36E77619R0042-002.doc

DOC document 101 KB Posted

Attached to
Construction - Sacramento VAMC - Correct Campus Water System Federal contract opportunity
Solicitation number
36E77619R0042
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

36E77619R0042 Attachment 1 - Spec 00 11 21 - RFP To DB.doc

View the file

Other files for this federal contract opportunity

Other files attached to Construction - Sacramento VAMC - Correct Campus Water System, newest first.
File Type Posted
36E77619C0067-000.docx DOCX document
36E77619R0042-0001008.docx DOCX document
36E77619R0042-003.docx DOCX document
36E77619R0042-007.docx DOCX document
36E77619R0042-008.docx DOCX document
36E77619R0042-001.docx DOCX document
36E77619R0042-010.pdf PDF
36E77619R0042-011.pdf PDF
36E77619R0042-006.zip ZIP file
36E77619R0042-012.pdf PDF
36E77619R0042-005.pdf PDF
36E77619R0042-004.pdf PDF
36E77619R0042-009.docx DOCX document
36E77619R0042-000.docx DOCX document
36E77619R0042-000.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1

SECTION 00 11 21

REQUEST FOR PROPOSAL TO DESIGN-BUILD

A.

PART I - General

A1. Scope of Contract

Provide all labor, materials, tools, equipment, design and construction services necessary to complete the design and subsequent construction of the project described herein and other specific tasks as further defined by this request for proposal (RFP).

A. Project Number: 612A4-19-020 B. Project Title: Correct Sacramento Campus Water System

C. Project Location: 10535 Hospital Way, Mather, CA 95655

D. Scope of Work: ATTACHMENT 2 SOW

E. General Drawing Submission Requirements: Shop Drawing Submission Requirements are available on the internet at the following address: http://www.cfm.va.gov/. As-built drawings for the Medical Center are available. (note: these drawings are not completely accurate. A-E shall verify existing conditions.) All drawings will be prepared with the VA Standard Title Block and Border. All drawings shall be produced using AutoCAD 2005 or newer. Each individual file on a DVD shall be named by numbers corresponding to the construction documents (i.e. the specs shall be named 00 11 22, 33 44 55, etc. and the drawings shall be E1, E2, etc.) and the final AutoCAD/specifications files shall be exactly as submitted in the final submission.

G. Incorporated References: The following Department of Veterans Affairs, Office of Construction and Facilities Management, information is incorporated within the Scope of Work by reference, and can be found on the VA web site at http://www.cfm.va.gov/ Master Specifications; Design Guides; Design Manuals; Standard Details; Design Alerts; and Quality Alerts.

A2.

Definitions

A.

Design-Build (D-B) as defined by the Department of Veterans Affairs (VA) is the procurement by the Government, under one contract, with one firm or Joint Venture (JV) for both design and construction services for a specific project.

1.

Contracting Officer (C0): A person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the contracting officer acting within the limits of their authority as delegated by the contracting officer. “Administrative contracting officer (ACO)” refers to a contracting officer who is administering contracts. “Termination contracting officer (TCO)” refers to a contracting officer who is settling terminated contracts. A single contracting officer may be responsible for duties in any or all of these areas.

2.

Contracting Officer’s Representative (COR): The Contracting Officer's written designation of a representative responsible for administering contracts under the immediate direction of the Contracting Officer. For the purposes of this contract the term “COR” will be used herein.

3.

Technical Monitor (TM): This term, as used herein, refers to the person(s) assisting the COR in administering contracts under the immediate direction of the Contracting Officer.

4.

Design-Build Contract: This term, as used herein, refers to the Contract(s) to perform the design and construction of the project.

5. Design-bid-build (D-B-B): The traditional delivery method where design and construction are sequential and contracted for separately with two contracts and two contractors.

6.

Contractor: This term, as used herein, refers to the contractor under this contract or the D-B team. The contractor or D-B team is solely responsible for the management (planning, supervision, and contract coordination), design, and (professional) services and installation (including all labor, equipment, materials, tools, and inspections) to meet the requirements of this contract.

7.

Architect-Engineer (A-E): This term, as used herein, refers to the A-E firm(s) that is a part of the D-B team, also referred to as D-B A-E.

8. Project Management: The contractor shall provide an individual in the capacity of a contractor project manager. The contractor project manager shall have legal (on-site signature) authority to represent the Contractor. The Project Manager shall be the initial point of contact for coordinating with the VA.

A3.

Pre-Proposal Site Visit (This section will be removed after award.)

A pre-proposal site visit will be conducted in Phase II. The most highly qualified firms selected to proceed to Phase II will be invited to attend the pre-proposal site visit. The Contracting Officer will establish the date and time and notify the Phase II offerors in writing. See Federal Acquisition Regulation (FAR) Clause 52.236-27 of this solicitation.

Location: TBD Date / Time: TBD

All Offerors, consultants, subcontractors, manufacturers and suppliers are invited to attend. The following agenda is furnished for this meeting:

1.

Open meeting & Introductions;

2.

Review of project and Design-Build method for construction contracting;

3.

Specifications;

4.

General requirements, Solicitation Documents and Offer Submission Procedure;

6.

Questions and answers;

7.

Close; and

8.

Site walk through – attendance is optional.

*Please note that attendance for the pre-proposal conference and / or the site walkthrough is voluntary.

A5. Permit Requirements

A. The D-B Contractor is responsible for obtaining all permits and approvals necessary to complete the project, prior to starting Construction. This includes working with FAA, local counties, municipalities, and cities.

A6.

Selection Criteria (This section will be removed after award.)

A. In accordance with FAR part 15 The Government intends to award a contract resulting from this solicitation to the responsible Offeror whose proposal represents the best value after evaluation in accordance with the factors in the Two-Phase Design-Build solicitation. A responsibility determination will be made in accordance with FAR 9.1, Responsible Prospective Contractors.

B. Evaluations: All Phase I and Phase II proposals shall be subject to evaluation by a team of Government personnel. In Phase I of the Two-Phase Design-Build process, Offerors will submit a Phase I proposal in accordance with the four (4) evaluation factors listed in C.3. Upon receipt of the Phase I proposals, the VA team will evaluate and determine the highest qualified Offerors based on their Phase I proposal submissions. The Phase I proposals will only be evaluated on the four (4) evaluation factors listed. A maximum of four (4) Offerors will be selected to provide a proposal for Phase II. The Offerors not selected to provide Phase II proposals will be notified that they are no longer being considered for this project. The Phase II proposals will consist of both technical and price factors, which are listed in D.4. The Government intends to award without discussions; however, the Government reserves the right to conduct discussions if determined necessary based on the initial evaluation of the Phase II proposals. Using the tradeoff process to achieve the best value, it may be in the Government’s best interest to consider award to other than the lowest price Offeror or other than the highest technically rated offeror in Phase II. Both Phase II technical evaluation factors, when combined are approximately equal to price.

B.

PART II - RESPONSIBILITIES

B1.

VA Team A. The VA team is comprised of the VHA-PCAC Contracting Officer and Contract Specialist, the COR who will be located at the construction site, and VA Medical Center staff.

B2. Use of Advisors

A. Contractors are advised that VA contractor personnel may assist the Government during the Government’s evaluation of Proposals. The persons shall be authorized access to only those portions of the proposal and discussions that are necessary to enable them to provide technical advice on specialized matters or on specific problems. These individuals will be required to protect the confidentiality of any specifically identified trade secrets and/or privileged or confidential commercial or financial information obtained because of their participation in this evaluation. They shall be expressly prohibited from scoring, ranking or recommending the selection of a vendor.

B3.

Design-Build Team:

A.

The D-B team includes all J/V partners, consultants, and sub-contractors to the one firm. The D-B team shall provide Architectural and Engineering disciplines for the preparation of construction documents, and construction contractor capabilities for construction of the project.

B.

If the D-B Team and A-E contractor are a J/V (not one and the same firm), engineering and other technical consultants shall be subcontractors of the J/V Architect - not the Design-Build construction contractor or sub-contractors. If the D-B Team A-E and contractor are one and the same firm (not a J/V) those consultants shall be subcontractors of the D-B firm, not the construction subcontractors.

C.

The RFP documents are intended to define existing conditions, certain required items, and design parameters to be included in the project. It is the contractor's responsibility to visit the site or ascertain the conditions at each site. In addition, the Contractor acknowledges that it has taken steps reasonably necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, the existing conditions, certain required items, and design parameters to be included in the project. It is the D-B Team’s responsibility to complete the documents and construction in a manner consistent with the intent of the RFP documents within the required period of performance.

C.

PART III - PROPOSAL REQUIREMENTS (This section will be removed after award.)

C1.

General

PHASE I

A.

Phase I proposals shall be based on the solicitation documents issued for RFP Solicitation Number 36E77619R0058. Phase I proposals will be in the format stipulated elsewhere in Section C2. Phase I Proposal Format.

B.

Phase I proposals shall be received on or before the date listed in Block 13a of the SF 1442. There will be no public opening of the proposals.

C.

Submit Phase I proposals via email to:

1.

Kaylan.Grove@va.gov 2.

Emails are limited to five (5) MB.

3. Phase I proposals will only be accepted via email.

C2.

PHASE I Proposal Format A.

The Offeror shall submit the Phase I proposal in one (1) PDF document. The proposal shall be labeled with the Offeror’s organization, business address and VA solicitation number. The Offeror shall not include any price or price related material in the Phase I proposal.

B. The Offeror shall submit the Phase I proposal in electronic format only. Include page numbers and the company name in the header or footer of each page.

C. The Offer, including title page, detailed table of contents, preface, for the Phase I proposal shall not exceed a total of 25 (twenty-five) pages in Microsoft Arial size 12 font. Use graphic presentations where such use will contribute to the compactness and clarity of the proposal.

D. A page is defined as each face of an 8.5 X 11-inch sheet of paper containing information. All information (except for document numbers, page numbers, etc.) shall be provided in an image area of 7 X 9 inches. The background color of each page of the submission shall be white or ivory stock only. Excess pages will not be evaluated. Text lines will be single-spaced. A smaller font size for any graphics presented in a proposal is permitted if the information is legible to the human eye. Fonts other than Arial are permissible in the presentation of graphic material only.

C3.

PHASE I Proposal Evaluation Factors and Instructions to Offerors

Factor 1, Past Performance: Provide a minimum of one (1) and a maximum of three (3) projects completed within the last five years (5) years similar in size, complexity and scope to this project. Projects must demonstrate an offeror’s experience as a prime contractor managing multiple subcontractors to include A-E firms if applicable. If the contractor does not possess D-B experience, provide a minimum of (1) and a maximum of two (2) projects completed by the A-E firm similar in size, complexity, and scope to this project in addition to the one (1) to three (3) projects submitted for the prime contractor. For purposes of this evaluation, a relevant project is further defined as “design and/or construction completed in a clinical, hospital or other medical related use space similar in size and scope to this project.” Project(s) shall have a minimum value of $3M and be 100% completed for D-B or D-B-B. Projects shall have a minimum value of $250,000 and be 100% completed for designs completed by the A-E firm in support of D-B or D-B-B.

For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project. If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects shall be submitted for each Joint Venture partner. Offerors who fail to submit experience for all Joint Venture partners may be rated lower. The Offeror’s submission should include at a minimum:

· Project Title, Project Location (Physical Address); Contract Type (Example: Design-Build, Design Bid Build)

· Project owner name and contact information

· A brief description of the scope of work

· Project prime contractor and major subcontractors

· Project statistics including start and completion dates (original vs actual) and project cost (original vs actual). If original vs actual completion dates and project cost differ, please provide an explanation as to why they differ.

If a completed past performance evaluation is available in the Past Performance Information Retrieval System (PPIRS), it shall be submitted with the proposal for each project referenced for Past Performance. If there is not a completed past performance evaluation available in PPIRS, then the Offeror shall submit a Past Performance Questionnaire (PPQ) (reference Attachment 6) for each project referenced for Past Performance. The Offeror shall notify their client that the PPQ shall be submitted via email to the Government’s point of contact, kaylan.grove@va.gov. If the Offeror is unable to obtain a completed PPQ from a client for a project before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project. The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires.

Factor 2, Key Personnel Experience: The Offeror shall provide a resume for each of the following key A-E personnel: Architect, Mechanical Engineer – Plumbing, Mechanical Engineer – HVAC, Electrical Engineer, Civil Engineer, Hospital Planner, Geo-Technical Engineer, and Surveyor.

The Offeror shall also provide a resume for each of the following key construction personnel: Project Manager, Project Engineer, Site Supervisor, and any known major subcontractors. For each resume, include company name; name of individual; relevant listing of experience; qualifications such as specialized training, education, experience, etc. For any subcontractors identified, provide a resume for that company, identify any key personnel that will be assigned to the contract resulting from this solicitation, and the relevant experience of both the company and any key personnel that were identified. Please delineate the approximate percentage of work the prime contractor will perform and the approximate percentage of work the subcontractors (collectively) will perform. The VA will use the information provided to evaluate, among other things, specialized experience and technical competence.

Factor 3, Technical Approach: Provide a brief narrative (page limitation: five (5) pages) describing the Offeror’s method to manage the project to achieve design and construction objectives as described in the solicitation. If the page limits are exceeded, the pages exceeding the limit will not be read or considered. Include in the brief narrative all requirements detailed in the scope of work. The following shall be included in the narrative:

· Design Approach: Describe the techniques and methods for an efficient, effective design and;

· Construction Approach: Describe the techniques and methods for this construction project to include coordination with the design packages, projected timelines and coordination of work.

Factor 4, Capability to Perform: The Offeror shall provide a letter from their surety demonstrating the offeror’s total bonding capacity and current available bonding capacity. Total bonding capacity and current available bonding capacity must be outlined in a letter dated no earlier than the solicitation release date.

C4. Evaluation of Offers (Phase I)

Phase I evaluations will be conducted in accordance with the Two-Phase Design-Build Evaluation process and the methodologies outlined below. Adjectival ratings will be assigned for all evaluation factors considered in Phase I.

Factor 1, Past Performance: Will be evaluated on recent and relevant experience as well as the quality rendered of the projects provided. If D-B experience is not applicable, the construction contractor and the A-E firm will be evaluated on relevant and recent projects to the applicable portion of the project, construction or design respectively. Past performance will be evaluated on the quality of the Offeror’s past performance with respect to the projects provided. When evaluating quality aspects that may be considered are timeliness of contract completion, adherence to contract schedules and timely submission of data deliverables, the contractor’s ability to comply with the terms and conditions of the contract, the overall quality of the work performed on the contract, the Offeror’s managerial performance, and whether the reference would enter into a contract with the contractor again. Contractors without relevant past performance or for whom past performance information is not available, will be rated neither favorably nor unfavorably on past performance. In accordance with VA Information Letter (IL) 049-03-9, past performance evaluations may also be conducted using information obtained from CPS or PPIRS and any other sources deemed appropriate by the CO. Other sources may include, but are not limited to, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.

Factor 2, Key Personnel Experience: Will be evaluated on relevant management personnel, technical personnel, and subcontractor capabilities and qualifications to provide the required planning, implantation, and completion of the project.

NOTE: If awarded the contract resulting from this solicitation, any deviation from the A-E firm or personnel submitted for evaluation during contract performance must be approved by the Contracting Officer. Substitutions may be approved if a firm or person possesses the same qualifications as the firm or person submitted for evaluation.

Factor 3, Technical Approach: Will be evaluated based on the Offeror’s proposed technical approach for this design-build project as defined in the solicitation submittal requirements. The assessment of the offeror’s method to manage the project shall be used as a means of evaluating the offeror’s ability to successfully meet the requirements of the solicitation.

Factor 4, Capability to Perform: Will be evaluated based on whether or not the Offeror has adequate total bonding capacity and available bonding capacity to accommodate the design and construction of the project.

PHASE II

D1.

General (This section will be removed after award.)

A.

Phase II proposals shall be based on solicitation documents issued for RFP Solicitation Number 36E77619R0058 and the instructions provided by the Contracting Officer in the Phase II Notice of Offerors that they were selected as one of the most qualified offerors in Phase I. Proposals will be in the format stipulated in Section D2. Phase II Proposal Format.

B.

Proposals shall be received on or before the date specified in the Phase II Notice of Offerors.

C.

Submit Phase II proposals via email to:

1. Kaylan.grove@va.gov 2.

Emails are limited to five (5) MB.

3. Phase II proposals will only be accepted via email.

D.

Submit the original Bid Bond by mail to:

1.

US Postal Service Deliveries:

Kaylan Grove Veterans Health Administration

Program Contracting Activity Central (VHA-PCAC)

6150 Oaktree Blvd Suite 300

Independence, OH 44131

2.

Commercial Delivery Services / Hand Carry (Monday- Friday, 8:00 AM to 4:30 PM (EDT)) Kaylan Grove Veterans Health Administration

Program Contracting Activity Central (VHA-PCAC)

6150 Oaktree Blvd Suite 300

Independence, OH 44131

3. Failure to furnish the required bid guarantee in the proper form and amount, by the time specified in Block 13 of the SF 1442, may result in rejection of the Phase II proposal. SEE FAR Provision 52.228-1, Bid Guarantee, of this solicitation.

d2.

PHASE II Proposal Format (This section will be removed after award.)

A.

Technical, Schedule, and Price sections of the Offerors Phase II proposals will be evaluated independently; therefore, the Offeror shall submit the Phase II proposal in three (3) Volumes (Volume I: Technical Solution, Volume II: Draft Project Schedule, and Volume III: Price). In order to evaluate Volume I: Technical Solution and Volume II: Draft Project Schedule strictly on the merit of the material submitted, the contractor shall include NO price information in Volume I or II. The offeror shall separately bind Volumes I, II, and III. All three (3) volumes must be labeled with the Offeror's organization, business address, and VA Solicitation Number.

B. The Offeror shall submit Volumes I, II, and III in electronic format only. No hard copies will be accepted. Include page numbers and the company name in the header or footer of each page.

C. The Offer, including title page, detailed table of contents, and preface, for Volume I - Technical Solution shall not exceed a total of 30 (Thirty) pages in Microsoft Arial size 12 font. Volume II shall not exceed five (5) pages and shall be formatted in a time scaled bar graph format. Volume III - Price Proposal shall not exceed a total of twenty (20) pages in Arial size 12 font. Use graphic presentations where such use will contribute to the compactness and clarity of the proposal. The SF 1442, Representations and Certifications and acknowledged amendments shall all be part of Volume III and will not count against the page limitations. The J/V documentation, if applicable, will not be counted in the page limit.

D. A page is defined as each face of an 8.5 X 11-inch sheet of paper containing information. All information (except for document numbers, page numbers, etc.) shall be provided in an image area of 7 X 9 inches. The background color of each page of the submission shall be white or ivory stock only. Excess pages will not be evaluated. Text lines will be single-spaced. A smaller font size for any graphics presented in a proposal is permitted as long as the information is legible to the human eye. Fonts other than Arial are permissible in the presentation of graphic material only.

E. Offeror shall include all required Representations and Certifications; and acknowledge receiving amendments by filling out section 19 of the SF 1442 and returning a signed copy of the amendment(s) with the proposal.

F.

Offeror shall include their Safety or Environmental Violations and Experience Modification Rating Information as part of Volume III, including filling out Attachment 4 of the solicitation. It will not be evaluated as part of Volume III Price, but will be used as part of the Responsibility Determination. It will also not count against the page limitations for Volume III.

1.

All Offerors shall submit information pertaining to their past Safety and Environmental record. The information must contain a certification that the Offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If such certification cannot be made, an Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.

2.

All Offerors shall submit information regarding their current Experience Modification Rate (EMR). This information shall be obtained from the Offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If an Offeror’s EMR is above 1.0, Offeror must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the elevated EMR and the anticipated date the EMR may be reduced to 1.0 or below.

3.

Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.

4.

If the NCCI cannot issue an EMR because the Offeror lacks insurance history, Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead, and include a letter from the NCCI indicating that is has assigned Offeror a Unity Rating of 1.0.

5.

The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility. *The above information is not required for subcontractors.

6. Failure to provide Attachment 4 of the solicitation containing the above information, may result in a determination that an Offeror is not responsible and therefore ineligible for award.

D3.

PHASE II – Proposal Evaluation Factors The Phase II proposal shall address the following evaluation factors. Both Phase II technical evaluation factors, when combined are approximately equal to price Factor 1, Technical Solution (Volume I) The offeror shall provide a detailed technical solution to accomplishing the design and construction of the correction of the Sacramento VAMC water system. The narrative will detail how the contractor intends to design the project, prepare the site, construct the water system, and connect utility services to the facility within the specified time limits.

Factor 2, Draft Project Schedule (Volume II)

The offeror shall demonstrate their understanding of Attachment 10 Project Schedule Specification by submitting a draft project schedule for design and construction that adheres to the requirements outlined in Attachment 10 Project Schedule Specification.

Factor 3, Price Proposal Requirements (Volume III) A. Carefully follow “Instructions, Conditions, and Notices to Offerors”. Standard form (SF) 1442 Solicitation, Offer and Award (Construction, Alteration, or Repair) and the pricing schedule located on page 6 when submitting price offers. Submit a bid guarantee as stipulated in the solicitation”.

B. The prices shall be Firm Fixed Price. The Offeror shall take care not to include remarks that take exception to the Government’s SOW/Specifications or pricing requirements or otherwise preclude the Government from evaluating the offer or render the offer as non-responsive or unacceptable.

C. If the Offeror communicates in its proposal any qualifications, exceptions, exclusions, or conditions to the proposed prices not provided for in the Offerors proposal documents, the Contracting Officer may reject the proposal and exclude the Offeror from further discussions.

D. In addition to the pricing schedule, Offerors shall submit a complete Breakdown of the Division Pricing for CLIN 0001 and CLIN 0002.

D4. Evaluation of Offers

The Phase II evaluations will be conducted in accordance with Two-Phase Design-Build Evaluation process and the methodologies provided below. All evaluation factors other than price, when combined are approximately equal to price.

Factor 1, Technical Solution (Volume I): The VA will evaluate and use as an aid to help determine that the Offeror understands the complexity and risks of performing all the required elements. The Technical Solution will be evaluated for inclusion of the technical areas listed in the criteria. The VA will evaluate Offeror’s specific details in each of the technical areas regarding design and constructability of design. The Offeror’s narrative should provide enough detail to demonstrate that the scope and complexity of the project requirements are understood and will be successfully completed.

Factor 2, Draft Project Schedule (Volume II): The VA will evaluate and use as an aid to help determine that the Offeror understands and can perform all the required elements of the project in the time frame specified with limited impact, to the greatest extent possible, to the Medical Center. (The draft schedule submitted with the proposal should not be construed as the agreed upon schedule as per FAR 52.236-15, the contractor shall, within 21 Calendar days after receiving the Notice to Proceed, submit an interim project schedule which will supersede the draft project schedule. The interim project schedule will be subject to VA approval and must show the project being accomplished within the time frame specified on the SF 1442.)

Factor 3, Price (Volume III): The Contracting Officer will evaluate Offers in accordance with the process identified in the Price Schedule. The total evaluated price will be determined by the Offeror’s price for all the CLINs listed. Note: The VA will look at the total evaluated price and non-price factors to determine the best value. “Best Value” means the expected outcome of an acquisition that, in the Government’s estimation, provides the greatest overall benefit in response to the requirements.

D5.

Final Proposal Revisions (FAR 52.215-1)

A.

If determined to be necessary, Phase II proposal revisions will be requested from the Phase II proposals received. The CO will identify those Offerors, whose Phase II proposals are within the competitive range, considering the selection criteria identified in this section. Negotiations may be conducted with those Offerors falling within the competitive range, after which Phase II proposal revisions will be requested. Sealed Phase II proposal revisions will be submitted as per Part III.D1.D, above, except as noted below and will be due at a time and place to be determined.

B.

Offerors submitting Phase II proposal revisions will not be requested to re-submit any documents which are unchanged from their initial Phase II proposals. They should provide necessary changes to individual paragraphs, as briefly as possible, together with a table of contents, which clarifies where within the initial Phase II proposal the additional information or changed documents would be placed. Phase II proposal revisions shall include a completed SF 1442 that acknowledges receiving all amendments, by number. A new bid bond shall be submitted only if the final Phase II proposal revisions Offeror’s price proposal is greater than its initial price proposal.

E.

PART IV - POST AWARD REQUIREMENTS

E1.

Construction Document Preparation:

A.

Design Review Submissions:

1.

The Design-Build Team A-E (D-B A-E) shall prepare and submit complete construction documents for review and approval by the VA in accordance with standard professional practice, the Department of Veterans Affairs RFP (VA RFP), and prevailing codes.

2.

The documents may be divided into multiple review submission packages. The VA will review as many as six (6) package submissions (examples: demolition, civil, architectural, structural, mechanical, electrical, plumbing etc.) to facilitate the start of construction.

3.

All submission packages will be reviewed at 35%, 65%, 95% and 100% completion stages. Each submission package shall incorporate the final review comments from the previous review. If any package is not complete for the required stage a post review may be required, the cost of which will be borne by the DB Team.

4.

Each review submission package shall include the following:

i. 35% design review: Provide two (2) hard copy size ANSI C, and PDF review sets. Upload to VA specified electronic document management system.

ii. 65% design review: Provide two (2) hard copy size ANSI C, and PDF review sets. Upload to VA specified electronic document management system.

iii. 95% design review: Provide two (2) hard copy ANSI E1 and ANSI C, and PDF review sets. Upload to VA specified electronic document management system.

iv. 100% design review: Provide two (2) hard copy ANSI E1 and ANSI C, and PDF review sets. Upload to VA specified electronic document management system.

The package will include an index of drawings (by sheet number and title) and specifications (by section number and title) submitted. The packages will be distributed to the VA Project Manager, the VA Medical Center, VA COR and others as determined to be appropriate by the VA Project Manager.

B.

Design Review Meetings:

The Design-Build Contractor (and A/E if separate entities) shall attend meetings at the time and place requested by the Contracting Officer and COR. Minutes of the meetings shall be taken by the Design-Build Contractor and submitted to the Contracting Officer and COR.

1.

A review meeting to resolve design issues will be held for each design review package submitted. The meeting will include discussion of VA comments on functional relationships and technical peer review comments (by others).

2.

Participants will include VA Staff and D-B team members as appropriate for the specific package to be reviewed. D-B team management will be present at each review meeting.

3.

The D-B team shall allow a minimum of ten (10) working days for each review cycle. A cycle includes:

a.

The VA’s receipt of the design review submission package.

b.

The review meeting.

c.

D-B teams receipt of comments from the VA, either electronically, by fax, or by hard copy delivery.

4.

Coordination of the review meeting schedules will be the responsibility of the VA Project Manager/COR and the D-B Team Project Manager. See section I. Quality Assurance/Quality Control.

C.

Electronic Media:

1.

Design review submission drawings and final Construction Document submission drawings will be executed in electronic format Revit 2017. See attached Minneapolis VA BIM Management Plan Worksheet and Minneapolis VA Revit Model Standards V1 for further information.

D.

Professional Licensing:

1.

The D-B A-E who prepares the construction documents shall be a professional architect or engineer licensed in the state in which the design work is completed.

2.

The professional seal indicating such license by the state shall appear on the final construction documents. The architect whose seal is shown will be known as the Architect of Record. The D-B A-E shall certify compliance with the VA RFP and all applicable codes.

E.

Approved Construction Documents:

1.

The final construction document submission package will be submitted by the D-B team for approval by the VA after completion of the 100% review cycle for the final package to be submitted by the D-B team. The VA will have seven (7) calendar days to take approval action.

2.

The final construction documents submission package will include:

two (2) hard copy size ANSI E1 and ANSI C complete set of construction drawings. Additionally, the contractor shall provide PDF, DWG, and RVT. All documents will be uploaded to the VA specified electronic document management system.

3.

The final construction documents submission package will incorporate all VA supplied comments from the earlier 35%, 65%, and 95% submission package reviews and will comply with the VA RFP and SOW and shall include all responses to VA comments.

4.

If the final construction documents submission package is not complete, a post submittal may be required the cost of which will be borne by the D-B Team.

5.

The approved final construction documents include such details that the project can be constructed and will be used for construction of the project.

6.

See Part IV, E2 Construction Period Submittals for Approved Construction Document distribution.

F.

Construction Drawing Preparation - Mandatory material and equipment schedules and details may be indicated either on the drawings or in the specifications, at the option of the D-B team. The construction drawings shall include a coordinated set of the following:

1.

Civil engineering drawings including demolition plans, grading and drainage plans, paving plans, utility plans, schedules calculations and details.

2.

Landscape drawings including demolition plans, landscape plans, plant schedule and list, special landscape elements, proposed materials to be used for each special landscape element, calculations and details.

3.

Structural drawings including foundation plans, framing plans, schedules, and details, including general notes and all calculations.

4.

Architectural drawings including floor plans, building elevations, building sections, wall sections, radiation safety, reflected ceiling plans, stair details, toilet and bath details, door schedules and details, window schedules and details, room finish schedules, auto transport and other details.

5.

Fire protection drawings including floor and roof plans, riser diagrams, equipment schedules, and details, including general notes calculations and all related calculations.

6.

Plumbing drawings including floor and roof plans, riser diagrams equipment schedules, plumbing fixture schedules, and details, including general notes, and all related calculations.

7.

HVAC drawings including floor and roof plans, one-line flow diagrams, equipment schedules, and details, including general notes and all related calculations. Also provide sections for mechanical equipment rooms and sequence of operation for all HVAC equipment.

8.

Outside steam distribution drawings including demolition plans, system plans and profiles, manhole piping plans, calculations and sections, equipment schedules, and details.

9.

Electrical drawings and specifications including site demolition plans, site, floor and roof plans (power, lighting, controls, and other systems), one-line diagrams, panel schedules, equipment schedules, light fixture schedules calculations and details.

10.

Asbestos abatement drawings including site demolition plans and floor plans indicating asbestos abatement method.

11.

Parking Control drawings including paving plans, schedules calculations and details for the parking fee collection/parking control system for the entire West Haven Facility.

G.

Construction Specifications - Project specifications shall include specifications for all products, materials, equipment, methods, and systems shown on the construction drawings in accordance with standard professional practice and the VA RFP. The specification submitted for review shall include:

1.

The name of the manufacturer, the product name, model number, or other identification as appropriate to clearly identify the product that will be used in the construction of the project;

2.

Other data as appropriate to clearly identify the product that will be used in the construction of the project i.e. shop drawings, product data, and samples as required by the VA RFP documents; and

3.

The required stamp of the licensed architect or engineer of record will be considered as certification of compliance with the RFP requirements.

H.

Design Requirements - Compliance with codes and standards.

1.

Project design shall follow applicable standards and codes described in VA Program Guides and design materials included or referenced in the solicitation materials.

2.

In the design of new building and alteration work under this contract, the D-B team shall consider all requirements (other than procedural requirements) of:

a.

Zoning laws b.

Environmental and erosion control regulations c.

Laws relating to landscaping, open space, minimum distance of a building from the property line, maximum height of a building, historic preservation, and esthetic qualities of a building. Also, similar laws, of the State and local political division, which would apply to the building if it were not to be constructed or altered by the U.S. Government.

3.

The D-B team shall consult with appropriate officials of the Federal, state, and political subdivision, and submit plans under the rules prescribed by those reviewing authorities. The A-E and VA shall give due consideration to the recommendations of the referenced building officials. VA will also permit inspection by the officials described above during the construction period in accordance with the customary schedule of inspections in the locality of the building construction. Such officials shall provide VA with a copy of the schedule before construction begins or give reasonable notice of their intention to inspect before conducting an inspection.

4.

The D-B team shall provide prompt, written notification to the Contracting Officer concerning conflicts with, or recommended deviations from codes, laws, regulations, standards, and opinions of review officials as described above. No work altering the scope of this contract shall be undertaken prior to receipt of written approval from the Contracting Officer.

5.

No action may be brought against the D-B Team or VA and no fine or penalty may be imposed for failure to carry out any of the previously described recommendations of Federal, state, or local officials. VA and its contractors shall not be required to pay any amount for any action taken by a state or political division of a state in carrying out functions described in this article, including reviewing plans, carrying out on-site inspections, issuing permits, and making recommendations.

6.

The D-B team shall advise the Contracting Officer of any variances with the applicable Department of Labor, Occupational Safety and Health Standards, for occupancy requirements.

I.

Quality Assurance/Quality Control:

1.

To reduce design errors and omissions, the D-B team shall develop and execute a QA/QC plan that demonstrates the project plans and specifications have gone through a rigorous, thorough review and coordination effort.

2.

No later than 15 calendar days after receipt of Notice to Proceed, the D-B Team will submit a detailed QA/QC plan describing each QA/QC task that will be taken during the development of the various design submission packages and the name of the D-B Team member responsible for QA/QC.

a.

Upon its completion each task shall be initialed and dated by the responsible D-B Team member.

b.

A 100% completed QA/QC plan shall be submitted with the final construction document submission package.

E2.

Construction Period Submittals

A.

The D-B contractor shall distribute construction documents prepared by the D-B Team to the VA, as required in the SOW.

B.

Other submittals - The D-B team shall submit test results, certificates, manufacturer’s instructions, manufacturers field reports, etc. as required by the VA RFP specifications, to the COR.

C.

Project record drawings - The D-B team will maintain a set of construction documents (field as-built drawings) to record actual construction changes during the construction process as required by the RFP specifications. The project record drawings will be available for review by the VA COR at all times.

D.

Shop drawings and submittals - The D-B A-E shall check government furnished and/or the D-B construction contractor's shop drawings, detail drawings, schedules, descriptive literature and samples, testing labor-laboratory reports, field test data and review the color, texture and suitability of materials for conformity with the RFP Documents and construction documents. The D-B A-E shall recommend approval, disapproval, or other suitable disposition to the VA COR. The COR will have final approval authority. The D-B A-E shall evaluate the submittals with reference to any companion submittals that constitute a system. When necessary, the D-B A-E will request the D-B Construction Contractor to submit related components of a system before acting on a single component. Should this procedure be inappropriate, the D-B A-E shall review all prior submittals for related components of the system before acting on a single component. The D-B A-E shall notify the VA COR in writing of all deviations from the requirements of the construction documents that he has found in the submittals.

E3.

Project Close-Out

The D-B team shall comply with the requirements in FAR 4.804 Closeout of Contract Files, for submission of final RFP as built drawings, manuals, and other documents as noted. Required as built drawings and specifications will be submitted in the same format required for the construction documents.

E4.

Site Visits and Inspections

During the construction period the D-B A-E shall make weekly visits to the project site when requested by the COR. The COR may also request visits for special purposes. Only registered architects and engineers thoroughly familiar with the project may make these site visits. The COR has the prerogative to determine the professional discipline(s) required for any visit. The D-B A-E shall observe the construction, advise the COR of any deviations or deficiencies or solutions to issues discussed. A site inspection report which includes the purpose of the inspection, items reviewed, deficiencies observed, recommendations and additional actions required, shall be furnished to the COR within three (3) calendar days following the site visit date.

- - - E N D - - - 00 11 21-21