This document is a First Article Requirements form related to a federal contract opportunity for a liner, augmentor.
The key details are:
- The contract opportunity is for a liner, augmentor, with Solicitation Number SPRTA124R0198-01, issued by the Defense Logistics Agency Aviation.
- The First Article Quantity is 3 units, with 2 to be part of the production quantity and 1 additional. Contractor testing and a test plan are required, and the first article must be delivered within 120 calendar days.
- First Article Testing may be waived if the offeror has previously provided the same or similar articles to the government with satisfactory performance, or if the offeror is the prime contractor Pratt & Whitney.
- The estimated cost of government testing/inspection is $2,500. Disposition of approved/disapproved first articles is specified.
- The cognizant engineering organization responsible for approving the first article is AFLCMC / LPSBE.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 3573197_QUALRQMT.pdf | ||
| 3877905_TRNSPDATA_REPORT.pdf | ||
| 3877908_PKGRQMT_REPORT.pdf | ||
| SPRTA124R0198.pdf | ||
| 3470480_EDL_REPORT.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST ARTICLE REQUIREMENTS 1. DATE
26 JUN 2023(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)
2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER
77445 / 4084791
4. NSN
2840014559138NZ
5. FIRST ARTICLE QUANTITY
THE FIRST ARTICLE IS 3 UNIT(S) OF LOT / ITEM 1
AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY
6. ARTICLES
WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD
7. LONG LEAD TIME ITEMS
REQUIRED X NOT REQUIRED
(See FAR 52.209-3 OR -4, alternate II)
8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)
X REQUIRED NOT REQUIRED
"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."
9. TEST / INSPECTION REQUIREMENTS
A. X CONTRACTOR TESTING
GOVERNMENT TESTING
Performance or other characteristics which the First Articles must meet are identified in drawing 4084791, sub-tier drawings (if an assembly) and specifications identified therein.
B. The detailed technical requirements for First Article approval tests are contained in
Block 12 of this form and LPF-QAR-003.
(Cite Spec and Para number)
C. X TEST PLAN REQUIRED
(3) Number of days for government approval / disapproval days.
(1) DD Form 1423 ELIN
(2) Delivery due calendar days from date of contract.
D. Contractor's notification to ACO and
PCO
(Requesting Activity) of test time and location due 10 days prior to start of testing.
E. X TEST REPORT REQUIRED
(3) Forwarded to
DDOO SOP FIRST ARTICLE
7330 SENTRY BLVD BLDG 469 DR 20
TINKER AIR FORCE BASE,OKLAHOMA73145
ATTN DDOO-SOP, DO NOT POST, NON-ACC
(4) Government written notice of approval / disapproval due
(2) Due
(1) DD Form 1423 ELIN days after receipt of contractor's report.60 calendar days from date contract.
AFMC IMT 260, 20230316, V-5,
Version 15Generated by PRPS using Jasper Reports on 05 Mar 2024
PREVIOUS EDITION IS OBSOLETE
Prescribed by: AFMCI23-110
F. FIRST ARTICLE DELIVERY
(1) Due within 120 calendar days from date contract.
(2) Notify 10 calendar days prior to shipment.
(3) Delivered to government at
(Set Forth Consignee and Address)
(4) Government written notice of approval / disapproval within 45 days after receipt of first article package.
G. Estimated cost of government testing / inspection evaluation.
$2,500.0000
10. DISPOSITION OF FIRST ARTICLES
Approved First Articles will be forwarded to
(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.
First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.
Disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.
On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).
a. Approved First Articles will be returned to the contractor for shipment with production item.
b. Disposition of disapproved First Articles will remain the same as marked above.
X Other Disposition:
see remarks
11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL
a. X Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the X Government, DoD, Air Force.
b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract.
c. X Offerors who have previously furnished production quantities of the same or similar articles to the X Government, DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.
d. X Provided not more than 36 months have elapsed since completion of the contract.
e. First Article testing will not be waived.
f. X See Remarks in block 12 below.
NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:
A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION
AFMC IMT 260, 20230316, V-5,
Version 15Generated by PRPS using Jasper Reports on 05 Mar 2024
12. REMARKS
Shelley, Eric CNAME: 26 JUN 2023DATE:
3. E-Publishing Block 3: Part Number __ 4084791____
5. First Article Quantity is 3 parts:
2 parts will be part of production quantity 1 part will be in addition to production quantity 9.B. First article test requirements shall be per LPF-QAR-003 and the following:
a. All three first articles shall be inspected in accordance with the requirements of paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPF-QAR-003."
b. The assembly detail part numbers (if an assembly), shall be inspected per paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPF-QAR -003 prior to assembly."
c. After completion of inspections per 9.B.a above, one article shall be destructively tested/ evaluated in accordance with the requirements of paragraph 3.6 of LPF-QAR- 003.
NOTE: Deliveries (FAT test plan and Reports) are preferably submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Formant.
C. 1) DD Form 1423 ELIN______________________ 2)Deliver due _____45______calendar days from date of contract E. 1)DD Form 1423 ELIN______________________ 2)Due ______60________calendar days from date of contract
10. Disposition of first Articles:
Destructively tested first article assets will be condemned and disposed of at vendor's facility.
11. The cognizant Government engineering authority shall be the final authority for determining if a contractor meets the conditions of waiver identified in 11.a or 11.c.
First article testing is waived if the offeror is the prime contractor, Pratt & Whitney.
This a critical part used in the F100 series turbine engine. Poor quality parts will have an adverse effect on mission capability and system safety. For this reason, First Article Testing is required to insure first time manufacturers or manufacturers that have not produced the item within three years manufacture parts in accordance with the drawing and specification requirements.
13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING
(Name, Organization, Phone)
Shelley, Eric C
AFLCMC / LPSBE
405-734-0001
884-0001
14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING
TEST (Name, Organization, Phone)
AFMC IMT 260, 20230316, V-5,
Version 15Generated by PRPS using Jasper Reports on 05 Mar 2024