36E77618R0113-0001002.pdf
PDF 7 MB Posted
- Attached to
- Bronx CM & Cx Oversight (VA-18-00073522) Federal contract opportunity
- Solicitation number
- 36E77618R0113
About this file
36E77618R0113 0001 Attachment 2 - Vol I Technical Final IGA - VISN 2 Bronx.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36E77618R0113-0001000.docx | DOCX document | |
| 36E77618R0113-0001001.docx | DOCX document | |
| 36E77618R0113-003.docx | DOCX document | |
| 36E77618R0113-004.pdf | ||
| 36E77618R0113-000.docx | DOCX document | |
| 36E77618R0113-001.pdf | ||
| 36E77618R0113-005.doc | DOC document | |
| 36E77618R0113-002.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Volume I Technical Proposal March 7, 2018
Final Investment Grade Audit James J. Peters VAMC Bronx, NY
101 Constitution Avenue NW Suite 525E Washington, DC 20001 www.federal.ameresco.com
Points of Contact Nicole Bulgarino 202-650-6218 nbulgarino@ameresco.com
Jason Vass 443-276-8277 jvass@ameresco.com
This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed— in whole or in part—for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of—or in connection with—the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government’s right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained on all pages.
Final Investment Grade Audit Report, Volume I Technical Proposal
James J. Peters VAMC, Bronx, NY
Veterans Integrated Service Network 2
RFP Number TORFP VA-701-16-R-0057
Submitted on March 7, 2018
Submitted by
111 Speen Street, Suite 410
Framingham, MA 01701
Nicole Bulgarino
202-650-6218 nbulgarino@ameresco.com
Jason Vass
443-276-8277 jvass@ameresco.com
VISN 2: James J. Peters VAMC, Bronx, NY Final Investment Grade Audit Report Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Table of Contents
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal
TABLE OF CONTENTS
A. Project Overview
A.1 Executive Summary
Proposed Scope of Work Summary
Project Costs and Savings Summary
Investment Grade Audit Organization
A.2 Site Description and Utility Summary
A.2.1 Site Description
A.2.2 Utility Summary
B. Volume 1 – Technical Proposal
B.1 ECM Descriptions
B.1.1 ECM 1: Boiler Plant Improvements
B.1.2 ECM 2: Chiller Plant Improvements
B.1.3 ECM 3: Building Automation Systems/Energy Management and Control Systems
B.1.4 ECM 4: Heating, Ventilation, and Air Conditioning
B.1.5 ECM 5: Lighting Improvements
B.1.6 ECM 6: Building Envelope Modifications
B.1.7 ECM 7: Chilled Water, Hot Water, and Steam Distribution Systems
B.1.8 ECM 8: Electric Motors and Drives
B.1.9 ECM 9: Distributed Generation – Not Included
B.1.10 ECM 10: Renewable Energy Systems – Not Included
B.1.11 ECM 11: Energy/Utility Distribution Systems – Transformers
B.1.13 Other ECMs Considered
B.1.14 Project Schedule
B.2 Metering Plan
Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Table of Contents
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal
B.2.1 ECM 1: Boiler Plant Improvements
B.2.2 ECM 2: Chiller Plant Improvements
B.2.3 ECM 3: Building Automation Systems/Energy Management and Control Systems
B.2.4 ECM 4: Heating, Ventilation, and Air Conditioning (HVAC)
B.2.5 ECM 5: Lighting Improvements
B.2.6 ECM 6: Building Envelope Modifications
B.2.7 ECM 7: Chilled Water, Hot Water and Steam Distribution Systems
B.2.8 ECM 8: Electric Motors and Drives
B.2.10 ECM 11: Energy/Utility Distribution Systems
B.3 ECM Performance Measurement
B.3.1 Measurement and Verification (M&V) Plan
B.3.2 ECM Commissioning Plan
B.4 Management Approach
B.4.1 Management Process and Organization
B.4.2 Risk, Responsibility, and Performance Matrix
B.4.3 Operations, Maintenance, Repair, and Replacement
B.4.4 Warranty Information
B.4.5 ECM Training
Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Table of Contents
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal
VOLUME III - APPENDICES
Appendix 1 – Baseline Utility Analysis
Appendix 2 – Manufacturers Literature and Specifications
Appendix 3 – Data Logging Plan and Results
Appendix 4 –eQUEST Modeling Report
Appendix 5 –Designs and Drawings
Appendix 6 –Savings Calculations Files
Appendix 7 – Measurement & Verification Plan
Appendix 8 – Commissioning Plan
Appendix 9 – O&M Schedules for Major Equipment
Appendix 10 – Construction Project Schedule
Appendix 11 – Costing
Appendix 12 – Individual Small Business Subcontracting Plan
Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Table of Contents
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal
LIST OF TABLES
Table A.1-1 Overall Project Savings and Cost Summary1
Table A.1.2 Benefits to VA of Ameresco’s Proposed Solutions – VAMC Bronx
Table A.1.3 Preliminary Energy, Water, and Related Cost Savings
Table A.1.4 Energy and Water Savings
Table A.2.1.3-1 Building/Facility List
Table A.2.1.4-1 Chiller Plant Schedule
Table A.2.1.4-2 Chiller Plant Pump Schedule
Table A.2.1.4-3 AHU Schedules
Table A.2.1.4-3 AHU Schedules (continued)
Table A.2.1.4-4 VAMC Bronx Water Fixtures
Table A.2.1.4-5 VAMC Bronx Water Fixture Usage
Table A.2.2.1-1 VAMC Bronx Utility Rates
Table A.2.2.4-1 VAMC Bronx Incentive Applications
Table A.2.2.4-2 VAMC Bronx Incentive Summary
Table B.1.2-1 Total Baseline Pre-Proposed ECM Usage
Table B.1.2-2 Total Baseline Post-Proposed ECM Usage
Table B.1.2-3 ECM 2 Parametric Components
Table B.1.2-3a Chiller Hours of Operation
Table B.1.2-4 ECM 2 Proposed Equipment
Table B.1.2-5 ECM 2 Cost and Savings Summary
Table B.1.2-6 ECM 2 Proposed Annual Savings, Baseline, and Post-Installation Energy Consumption
Table B.1.3-1 Utility Baseline Usage
Table B.1.3-2 Total Baseline Pre-Proposed ECM Usage
Table B.1.3-3 Total Baseline Post-Proposed ECM Usage
Table B.1.3-4 ECM 3 Main Model Parametric Components
Table B.1.3-5 ECM 3 Proposed Equipment
Table B.1.3-6 ECM 3 Cost and Savings Summary
Table B.1.3-7 ECM 3 Proposed Annual Savings, Baseline, and Post-Installation Energy Consumption
Table B.1.4-1 Proposed AHU Replacements
Table B.1.4-2 Proposed AHU Revitalizations
Table B.1.4-2 Utility Baseline Usage
Table B.1.4-3 Total Baseline Pre-Proposed ECM Usage
Table B.1.4-4 Total Baseline Post-Proposed ECM Usage
Table B.1.4-5 ECM 4 Main Model Parametric Components
Table B.1.4-6 ECM 4 Out-Building System Parameters
Table B.1.4-7 ECM 4.A Proposed Equipment
Table B.1.4-8 ECM 4.B & 4.C Proposed Equipment
Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Table of Contents
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal
Table B.1.4-9 ECM 4 Cost and Savings Summary (Base Scope of Work)
Table B.1.4-10 ECM 4 Proposed Annual Savings, Baseline, and Post-Installation Energy Consumption ... 70
Table B.1.5-1 Utility Baseline Usage
Table B.1.5-2 Total Baseline Pre-Proposed ECM Usage
Table B.1.5-3 Total Baseline Post-Proposed ECM Usage
Table B.1.5-4 Lighting Incentive Breakdown
Table B.1.5-5 ECM 5 Cost and Savings Summary
Table B.1.5-6 ECM 5 Proposed Annual Savings, Baseline, and Post-Installation Energy Consumption
Table B.1.7-1 Condensate Return Unit Schedule
Table B.1.7-2 Utility Baseline Usage
Table B.1.7-3 Total Baseline Pre-Proposed ECM Usage
Table B.1.7-4 Total Baseline Post-Proposed ECM Usage
Table B.1.7-5 ECM 7 Proposed Equipment
Table B.1.7-6 ECM 7 Cost and Savings Summary
Table B.1.7-7 ECM 7 Proposed Annual Savings, Baseline, and Post-Installation Energy Consumption
Table B.1.8-1 Utility Baseline Usage
Table B.1.8-2 Total Baseline Pre-Proposed ECM Usage
Table B.1.8-3 Total Baseline Post-Proposed ECM Usage
Table B.1.8-4 ECM 8 Proposed Equipment
Table B.1.8-5 ECM 8 Cost and Savings Summary
Table B.1.8-6 ECM 8 Proposed Annual Savings, Baseline, and Post-Installation Energy Consumption
Table B.1.11-1 ECM 11 Proposed Equipment
Table B.1.11-2 ECM 11 Anticipated Cost and Savings Summary
Table B.1.11-3 ECM 11 Anticipated Annual Savings, Baseline, and Post-Installation Energy Consumption
Table B.1.14-1 VISN 2 VAMC Bronx Project Schedule
Table B.2.2-1 ECM 2 Key Performance Variables
Table B.2.3-1 ECM 3 Key Performance Variables
Table B.2.4-1 ECM 4 Key Performance Variables
Table B.2.5-1 ECM 5 Key Performance Variables
Table B.2.7-1 ECM 7 Key Performance Variables
Table B.2.8-1 ECM 8 Key Performance Variables
Table B.2.10-1 ECM 11 Key Performance Variables
Table B.3.1-1 Summary M&V Plan by ECM Technology Category
Table B.3.2-1 Ameresco’s ECM-Specific Summary Commissioning Approach
Table B.4.1 Features and Benefits of Ameresco’s Project Management Approach
Table B.4.4-1 Warranty Matrix
Table B.4.5-1: VAMC Bronx ECM Training
Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Table of Contents
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal
LIST OF FIGURES
Figure A.2.1.4-1 VAMC Bronx Boiler Plant 2016 Load Duration Profile
Figure A.2.1.4-2 Steam Demand vs Outside Air Temperature
Figure A.2.1.4-3 Outside Air Damper Actuator Disconnected
Figure A.2.1.4-4 Existing Three Lamp Biax Fixture
Figure A.2.1.4-5 Cooling Tower Cycles of Concentration
Figure A.2.2.1-1 VAMC Bronx Relative Consumption and Cost Relationship for Baseline Energy-Related
Utilities
Figure A.2.2.1-2 VAMC Bronx Relative Cost Relationship for Energy and Water Utilities
Figure A.2.2.3-1 VAMC Bronx Campus Electric Consumption
Figure A.2.2.3-2 VAMC Bronx Campus Natural Gas Consumption
Figure A.2.2.3-3 VAMC Bronx Campus Water Consumption
Figure B.1.2-1 New High Efficiency Electrical Centrifugal Chiller
Figure B.1.2-2 Existing Cooling Tower Hot Water Distribution Basin
Figure B.1.2-3 Marley Variflow Nozzle Cups
Figure B.1.2-4 York Centrifugal Magnetic Drive Chiller
Figure B.1.3-1 Existing Johnson Controls Metasys System Screenshot
Figure B.1.3-2 Bypassed Air Handling Unit Supply Fan VFD
Figure B.1.3-3 Existing Dual Duct Mixing Box Exterior
Figure B.1.3-4 Existing Dual Duct Mixing Box Control Hardware
Figure B.1.3-5 Proposed Dual Duct Mixing Box Configuration
Figure B.1.3-6 eQUEST Energy Model Building View
Figure B.1.3-7 Daily Schedule: Proposed Fan S-S Sch
Figure B.1.4-1 Economizer Schedule
Figure B.1.4-2 Bldg 16 Rear with Window AC
Figure B.1.4-3 Kitchen Hood Controls
Figure B.1.4-4 Kitchen Hood Fan Schedules
Figure B.1.5-1 Proposed LED Retrofit Kit
Figure B.1.5-2 Existing Patient Room Over-Bed Fixture
Figure B.1.7-1 Steam Distribution and Condensate Return System Flow Diagram
Figure B.1.7-2 Building 106 CRU Drains to Floor
Figure B.1.7-3 Thermal Imaging
Figure B.1.7-4 Removable Insulation Cover
Figure B.1.8-1 Proposed Evaporator Fan Controller and EC Motor
Figure B.1.8-2 Proposed Domestic Water Booster Pump Skid and Pressure Tank
Figure B.1.8-3 VAMC Bronx Therapy Pool
Figure B.1.8-4 Pool VFD
Figure B.1.11-1 Proposed Transformer file://///fsmdcol/Data/project_files/active/ENERGY%20PROJECTS/VISN%202%20Bronx%20VAMC/07%20-%20Investment%20Grade%20Audit/C.%20%20IGA%20Report/3rd%20Final%20IGA%20TBD/Vol%20I%20Technical%20Final%20IGA%20-%20VISN%202%20Bronx%20-%202%20Mar%202018.docx%23_Toc507764780 file://///fsmdcol/Data/project_files/active/ENERGY%20PROJECTS/VISN%202%20Bronx%20VAMC/07%20-%20Investment%20Grade%20Audit/C.%20%20IGA%20Report/3rd%20Final%20IGA%20TBD/Vol%20I%20Technical%20Final%20IGA%20-%20VISN%202%20Bronx%20-%202%20Mar%202018.docx%23_Toc507764781 file://///fsmdcol/Data/project_files/active/ENERGY%20PROJECTS/VISN%202%20Bronx%20VAMC/07%20-%20Investment%20Grade%20Audit/C.%20%20IGA%20Report/3rd%20Final%20IGA%20TBD/Vol%20I%20Technical%20Final%20IGA%20-%20VISN%202%20Bronx%20-%202%20Mar%202018.docx%23_Toc507764788 file://///fsmdcol/Data/project_files/active/ENERGY%20PROJECTS/VISN%202%20Bronx%20VAMC/07%20-%20Investment%20Grade%20Audit/C.%20%20IGA%20Report/3rd%20Final%20IGA%20TBD/Vol%20I%20Technical%20Final%20IGA%20-%20VISN%202%20Bronx%20-%202%20Mar%202018.docx%23_Toc507764793 file://///fsmdcol/Data/project_files/active/ENERGY%20PROJECTS/VISN%202%20Bronx%20VAMC/07%20-%20Investment%20Grade%20Audit/C.%20%20IGA%20Report/3rd%20Final%20IGA%20TBD/Vol%20I%20Technical%20Final%20IGA%20-%20VISN%202%20Bronx%20-%202%20Mar%202018.docx%23_Toc507764794 file://///fsmdcol/Data/project_files/active/ENERGY%20PROJECTS/VISN%202%20Bronx%20VAMC/07%20-%20Investment%20Grade%20Audit/C.%20%20IGA%20Report/3rd%20Final%20IGA%20TBD/Vol%20I%20Technical%20Final%20IGA%20-%20VISN%202%20Bronx%20-%202%20Mar%202018.docx%23_Toc507764795 file://///fsmdcol/Data/project_files/active/ENERGY%20PROJECTS/VISN%202%20Bronx%20VAMC/07%20-%20Investment%20Grade%20Audit/C.%20%20IGA%20Report/3rd%20Final%20IGA%20TBD/Vol%20I%20Technical%20Final%20IGA%20-%20VISN%202%20Bronx%20-%202%20Mar%202018.docx%23_Toc507764796 file://///fsmdcol/Data/project_files/active/ENERGY%20PROJECTS/VISN%202%20Bronx%20VAMC/07%20-%20Investment%20Grade%20Audit/C.%20%20IGA%20Report/3rd%20Final%20IGA%20TBD/Vol%20I%20Technical%20Final%20IGA%20-%20VISN%202%20Bronx%20-%202%20Mar%202018.docx%23_Toc507764799 file://///fsmdcol/Data/project_files/active/ENERGY%20PROJECTS/VISN%202%20Bronx%20VAMC/07%20-%20Investment%20Grade%20Audit/C.%20%20IGA%20Report/3rd%20Final%20IGA%20TBD/Vol%20I%20Technical%20Final%20IGA%20-%20VISN%202%20Bronx%20-%202%20Mar%202018.docx%23_Toc507764800 file://///fsmdcol/Data/project_files/active/ENERGY%20PROJECTS/VISN%202%20Bronx%20VAMC/07%20-%20Investment%20Grade%20Audit/C.%20%20IGA%20Report/3rd%20Final%20IGA%20TBD/Vol%20I%20Technical%20Final%20IGA%20-%20VISN%202%20Bronx%20-%202%20Mar%202018.docx%23_Toc507764802 file://///fsmdcol/Data/project_files/active/ENERGY%20PROJECTS/VISN%202%20Bronx%20VAMC/07%20-%20Investment%20Grade%20Audit/C.%20%20IGA%20Report/3rd%20Final%20IGA%20TBD/Vol%20I%20Technical%20Final%20IGA%20-%20VISN%202%20Bronx%20-%202%20Mar%202018.docx%23_Toc507764803 file://///fsmdcol/Data/project_files/active/ENERGY%20PROJECTS/VISN%202%20Bronx%20VAMC/07%20-%20Investment%20Grade%20Audit/C.%20%20IGA%20Report/3rd%20Final%20IGA%20TBD/Vol%20I%20Technical%20Final%20IGA%20-%20VISN%202%20Bronx%20-%202%20Mar%202018.docx%23_Toc507764804 file://///fsmdcol/Data/project_files/active/ENERGY%20PROJECTS/VISN%202%20Bronx%20VAMC/07%20-%20Investment%20Grade%20Audit/C.%20%20IGA%20Report/3rd%20Final%20IGA%20TBD/Vol%20I%20Technical%20Final%20IGA%20-%20VISN%202%20Bronx%20-%202%20Mar%202018.docx%23_Toc507764806 file://///fsmdcol/Data/project_files/active/ENERGY%20PROJECTS/VISN%202%20Bronx%20VAMC/07%20-%20Investment%20Grade%20Audit/C.%20%20IGA%20Report/3rd%20Final%20IGA%20TBD/Vol%20I%20Technical%20Final%20IGA%20-%20VISN%202%20Bronx%20-%202%20Mar%202018.docx%23_Toc507764808 file://///fsmdcol/Data/project_files/active/ENERGY%20PROJECTS/VISN%202%20Bronx%20VAMC/07%20-%20Investment%20Grade%20Audit/C.%20%20IGA%20Report/3rd%20Final%20IGA%20TBD/Vol%20I%20Technical%20Final%20IGA%20-%20VISN%202%20Bronx%20-%202%20Mar%202018.docx%23_Toc507764811 file://///fsmdcol/Data/project_files/active/ENERGY%20PROJECTS/VISN%202%20Bronx%20VAMC/07%20-%20Investment%20Grade%20Audit/C.%20%20IGA%20Report/3rd%20Final%20IGA%20TBD/Vol%20I%20Technical%20Final%20IGA%20-%20VISN%202%20Bronx%20-%202%20Mar%202018.docx%23_Toc507764812
Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Table of Contents
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal
Figure B.1.11-2 Existing and Proposed Transformers
Figure B.4.1-1 Mobile dust containment cart
Figure B.4.1-2 Ameresco VISN 2 VAMC Bronx ESPC Project Team Organization file://///fsmdcol/Data/project_files/active/ENERGY%20PROJECTS/VISN%202%20Bronx%20VAMC/07%20-%20Investment%20Grade%20Audit/C.%20%20IGA%20Report/3rd%20Final%20IGA%20TBD/Vol%20I%20Technical%20Final%20IGA%20-%20VISN%202%20Bronx%20-%202%20Mar%202018.docx%23_Toc507764815
Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Table of Contents
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal
ACRONYMS AND ABBREVIATIONS
AHU air handling unit
BAS building automation system
BHP boiler horsepower
CIP construction impact plan
CHP combined heat and power
CHW chilled water
CT cooling tower
CW condenser water
DDC direct digital controls
DX direct expansion
DOE Department of Energy
ECM energy conservation measure
ESCO energy services company
HID high intensity discharge
HP horsepower
HPS high pressure steam
IC infection control
IGA Investment Grade Audit
IPT Integrated Project Team kW kilowatt kWh kilowatt hour
LED light emitting diode
LPS low pressure steam
M&V measurement & verification
MMBtu million British thermal units
MPS medium pressure steam
NOITA Notice of Intent to Award
NYISO New York Independent System Operator
NYSERDA New York State Energy Research and
Development Authority
O&M operations & maintenance
OMB Office of Management & Budget
PA Preliminary Assessment
PON Program Opportunity Notice
PPH pounds per hour
PRV Pressure Reducing Valve psi pounds per square inch
PV photovoltaic
TMS trap management system
TO Task Order
TORFP Task Order Request for Proposal
TRV thermostatic radiator valve
VISN Veterans Integrated Service Network
VFD variable frequency drive
Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Page 1
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal
A. PROJECT OVERVIEW
A.1 Executive Summary
Ameresco is pleased to provide this final submittal of the
Investment Grade Audit (IGA) for James J. Peters VA
Medical Center (VAMC Bronx), part of the NY/NJ
Health Care Network (VISN 2). This document details the technical feasibility and economic potential of implementing self-funding Energy Conservation
Measures (ECMs) for the facility improvements proposed for VAMC Bronx. This project will address critical infrastructure improvements, enhancing the efficiency, reliability and resiliency of the facility thru the replacement of all site air handling units (AHUs), the deployment of a comprehensive direct digital control
(DDC) system, and the installation of a high-efficiency chiller.
In the aggregate, the proposed base scope of work solutions presented in this final
IGA will reduce overall site energy consumption by 62% and water consumption by 13% and save VISN 2 over $117 million over the 21-year performance period term of the proposed
ESPC. This project provides a sustainable solution for VISN 2 and ensures Veterans and their families have continued exceptional environment of care for generations to come.
New Air Handling Units
New High Efficiency VFD Chiller
Comprehensive DDC Control System
Table A.1-1 Overall Project Savings and Cost Summary1
Implementation Price $59,856,094
Financing Procurement Price $10,755,289
Less Year Zero Payment ($5,195,641)
Total Financed Project Price $65,415,742
Year 1 Energy Proposed Savings $3,604,366
Expected Savings for Term $117,395,759
Project Simple Payback (years) 16.6
Performance Period Term (years) 21.0
1 Refer to IGA Task Order Schedules.
Ameresco’s VAMC Bronx ESPC
Project Highlights
$60 million in energy efficiency and infrastructure improvements
Annual Year 1 cost savings of more than
$3.6 million
A total site energy use reduction of 62 percent
Modernized energy infrastructure
Lower lifecycle operating costs
Reduced exposure to commodity price volatility
Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Page 2
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal
Proposed Scope of Work Summary
Table A.1-2 presents the solutions that Ameresco is proposing in the sections below, along with the associated benefits that will accrue to VISN 2 VAMC Bronx.
Table A.1.2 Benefits to VA of Ameresco’s Proposed Solutions – VAMC Bronx
ECM Proposed Solution Benefits to VA
2 – Chiller Plant Improvements
Install a new high efficiency electric chiller.
Automate chilled water plant operation.
Retrofits for variable chilled and condenser water pumping.
Increased chiller plant efficiency
Enhanced system reliability and redundancy
3 – Building Automation Systems/Energy Management and Control Systems
(BAS/EMCS)
Replace existing pneumatic systems with DDC equivalents. Implement advanced energy savings strategies.
Improved occupant comfort and indoor air quality
Longer HVAC equipment life
Ability to benchmark building energy consumption
Simplified building operations for facility staff
Resolution of building pressurization issues
4 – Heating, Ventilation, and Air Conditioning (HVAC)
– Phase 4
Replace 9 existing AHUs not currently meeting updated VA Standards. Overhaul building 16 HVAC. Install kitchen hood controls.
Improved HVAC system reliability
Reduced maintenance burdens on the VA staff
Avoidance of future capital investments
Quieter, more comfortable canteen and kitchen operation
5 – Lighting Improvements
Provide new LED lighting systems.
Provide new sensors to keep lights off when not needed.
Improved quality of light
Reduced maintenance of lighting fixtures
Standardized lighting fixtures
High quality illumination, dimming controls
7 – Chilled Water, Hot Water, and Steam Distribution Systems
Expand steam trap monitoring system, re-insulate steam piping, replace faulty CRUs
Decreased steam energy loss
Increased steam system efficiency
Proactive rather than reactive trap maintenance
8 – Electric Motors and Drives
Replace walk-in refrigeration systems, upgrade boxes, replace DW booster pumps, pool pump controls
Reduced energy costs
Variable speed operation
Improved reliability
11 – Energy/Utility Distribution Systems
Replace dry type transformers
Improved equipment reliability
Improved power quality
Reduced noise and heat
Project Costs and Savings Summary
A financial summary for the base scope of work for each proposed ECM is shown in the following tables.
Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Page 3
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal
Table A.1.3 Preliminary Energy, Water, and Related Cost Savings
ECM
Number
Description
Total Energy Savings
(MMBtu/yr)
Total Water
Savings (kgal/yr)
Electricity Savings (kwh
$/yr)
Demand Savings (kW
$/yr)
Natural Gas Savings ($/yr)
Water Savings ($/yr)
Sewer Savings
($/yr)
O&M Savings
($/yr)
Total Savings ($/yr)
2 Chiller Plant Improvements 43,121 8,251 $ 53,962 $ (8,025) $ 275,108 $ 48,791 $ 77,578 $ - $ 447,414
3 BAS/EMS Control System 121,618 0 $ 1,024,037 $ 205,570 $ 610,683 $ - $ - $ - $ 1,840,291
4 HVAC 29,967 0 $ 210,904 $ 40,288 $ 158,001 $ - $ - $ - $ 409,193
5 Lighting Improvements 7,402 0 $ 385,706 $ 139,794 $ (22,172) $ - $ - $ - $ 503,329
7 Steam Distribution Systems 41,410 956 $ - $ - $ 272,003 $ 5,654 $ 8,989 $ - $ 286,646
8 Electric Motors and Drives 1,370 0 $ 49,026 $ 4,792 $ - $ - $ - $ - $ 53,818
Energy/Utility Distribution Systems
1,525 0 $ 54,507 $ 9,167 $ - $ - $ - $ - $ 63,674
Total 246,413 9,208 $ 1,778,142 $ 391,587 $ 1,293,623 $ 54,445 $ 86,567 $ - $ 3,604,366
ECM
Number
Description Guaranteed
Rebates Implementation
Price Simple
Payback
2 Chiller Plant Improvements $ (49,215) $ 5,344,034 11.9
3 BAS/EMS Control System $ (570,764) $ 22,931,031 12.5
4 HVAC $ (117,809) $ 18,595,461 45.4
5 Lighting Improvements $ (244,698) $ 7,431,569 14.8
7 Steam Distribution Systems $ - $ 2,906,832 10.1
8 Electric Motors and Drives $ (54,587) $ 680,456 12.6
11 Energy/Utility Distribution Systems $ (60,754) $ 1,238,706 19.5
Total $ (1,097,826) $ 59,219,677 16.6
Note that summary data is based on TO-4 Year 1 values and does not include the IGA and Final Proposal Expense in total economics.
Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Page 4
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal
Table A.1.4 Energy and Water Savings
Total Site Energy Savings
(MMBtu)
Total Site Energy Savings
(%)1
Total Water Savings
(kgal)
Total Water Savings
(%)1
246,413 62% 9,208 13% 1 Compared to baseline energy and water consumption provided in Section A.2.2.
Investment Grade Audit Organization
The IGA is presented in accordance with the requirements of the Task Order Request for Proposal
(TORFP) provided by PCAC and the IGA Checklist. The following Site Description and Utility
Summary provides a detailed overview of the existing site conditions and energy and water consumption and cost at VAMC Bronx.
The Technical Proposal provided in Volume 1 discusses the recommended measures in detail and associated project information is provided, including the project schedule. Following the building sections, project-level sections address the Metering Plan, an M&V plan, the project management plan, the project risk and responsibility matrix, and the project pricing proposal.
Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Page 5
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal
A.2 Site Description and Utility Summary
A.2.1 Site Description
A.2.1.1 Overview
James J. Peters VAMC 130 West Kingsbridge Road Bronx, NY 10468
Primary Use:
Area:
Year Built:
Hospital 1,013,103 ft2
>90% in 1981 Buildings:
Size:
Operating Hours:
431 beds 24/7
A.2.1.2 Site Map
A.2.1.3. Building/Facility List
Table A.2.1.3-1 Building/Facility List
Building Facility Type Square Footage Hours of Operation
16 VISN Headquarters Building 14,375 7AM-5PM
100 Main Hospital Building 789,331 24/7
101 Energy Center Building 29,500 24/7
105 Research Building 100,518 24/7
106 Nursing Home Care Unit Bldg. 56,670 24/7
107 Chapel 15,736 7AM-5PM
110 Therapeutic Pool 6,973 9AM-3PM
Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Page 6
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal
A.2.1.4 Facility Descriptions
Boilers
The central heating plant (bldg. 101) serves the entire campus and contains three Trane Murray high pressure steam (HPS) boilers. The boilers are dual fuel using natural gas and no. 2 fuel oil; however, natural gas is their primary fuel source. All units are of the same type and capacity. They were installed in 1977 and were originally rated to output 40,000 lbs per hour. New burners were installed in 2011 rated for 31,480 lbs per hour.
The plant produces steam year-round at 115 pounds per square inch gauge (psig). Steam is needed in the summer season for the absorption chillers, heating coils on dual-duct air handling units, terminal equipment, clean steam generation for humidification and steam-to-hot water converters for heating and domestic hot water. Within the buildings, pressure reducing stations reduce the steam pressure to medium and low pressure.
The steam and condensate piping are in good condition. Distribution runs from the boiler plant, through the tunnels, and up the risers. In numerous mechanical rooms, insulation is missing from sections of the pipework. In the lower levels, some of the condensate return units were flowing to drain rather than back to the boiler plant.
Ameresco analyzed boiler data from the Supervisory Control and Data Acquisition (SCADA) system to determine the following baseline operating conditions.
The boilers operate with the following average thermal efficiencies:
Boiler 1: 73.4%
Boiler 2: 69.0%
Boiler 3: 75.1%
These averages were calculated by dividing the enthalpy difference between the outgoing steam and incoming condensate (Net Work Out) by the Btu content of the entering natural gas (Net Work In).
The boiler plant operates with the following steam load duration curve. The peak is 40.35 MMBtu and the lowest is 1.42 MMBtu. The load is relatively flat compared to most boiler plants and this is due to the use of the absorption chillers in the summer.
Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Page 7
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal
Figure A.2.1.4-1 VAMC Bronx Boiler Plant 2016 Load Duration Profile
Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Page 8
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal
In addition, Ameresco used metered data from the Boiler SCADA System, the Schneider Electric
Energy Management System, and Con Edison utility bills to determine the steam load profiles based on Outside Air Temperature (Dry Bulb °F). The absorption chillers contribute significant load during warmer times of the year. During the IGA development, chiller operating logs for every day of 2016 were gathered to separate the baseline steam consumption into two groups; steam for heating and steam for cooling. Additionally, steam meters attached to both of the Broad absorbers were used to verify chiller consumption and efficiency. The graph below presents the baseline operating profile.
Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Page 9
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal
Figure A.2.1.4-2 Steam Demand vs Outside Air Temperature
Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Page 10
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal
Chillers
The central cooling plant (bldg. 101) serves every building on site except building 16. The plant contains five chillers and one plate and frame heat exchanger as described in the table below. The chiller staging is selected manually and is dependent on the time of year, plant load, and the chiller operator preferences. Generally, the free-cooling heat exchanger and an electric chiller are used during the colder periods, while the absorbers are favored during the hotter times when building demand for heating and steam is reduced.
Table A.2.1.4-1 Chiller Plant Schedule
Tag Manufacturer Capacity
(Tons) Age Type
CH-1 Broad 1,000 2013 Two Stage Absorption Chiller
CH-2 Trane 1280 2003 Electric Centrifugal, Water-Cooled
CH-3 Trane 1280 2003 Electric Centrifugal, Water-Cooled
CH-4 Trane 1371 2003 One Stage Low Pressure Steam Absorption Chiller
CH-5 Broad 800 2013 Two Stage Absorption Chiller
CH-6 Tranter 875 1996 Superchanger Plate & Frame Heat Exchanger
CT-1 to 4 Marley 875 2012 Crossflow Model NC with Four double cell units
An existing Johnson Controls Metasys system controls the chiller plant; however, the chillers are staged manually. Each of the chillers’ (and heat exchanger’s) condenser pipework is headered together with 8 constant speed, 75 hp condenser pumps. The cooling towers operate with variable speed fans
(50 hp) and are in very good condition. Each chiller is paired with a constant speed, primary pump to meet its’ required evaporator flow rate. A condenser water by-pass installed allows mixing of condenser supply and return water. The bypass is used during extreme cold periods, and when switching from plate and frame heat exchanger operation to a mechanical chiller. Each of the existing chillers require at least 60°F entering condenser water to ensure adequate refrigerant migration to keep the compressor bearing lubricated. This limitation impacts the plants ability to concurrently operate the free cooling HX and a chiller. The condenser water setpoint is fixed, controlled manually, and was seen to vary between 78 and 85F
The chilled water piping in the plant is configured as a constant speed primary loop feeding a variable speed secondary loop. A bypass is installed to allow primary chilled water to recirculate when the secondary flow demand is less. The secondary chilled water loop pumps are controlled with VFDs based upon pressure sensors in each of the risers. Three of the nine secondary pump VFDs are not operating properly. In each of these three risers, the secondary pump VFDs are running in bypass mode and a hydraulic bypass has been opened to allow the supply chilled water to bypass the riser and become return chilled water, preventing dead-heading of the pumps.
Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Page 11
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal
The chiller plant operates year-round producing 42°F chilled water. Facilities personnel indicated that they utilize the free cooling plate and frame heat exchanger when the temperature (<40 °F) and load are low enough followed by an electric chiller. Transitioning from free-cooling to mechanical cooling is typically done with the single-effect Trane unit due to its reliability when running colder condenser water. During the summer months 2-3 of the absorption chillers operate continuously, an additional electric machine is required to meet the peak cooling load of roughly 3,500 tons.
Table A.2.1.4-2 Chiller Plant Pump Schedule
Bldg Location Tag Flow Type
VFD
Condition
VFD
Brand
Fluid Type HP Service
Chiller Plant
CWP-5
Constant Speed
N/A N/A Condenser
Water 75 Common/Headered
Chiller Plant
CWP-6
Constant Speed
N/A N/A Condenser
Water 75 Common/Headered
Chiller Plant
CWP-7
Constant Speed
N/A N/A Condenser
Water 75 Common/Headered
Chiller Plant
CWP-8
Constant Speed
N/A N/A Condenser
Water 75 Common/Headered
Chiller Plant
CWP-9
Constant Speed
N/A N/A Condenser
Water 75 Common/Headered
Chiller Plant
CWP-10
Constant Speed
N/A N/A Condenser
Water 75 Common/Headered
Chiller Plant
CWP-11
Constant Speed
N/A N/A Condenser
Water 75 Common/Headered
Chiller Plant
CWP-12
Constant Speed
N/A N/A Condenser
Water 75 Common/Headered
Chiller Plant
CHWP-1
Constant Speed
N/A N/A Primary CHW 40 Chiller One
Chiller Plant
CHWP-2
Constant Speed
N/A N/A Primary CHW 30 Chiller Two
Chiller Plant
CHWP-3
Constant Speed
N/A N/A Primary CHW 30 Chiller Three
Chiller Plant
CHWP-4
Constant Speed
N/A N/A Primary CHW 60 Chiller Four
Chiller Plant
CHWP-5
Constant Speed
N/A N/A Primary CHW 25 Chiller Five
Chiller Plant
CHWP-6
Constant Speed
N/A N/A Primary CHW 30 Free Cooling HX
105 G-Level P-1&2 Variable Speed
Drive, Auto ABB Secondary CW Loop
40 105 Riser
100 Tunnel P-3&4 Variable Speed
Drive, Auto ABB Secondary CW Loop
40 Area B Riser
100 Tunnel P-7&8 Variable Speed
Hand, Bypass
ABB
Secondary CW Loop
25 Area G Riser
100 Tunnel P-11&12 Variable Speed
Drive, Auto ABB Secondary CW Loop
60 Area E Riser
106 Tunnel P-11&12 Variable Speed
Hand, Drive ABB Secondary CW Loop
10 106 and 107 Secondary
100 Tunnel P-13&14 Variable Speed
Drive, Auto ABB Secondary CW Loop
Area D Riser Secondary
Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Page 12
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal
Bldg Location Tag Flow Type
VFD
Condition
VFD
Brand
Fluid Type HP Service
100 G-Level P-17&18 Variable Speed
Drive, Auto ABB Secondary CW Loop
Area C Riser Secondary
F Mech
RM G
P-23&24 Variable Speed
Drive, Auto ABB Secondary CW Loop
10 Area F Secondary
100 Tunnel P-28&29 Variable Speed
Hand, Bypass
ABB
Secondary CW Loop
Area A Riser
Secondary Penthouse
Heating, Ventilation, and Air Conditioning
Heating
High pressure steam is generated in the central boiler plant and distributed at 115 psi throughout the campus. Pressure reducing valve (PRV) stations in multiple locations reduce the steam pressure for use in the buildings. The air handling units (AHUs) use steam for preheat and/or heating coils.
Existing direct fired steam humidifiers have been abandoned in place. Newer units utilize steam to generate clean steam for humidification. Steam is also used to generate heating hot water for use by perimeter finned-tube radiators.
Building 16 uses low pressure (15 psi) steam directly for space heating via steam radiators. The radiators are controlled by a single steam shut-off valve to the system. There are no active AHUs in bldg. 16.
Building 110 (Pool) uses two steam to hot water heat exchangers, one for pool water heating, the other for a hot water heating coil in the air-handling unit located on the roof.
Building 107 is heated through hot water perimeter radiation as well as hot water reheat coils on the
VAV boxes. Both hot water loops are steam-fired.
Cooling
The James J. Peters Hospital has over 52 AHUs serving buildings 100, 101, 105, 106, 107, and 110.
Building 16 uses unitary window-mounted air conditioning units and ductless split systems for space cooling. Most of the buildings on site are served with central air. Chilled water from the central plant is distributed to these air handling units. The chilled water is used at the AHUs to cool and dehumidify the circulated air. The table below shows a schedule of AHUs and their characteristics.
Ventilation and Air Distribution
The majority of the AHUs serving building 100 and 105 are dual duct units providing 90 to 110-degree air in the hot deck and 53 to 55-degree air in the cold deck year-round. The units were originally constant volume, but most were modified in the early 1990’s to operate as variable volume units. To accomplish this each supply and return fan was retrofitted with a VFD, fixed-volume restrictors in
Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Page 13
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal each of the mixing boxes were replaced with a damper and pneumatic actuator, and pneumatic controllers were installed to control the volume dampers. The controllers were setup to reduce airflow by 50% when in the full heating mode. A pneumatically operated mixing damper controls (through a connected linkage) the ratio of hot and cold enter entering the mixing box. Because of this linkage, it not possible to control the air streams independently. The condition of the mixing boxes range widely from very poor to brand new (when they fail the site’s HVAC shop will replace them with new pneumatically controlled boxes with independent control of the hot and cold deck airflows). AHUs are generally in poor condition. The has conducted a study and implemented a five-phase approach to replacing most of the units. Construction of phases 1, 2, and 3 have commenced. Phase 4 has been designed and is waiting for funding, while work on phase 5 has not yet begun. Outside air dampers in most of the units have seized and been disconnected from the damper actuators (normally in the closed position). Finally, the supply fan VFDs are in poor condition and most have been placed in bypass or hand operation. Site operators have indicated that failure of the downstream duct static pressure transmitters have caused VFDs to ramp to 60Hz regardless of drive mode. A summary of the AHUs on-site is included in the table below.
Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Page 14
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal
Table A.2.1.4-3 AHU Schedules General Control Control Filter Airflow Supply
Building No.
Equipment Location
Equip Tag
Area/Equipment Served
Group Name Replacement
Phase
Dual Duct
Yes or No
Air Flow Design
Unit Overall Condition
Year of Installation
Electronic or Pneumatic or
E-to-P Control Filter Type
Filter Condition
Design Supply Airflow
(CFM)
OA Min
(CFM)
% OA
MIN
(CFM)
Economizer
Economizers Overall
Conditions
Supply Fan
Motor
HP
Supply Fan VFD
VFD
Brand
Supply Fan VFD Overall Conditions
Audit Info on Supply VFD
100 Warehouse HVC-2 No CV E-to-P
BMS
Johnson Cartridge Destroyed 11,690 6400 100% 15 No N/A
100 GB-06 AH-1 Floor G Area B Engineering 4 Yes CV Poor 1977 E-to-P
BMS
Johnson Roller 8,667 2,654 31% Yes Poor 20 No Toshiba None
100 GG-04 AH-2 Floor G Area G 3 Yes CV Poor 1977 E-to-P
BMS
Johnson 14,662 14,272 100% No N/A 10 No Toshiba None
100 GF-17 AH-3 Floor G Area F Pump Room 2 Yes VAV Poor 1977
BMS
Johnson Roller 15,204 4,872 32% Yes Poor 20 Yes Toshiba Fair -
100 GE-12 AH-4 Floor G Area E 4 Yes CV Poor 1977 Pneumatic Roller 31,930 26,661 83% N/A 50 No Toshiba None Hand
100 GD-AH AH-5 Floor G Area D 2 Yes VAV Poor 1977 E-to-P Andover Roller good 17,206 8,072 47% Yes N/A 25 Yes Toshiba Poor Auto
100 G AH-37 JA No CV 5,493 1,320 24%
100 G AH-38 JB No CV 6,687 650
100 G HV-5 H 24,200 14,900 15
100 1B-26 AH-6 Floor 1 Area B Pharmacy 4 Yes VAV Poor 1977 E-to-P
BMS
Johnson Roller 13,851 3,396 25% Poor 25 Yes ABB Poor Normal, Auto
100 1C-47 AH-7 Floor 1 Area C Eye Care/Urology Yes VAV Poor 1977 E-to-P
BMS
Johnson Roller 15,635 3,805 24% Yes Poor 20 Yes ABB Poor Hand, 60 Hz
100 1B-40 AH-8 Floor 1 Area G Kitchen 4 Yes CV Poor 1977 E-to-P Andover Roller 20,149 7,597 38% N/A 50 No Andover None Wired through
100 1F-25 AH-9 Floor 1 Area F E.R. 2000 +/- Yes VAV Fair/good E-to-P
BMS
Johnson Cartridge New/clean 18,959 18,494 100% No N/A 25 Yes ABB Fair Hand @
100%
100 1E-72 AH-10 Floor 1 Area E Spinal Cord Ward 3 Yes VAV Poor 1977 E-to-P
BMS
Johnson Roller 17,312 2,505 14% Yes Poor 25 Yes ABB Fair Normal, Hand
@ 57.23%
100 1D-64 AH-11 Floor 1 Area D Spinal Cord Ward 3 Yes VAV Poor 1977 E-to-P
BMS
Johnson Roller 17,312 2,505 14% Yes Poor 25 Yes ABB Poor Bypass, hand
@ 70%
100 1 RTU-PT Physical Therapy
100 2B-AH AH-12 Floor 2 Area B Diagnostic Lab 4 Yes CV Poor 1977 E-to-P
BMS
Johnson Roller 15,364 14,987 100% No N/A 20 No N/A None -
100 2C-54 AH-13 Floor 2 Area C Dental/Cardiology 4 Yes VAV Poor 1977 E-to-P
BMS
Johnson Roller Missing 22,301 21,754 100% No N/A 40 Yes Toshiba None -
100 2G-65 AH-14 Floor 2 Area G Morgue Area 4 Yes CV Poor 1977 E-to-P Andover Roller Very poor 22,714 22,714 100% No N/A 40 No Andover None -
100 2C-84/2F AH-15 Floor 2 Area F Dematology/Surg 5 Yes CV Poor 1977 E-to-P
BMS
Johnson Roller Dirty 19,013 3,089 16% Yes Poor 25 No N/A None -
100 2E-11 AH-16 Floor 2 Area E O.R. No VAV New 2009 E-to-P
BMS
Johnson Cartrige Good 27,069 26,394 100% No N/A 50 Yes ABB
Drive good but not tied in No VFD Hand
@ 60Hz
100 2D-AH AH-17 Floor 2 Area D Radiology 4 Yes VAV Poor 1977 E-to-P
BMS
Johnson Roller Poor 27,172 26,459 100% No N/A 50 Yes ABB N/A Hand, bypass
100 3B-AH AH-18 Floor 3 Area B Clinic 5 Yes VAV Poor 1977 E-to-P
BMS
Johnson Roller Dirty 15,141 3,685 24% Yes Poor 20 Yes Poor Bypass -
Hand @ 74%
100 3C-AH AH-19 Floor 3 Area C Clinic Yes VAV Fair 1998 E-to-P
BMS
Johnson Roller 15,870 3,862 24% Yes 40 Yes ABB Poor
Bypass - Hand @
100%
100 3E-AH AH-20 Floor 3 Area E Neurology/Prosthetic 3 Yes VAV Poor 1977 E-to-P
BMS
Johnson Roller Dirty 21,700 5,281 24% Yes Poor 30 No N/A Poor Wired through
100 3D-20 AH-21 Floor 3 Area D Rehab/Party 3 Yes VAV Poor 1977 E-to-P
BMS
Johnson Roller Not working 22,724 5,531 24% Yes Poor 30 Yes Toshiba Poor Wired through
100 4B-AH AH-22 Floor 4 Area B Hotel/Vol Serv 5 Yes VAV Fair 1977 E-to-P
BMS
Johnson Roller 13,777 3,515 26% Yes Good 30 Yes ABB Good Normal, Auto
@ 60 Hz
100 4C-58 AH-23 Floor 4 Area C Hemodialysis 3 Yes VAV Poor 1977 E-to-P
BMS
Johnson Roller 17,312 2,505 14% Yes Poor 25 Yes ABB Poor Hand, normal
100 5B-58 AH-24 Floor 5 Area B Recovery Serv 5 Yes VAV Fair 1977 E-to-P
BMS
Johnson Roller Not Moving, Dirty 12,424 67 -1% Yes Poor 30 Yes Toshiba Poor Bypass
100 5C-58 AH-25 Floor 5 Area C I.T. Yes VAV Poor 1977 E-to-P
BMS
Johnson Roller Not Moving, Dirty 17,312 2,505 14% Yes Good 25 Yes Toshiba Poor Abondoned
VFD
100 6B-AH AH-26 Floor 6 Area B Mental Health 1 Yes VAV Poor 1977 E-to-P
BMS
Johnson Roller 13,777 3,515 26% Yes Good 30 Yes Good Normal, Auto
@ 60 Hz
100 6C-AH AH-27 Floor 6 Area C Women Health 5 Yes VAV Fair 1977 E-to-P
BMS
Johnson Roller Poor 17,312 2,505 14% Yes Good 25 Yes ABB Good Hand Normal
100 7B-AH AH-28 Floor 7 Area B Med/Surgical 1 Yes VAV Poor 1977
BMS
Johnson Roller 14,168 4,265 30% Yes Poor 30 Yes Poor -
100 7C-AH AH-29 Floor 7 Area C Med/Surgical 1 Yes VAV Poor 1977
BMS
Johnson Roller 17,312 2,505 14% Yes Poor 25 Yes ABB Good Hand Bypass
100 8B-58 AH-30 Floor 8 Area B Pulmonary 1 Yes CV Fair 1977 E-to-P Powers Roller Not working 12,533 12,848 100% No N/A 25 No N/A N/A -
Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Page 15
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal
General Control Control Filter Airflow Supply
Building No.
Equipment Location
Equip Tag
Area/Equipment Served
Group Name Replacement
Phase
Dual Duct
Yes or No
Air Flow Design
Unit Overall Condition
Year of Installation
Electronic or Pneumatic or
E-to-P Control Filter Type
Filter Condition
Design Supply Airflow
(CFM)
OA Min
(CFM)
% OA
MIN
(CFM)
Economizer
Economizers Overall
Conditions
Supply Fan
Motor
HP
Supply Fan VFD
VFD
Brand
Supply Fan VFD Overall Conditions
Audit Info on Supply VFD
100 8C-58 AH-31 Floor 8 Area C Instensive Care Yes CV Good with leaks E-to-P
BMS
Johnson Roller 19,013 3,089 16% Yes 25 No N/A - Hand
100 9B-AH AH-32 Floor 9 Area B Admin 5 Yes VAV Fair 1977 E-to-P
BMS
Johnson Roller 17,312 2,505 14% Yes Poor 25 Yes Toshiba Poor Wired through
100 9C-58 AH-33 Floor 9 Area C Admin 5 Yes VAV Poor 1996 E-to-P
BMS
Johnson Roller Not moving 12,721 -478 -4% Yes Poor 30 Yes ABB Fair Auto Drive
100 Penthouse AH-34 Floors 2(south core),5, 6 Area A 2 Yes VAV Poor 1977 E-to-P
BMS
Johnson Cartridge Good 43,438 10,572 24% Yes Poor 100 Yes Toshiba Fair Bypass
100 Penthouse AH-35 Floors 4, 7, 8, 9
Area A 2 Yes VAV Poor 1977 Pneumatic Roller 52,792 52,792 100% No N/A 125 Yes None Auto
100 Penthouse AH-36 Floor PH Area A G, 1, 2(north core), 3 2 No VAV E-to-P Cartridge Good 49,902 13,352 27% Yes Fair 100 Yes Toshiba Poor Inv/auto
Elev. Mach.
Rm.
AH-1
Pent
Elev. Machine Room No CV Good New Electronic thermostat locat setpt at
55F Cartridge Good 11,114 0 0% No N/A 10 No N/A None None
Elev. Mach.
Rm.
AH-2
Pent
Elev. Machine Room No CV Good New Electronic thermostat locat setpt at
55F Cartridge Good 11,114 0 0% No N/A 10 No N/A None None
Chiller Plant G HV-5 ? 24,200 61% No?
105 GF-AH AH-1 Research G Floor Animal Research No VAV New 2016 Electronic
BMS
Johnson Cartridge Good 20,000 20000 100% No - 50 Yes New
Johnson Good Auto
105 GF-AH
AH-2
GND Research G Floor Animal Research No VAV New 2016 Electronic
BMS
Johnson Cartridge Good 20,000 20000 100% No - 50 Yes
New Johnson Good Auto
105 1F-18 AH-2 Research 1st Floor Yes VAV Poor 1977 E-to-P
BMS
Johnson Roller Bad 22,200 12,990 59% Yes Poor 40 Yes ABB Poor Normal, Auto
@ 57 Hz
105 2F-17 AH-3
Research 2nd
Floor Yes CV Poor 1977
BMS
Johnson Roller 20,750 9260 45% Yes 40 No N/A None On
105 3F-15 AH-4
Research 3rd
Floor Yes CV Poor 1977 E-to-P
BMS
Johnson Roller Poor 20,460 14,300 70% Yes N/A 40 No N/A None On
105 4F-17 AH-5
Research 4th
Floor Yes VAV New 2016
BMS
Johnson Roller 18,450 10,720 58% Yes 40 Yes Good -
105 5F AH-6
Research 5th
Floor No VAV New 2016 Electronic
BMS
Johnson Cartridge Good 22,220 8,980 40% Yes Good 40 Yes New
Johnson Good Bypass, off @
52.4 Hz
106 Penthouse AHU-1 CLC - Patient Area 1 No VAV New 2013 Electronic
BMS
Johnson Cartridge Good 36,870 11,885 32% Yes Good 60 Yes New Auto
106 Penthouse AHU-2 CLC - Kitchen 1 No VAV New 2013 Electronic
BMS
Johnson Cartridge Good 8,210 1,370 17% Yes Good 15 Yes New VFD Auto
107 G AHU-2 Floor 1 Perimeter 1st Fl Perimeter No VAV New ~2010 Electronic
BMS
Johnson Cartridge Partially
Open 8,455 755 9% 7.5 Yes New VFD Auto @
56.4 Hz
107 G AHU-3 Floor 1 Internal 1st Fl Internal No CV New ~2011 Electronic
BMS
Johnson Cartridge Partially
Open 2,650 480 18% 3 No N/A N/A None
107 G AC-2 Chapel Chapel Hall No CV Poor Electronic
BMS
Johnson Cartridge Bad No N/A N/A None
110 Roof
BLDG
110-
POOL Pool No CV ~1994 14,000 14,000 100% 15 No
Department of Veterans Affairs, TORFP VA-701-16-R-0057 Volume I Technical Proposal, Page 16
Use or disclosure of data contained on this sheet is subject to the restrictions on the cover page of this submittal
Table A.2.1.4-3 AHU Schedules (continued)
General Return Heat
Recovery
PREHEATING COIL REHEATING COIL COOLING COIL
Building No.
Equipment Location
Equip Tag Area/Equipment
Served Group Name
Replacement Phase
Dual Duct
Yes or No
Air Flow Design
Unit Overall Condition
Year of Installation
Return Fan Motor
HP
Return Fan VFD
Return Fan VFD Overall Conditions
Audit Info on Return
VFD
Heat Recovery Type
Coil Type Coil Overall Conditions
Coil Type Coil Overall Conditions
Coil Type
Coil Overall Conditions
100 Warehouse HVC-2 No CV No Steam CHW Good
100 GB-06 AH-1 Floor G Area B Engineering 4 Yes CV Poor 1977 5 No N/A None N/A Steam Fair CHW Fair
100 GG-04 AH-2 Floor G Area G 3 Yes CV Poor 1977 N/A No Fair Yes N/A Steam
Face&Bypass Steam CHW Fair
100 GF-17 AH-3 Floor G Area F Pump Room 2 Yes VAV Poor 1977 5 Yes Fair - N/A None N/A Steam Fair CHW Fair
100 GE-12 AH-4 Floor G Area E 4 Yes CV Poor 1977 5 No None - N/A Steam Steam Fair CHW Fair
100 GD-AH AH-5 Floor G Area D 2 Yes VAV Poor 1977 5 Yes Poor - N/A Steam
Face&Bypass Steam Fair CHW Fair
100 G AH-37 JA No CV Steam Chw
100 G AH-38 JB No CV Steam CHW
100 G HV-5 H Steam
100 1B-26 AH-6 Floor 1 Area B Pharmacy 4 Yes VAV Poor 1977 7.5 Yes Poor Normal, Auto N/A None N/A Steam Fair CHW Fair
100 1C-47 AH-7 Floor 1 Area C Eye Care/Urology Yes VAV Poor 1977 10 Yes Poor Bypass, 60Hz N/A None N/A Steam Fair CHW Fair
100 1B-40 AH-8 Floor 1 Area G Kitchen 4 Yes CV Poor 1977 10 No None - N/A Steam
Face&Bypass Steam Fair CHW Fair
100 1F-25 AH-9 Floor 1 Area F E.R. 2000 +/- Yes VAV Fair/good Yes Hand @
100% None Steam Steam CHW
100 1E-72 AH-10 Floor 1 Area E Spinal Cord Ward 3 Yes VAV Poor 1977 5 Yes Fair
Normal, Auto @ 94.6% N/A None N/A Steam Fair CHW Fair
100 1D-64 AH-11 Floor 1 Area D Spinal Cord Ward 3 Yes VAV Poor 1977 7.5 Yes Poor
Normal, Auto @ 48
Hz N/A None N/A Steam Fair CHW Fair
100 1 RTU-PT Physical Therapy
100 2B-AH AH-12 Floor 2 Area B Diagnostic Lab 4 Yes CV Poor 1977 N/A No None - N/A Steam Steam Fair CHW Fair
100 2C-54 AH-13 Floor 2 Area C Dental/Cardiology 4 Yes VAV Poor 1977 N/A No Poor - N/A Steam
Face&Bypass Steam Fair CHW Fair
100 2G-65 AH-14 Floor 2 Area G Morgue Area 4 Yes CV Poor 1977 N/A No None - N/A Steam
Face&Bypass Steam Fair CHW Fair
100 2C-84/2F AH-15 Floor 2 Area F Dematology/Surg 5 Yes CV Poor 1977 10 No None - N/A None N/A Steam Poor CHW Poor
100 2E-11 AH-16 Floor 2 Area E O.R. No VAV New 2009 Steam CHW
100 2D-AH AH-17 Floor 2 Area D Radiology 4 Yes VAV Poor 1977 N/A Yes N/A Hand bypass N/A Steam Steam N/A CHW N/A
100 3B-AH AH-18 Floor 3 Area B Clinic 5 Yes VAV Poor 1977 7.5 Yes Poor
Bypass - Hand @
62% N/A None N/A Steam Fair CHW Fair
100 3C-AH AH-19 Floor 3 Area C Clinic Yes VAV Fair 1998 15.0 No good hand None N/A Steam CHW
100 3E-AH AH-20 Floor 3 Area E Neurology/Prosthetic 3 Yes VAV Poor 1977 10 No Poor - N/A None N/A Steam…