Upgrade Cath Lab 2 - Minneapolis Site Prep Federal contract opportunity
Solicitation number
36E77618R0105
Issued by
Department of Veterans Affairs Headquarters

About this file

36E77618R0105 ATTACHMENT 7 - ADDITIONAL PRICE BREAKDOWN.docx

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Cath Lab 2 - Minneapolis Site Prep, newest first.
File Type Posted
36E77618C0040-000.docx DOCX document
36E77618R0105-0004000.docx DOCX document
36E77618R0105-0003000.docx DOCX document
36E77618R0105-0003001.pdf PDF
36E77618R0105-0002000.docx DOCX document
36E77618R0105-0002001.pdf PDF
36E77618R0105-0001002.zip ZIP file
36E77618R0105-0001003.zip ZIP file
36E77618R0105-0001000.docx DOCX document
36E77618R0105-0001004.zip ZIP file
36E77618R0105-0001001.pdf PDF
36E77618R0105-007.pdf PDF
36E77618R0105-003.pdf PDF
36E77618R0105-011.pdf PDF
36E77618R0105-009.docx DOCX document
36E77618R0105-002.pdf PDF
36E77618R0105-004.pdf PDF
36E77618R0105-001.docx DOCX document
36E77618R0105-006.pdf PDF
36E77618R0105-005.pdf PDF
36E77618R0105-010.docx DOCX document
36E77618R0105-000.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 7 – ADDITIONAL PRICE BREAKDOWN

PRICE / COST SCHEDULE

Project Title:
UPGRADE CATH LAB 2
Project No:
618-CSI-300
Division No.
Division
Price

General Requirements

Bonds and Insurance

Project Management

Overhead and Profit

Existing Condition/Site Work

Selective Demolition

Concrete, Masonry

Metals Fabrications

Rough Carpentry

Finish Carpentry

Thermal and Moisture Protection

Applied Fire Proofing

Firestopping

Joint Sealants

Doors/ Frames/Hardware

Automatic Door Operators

Glazing

Finishes – Paint/Wallcovering

Non-Structural Metal Framing

Gypsum Board

Sheet Flooring and Tile

Resinous Poured in Place Flooring

Signage

Wall and Door Protection

Equipment – Service Booms

Casework

Furnishings

Fire Suppression

Plumbing

Laminar Air Ceiling System

Heating, Ventilating & Air Conditioning

Direct Digital Controls

Indoor Central-Station Air Handling Units

Electrical

Communications

Electronic Safety and Security

Communications

Nurse Call

Miscellaneous

Divisions Subtotal

Profit and Over-Head

Total