

MIL-STD-1686C, Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices) TO 00-85B-3, How to Package Air Force Spares

FED-STD-313E, Federal Standard: Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities

MIL-STD-1686C, Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices).

REV: ENGINEERING DATA REQUIREMENTS

(ATTACHMENT “A”)

NOTE: MILITARY SPECIFICATIONS / STANDARDS WILL NOT BE FURNISHED IN THE BID SET.

1. THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:

RUDDER ASSY-AIRCRAFT

2. PART NUMBER:

16T7302-805

3. NATIONAL STOCK NUMBER:

1560-01-077-1314WF

PREPARED BY:

Bill Garcia

OFFICE SYMBOL:

416 SCMS/GUEAA

DATE:

2/13/2019

HILL AFB FORM 462 Page 1 of 1

4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC., WILL BE USED IN LIEU OF THE DATA INDICATED. THE SUPERSEDED DATA WILL NOT

BE FURNISHED UNLESS SO INDICATED.

5. THE SOURCE/MATERIAL IF LISTED ON THE STANDARDS, SPECIFICATION AND DRAWINGS ARE THE ONLY SOURCE/MATERIALS FOR THOSE

ITEMS.

6. DEVIATIONS FROM SPECIFICATIONS IDENTIFIED IN CONTROL DRAWINGS ARE NOT AUTHORIZED WITHOUT PRIOR APPROVAL BY OO-ALC

ENGINEERING.

7. PART MARKING PER MIL-STD-130 IN LIEU OF FPS-3008

8. 16PR100 IS NOT REQUIRED FOR MANUFACTURE AND WILL NOT BE PROVIDED.

9. 16PR006 IS NOT FURNISHED. USE IGES LOFT DATA LISTED ON THE EDL.

10. USE MATERIAL PER SAE AMS-QQ-A-250/4 IN LIEU OF QQ-A-250/4.

ENGINEERING DATA LIST

04 FEB 2019

REVISION: 11 *HISTORY*

CAGE:

81755

PAGE:

NSN:

1560010771314WF

DATA TECH:

East, William J

END ITEM:

F-16

ORGANIZATION/OFFICE SYMBOL:

429 SCMS GUMACA/

MANUFACTURER NAME:

LOCKHEED MARTIN CORPORATION

REFERENCE NUMBER:

NOUN:

RUDDER,AIRCRAFT

LINE/

SUB CAGE

ENG DRAWING NUM/ ACCOMP

DOC NUM REV

NR

SHEETS

FURN

CODE

DIST

CODE NOUN REMARKS

L 81755 C180 AD S PRECIPITATION STATIC

DISCHARGER

L 81755 C7530 F S NUT, SELF-LOCKING

L 81755 C7984 R S BOLT

L 81755 FMS-1023 K S EPOXY RESIN MAT'L East, William J 04 FEB 2019

W/AM 2 & W/FQML-1023-26 QUALIFIED MAT'L LIST

NAME: DATE:

L 81755 FMS-1044 J S SEALANT, FUEL TANK East, William J 05 FEB 2019

W/FQML-1044-41 QUALIFIED MAT'L LIST

L 81755 FMS-1097 C S ADHESIVE East, William J 05 FEB 2019

W/AM 1 & W/FQML-1097-4 QUALIFIED MAT'L LIST

L 81755 FMS-2023 F S GRAPHITE FIBER TAPE East, William J 05 FEB 2019

W/FQML-2023-28 QUALIFIED MAT'L LIST

L 81755 FMS-3002 A S PLATE IDENTIFICATION East, William J 05 FEB 2019

W/AM 1 & W/FQML-3002-13 QUALIFIED MAT'L LIST

L 81755 FMS-3011 G S MODIFIED EPOXY ADHESIVE East, William J 04 FEB 2019

W/FQML-3011-3 QUALIFIED MAT'L LIST

L 81755 FMS-3018 K S STRUCTURAL ADHESIVE East, William J 05 FEB 2019

W/AM 2 & W/FQML-3018-18 QUALIFIED MAT'L LIST

L 81755 FMS-3019 E S ADHESIVE FILM

COMPOUND/HONEYCOMB

East, William J 04 FEB 2019

W/FQML-3019-7 QUALIFIED MAT'L LIST

L 81755 FMS-3096 S MODIFIED EPOXY COMPOSITE East, William J 04 FEB 2019

W/ AM 1 & W/FQML-3096 QUALIFIED MAT'L LIST

L 81755 FPS-1003 M S SEALING SPEC

L 81755 FPS-1012 M S APPLICATION/BONDING

ADHESIVE

East, William J 05 FEB 2019

W/FQPL-1012-1 QUALIFIED PROCESSORS LIST

L 81755 FPS-1047 C S ANAEROBIC COMPOUND

C - CLASSIFIED DOCUMENT.

S - FURNISHED WITH SOLICITATION.

M - STABLE BASE DRAWING REQUIRED; FURNISHED WITH

CONTRACT AWARD.

X - DATA SUPPLIED (NOT IN JEDMICS).

R - FURNISHED BY PCO UPON REQUEST.

P - PARTIAL DOCUMENT FURNISHED.

V - VENDOR DRAWING; (NOT PROVIDED).

G - GOV'T DOCUMENT.

O - OTHERS, CONTRACTOR MUST ACQUIRE.

A- DATA NOT AVAILABLE.

FURNISHED METHOD CODE LEGEND:

Page 1 of 5EDL Version 11Generated by PRPS using Jasper Reports on 19 Oct 2023

L 81755 FPS-2021 E S LAMINATES MFG East, William J 04 FEB 2019

W/AM 2

L 81755 FPS-3001 G S FINISH SPEC

L 81755 FPS-3016 S S ADHESIVE BONDING ASSY East, William J 04 FEB 2019

W/FQPL-3016-24 QUALIFIED PROCESSORS LIST (BONDING)

L 81755 FPS-3017 F S METAL REMOVAL East, William J 04 FEB 2019

W/FQPL-3017-10 QUALIFIED PROCESSORS LIST

L 81755 FPS-3018 B S FORMING ALUM ALLOY East, William J 05 FEB 2019

W/AM 4

L 81755 FPS-3024 G S ELECTRICAL BONDING East, William J 05 FEB 2019

W/FQPL-3024-12 QUALIFIED PROCESSORS LIST

L 81755 FPS-3026 F S PLASTIC PARTS East, William J 05 FEB 2019

W/AM 2 & W/FQPL-3026-10 QUALIFIED PROCESSORS LIST

L 81755 FPS-3032 F S GRAPHITE PROCESS East, William J 05 FEB 2019

W/FQPL-3032-2 QUALIFIED PROCESSORS LIST

L 81755 M001 AA S ROUGHNESS TOLERANCE

L 81755 M016 Y S TORQUE & SEALANT

APPLICATION

L 81755 M057 Y S BOLT INSTALLATION

L 81755 M065 AG S NUT INSTALLATION

L 81755 M100 AT S RIVET INSTALLATION

L 81755 M131 AE S GRIP LENGHTH VARIATION

L 81755 M198 AH S FASTNER INSTALLATION

L 81755 M219 AS S SEAL/PRIMER INSTALLATION

L 81755 M16T7303 M MYLAR

L 81755 NDTS-1101 J S PENETRANT INSPECTION East, William J 05 FEB 2019

W/FQPL-1101-26 QUALIFIED MAT'L LIST

L 81755 NDTS-1500 K S HARDNESS/CONDUCTIVITY

TESTING

Page 2 of 5EDL Version 11Generated by PRPS using Jasper Reports on 19 Oct 2023

L 81755 NDTS-1501 K S HARDNESS TESTING

L 81755 NDTS-1502 M S CONDUCTIVITY TESTING

L 81755 NDTS-5101 A S ULTRASONIC INSPECTION East, William J 05 FEB 2019

W/SUP -1, -2, -3, AND 4A & W/AM3

L 81755 NDTS-5103 E S ULTRASONIC INSPECTION-

COMPOSITE

L 81755 P082 C S PLATE, IDENT/MOD ADHES

BACKED

L 81755 P190 A S CORE, HONEYCOMB

L 81755 P5055 U S GLASS, FINISHED, TAPE East, William J 05 FEB 2019

W/FQML-P5055-1 QUALIFIED MAT'L LIST

L 81755 P6150 H S ADHESIVE, NON-ASBESTOS

L 81755 P5026 U S COMPOUND, RETAINING East, William J 04 FEB 2019

W/FQML-P5026-2 QUALIFIED MAT'L LIST

L 81755 P5284 M S FABRIC,GLASS, IMPREGNATED

L 81755 P5362 L S CLOTH, GLASS IMPREGNATED

L 81755 16T7302 AP S RUDDER ASSY-AIRCRAFT East, William J 05 FEB 2019

W/PL ISSUE 164 REV BB W/ ECO 779N5

L 81755 16T7303 DN S RUDDER ASSY East, William J 05 FEB 2019

W/PL ISSUE 244 REV CN W/ECN 244M3

L 81755 16T7307 L S SKIN-RUDDER,ASSY OF East, William J 05 FEB 2019

W/PL ISSUE 93 REV M W/ECN 22D89

L 81755 16T7308 F S WEDGE, TRAILING EDGE

RUDDER

W/PL ISSUE 26 REV D

L 81755 16T7309 Y S BELLCRANK, RUDDER-ASSY

OF

W/PL ISSUE 159 REV AD, W ECN 951I1

L 81755 16Z001 AK S INTERPETATION, FORMATS East, William J 04 FEB 2019

W/PL REV FZ, ISSUE 204

Page 3 of 5EDL Version 11Generated by PRPS using Jasper Reports on 19 Oct 2023

L 98747 HILL AFB FORM 462 X ATTACHMENT A

L 81755 16PR070 T S FINISH CODES/F-16 East, William J 04 FEB 2019

W/AP A & B

L 81755 16AEI-11-1003 A S RUDDER INSTALL & REMOVE

PROC.

PL ONLY

L 81755 C7985 S S BOLT, 100 DEG, REDUCED

HEAD

L 81755 C061 W S NUT, PLATE, FLOATING

L 81755 P103 J S SHIM STOCK, LAMINATED

L 81755 P6141 E S ADHESIVE, EPOXY, EXTRA

FAST SETTING

L 81755 16T7304 AD S SPAR,RUDDER-VERTICAL

STABILIZER

W/PL IS 054 REV S, W/ECN 984C1

L 81755 16T7305 AH S RIB ROOT, RUDDER East, William J 05 FEB 2019

W/PL IS 133 REV R

L 81755 16T7306 E S RIB, RUDDER, WL 211.50 East, William J 04 FEB 2019

W/PL IS 028 REV E

L 81755 16W044 BF S FLAPERON,OUTBD-ASSY OF East, William J 05 FEB 2019

W/PL IS 076 REV AP

L 81755 16W021 EU S FLAPERON,WING-ASSY OF East, William J 05 FEB 2019

W/PL IS 277 REV DU, ECN 778N7

L 81755 16W092 A S GEOMETRY,WING FLAPERON East, William J 04 FEB 2019

W/PL IS 006 REV A

L 81755 M16T7302 M MSLO

L 81755 M16T7304 M MSLO

L 81755 M16T7305 M MSLO

L 81755 M16T7306 M MSLO

L 81755 M16T7308 M MSLO

L 81755 M16W021 M MSLO

Page 4 of 5EDL Version 11Generated by PRPS using Jasper Reports on 19 Oct 2023

L 81755 16T7307-25 S IGES DATA

L 81755 16T7307-26 S IGES DATA

L 81755 FPS-1051 C S CHEMICAL MILLING OF

METALS

L 81755 FPS-3030 D S SPLIT SLEEVE COLD WORK

HOLES

W/FQPL-3030-2 QUALIFIED PROCESSORS LIST

L 81755 M039 L S CHEMICAL MILLING

L 81755 M199 D S HOLE PREPARATION

L 81755 M172 B S APPLICATION OF P6104

L 81755 M221 D S NUT INSTALLATION,

CAPTIVATING, C7592 AND

STANDARD ENGINEERING TEXT

RELEASE OF THIS DATA TO A FOREIGN OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE.

Page 5 of 5EDL Version 11Generated by PRPS using Jasper Reports on 19 Oct 2023

File details come from the government source that posted it. Updated .